CN206419063U - Fill platform suspension attachment - Google Patents
Fill platform suspension attachment Download PDFInfo
- Publication number
- CN206419063U CN206419063U CN201720046612.3U CN201720046612U CN206419063U CN 206419063 U CN206419063 U CN 206419063U CN 201720046612 U CN201720046612 U CN 201720046612U CN 206419063 U CN206419063 U CN 206419063U
- Authority
- CN
- China
- Prior art keywords
- rod
- flexible pipe
- steel
- nut
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of filling platform suspension attachment, one end of mixing tube connects two delivery pumps, the other end of mixing tube has current divider, current divider connects several defeated slurry flexible pipes, defeated slurry flexible pipe is ridden on a rod, have above rod on a top plate, top plate and be installed with several anchor pole heads, it is characterised in that:With two steel poles, steel pole bottom is installed with horizontal handle, and the upper end of steel pole is fixed with chain link, and the upper end of chain link is installed with nut, and nut is arranged on the external screw thread set by anchor pole head lower end, on the annular iron wire that rod hanging is connected in steel pole lower end.The utility model is removed when can reduce reach filling platform, the set-up time, is reduced the labor intensity of worker, is lifted worker's job safety coefficient.
Description
Technical field
The utility model belongs to a kind of a kind of tool equipment of suspention filling platform in winning equipment, more particularly to ore deposit.
Background technology
Fully mechanized mining prepare team mined in C2405 working faces, packing job, be under normal circumstances night shift coal cutting, the middle class in a kindergarten is filled
Fill out.As shown in figure 1, slurries are delivered to from 15 meters or so in front of working face altogether by pump for mortar transmission A, delivery pump B respectively in filling chamber
With meeting in mixing tube 1, defeated slurry flexible pipe namely flexible pipe 1', flexible pipe 2', flexible pipe are realized in the current divider 2 of the end of mixing tube 1
3', flexible pipe 4', flexible pipe 5' shunting, the setting angle and non-horizontal of current divider 2 are limited by gate valve, to realize defeated slurry flexible pipe shunting
After convey smooth, need to be connected to two upper ends of 14# iron wires 4 on top plate 5 and about 2 meters of long half round timbers 3 are suspended to 1 meter
Highly, then defeated slurry flexible pipe namely flexible pipe 1', flexible pipe 2', flexible pipe 3', flexible pipe 4', flexible pipe 5' are ridden over again and formed on half round timber 3
Fill platform.It is that this is just needed, it is necessary to constantly remove defeated slurry flexible pipe to realize the reach of current divider 2 in advance of the face engineering
Constantly to remove filling platform.Because half round timber 3 is hung on fixed anchor pole on top plate 5 first 6 by annular iron wire 4(It is high
About 2.8 meters of degree), annular iron wire 4 is directly fixedly connected on top plate 5, is needed during removing reach and installing again
Worker is done to aid in using ladder, and whole process is related to operation of ascending a height, than relatively hazardous.
Utility model content
The utility model provides a kind of filling platform suspension attachment, and the purpose is to solve the shortcoming of prior art presence, drop
Dismounting, set-up time, reduce the labor intensity of worker during low reach filling platform, lift worker's job safety coefficient.
The utility model solves the technical scheme that its technical problem used:
One kind filling platform suspension attachment, one end of mixing tube connects two delivery pumps, and the other end of mixing tube, which has, to be divided
Device is flowed, current divider connects several defeated slurry flexible pipes, and defeated slurry flexible pipe is ridden on a rod, has a top plate, top plate above rod
On be installed with several anchor pole heads, it is characterised in that:With two steel poles, steel pole bottom is installed with horizontal handle, steel pole it is upper
End is fixed with chain link, and the upper end of chain link is installed with nut, and nut is arranged on the external screw thread set by anchor pole head lower end, rod hanging
On the annular iron wire being connected in steel pole lower end.
It is of the present utility model to be beneficial in that:
The utility model instrument main portions are combined by the chain link and round steel for having welded nut.The instrument can be replaced
Iron wire used in generation original hanging half round timber, worker station can be easily accomplished the hanging and dismounting of half round timber on roadway floor,
The higher operation of the danger coefficients such as operation of ascending a height is eliminated, while operating efficiency can be lifted effectively.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is prior art construction figure;
Fig. 2 is the utility model structure chart;
Fig. 3 is the utility model suspension rod schematic diagram.
Embodiment
In order to illustrate more clearly of the technical solution of the utility model, the required accompanying drawing used in description will be made below
Simply introduce, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, for this area
For those of ordinary skill, on the premise of not paying creative work, other implement can also be obtained according to these accompanying drawings
Example.
As shown in Figure 2 and Figure 3:
Slurries are delivered to from 15 meters of left sides in front of working face by pump for mortar transmission A, delivery pump B respectively in the utility model filling chamber
The right side meet at jointly in mixing tube 1, realized in the current divider 2 of the end of mixing tube 1 it is defeated slurry flexible pipe namely flexible pipe 1', flexible pipe 2',
Flexible pipe 3', flexible pipe 4', flexible pipe 5' shunting, about 2 meters of long half round timbers 3(Half round timber 3 namely rod)It is suspended to half round timber 3
The height of 1 meter away from ground of the top plate 5 of top and half round timber 3, then again by defeated slurry flexible pipe namely flexible pipe 1', flexible pipe 2', flexible pipe 3',
Flexible pipe 4', flexible pipe 5', which ride over, forms filling platform on half round timber 3.
It is of the present utility model to the improvement is that:
With two suspension rods 7, suspension rod is made up of 80cm round steel 71,40t chain links 72, nut 73, handle 74.
The bottom of round steel 71 is installed with horizontal handle 74, and the upper end welding of round steel 71 is fixed with chain link 72, chain link 72 it is upper
End welding is installed with nut 73, and nut 73 is arranged on the external screw thread set by first 6 lower end of anchor pole fixed on top plate 5, half round timber 3
Hanging is on the annular iron wire 41 that the lower end of round steel 71 is connected, so that half round timber 3 is hung on top plate 5 by suspension rod 7.
When actual use, worker station hand-held suspension rod 7 on roadway floor(Fill platform suspension attachment), catch handle
74, the nut 73 welded by rotating on 40t chain links 72 makes nut 73 be screwed togather with anchor pole first 6, suspension rod 7 is rapidly secured at into top
On plate 5, then with annular iron wire 41 half round timber 3 is hung, and then complete the installation of suspension platform;When dismounting from annular iron wire 41
Half round timber 3 is removed, handle 74 is caught, suspension rod 7 is rapidly separated top plate 5 by the nut 73 welded by rotating on 40t chain links 72.
Worker station can be easily accomplished the hanging and dismounting of half round timber 3 on roadway floor, can effectively reduce reach and fill
Dismounting, set-up time when filling out flexible pipe suspension platform;Ascend a height operation of the worker when installing suspension platform is avoided, duty has been ensured
The personal safety of work.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other
Between the difference of embodiment, each embodiment identical similar portion mutually referring to.To the upper of the disclosed embodiments
State bright, professional and technical personnel in the field is realized or use the utility model.A variety of modifications pair to these embodiments
It will be apparent for those skilled in the art, generic principles defined herein can not depart from this reality
In the case of with new spirit or scope, realize in other embodiments.Therefore, the utility model is not intended to be limited to this
These embodiments shown in text, and it is to fit to the most wide scope consistent with features of novelty with principles disclosed herein.
Claims (1)
1. one kind filling platform suspension attachment, one end of mixing tube connects two delivery pumps, the other end of mixing tube has shunting
Device, current divider connects several defeated slurry flexible pipes, and defeated slurry flexible pipe is ridden on a rod, has above rod on a top plate, top plate
It is installed with several anchor pole heads, it is characterised in that:With two steel poles, steel pole bottom is installed with horizontal handle, the upper end of steel pole
Chain link is fixed with, the upper end of chain link is installed with nut, and nut is arranged on the external screw thread set by anchor pole head lower end, rod hanging exists
On the annular iron wire that steel pole lower end is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720046612.3U CN206419063U (en) | 2017-01-16 | 2017-01-16 | Fill platform suspension attachment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720046612.3U CN206419063U (en) | 2017-01-16 | 2017-01-16 | Fill platform suspension attachment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206419063U true CN206419063U (en) | 2017-08-18 |
Family
ID=59571947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720046612.3U Expired - Fee Related CN206419063U (en) | 2017-01-16 | 2017-01-16 | Fill platform suspension attachment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206419063U (en) |
-
2017
- 2017-01-16 CN CN201720046612.3U patent/CN206419063U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204571261U (en) | A kind of ring attaching skirt hand cradle for removing chimney and water tower | |
CN206419063U (en) | Fill platform suspension attachment | |
CN104452715A (en) | Special operation platform suitable for single pile offshore construction | |
CN207347033U (en) | A kind of small-sized hanging apparatus of civil engineering | |
CN206495647U (en) | A kind of well head automated round trip sets | |
CN205145443U (en) | Transformer upper portion construction safety belt hanging device | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN105311771A (en) | Safety belt suspending device for upper construction of transformer | |
CN204590623U (en) | A kind of material transfer box for aluminum alloy mould plate system | |
CN206707396U (en) | A kind of hand-rail type electric pole group founds gin pole | |
CN206338037U (en) | A kind of well workover self-balancing derrick | |
CN206637572U (en) | High-Pole Lamp bar top transmission mechanism | |
CN204311980U (en) | A kind of protector for the safe dismounting of oil-well rig boring tower | |
CN206014340U (en) | A kind of cooperation fork truck can 360 degree of pipe risers for rotating | |
CN205328438U (en) | Handling is from lift -type cylindric spud leg hanging beam | |
CN104088281B (en) | A kind of used in vertical transportation of concrete buffer | |
CN107253677A (en) | A kind of firm engineering tower crane of underframe | |
CN204825670U (en) | Inclined to one side hanging beam frame device is prevented turning round by eccentric case roof beam | |
CN206842842U (en) | Band core bore precast concrete unit hoisting tool | |
CN203960874U (en) | A kind of used in vertical transportation of concrete snubber | |
CN103343546B (en) | Universal tower crane concrete foundation | |
CN208378285U (en) | Colliery downhole equipment lifting device | |
CN103935795B (en) | Hydraulic pressure tape handler | |
CN205086157U (en) | Apron is used in nodular cast iron pipe health preserving pond of using electromagnet to lift by crane | |
CN211644368U (en) | Lifting device for bucket of manual hole digging pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170818 Termination date: 20180116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |