CN206414665U - A kind of new construction trampoline for being easy to assemble and disassemble - Google Patents

A kind of new construction trampoline for being easy to assemble and disassemble Download PDF

Info

Publication number
CN206414665U
CN206414665U CN201621357651.7U CN201621357651U CN206414665U CN 206414665 U CN206414665 U CN 206414665U CN 201621357651 U CN201621357651 U CN 201621357651U CN 206414665 U CN206414665 U CN 206414665U
Authority
CN
China
Prior art keywords
new construction
trampoline
easy
pipe
disassemble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621357651.7U
Other languages
Chinese (zh)
Inventor
王玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Ming Kun Metal Products Co Ltd
Original Assignee
Changshu Ming Kun Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Ming Kun Metal Products Co Ltd filed Critical Changshu Ming Kun Metal Products Co Ltd
Application granted granted Critical
Publication of CN206414665U publication Critical patent/CN206414665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of new construction trampoline for being easy to assemble and disassemble, including ring pipe, support feet standpipe and spring face, the bottom formation framework that described support feet standpipe is uniformly arranged on ring pipe respectively is installed by three-dimensional, it is characterized in that, described spring face is arranged in framework by bungee and Plastic fastener, also include T-shaped handrail, described T-shaped handrail is detachably arranged in a side of framework and extends upwardly to the top in spring face.Through the above way, the new construction trampoline of the present utility model for being easy to assemble and disassemble, ring pipe, support feet standpipe, spring face, T-shaped handrail are all dismountable set, transport, install, dismounting is all easier, time saving and energy saving, by it is three-dimensional split, install obtain product production, the advantage in terms of accumulating, so as to reach trampoline in production and the upgrading of accumulating, reach that manufacturing cost is optimized, while structural stability is strong, security performance is high.

Description

A kind of new construction trampoline for being easy to assemble and disassemble
Technical field
The utility model is related to the technical field of trampoline, more particularly to a kind of new construction trampoline for being easy to assemble and disassemble.
Background technology
Now with the raising of people's quality of the life, increasingly focus on leisure, trampoline is a kind of recreation trip that people like Happy facility, trampoline as it is a kind of integrate amusement and body-building outdoor activity articles for use, some large-scale recreation grounds almost with Place is visible, and small sized bouncing bed is mainly used in the entertainment for children of the occasions such as family, is increasingly favored by consumer.
Trampoline of the prior art, the support feet for including framework, the spring face in the framework and framework lower end is stood Pipe, is connected, user jumps on spring face, the process in its whereabouts between framework and spring face by extension spring or bungee In, a downward pressure can be applied to spring face, the spring face declines along its normal direction displacement under the effect of the pressure, when When pressure is removed, the spring face and extension spring or bungee will provide response force, promote spring face to keep in the center, take this, use It can back and forth be bounced on spring face, and then reach the effect of sport and body-building.
But, when people state trampoline in design, although substantial amounts of work has been done in trampoline quality, with regard to its trampoline in folding Some effects are achieved in folded, merging, but trampoline installs more complicated in an assembling process, is not easy to dismounting, wastes time and energy, Moulding is also less attractive in appearance, split, merge structure thinking in or a vacancy, ensure trampoline high-quality on the premise of, Production, accumulating advantage cannot upgrade all the time.
Utility model content
The utility model mainly solving the technical problems that provide it is a kind of be easy to assembly and disassembly new construction trampoline, ring pipe, Support feet standpipe, spring face, T-shaped handrail are all dismountable settings, and transport, installation, dismounting are all easier, time saving and energy saving, By it is three-dimensional split, install obtain product production, the advantage in terms of accumulating, so as to reach liter of the trampoline in production and accumulating Level, reaches that manufacturing cost is optimized, while structural stability is strong, security performance is high.
In order to solve the above technical problems, the technical scheme that the utility model is used is:It is easy to assembly and disassembly there is provided one kind New construction trampoline, including ring pipe, support feet standpipe and spring face pass through and three-dimensional install described support feet standpipe point Framework is formed on the bottom for not being uniformly arranged on ring pipe, and described spring face is arranged on framework by bungee and Plastic fastener Interior, in addition to T-shaped handrail, described T-shaped handrail is detachably arranged in a side of framework and extends upwardly to spring face Top.
In one preferred embodiment of the utility model, described spring face is shaped as circle, described spring face Diameter is less than the diameter of ring pipe.
In one preferred embodiment of the utility model, described Plastic fastener uses one side Plastic fastener or two-sided Plastic fastener.
In one preferred embodiment of the utility model, described one side Plastic fastener includes the first positioning pipe, the second positioning Pipe, locating piece and connecting plate, described locating piece are arranged on the centre position of connecting plate bottom, described the first positioning pipe and the Two positioning pipes are symmetrically arranged at the right and left of locating piece and on connecting plate, and the two ends of described bungee lead to respectively Cross clamp ring to be connected in the first positioning pipe and the second positioning pipe, ring Guan Houzai spiral-locks are bypassed in the middle part of described band In locating piece.
In one preferred embodiment of the utility model, the edge of described locating piece is provided with arc groove.
In one preferred embodiment of the utility model, described two-sided Plastic fastener includes locating button, fixed plate and connection Hole, the two ends that described locating button is arranged on the rear end of fixed plate and locating button are bent to the both sides up and down of fixed plate, institute respectively The connecting hole stated is horizontally installed in fixed plate, and described spring face is attached by connecting hole with two-sided Plastic fastener, described Band bypass ring Guan Houzai spiral-locks above and below the fixed plate in the locating button of both sides.
In one preferred embodiment of the utility model, the described telescopically adjustable height of T-shaped handrail.
In one preferred embodiment of the utility model, described ring pipe is made up of multistage arc point circle pipe, described The two ends of arc point circle pipe be provided with the square contracting being engaged and rise bore.
In one preferred embodiment of the utility model, described new construction trampoline also includes square pipe fitting, described The upper port of support feet standpipe is respectively welded at the bottom of square pipe fitting, and the left and right ends mouthful of described square pipe fitting are distinguished It is arranged on the junction of arc point circle pipe.
In one preferred embodiment of the utility model, described new construction trampoline also includes V-arrangement supporting fixing device, institute The V-arrangement supporting fixing device stated is arranged between adjacent two support feets standpipe.
The beneficial effects of the utility model are:The new construction trampoline of the present utility model for being easy to assemble and disassemble, ring pipe, support Pin standpipe, spring face, T-shaped handrail are all dismountable settings, and transport, installation, dismounting are all easier, time saving and energy saving, are passed through Advantage in terms of solid splits, install to obtain product production, accumulating, so that trampoline is reached in production and the upgrading of accumulating, Reach that manufacturing cost is optimized, while structural stability is strong, security performance is high.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the utility model embodiment The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Other accompanying drawings are obtained, wherein:
Fig. 1 is the structural representation of a preferred embodiment of the new construction trampoline that the utility model is easy to assembly and disassembly;
Fig. 2 is the structural representation of one side Plastic fastener;
Fig. 3 is the structural representation of two-sided Plastic fastener;
Fig. 4 is the assembling schematic diagram of ring pipe;
Mark in accompanying drawing for:1st, ring pipe, 2, support feet standpipe, 3, spring face, 4, bungee, 5, Plastic fastener, 6, T Shape handrail, 7, square pipe fitting, 8, V-arrangement supporting fixing device, 11, arc point circle pipe, 12, square contracting rise bore, 51, one side Plastic fastener, 52, two-sided Plastic fastener, the 511, first positioning pipe, the 512, second positioning pipe, 513, locating piece, 514, connecting plate, 515, Clamp ring, 521, locating button, 522, fixed plate, 523, connecting hole.
Embodiment
The technical scheme in the utility model embodiment will be clearly and completely described below, it is clear that described Embodiment is only a part of embodiment of the present utility model, rather than whole embodiments.Based on the implementation in the utility model Example, all other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made is belonged to The scope of the utility model protection.
As shown in figure 1, the utility model embodiment includes:
A kind of new construction trampoline for being easy to assemble and disassemble, including ring pipe 1, support feet standpipe 2 and spring face 3, by vertical Body installs the bottom formation framework that described support feet standpipe 2 is uniformly arranged on ring pipe 1 respectively, and described spring face 3 leads to Cross bungee 4 and Plastic fastener 5 to be arranged in framework, in addition to T-shaped handrail 6, described T-shaped handrail 6 is detachably arranged in frame One side of frame and the top for extending upwardly to spring face 3.
Wherein, the described telescopically adjustable height of T-shaped handrail 6.Because the spring face having is smaller, if flat during spring Weighing apparatus grasps bad, just has the possibility thrown from trampoline, therefore, a T-shaped handrail 6 is set on trampoline, T-shaped handrail can be used 6 handrail complete jump, security performance is high, while convenient regulation height, suitable different crowd is used.
In above-mentioned, described spring face 3 is shaped as circle, and the diameter in described spring face 3 is less than the straight of ring pipe 1 Footpath, described spring face 3 is arranged in ring pipe 1 by bungee 4 and Plastic fastener 5, convenient assembly and disassembly.
Further, described Plastic fastener 5 is using the Plastic fastener 52 of one side Plastic fastener 51 or two-sided.
As shown in Fig. 2 described one side plastic cement 51 is buckled including the first positioning pipe 511, the second positioning pipe 512, locating piece 513 With connecting plate 514, described locating piece 513 is arranged on the centre position of the bottom of connecting plate 514, the first described positioning pipe 511 The right and left of locating piece 513 is symmetrically arranged at the second positioning pipe 512 and on connecting plate 514.Described is elastic The two ends of rope 4 are connected in the first positioning pipe 511 and the second positioning pipe 512 by clamp ring 515 respectively, described band 4 Middle part bypass after ring pipe 1 again spiral-lock in locating piece 513.
Wherein, the diameter of the first described positioning pipe 511 and the second positioning pipe 512 is equal and is more than the diameter of bungee 4. Described locating piece 513 is shaped as semicircular structure, and the edge of locating piece 513 is provided with arc groove, facilitate bungee 4 to detain It is not easily shifted in the arc groove of locating piece 513.
As shown in figure 3, described two-sided Plastic fastener 52 includes locating button 521, fixed plate 522 and connecting hole 523, it is described The two ends that locating button 521 is arranged on the rear end of fixed plate 522 and locating button 521 are bent to the both sides up and down of fixed plate 522 respectively, Described connecting hole 523 is horizontally installed in fixed plate 522.Described spring face 3 passes through connecting hole 523 and two-sided Plastic fastener 52 It is attached, described band 4 bypasses after ring pipe 1 locating button 521 of the spiral-lock in fixed plate both sides about 522 again It is interior, it is not easily shifted.
As shown in figure 4, described ring pipe 1 is made up of multistage arc point circle pipe 11, described arc point encloses pipe 11 Two ends are provided with the square contracting being engaged and risen bore 12, rise by bore 12 by multistage arc point by the square contracting being engaged Enclose the composition ring of pipe 11 pipe 1, convenient assembly and disassembly.Wherein, the rise length of bore 12 of described square contracting is 30-35mm.
Further, described new construction trampoline also includes square pipe fitting 7, the upper port of described support feet standpipe 2 The bottom of square pipe fitting 7 is respectively welded at, the left and right ends mouth of described square pipe fitting 7 is separately positioned on adjacent arc point Enclose the junction of pipe 11, convenient assembly and disassembly.
In the present embodiment, described new construction trampoline also includes V-arrangement supporting fixing device 8, described V-arrangement supporting & stablizing dress Put 8 to be arranged between adjacent two support feets standpipe 2, structural stability is strong, security performance is high.
In summary, the new construction trampoline of the present utility model for being easy to assemble and disassemble, ring pipe 1, support feet standpipe 2, spring Face 3, T-shaped handrail 6 are all dismountable settings, and transport, installation, dismounting are all easier, time saving and energy saving, splitted by solid, Install come the advantage in terms of obtaining the production of product, accumulating, so as to reach that trampoline, in production and the upgrading of accumulating, reaches and is manufactured into This optimization, while structural stability is strong, security performance is high.
Embodiment of the present utility model is the foregoing is only, the scope of the claims of the present utility model is not thereby limited, it is every The equivalent structure or equivalent flow conversion made using the utility model description, or directly or indirectly it is used in other phases The technical field of pass, is similarly included in scope of patent protection of the present utility model.

Claims (10)

1. a kind of new construction trampoline for being easy to assemble and disassemble, including ring pipe, support feet standpipe and spring face, pass through solid installation Framework is formed on the bottom that described support feet standpipe is uniformly arranged on ring pipe respectively, it is characterised in that described spring face It is arranged on by bungee and Plastic fastener in framework, in addition to T-shaped handrail, described T-shaped handrail is detachably arranged in framework A side and extend upwardly to the top in spring face.
2. the new construction trampoline according to claim 1 for being easy to assembly and disassembly, it is characterised in that described spring face is shaped as Circle, the diameter in described spring face is less than the diameter of ring pipe.
3. the new construction trampoline according to claim 1 for being easy to assemble and disassemble, it is characterised in that described Plastic fastener uses one side Plastic fastener or two-sided Plastic fastener.
4. the new construction trampoline according to claim 3 for being easy to assemble and disassemble, it is characterised in that described one side Plastic fastener includes First positioning pipe, the second positioning pipe, locating piece and connecting plate, described locating piece are arranged on the centre position of connecting plate bottom, Described the first positioning pipe and the second positioning pipe is symmetrically arranged at the right and left of locating piece and on connecting plate, described The two ends of bungee be connected to respectively by clamp ring in the first positioning pipe and the second positioning pipe, the middle part of described band Ring Guan Houzai spiral-locks are bypassed in locating piece.
5. the new construction trampoline according to claim 4 for being easy to assemble and disassemble, it is characterised in that the edge of described locating piece is set It is equipped with arc groove.
6. the new construction trampoline according to claim 3 for being easy to assemble and disassemble, it is characterised in that described two-sided Plastic fastener includes Locating button, fixed plate and connecting hole, described locating button are arranged on the rear end of fixed plate and the two ends of locating button and are bent to respectively The both sides up and down of fixed plate, described connecting hole is horizontally installed in fixed plate, described spring face by connecting hole with it is two-sided Plastic fastener is attached, and described band bypasses ring Guan Houzai spiral-locks above and below the fixed plate in the locating button of both sides.
7. the new construction trampoline according to claim 1 for being easy to assemble and disassemble, it is characterised in that described T-shaped handrail is scalable Regulation height.
8. the new construction trampoline according to claim 1 for being easy to assemble and disassemble, it is characterised in that described ring pipe is by multistage Arc, which divides, encloses pipe composition, and the two ends of described arc point circle pipe are provided with the square bore that rises that contracts being engaged.
9. the new construction trampoline according to claim 1 for being easy to assemble and disassemble, it is characterised in that described new construction trampoline is also wrapped Square pipe fitting is included, the upper port of described support feet standpipe is respectively welded at the bottom of square pipe fitting, described square The left and right ends mouth of pipe fitting is separately positioned on the junction of arc point circle pipe.
10. the new construction trampoline according to claim 1 for being easy to assemble and disassemble, it is characterised in that described new construction trampoline is also Including V-arrangement supporting fixing device, described V-arrangement supporting fixing device is arranged between adjacent two support feets standpipe.
CN201621357651.7U 2016-12-08 2016-12-12 A kind of new construction trampoline for being easy to assemble and disassemble Expired - Fee Related CN206414665U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016213409548 2016-12-08
CN201621340954 2016-12-08

Publications (1)

Publication Number Publication Date
CN206414665U true CN206414665U (en) 2017-08-18

Family

ID=59575082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621357651.7U Expired - Fee Related CN206414665U (en) 2016-12-08 2016-12-12 A kind of new construction trampoline for being easy to assemble and disassemble

Country Status (1)

Country Link
CN (1) CN206414665U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106730572A (en) * 2016-12-08 2017-05-31 常熟铭坤金属制品有限公司 A kind of new construction trampoline for being easy to assemble and disassemble
GB2600968A (en) * 2020-11-13 2022-05-18 William Male Andrew Trampoline with balance handle
WO2022101631A1 (en) * 2020-11-13 2022-05-19 Andrew William Male Trampoline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106730572A (en) * 2016-12-08 2017-05-31 常熟铭坤金属制品有限公司 A kind of new construction trampoline for being easy to assemble and disassemble
GB2600968A (en) * 2020-11-13 2022-05-18 William Male Andrew Trampoline with balance handle
WO2022101631A1 (en) * 2020-11-13 2022-05-19 Andrew William Male Trampoline

Similar Documents

Publication Publication Date Title
CN206414665U (en) A kind of new construction trampoline for being easy to assemble and disassemble
CN201679853U (en) Connecting structure of bounce bed supporting rod
CN106730572A (en) A kind of new construction trampoline for being easy to assemble and disassemble
CN205971635U (en) Multifunctional bicycle goods shelves
CN208779312U (en) A kind of street lamp post
CN209422857U (en) A kind of dance training pressing-leg device convenient for adjusting height
CN204456977U (en) A kind of platform mechanism of recreation facility
CN207506982U (en) A kind of amusement facility platform
CN203059016U (en) Portable folding stool
CN205988558U (en) Roller type seesaw
CN205144132U (en) Clothing stores pylon
CN204797322U (en) Folding crib that to reequip can sway
CN204641978U (en) There is the support frame structure of multistage adjustment
CN205182125U (en) Simulation basketball stands for shooting toy
CN207257859U (en) A kind of scooter footboard structure and scooter
CN208799714U (en) A kind of anti-slip type horizontal bar
CN206954366U (en) The telescopic shelter of pole
CN208576642U (en) A kind of saddle bottom case with safeguard structure
CN218165867U (en) Multifunctional trampoline
CN213491879U (en) Basketball stand with basket ring anti-drop function
CN206964962U (en) A kind of anti-skidding trampoline
CN208353522U (en) A kind of stage sound installation device
CN205998041U (en) A kind of bicycle jug carrier
CN207028687U (en) A kind of drawing board
CN201855550U (en) Portable basketball stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

Termination date: 20181212

CF01 Termination of patent right due to non-payment of annual fee