CN206418593U - Spherical tent - Google Patents
Spherical tent Download PDFInfo
- Publication number
- CN206418593U CN206418593U CN201621446782.2U CN201621446782U CN206418593U CN 206418593 U CN206418593 U CN 206418593U CN 201621446782 U CN201621446782 U CN 201621446782U CN 206418593 U CN206418593 U CN 206418593U
- Authority
- CN
- China
- Prior art keywords
- binding
- binding end
- spherical tent
- noumenon portion
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses a kind of spherical tent, it includes multiple first connectors, every one first connector has a first noumenon portion of tubulose, two the first binding ends connect the two ends in the first noumenon portion respectively, first binding end is flat, multiple second connectors, every one second connector has one second body, the external diameter of second body is less than the internal diameter in the first noumenon portion, second body part is in the first noumenon portion, two the second binding ends connect the two ends of the second body respectively, second binding end is flat, second binding end is located in the first binding end, adjacent two the first binding ends connection, adjacent two the second binding ends connection, the intensity of junction is considerably beyond the scheme in background technology, and cost increase is few, how much sphere structure deadweight there is not increase yet.
Description
【Technical field】
The utility model is related to a kind of spherical tent, espespecially a kind of spherical tent of strength enhancing.
【Background technology】
The movable spherical tent that activity is used, the superposition screw locking mode set-up time after improvement is fast, Stability Analysis of Structures peace
Entirely, the demand that the industries such as activity, the exhibition of temporary building attract eyeball and fast installed is met, but as spherical frame adds
Greatly, it is necessary to be made of the bigger or thicker metal tube of wall thickness, this not only adds cost, and spheroid framework is added
The weight of itself, it is very unfavorable to installation rate.
Therefore, it is necessary to a kind of good spherical tent be designed, to overcome above mentioned problem.
【Utility model content】
For background technology problem encountered, the purpose of this utility model is that provide one kind is set by sleeve pipe and flattening
Meter so that cost is low, and the high spherical tent of intensity.
To achieve the above object, the utility model uses following technological means:
A kind of spherical tent, it includes multiple first connectors, and every one first connector has a first noumenon of tubulose
Portion, two the first binding ends connect the two ends in the first noumenon portion respectively, and the first binding end is flat, multiple second connectors,
Every one second connector has one second body, and the external diameter of the second body is less than the internal diameter in the first noumenon portion, the second body
Portion is located in the first noumenon portion, and two the second binding ends connect the two ends of the second body respectively, and the second binding end is flat,
Second binding end is located in the first binding end, adjacent two the first binding ends connection, adjacent two the second binding ends connection.
Further, the first connector and the second connector are built from the top of spherical tent towards bottom direction.
Further, the second body is tubulose.
Further, a diameter of 38mm in the first noumenon portion, a diameter of 32mm of the second body.
Further, the thickness of the first noumenon portion and the second body is 2.5mm.
Further, the first binding end has provided a through hole, and the second binding end has provided a perforation, and through hole is corresponding with perforation
Set, a locking part is located at through hole and perforation.
Further, the outside of the second binding end abuts the inner side of the first binding end.
Further, three the first connectors are connected with each other, triangle.
Further, six the first binding ends and six the second binding ends are fixedly connected by a locking part.
Further, the width of the first binding end is more than the width in the first noumenon portion, and the width of the second binding end is more than the
The width of two bodies.
Further, the upside of upside laminating the first binding end of contact of the second binding end, the downside patch of the second binding end
Splice grafting touches the downside of the first binding end.
Compared with prior art, the utility model has the advantages that:
Above-mentioned spherical tent, due to the second body external diameter be less than the first noumenon portion internal diameter, the second body part in
In the first noumenon portion, two the second binding ends connect the two ends of the second body respectively, and the second binding end is flat, the second knot
Close end to be located in the first binding end, adjacent two the first binding ends connection, adjacent two the second binding ends connection, so not
Only the intensity of the first noumenon portion and the second body is increased, and in junction, because the second binding end is flat, the second knot
Close end to be located in the first binding end, so the intensity of junction is considerably beyond the scheme in background technology, and cost increase is not
Many, how much sphere structure deadweight there is not increase yet.
