CN206420024U - A kind of boiler heating system - Google Patents

A kind of boiler heating system Download PDF

Info

Publication number
CN206420024U
CN206420024U CN201621409190.3U CN201621409190U CN206420024U CN 206420024 U CN206420024 U CN 206420024U CN 201621409190 U CN201621409190 U CN 201621409190U CN 206420024 U CN206420024 U CN 206420024U
Authority
CN
China
Prior art keywords
intake stack
heating system
boiler
inner chamber
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621409190.3U
Other languages
Chinese (zh)
Inventor
王志强
侯纪敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aoli Hengtong Cci Capital Ltd
Original Assignee
Beijing Aoli Hengtong Cci Capital Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Aoli Hengtong Cci Capital Ltd filed Critical Beijing Aoli Hengtong Cci Capital Ltd
Priority to CN201621409190.3U priority Critical patent/CN206420024U/en
Application granted granted Critical
Publication of CN206420024U publication Critical patent/CN206420024U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model is related to a kind of boiler heating system, include the heat supply pipeline of controller, heat supply end, user terminal and the connection heat supply end and user terminal, the heat supply end includes boiler, the boiler includes housing and inner chamber, burner hearth is provided with the inner chamber, it is additionally provided with the inner chamber on the heat exchange department being connected with the burner hearth, the burner hearth and is connected with fuel channel, intake stack and smoke discharging pipe;Smoke eliminator is provided with the smoke discharging pipe;The heating system also includes the sensor being connected with the controller.The utility model can realize the purpose of intelligent control, and no matter outdoor temperature how much, user terminal can have one and compare stationary temperature;And heating plant has itself function of fuel gas purification, and purification efficiency is high;In addition, the boiler heating system can be effectively increased heat exchanger effectiveness, efficiency of combustion, the discharge of heat, energy-saving and emission-reduction are greatly reduced.

Description

A kind of boiler heating system
Technical field
The utility model is related to a kind of boiler heating system.
Background technology
Boiler heating system is essential equipment in northern area daily life.And for the improvement of heating system It is continual to update.However, boiler heating system also has more deficiency.
1. at this stage, China's central heating lacks fine-grained management, and fireman is with sensation, by rule of thumb burning boiler, boiler In type selecting, selected by live worst environment, can meet and be used under local minimum temperature, but in whole Heating Period Difference variation amplitude all than larger, the temperature difference in most parts of the north daytime and evening is all very big, if warm heat supply If amount is big, room temperature will be too high, indoor temperature can be caused too high, it is desirable to reduce clothes when indoors, has even Opeing the window also, also can be too high because of indoor temperature, outgoing to cause the diseases such as flu, not only causes personnel uncomfortable, also results in Substantial amounts of energy waste and the energy burning produce environmental problem, therefore, if kettleman can not in time, reasonably change pot The operational factor of stove, will result in the waste of the energy.
2. nowadays, northern area haze row, especially during heating more very.It is red that table, severe haze are broken for PM2.5 Forecast, severe haze cause student to have a holiday or vacation, too low etc. extreme abnormal event of non-greasy weather visibility, and people seem the minister of public works in ancient china and seen It is used to.However, pollution, for response state-of-the-nation call, contributes haze great central heating industry to also begin to improve without small thing, to Pollutant emission is reduced to greatest extent.
3. most boiler by fuel in stove chamber inner combustion directly for boiler heat, also have in a small number of boilers in order to Increase heat exchanger effectiveness, and change the shape of burner hearth or increase the efficiency of heating surface in some additional simple projections of burner hearth etc..So And, contaminated today is increasingly changed in environment, these are also far from enough, therefore, further increases the efficiency of heating surface and make pot The more energy efficient emission reduction of furnace system is of crucial importance.
4. in steam generator system, the flue gas in smoke exhaust pipe carries very many heats, and current, and this partial heat is not Effective recovery, is all discharged into air mostly, is that environment brings large effect.
5. in addition, heating system includes the devices such as user terminal heating plant, heat supply pipeline, boiler;It is well known that user The inside of end heating plant can not be cleared up, if depositing too many impurity, incrustation scale etc., can directly result in heating efficiency low and use the longevity Life is short, and the cleaning of heat supply pipeline and boiler etc. is also extremely complex, cumbersome, accordingly, it would be desirable to farthest ensure its not by Magazine, incrustation scale etc. adhere to.And processing of the current many areas to front end water is insufficient, the heating systems such as boiler are caused to be sent out often Raw dirt deposition or corrosion etc..
The content of the invention
In view of this, the purpose of this utility model is to provide a kind of boiler heating system, to solve to mention in the prior art Deficiency.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of boiler heating system, including controller, heat supply end, user terminal and the connection heat supply end and user terminal Heat supply pipeline, the heat supply end includes boiler, and the boiler includes housing and the inner chamber surrounded by the housing, the housing It is provided with water inlet, sewage draining exit and the heat outlet for discharging hot water or vapours, the inner chamber and is provided with burner hearth, it is described interior The heat exchange department being connected with the burner hearth is additionally provided with chamber, the burner hearth, which is arranged on the bottom of the inner chamber, the burner hearth, to be connected It is connected to fuel channel, intake stack and smoke discharging pipe;
Smoke eliminator is provided with the smoke discharging pipe;The smoke eliminator includes the second roughing efficiency air filter, work At least one of property charcoal filter, electrodes for removing dust filter, the 2nd HEPA high efficiency particulate air filters and the 2nd RO membrane modules;
The heating system also includes the sensor being connected with the controller;The sensor includes being arranged at user terminal User's temperature sensor, be arranged in outdoor environment outdoor temperature sensor, be arranged at heat outlet leaving water temperature pass Sensor, the pressure sensor being arranged in boiler, the fuel flow sensor being arranged in fuel channel and it is arranged at blast pipe Air flow sensor in road.
Further, be connected with intelligent terminal on the controller, in the controller provided with processor and with it is described The circuit module of processor connection and the transport module that can be connected with the intelligent terminal.
Further, the smoke eliminator includes the first roughing efficiency air filter, dedusting successively by bending tubes end to smoke end Electrode filter, the 2nd RO membrane modules and active carbon filtering device.
Further, be connected with water inlet pipe on the water inlet of the housing, the top end face of the water inlet pipe be provided with it is described The through hole that the external diameter of smoke discharging pipe is engaged, the external diameter of the smoke discharging pipe is less than the internal diameter of the water inlet pipe;The smoke exhaust pipe Road passes the housing from the water inlet and extended in the water inlet pipe, and the smoke discharging pipe passes described from the through hole Outside steam generator system.
Further, the vertical upper and lower side for wearing the inner chamber of the heat exchange department, the bottom of the heat exchange department and the stove Thorax is connected, the top of the top of the heat exchange department close to the inner chamber.
Further, the heat exchange department is provided with multiple outwardly secondary heat exchange departments.
Further, the fuel channel is arranged in inner chamber in broken line type is roundabout.
Further, the intake stack include the first intake stack and the second intake stack, first intake stack and Second intake stack is connected respectively at the first air inlet on burner hearth and the second air inlet.
Further, the duct wall of the smoke discharging pipe is that can absorb the exhaust-heat absorption wall of heat;The smoke discharging pipe It is arranged side by side between the first intake stack and the second intake stack and solid with first intake stack and the second intake stack Fixed connection, and the wall of side that the smoke discharging pipe is connected with first intake stack is while be also the first intake stack wall A part, the wall for the side that the smoke discharging pipe is connected with second intake stack is while be also the one of the second intake stack wall Part.
Further, exhaust outlet is additionally provided with the housing, the exhaust outlet is provided with safety valve, and the safety valve is in shell Internal pressure can be vented automatically when exceeding threshold value.
Further, it is also associated with water treatment facilities on the water inlet pipe.
Further, provided with the warning device being connected with the processor in the controller, the alarm in the housing The preferred audible alarm unit of device.
Further, it is equipped with the magnetic valve being connected with the controller on the fuel channel and intake stack.
Further, the controller is provided with control panel and display.
The utility model at least has the advantages that:
1. multiple sensors are connected with controller of the present utility model, can be to outdoor temperature, the temperature of user terminal, pot Stove leaving water temperature etc. is measured, then according to the temperature everywhere determined, and processor carries out related processing, Ran Houbian The temperature in these temperature adjustment burner hearths can be integrated, specifically, is regulated and controled by adjusting the input quantity of fuel and the input quantity of wind Temperature, so as to realize the purpose of intelligent control, also make no matter outdoor temperature how much, user terminal can have the constant temperature of a comparison Degree.In addition, heating system of the present utility model can be alarmed when pot furnace pressure is too big, then automatic deflation again, it is to avoid The bursting of boilers or because pressure too greatly caused by relevant device damage and threat to worker safety.
2. the purification efficiency of the flue gas of smoke eliminator of the present utility model is high, realizes and is administered in manufacture substantially The quick theory for removing depollution, for depolluting, going haze that there is extremely important value;And the utility model can be abundant The heat in the flue gas with amount of heat is collected, and is effectively utilized;Therefore, more energy-saving and emission-reduction, environment-friendly.
3. the efficiency of heating surface of the present utility model is high, high combustion efficiency;And can to water inlet handle so that user terminal and Impurity, incrustation scale in heat supply pipeline are substantially reduced, so as to increase user terminal heating plant, heat supply pipeline, boiler in heating system Deng service life.
Brief description of the drawings
Fig. 1 is the structural representation of the heating system described in the utility model embodiment;
Fig. 2 is the structural representation of the boiler described in the utility model embodiment;
Fig. 3 is the structural representation of the intelligence system described in the utility model embodiment;
Fig. 4 is the structural representation of the boiler described in the utility model another embodiment;
Fig. 5 is Fig. 4 A-A profiles;
Fig. 6 is the structural representation of the boiler described in the utility model another embodiment;
Fig. 7 is Fig. 6 A-A profiles;
Fig. 8 is the structural representation of the safety valve described in the utility model embodiment.
In figure, 1, housing, 2, heat exchange department, 3, burner hearth, 4, inner chamber, 5, lead quirk, 6, water inlet pipe, 7, safety valve, 8, branch Support, 9, bearing, 20, intelligent terminal, 21, secondary heat exchange department, 30, controller, 31, fuel channel, the 32, first blast pipe Road, the 33, second intake stack, 34, smoke discharging pipe, 40, sensor, 51, fire conduction plate, 71, block, 72, pressure-bearing pad, 73, exhaust Block, 74, spring, 75, connecting rod, 76, through hole, 77, bleed off pressure groove, 78, sealing gasket, 100, heat supply end, 200, user terminal, 300, supply Hot channel, 301, processor, 302, circuit module, 303, transport module, 410, user's temperature sensor, 420, outdoor temperature passes Sensor, 430, leaving water temperature sensors, 440, fuel flow controller, 450, air flow sensor, 460, pressure sensor.
Embodiment
The technical scheme in the utility model embodiment is clearly and completely described below, it is clear that described reality It is a part of embodiment of the utility model to apply example, rather than whole embodiments.Embodiment of the present utility model presented below Detailed description be not intended to limit claimed scope of the present utility model, but be merely representative of of the present utility model selected Embodiment.Based on the embodiment in the utility model, this area commonsense method personnel are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment 1
As shown in Fig. 1 ~ 3, a kind of boiler heating system, including controller 30, heat supply end 100, user terminal 200 and connection The heat supply pipeline 300 of the heat supply end 100 and user terminal 200, the heat supply end 100 includes boiler, and the boiler includes housing 1 And the inner chamber 4 surrounded by the housing, the water source for needing to heat is placed in inner chamber 4, the housing 1 is provided with water inlet, row Dirty mouth and the heat outlet for discharging hot water or vapours, heat outlet are connected by heat supply pipeline 300 with user terminal, then just Can by heat supply pipeline 300 by heat transmission to user terminal 200, take heat for the common people;Burner hearth 3 is provided with the inner chamber 4.In described The heat exchange department 2 being connected with the burner hearth 3 is additionally provided with chamber 4, burner hearth 3 is arranged on the bottom of the inner chamber 4, the burner hearth 3 It is connected with fuel channel 31, intake stack and smoke discharging pipe 34.The intake stack enters including the first intake stack 32 and second Wind pipeline 33.
Smoke eliminator can be provided with the smoke discharging pipe 34, the smoke eliminator is generally arranged at smoke discharging pipe Close to the exit of flue gas in 34, then the flue-gas temperature at this is minimum, and clean-up effect is more preferably and to the infringement of smoke eliminator It is smaller.
Smoke eliminator by bending tubes end to smoke end successively include the first roughing efficiency air filter, electrodes for removing dust filter, 2nd RO membrane modules and active carbon filtering device, so just can be by the size of some in flue gas solid particle, pernicious gas etc. Can effectively it be filtered, the purification efficiency of flue gas realizes the quick removal administered in manufacture averagely all more than 98% The purpose of pollution, for depolluting, going haze that there is extremely important value.RO films in the utility model are counter-infiltration Film.
Provided with processor 301 and the circuit module 302 being connected with the circuit of processor 301 and transmission in controller 30 Module 303, the processor 301 is main control board.The heating system also includes being connected with the circuit of controller 30 Sensor 40;The sensor 40 includes being arranged at user's temperature sensor 410 of user terminal, is arranged in outdoor environment Outdoor temperature sensor 420, the leaving water temperature sensors 430 for being arranged at heat outlet, the pressure sensor being arranged in boiler 460th, the fuel flow sensor 440 being arranged in fuel channel and the air flow sensor 450 being arranged in intake stack, this A little sensors are respectively used to gather the temperature at the temperature, the temperature of outdoor environment, boiler water outlet of user terminal, the pressure in boiler Power, the flow for inputting fuel and the flow for inputting wind, these sensors are connected with the processor 301 in controller 30, these Sensor is connected with the processor 301 in the controller 30, can be by the data transfer monitored to processor 301.Need It is noted that it is for determining the pressure in boiler that pressure sensor, which needs to be arranged on the top in boiler, the i.e. sensor, Not hydraulic pressure, therefore, it can not be submerged in water.
Intelligent heating system also include intelligent terminal 20, the intelligent terminal 20 by with the transport module in controller 30 303 set up connection to be connected with processor 301.The transport module 303 is preferably wireless transport module, and this is wirelessly transferred mould Block includes at least one of 2G, 3G, 4G, wifi and gsm module.The data that then processor 301 is received can be transferred to intelligence Energy terminal 20, while intelligent terminal 20 also can be operated or controlled accordingly to controller 30.The intelligent terminal 20 includes Smart mobile phone, ipad, PC etc..
Provided with the warning device being connected with the processor 301 in the controller 30 in housing 1, the warning device is preferred Audible alarm unit, then will send alarm when pot furnace pressure is too big.Exhaust outlet, the exhaust outlet are additionally provided with the housing Safety valve is provided with, pressure of the safety valve in housing can be vented automatically when exceeding threshold value, it is to avoid blast, when pressure is super , will automatic deflation or exhaust when going out threshold value.Then when pressure is too big, it will be vented automatically while alarm, it is to avoid The danger rushed to and may occurred by staff's delay.
The magnetic valve being connected with the controller 30, convenient control are equipped with fuel channel 31 and intake stack.Control Device 30 is provided with the control panel and display being connected with processor 301, and associative operation can be directly carried out by control panel, shows Show that device can show the data of correlation.
As shown in Fig. 4 ~ 5, Fig. 5 is Fig. 1 A-A profiles, has part-structure not mark in figure.In inner chamber 4 also Provided with the heat exchange department 2 being connected with the burner hearth 3, heat exchange department 2 is cylindrical structural, increases specific surface area;The heat exchange Provided with firm plate between portion 2 and burner hearth 3, burner hearth 3 and heat exchange department 2 are communicated with the firm plate leads quirk 5, the heat The vertical upper and lower side for wearing the inner chamber 4 of exchange part 2, the i.e. bottom of heat exchange department 2 is connected with the burner hearth 3, the heat exchange department 2 Top is close to the top of the inner chamber 4, the i.e. top close to the inwall of housing 1, and the top of heat exchange department 2 is outwardly arc Face, increases heat exchange efficiency.Multiple outwardly secondary heat exchange departments 21, the secondary are uniformly provided with the heat exchange department 2 Heat exchange department 21 is hemispherical, to increase the specific surface area that heat exchange department 2 is contacted with the reclaimed water of inner chamber 4, so as to increase heat exchange efficiency.
The upper end of housing 1 is provided with fuel inlet and wind entrance, and the fuel channel 31 is by the fuel inlet and passes through The inner chamber inner chamber 4 and connected with the burner hearth 3;The intake stack is by the wind entrance and passes through the inner chamber inner chamber 4 And connected with the burner hearth 3.Fuel inlet and wind entrance are arranged to the upper end or top of housing 1, then cause fuel channel 31 Longer with distance of the intake stack in inner chamber 4, then the contact area with water is also longer, then the temperature in water can make cartridge The temperature of fuel and wind in road 31 and intake stack is improved, and temperature improves then burning, and easily efficiency of combustion is higher.
Fuel channel 31 is arranged in inner chamber 4 in broken line type is roundabout, and broken line type is designed to buffer gas flow, prior It is that can increase the contact area with the reclaimed water of inner chamber 4 so that the combustion gas in fuel channel 31 is heated, so that burning is easier Efficiency of combustion is higher.
The intake stack 33 of first intake stack 32 and second is respectively at the first air inlet and the second air intake on burner hearth 3 Mouth connection.A part for the smoke discharging pipe 34 is arranged side by side between the first intake stack 32 and the second intake stack 33, and three Person is in the same plane, and the wall of the smoke discharging pipe 34 is also simultaneously that a part for the wall of the first intake stack 32 and second enter A part for the wall of wind pipeline 33, the i.e. wall of the side of smoke discharging pipe 34 and the first intake stack 32 are shared, the wall of opposite side and second Intake stack 33 is shared;The duct wall of the smoke discharging pipe 34 is that can absorb the exhaust-heat absorption wall of heat.In smoke discharging pipe 34 Substantial amounts of heat is carried when flue gas is discharged, can absorb the setting of the wall of waste heat can be absorbed the heat in flue gas, and The setting of the concrete structure of these three pipelines enables the duct wall for absorbing heat in flue gas that partial heat is passed into It is distinguished and admirable in one intake stack 32 and the second intake stack 33, raise distinguished and admirable temperature, so that burning is easier to burn It is more efficient;In addition, smoke discharging pipe 34 can also be transferred heat in inner chamber 4 with the part that the intake stack is not connected Water so that discharge air in heat greatly reduce, more energy efficient, the side effect to environment is smaller.
As shown in Fig. 6 ~ 7, Fig. 7 is Fig. 3 A-A profiles, has part-structure not mark in figure.Housing 1 enters Water inlet pipe 6 is connected with the mouth of a river, the top end face of the water inlet pipe 6 is logical provided with what is be engaged with the external diameter of the smoke discharging pipe 34 Hole, the external diameter of the smoke discharging pipe 34 is less than the internal diameter of the water inlet pipe 6;The smoke discharging pipe 34 passes shell from the water inlet Body 1 is simultaneously extended in the water inlet pipe 6, and the through hole of the smoke discharging pipe 34 from the top end face of water inlet pipe 6 is passed, Ran Houyan Extend outside the heating system;I.e. smoke discharging pipe 34 is sheathed in the water inlet pipe 6 simultaneously, is preferably disposed in water inlet pipe 6 Centre, water inlet pipe 6 is sleeve structure with smoke discharging pipe 34, and its section is a concentric structure.The temperature into water has been raised, Also further reduce the heat demand of the water inlet.If the position that water inlet is set, can be by smoke discharging pipe in the lower end of housing 1 34 first extend to the upper end of inner chamber 4, then turn back and gone out from water inlet, structure class of the smoke discharging pipe 34 in inner chamber 4 in accompanying drawing 1 It is similar to "Ji" type or inverse u shape.
The water inlet end of the housing 1 is provided with water treatment facilities, and the water treatment facilities may be provided in water inlet pipe, can also be by Water inlet pipe is connected with a water supply container, and water treatment facilities is arranged in water supply container and carries out water process, then water supply container Water after processing is flowed into boiler by water inlet pipe.
As further preferred embodiment, lead and fire conduction plate 35 be provided with quirk 5, fire conduction plate 35 is provided with and leads fire hole, Fire stream or hot-fluid in burner hearth 3 can be made by leading fire hole into heat exchange department 2, due to heat exchange department 2 and secondary heat exchange Portion 21 is to communicate with each other, therefore, and fire stream or hot-fluid just enter in secondary heat exchange department 21.
As further preferred embodiment, the left-right and front-back of the burner hearth 3 can be outwardly arcuate structure, Increase heat exchange efficiency.Be connected with multiple heat exchange departments 2 on burner hearth 3, particular number can according to the diameter of heat exchange department 2, Depending on the size of secondary heat exchange department 21 and the size of boiler.
As further preferred embodiment, the distance between the top of the heat exchange department 2 and the top of inner chamber 4 can For 30cm, certainly according to actual conditions, this is apart from freely adjustable.
As further preferred embodiment, the burner hearth is fixedly installed in housing by support frame 8;The boiler Bottom surface be provided with bearing, can be used to support boiler.
As further preferred embodiment, the sensor also includes being arranged in the water of inner chamber, for determining boiler The inner chamber cooling-water temperature sensor of the temperature of interior water, the inner chamber cooling-water temperature sensor is equally connected with processor 301.
As further preferred embodiment, the sensor is also determined in burner hearth including being arranged at being used in burner hearth The burner hearth temperature sensor of temperature, the burner hearth temperature sensor is equally connected with processor 301.
Embodiment 2
On the basis of embodiment 1, the structure of the safety valve in embodiment 1 can be:
As shown in figure 8, the safety valve 7 includes block 71, elastomer, exhaust block 73, pressure-bearing pad 72 and is fixedly connected on Connecting rod 75 between the exhaust block 7 and pressure-bearing pad 72;The upper surface of the block 71 is provided with and the size of exhaust block 73 The through hole 76 being engaged, the outward flange of the pressure-bearing pad 72 and the close closing of inwall of block 71, preferably pressure-bearing pad 72 and block Sealing gasket 78 is provided between 71 inwall;Periphery of the elastomer sleeve together in connecting rod 57;The diameter of elastomer is more than described The diameter of through hole 76, the inwall of the block 71 bleeds off pressure groove 77 provided with height more than the pressure-bearing mat thickness.
When pressure is in safe range, the pressure in boiler is applied on pressure-bearing pad, and pressure-bearing pad overcomes elastomer to hinder Push dynamic connecting rod to rise, bleed off pressure groove in boiler;Then the air-flow in boiler will be flowed on pressure-bearing pad from bleeding off pressure at groove Side.At the same time, during pressure-bearing pad rises, elastomer is compressed, and connecting rod lifts exhaust block, and then exhaust block is pushed up Go out through hole, then air-flow is just flowed to outside exhaust block again while flowing into above pressure-bearing pad from through hole, that is, is flowed to outside safety valve, real The control of existing pressure.
The safety valve is arranged on boiler shell 1.
Above-mentioned elastomer is preferably spring 74.Pressure required for safe valve exhaust can be by spring resistance, pressure-bearing pad The resistance between resistance and exhaust block and through hole between block inwall calculates gained.
Embodiment 3
On the basis of embodiment 1 or 2, the structure of the water treatment facilities can be:The water treatment facilities is by water inlet end Side includes softening water treatment facilities, preliminary filter and precise filtering device successively.The preliminary filter is sintering Metal filter element, the sintered metal filtration element is the sintered stainless steel metal filter element that aperture is 0.2 ~ 10 μm.Institute Precise filtering device is stated at least one of for the first HEPA high efficiency particulate air filters, the first RO membrane modules and ore filter, it is excellent The first HEPA high efficiency particulate air filters and/or ore filter are selected, ore filter includes manganese sand filter and/or quartz sand mistake Filter.Certainly, above-mentioned sintered metal filtration element can be replaced with roughing efficiency air filter, can also be used simultaneously.The processing side Method is well arranged, purification is thorough, purification efficiency is high.
Above-mentioned sintered stainless steel metal filter element is one kind that stainless steel metal powder metallurgy processing technology is made Magnetic chimney filter, wherein containing the component that is magnetic.The filter element 6 is to the cutting mechanisms of the impurity such as iron, copper mainly by filtering and magnetic The function of absorption.And iron is magnetic and non magnetic two kinds of micels in water, due to spy of the filter element 6 with magnetic, micropore Point, thus can effectively remove the magnetic and non-magnetic impurities iron in steam condensate (SC).
Because the inside of user terminal heating plant can not be cleared up, if depositing too many impurity, incrustation scale etc., confession can be directly resulted in The thermal efficiency is low and service life is short, and the cleaning of heat supply pipeline and boiler etc. is also extremely complex, cumbersome, accordingly, it would be desirable to maximum The guarantee heating system of degree is not adhered to by impurity, incrustation scale etc..Thorough, effective progress is carried out by the above-mentioned water inlet to front end Processing so that impurity, incrustation scale in user terminal and heat supply pipeline etc. are substantially reduced, so as to increase user terminal heat supply in heating system The service life of device, heat supply pipeline, boiler etc..
When it is implemented, the controller 30 in the utility model may be provided on boiler, boiler nearby or elsewhere As long as the ground for conveniently setting and checking conveniently can.
Smoke discharging pipe 34 described in the utility model is can absorb the exhaust-heat absorption wall of heat, and it can be using heat absorption effect The tube wall that the high material of rate is constituted, specifically can be found in prior art, as long as effect can be reached using which kind of tube wall.
The sleeve structure of water inlet pipe 6 and smoke discharging pipe 34, is very easy to realize, usual smoke discharging pipe 34 in practical application It is all smaller than water inlet pipe 6, it is only necessary in the top end opening (i.e. through hole) of water inlet pipe 6, then to wear smoke discharging pipe 34 out of water inlet pipe 6 Go out the housing 1 of boiler, boiler system is then stretched out at opening and environment is stretched to and just may be used.It is of course also possible to by water inlet pipe 6 Opening is arranged on water supply container, and then smoke discharging pipe 34 runs through water inlet pipe 6, is then passed just at the opening on water supply container Can.Specifically opening be located on water inlet pipe 6 or water supply container on, as the case may be depending on, i.e., specifically to consider construction Situations such as scene whether there is length of water supply container, water inlet pipe etc..
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this area For technical staff, the utility model can have various changes and change.All institutes within spirit of the present utility model and principle Any modification, equivalent substitution and improvements of work etc., should be included within protection domain of the present utility model.

Claims (10)

1. a kind of boiler heating system, including controller, heat supply end, user terminal and the confession for connecting the heat supply end and user terminal Hot channel, the heat supply end includes boiler, and the boiler is included on housing and the inner chamber surrounded by the housing, the housing Provided with water inlet, burner hearth is provided with the inner chamber, it is characterised in that:The heat friendship being connected with the burner hearth is additionally provided with the inner chamber Portion is changed, the burner hearth is arranged on the bottom of the inner chamber, the burner hearth and is connected with fuel channel, intake stack and smoke exhaust pipe Road;
Smoke eliminator is provided with the smoke discharging pipe;The smoke eliminator includes the second roughing efficiency air filter, activated carbon At least one of filter, electrodes for removing dust filter, the 2nd HEPA high efficiency particulate air filters and the 2nd RO membrane modules;
The heating system also includes the sensor being connected with the controller;The sensor includes being arranged at the use of user terminal Family temperature sensor, the outdoor temperature sensor being arranged in outdoor environment, the leaving water temperature sensors for being arranged at heat outlet, The pressure sensor that is arranged in boiler, the fuel flow sensor being arranged in fuel channel and it is arranged in intake stack Air flow sensor.
2. boiler heating system according to claim 1, it is characterised in that:Intelligent terminal is connected with the controller, Processor and the circuit module being connected with the processor are provided with the controller and can be occurred with the intelligent terminal The transport module of connection.
3. boiler heating system according to claim 1, it is characterised in that:The smoke eliminator is by bending tubes end to going out Cigarette end includes the first roughing efficiency air filter, electrodes for removing dust filter, the 2nd RO membrane modules and active carbon filtering device successively.
4. boiler heating system according to claim 1, it is characterised in that:It is connected with the water inlet of the housing into water Pipe, the top end face of the water inlet pipe is provided with the through hole being engaged with the external diameter of the smoke discharging pipe, the external diameter of the smoke discharging pipe Less than the internal diameter of the water inlet pipe;The smoke discharging pipe passes the housing from the water inlet and extends to the water inlet pipe Interior, the smoke discharging pipe is passed outside the steam generator system from the through hole.
5. boiler heating system according to claim 1, it is characterised in that:The heat exchange department is vertical to wear the upper of the inner chamber Lower end, the bottom of the heat exchange department is connected with the burner hearth, the top of the top of the heat exchange department close to the inner chamber.
6. boiler heating system according to claim 5, it is characterised in that:The heat exchange department is provided with multiple convexes The secondary heat exchange department gone out.
7. the boiler heating system according to any one of claim 1 ~ 6, it is characterised in that:The fuel channel is in folding Line style is roundabout to be arranged in inner chamber.
8. boiler heating system according to claim 7, it is characterised in that:The duct wall of the smoke discharging pipe is to inhale Receive the exhaust-heat absorption wall of heat;
The intake stack includes the first intake stack and the second intake stack, first intake stack and the second intake stack point Do not connected in the first air inlet on burner hearth and the second air inlet;
The smoke discharging pipe be arranged side by side between the first intake stack and the second intake stack and with first intake stack It is fixedly connected with the second intake stack, and the wall of side that the smoke discharging pipe is connected with first intake stack is while be also A part for first intake stack wall, the wall of the side that the smoke discharging pipe is connected with second intake stack are while be also the A part for two intake stack walls.
9. boiler heating system according to claim 7, it is characterised in that:Exhaust outlet is additionally provided with the housing, it is described Exhaust outlet is provided with safety valve, and pressure of the safety valve in housing can be vented automatically when exceeding threshold value.
10. boiler heating system according to claim 7, it is characterised in that:Water process is also associated with the water inlet pipe Device.
CN201621409190.3U 2016-12-21 2016-12-21 A kind of boiler heating system Expired - Fee Related CN206420024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621409190.3U CN206420024U (en) 2016-12-21 2016-12-21 A kind of boiler heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621409190.3U CN206420024U (en) 2016-12-21 2016-12-21 A kind of boiler heating system

Publications (1)

Publication Number Publication Date
CN206420024U true CN206420024U (en) 2017-08-18

Family

ID=59576375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621409190.3U Expired - Fee Related CN206420024U (en) 2016-12-21 2016-12-21 A kind of boiler heating system

Country Status (1)

Country Link
CN (1) CN206420024U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116983820A (en) * 2023-08-16 2023-11-03 胜利油田凯龙工贸有限责任公司 Flue gas treatment equipment for heating furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116983820A (en) * 2023-08-16 2023-11-03 胜利油田凯龙工贸有限责任公司 Flue gas treatment equipment for heating furnace
CN116983820B (en) * 2023-08-16 2024-02-27 胜利油田凯龙工贸有限责任公司 Flue gas treatment equipment for heating furnace

Similar Documents

Publication Publication Date Title
CN103822306B (en) Split type air purification fresh air
CN206746173U (en) A kind of workshop dust collector
CN205448161U (en) New trend system of dehumidification humidification
CN207570068U (en) A kind of embedded indoor ventilation system
CN104315891A (en) Heat exchanger capable of achieving flue gas cleaning and waste heat recovery
CN106247451A (en) A kind of Household Air Purifier
WO2018032734A1 (en) Ionizing purification device
CN204535440U (en) A kind of kiln gas secondary utilization device
CN105727710A (en) Industrial lampblack treatment device
CN206420024U (en) A kind of boiler heating system
CN203893363U (en) Honeycomb ceramic wall flow filter waste recovery central ventilation system
CN105521682B (en) Structure improved industry lampblack processing unit
CN205435334U (en) Industrial oil cigarette processing apparatus of improvement structure
CN206504461U (en) A kind of Intelligent heating system
CN107744703A (en) A kind of easy-to-dismount efficient air purifier
CN205032017U (en) Multi -functional smoke and dust clarifier
CN216778259U (en) Biomass boiler flue gas processing apparatus
CN206504465U (en) A kind of heating plant of environment-friendly type
CN206504462U (en) A kind of steam generator system of energy-saving and emission-reduction
CN205373013U (en) Coal -burning air heater
CN206420143U (en) A kind of heating plant of high efficient heat exchanging
CN207569884U (en) A kind of purification flue dust incinerator
CN205461601U (en) Coupling assembling among industrial oil cigarette processing apparatus
CN104048306B (en) Energy-saving environmental-protection boiler exhaust emissions tower
CN203116276U (en) Hot blast heater heat recovery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

Termination date: 20171221