【Brief description of the drawings】
Fig. 1 is the top view of the utility model spherical tent;
Fig. 2 is the side view of the utility model spherical tent;
Fig. 3 is the schematic diagram of the first noumenon portion and the socket of the second body in the utility model spherical tent;
Fig. 4 is the first binding end and the schematic diagram of the second binding end flattening in the utility model spherical tent;
Fig. 5 is Fig. 4 top view;
Fig. 6 is the top view of multiple first connectors and the second connector interconnections in the utility model spherical tent.
The drawing reference numeral explanation of embodiment:
The binding end 12 of first connector, 1 the first noumenon portion 11 first
The body 21 of 13 second connector of through hole 2 second
Second binding end 22,23 locking parts 3 of perforation
【Embodiment】
For ease of being better understood from the purpose of this utility model, structure, feature and effect etc., in conjunction with accompanying drawing and specifically
The utility model is described in further detail for embodiment.
Fig. 1, Fig. 4-Fig. 6 are referred to, a kind of spherical tent, entirety is generally spherical in shape, and top is small, and bottom is big, is Kai Weite
Structure design, it includes multiple first connectors 1, and every one first connector 1 has a first noumenon portion 11 of tubulose, first
A diameter of 38mm in body portion 11, two the first binding ends 12 connect the two ends in the first noumenon portion 11 respectively, and the first binding end 12 is
Flat, the width of the first binding end 12 is more than the width in the first noumenon portion 11, multiple second connectors 2, every one second connection
Part 2 has one second body 21, and the second body 21 is tubulose, a diameter of 32mm of the second body 21, and the first noumenon
The thickness of the body of portion 11 and second is 2.5mm, and the external diameter of the second body 21 is less than the internal diameter in the first noumenon portion 11, second
Body portion 21 is located in the first noumenon portion 11, and two the second binding ends 22 connect the two ends of the second body 21 respectively, and second combines
End 22 is flat, and the width of the second binding end 22 is more than the width of the second body 21, and the second binding end 22 is located at the first knot
Close in end 12, the outside of the second binding end 22 abuts the inner side of the first binding end 12, the upside laminating contact of the second binding end 22
The upside of first binding end 12, the downside of downside laminating the first binding end 12 of contact of the second binding end 22, intensity is bigger.
Fig. 5 and Fig. 6 are referred to, the first binding end 12 has provided a through hole 13, and the second binding end 22 has provided a perforation 23,
Through hole 13 and perforation 23 are correspondingly arranged, and a locking part 3 is located at through hole 13 and perforation 23 so that two adjacent the first binding ends 12
Connection, two adjacent the second binding ends 22 are connected, and three the first connectors 1 are connected with each other, triangle, six the
One binding end 12 and six the second binding ends 22 are fixedly connected by a locking part 3, and locking part 3 is spiral shell in the present embodiment
Silk.
Refer to Fig. 2-Fig. 6, above-mentioned spherical tent builds step substantially:Due to the first connector 1 and the second connection
Part 2 is tubular structure, first loads the second connector 2 in first connector 1, and then the second body 21 is located at the first noumenon
In portion 11, i.e., the first binding end 12 and the second binding end 22 are subjected to flattening processing, then to the first binding end 12 and the second knot
Close end 22 and carry out through hole 13 and the processing of perforation 23, recycle a locking part 3 that two adjacent the first binding ends 12 are connected,
Two adjacent the second binding ends 22 are connected, also, build the first connector 1 and the from the top of spherical tent towards bottom direction
Two connectors 2, this building mode so that spherical tent can take 80m, even more greatly, such as 120m diameters, if according to
The building mode of background technology, takes from the bottom up, 30m diameters or so, erects and comes just gruelling, and one
20m diameters, 2 day time, or even 5 days are at least taken, and we build from the top of spherical tent towards bottom direction, only easily letter
Single can build up for 1 day.
Above-mentioned spherical tent, because the external diameter of the second body 21 is less than the internal diameter in the first noumenon portion 11, the second body
21 are located in the first noumenon portion 11, and two the second binding ends 22 connect the two ends of the second body 21, the second binding end 22 respectively
For flat, the second binding end 22 is located in the first binding end 12, and two adjacent the first binding ends 12 are connected, adjacent two
Second binding end 22 is connected, and so not only the intensity of the body 21 of the first noumenon portion 11 and second is increased, and in junction, by
It is flat in the second binding end 22, the second binding end 22 is located in the first binding end 12, so the intensity of junction much surpasses
The scheme crossed in background technology, and cost increase is few, and how much sphere structure deadweight there is not increase yet.
Detailed description above is only the explanation of the preferred embodiment of the utility model, and non-therefore limitation is of the present utility model specially
Sharp scope, so, all equivalence techniques changes with carried out by this creation specification and diagramatic content are both contained in the utility model
The scope of the claims in.
Claims (10)
1. a kind of spherical tent, it is characterised in that including:Multiple first connectors, every one first connector has the one of tubulose
The first noumenon portion, two the first binding ends connect the two ends in the first noumenon portion respectively, and the first binding end is flat, multiple second
Connector, every one second connector has one second body, and the external diameter of the second body is less than the internal diameter in the first noumenon portion, the
Two body parts are in the first noumenon portion, and two the second binding ends connect the two ends of the second body respectively, and the second binding end is
Flat, the second binding end is located in the first binding end, adjacent two the first binding ends connection, two second adjacent combinations
End connection.
2. spherical tent as claimed in claim 1, it is characterised in that:First is built from the top of spherical tent towards bottom direction
Connector and the second connector.
3. spherical tent as claimed in claim 1, it is characterised in that:Second body is tubulose, the diameter in the first noumenon portion
For 38mm, a diameter of 32mm of the second body.
4. spherical tent as claimed in claim 3, it is characterised in that:The thickness of the first noumenon portion and the second body is 2.5mm.
5. spherical tent as claimed in claim 1, it is characterised in that:First binding end has provided a through hole, the second binding end
A perforation is provided, through hole and perforation are correspondingly arranged, a locking part is located at through hole and perforation.
6. spherical tent as claimed in claim 1, it is characterised in that:The outside of second binding end abuts the interior of the first binding end
Side.
7. spherical tent as claimed in claim 1, it is characterised in that:Three the first connectors are connected with each other, triangle.
8. spherical tent as claimed in claim 1, it is characterised in that:Six the first binding ends and six the second binding ends by
One locking part is fixedly connected.
9. spherical tent as claimed in claim 1, it is characterised in that:The width of first binding end is more than the width in the first noumenon portion
Degree, the width of the second binding end is more than the width of the second body.
10. spherical tent as claimed in claim 1, it is characterised in that:The upside laminating contact first of second binding end is combined
The upside at end, the downside of downside laminating the first binding end of contact of the second binding end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621446782.2U CN206418593U (en) | 2016-12-27 | 2016-12-27 | Spherical tent |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621446782.2U CN206418593U (en) | 2016-12-27 | 2016-12-27 | Spherical tent |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206418593U true CN206418593U (en) | 2017-08-18 |
Family
ID=59576818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621446782.2U Active CN206418593U (en) | 2016-12-27 | 2016-12-27 | Spherical tent |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206418593U (en) |
-
2016
- 2016-12-27 CN CN201621446782.2U patent/CN206418593U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105545086B (en) | Guardrail quick-release arrangement based on T-shaped instrument | |
CN104264795B (en) | A kind of beam column flexible connecting device and construction method thereof | |
CN206418593U (en) | Spherical tent | |
CN202430653U (en) | Assembling type guardrail | |
CN103669989B (en) | The expansion of disaster relief environmental protection tent and Tent frame with remove receiving method | |
CN203544117U (en) | Open-tenon connection structure | |
KR20120067389A (en) | Self-assembly block tent | |
CN202170588U (en) | Unit curtain wall construction angle connection adapter piece | |
CN204385898U (en) | A kind of circle side node component | |
CN204780886U (en) | A bayonet joint for joint formula connecting piece | |
CN204001965U (en) | Hexagon simple portable tent | |
CN205604835U (en) | Crossbeam splicing mechanism of iron art tent | |
CN205243035U (en) | Can splice formula truss column connects | |
CN209457386U (en) | Side template bracing means | |
CN205242720U (en) | T wall structure | |
CN102758583A (en) | Corner connector for connecting frame and frame | |
CN204132066U (en) | A kind of spliced arched frame | |
CN208088958U (en) | A kind of card slot | |
CN205776975U (en) | High strength glass curtain wall | |
CN205475685U (en) | Spatial structure frame | |
CN202768565U (en) | Pip fitting | |
CN103669990B (en) | The expansion of disaster relief environmental protection tent and Tent frame with remove receiving method | |
CN204081080U (en) | The syndeton of a kind of precast plate and main structure body | |
CN203590645U (en) | Angle connector of machine cabinet skeleton | |
CN204938662U (en) | A kind of four sides bending sedan-chair wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |