- Publication number
- CN206411997U CN206411997U CN201621262788.4U CN201621262788U CN206411997U CN 206411997 U CN206411997 U CN 206411997U CN 201621262788 U CN201621262788 U CN 201621262788U CN 206411997 U CN206411997 U CN 206411997U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- phase electric
- meter
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012549 training Methods 0.000 title claims abstract description 16
- 238000004891 communication Methods 0.000 claims abstract description 30
- 230000005611 electricity Effects 0.000 claims description 7
- 230000005540 biological transmission Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 2
- 238000007405 data analysis Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
O&M actual training device is gathered the utility model discloses a kind of intelligent electric meter, it is related to intelligent electric meter field, the device includes power supply, concentrator, collector, the first single-phase electric energy meter, the first three-phase electric energy meter, first switch, second switch, the second single-phase electric energy meter, the second three-phase electric energy meter, combined connection box, the end of incoming cables of combined connection box connects power supply, the leading-out terminal connection concentrator of combined connection box by first switch;The power interface of collector connects power supply by first switch, and second switch is connected with collector;The communication interface of first three-phase electric energy meter, the communication interface of the second three-phase electric energy meter, the communication interface of the first single-phase electric energy meter, the communication interface of the second single-phase electric energy meter connect the communication interface of collector using RS485 cables.The utility model can simulate collection in worksite failure, operating personnel is improved the ability for judging handling failure, and grasp half carrier wave and full carrier meter reading principle and the RS485 modes of connection comprehensively.
Description
Technical field
The utility model is related to intelligent electric meter field, and in particular to a kind of intelligent electric meter gathers O&M actual training device.
Background technology
Intelligent electric meter be it is a kind of integrate multi-functional, teletransmission is defeated, data analysis electric energy meter, with intelligence deduct fees, electricity
The functional characteristic of the height technicalizations such as valency inquiry, electricity memory, meter reading time are freezed, remaining sum alarm, information remote transmission, can be
After power purchase amount of money input ammeter after supplementing with money, immediately begin to customer power supply, and carry out real time settlement.
The meter reading pattern of current intelligent electric meter is broadly divided into two kinds, and one is half carrier mode, using collector and every intelligence
Can ammeter RS485 interface links, copy reading family table data, then from collector by carrier system to concentrator transmission collection number
According to concentrator completes the data acquisition to intelligent electric meter to master station transmission data;Two be full carrier pattern, is passed through using concentrator
Carrier system copy reading family table data, directly the data acquisition to intelligent electric meter is completed by communication module to master station transmission data.
In order to ensure the normal work of intelligent electric meter, relevant staff needs to carry out the operation maintenance work of intelligent electric meter
Make, the technical training of correlation don't fail to be strengthened, but do not have the corresponding reality worked for intelligent electric meter operation maintenance at present
Training apparatus.
Utility model content
The purpose of this utility model is that there is provided a kind of intelligent electric meter collection O&M in order to overcome the shortcomings of above-mentioned background technology
Actual training device, the device can simulate collection in worksite failure, operating personnel is improved the ability for judging handling failure, and slap comprehensively
Hold half carrier wave and full carrier meter reading principle and the RS485 modes of connection.
The utility model provides a kind of intelligent electric meter collection O&M actual training device, and the device includes power supply, concentrator, collection
Device, the first single-phase electric energy meter, the first three-phase electric energy meter, the device also include first switch, second switch, the second single-phase electric energy
Table, the second three-phase electric energy meter, combined connection box, the end of incoming cables of the combined connection box connect power supply by first switch, described
The leading-out terminal connection concentrator of combined connection box;The collector has power interface, communication interface, the power supply of the collector
Interface connects power supply by first switch, and the second switch is connected with the collector;First single-phase electric energy meter, first
Three-phase electric energy meter, the second single-phase electric energy meter, the second three-phase electric energy meter are respectively provided with communication interface and power interface, first three-phase
The communication interface of electric energy meter, the communication interface of the second three-phase electric energy meter, the communication interface of the first single-phase electric energy meter, the second single-phase electricity
The communication interface of energy table connects the communication interface of collector using RS485 cables;The power supply of first single-phase electric energy meter connects
Mouth, the power interface of the first three-phase electric energy meter, the power interface of the second single-phase electric energy meter, the power interface of the second three-phase electric energy meter
Power supply is connected by first switch;First carrier module and communication module, the collector are installed inside the concentrator
Inside is provided with the second carrier module matched with first carrier module, the first single-phase electric energy meter, the first three-phase electric energy meter,
The family table carrier module matched with first carrier module is respectively installed inside two single-phase electric energy meters, the second three-phase electric energy meter.
On the basis of above-mentioned technical proposal, the device also includes bottom plate, and the backplate surface is provided with many one slide rails, institute
State the back side of collector, the back side of the first single-phase electric energy meter, the back side of the first three-phase electric energy meter, the back of the body of the second single-phase electric energy meter
Face, the back side of the second three-phase electric energy meter are provided with the dismountable buckle structure being flexibly connected with slide rail.
On the basis of above-mentioned technical proposal, the backplate surface is additionally provided with the LCDs for teaching, described
The power line of LCDs connects power supply by first switch.
On the basis of above-mentioned technical proposal, the device, which also includes many, to be used to store walking for RS485 cables and power line
Wire casing, the outside clamping of the cabling channel and the slide rail.
On the basis of above-mentioned technical proposal, the outer surface of the cabling channel is provided with the LED of strip.
Compared with prior art, advantage of the present utility model is as follows:
(1) actual training device provided by the utility model, can simulate collection in worksite failure, improve personnel's judgement processing
The ability of failure;Operating personnel can grasp low pressure meter scene well and stop hints on operation of sending a telegram in reply, while grasping semi-load comprehensively
Ripple and full carrier meter reading principle and the semi-load RS485 mode of connection.
(2) backplate surface of the present utility model is provided with many one slide rails, the back side of collector, the back of the body of the first single-phase electric energy meter
Face, the back side of the first three-phase electric energy meter, the back side of the second single-phase electric energy meter, the back side of the second three-phase electric energy meter are provided with sliding
Dismountable buckle structure that rail is flexibly connected, therefore, collector, the first single-phase electric energy meter, the first three-phase electric energy meter, the second list
Phase electric energy meter, the second three-phase electric energy meter can be moved on bottom plate, and facilitate dismounting and change, be conducive to saying for start-up
Solution.
(3) backplate surface of the present utility model is additionally provided with the LCDs for teaching, and many are used to store
The outside clamping of the cabling channel of RS485 cables and power line, cabling channel and slide rail, is conducive to arranging various cables and power line,
Make the plate face of bottom plate neat and artistic.The outer surface of cabling channel is provided with the LED of strip, is easy to see concentrator, electric energy meter clearly
Indicator lamp, facilitate deciding on failure.
Brief description of the drawings
Fig. 1 is the structural representation of intelligent electric meter collection O&M actual training device in the utility model embodiment.
Reference:1-concentrator, 2-collector, the 3-the first single-phase electric energy meter, the 4-the first three-phase electric energy meter, 5-
First switch, 6-second switch, the 7-the second single-phase electric energy meter, the 8-the second three-phase electric energy meter, 9-bottom plate, 10-slide rail,
11-cabling channel, 12-LED, 13-LCDs, 14-combined connection box.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
Shown in Figure 1, the utility model embodiment provides a kind of intelligent electric meter collection O&M actual training device, the device bag
Include power supply, concentrator 1, collector 2, the first single-phase electric energy meter 3, the first three-phase electric energy meter 4, the device also include first switch 5,
Second switch 6, the second single-phase electric energy meter 7, the second three-phase electric energy meter 8, combined connection box 14, the end of incoming cables of combined connection box 14 lead to
Cross the connection power supply of first switch 5, the leading-out terminal connection concentrator 1 of combined connection box 14;First switch 5 is total power switch, is adopted
Storage 2 has power interface, a communication interface, and the power interface of collector 2 connects power supply by first switch 5, second switch 6 with
Collector 2 is connected, and second switch 6 only controls the connecting and disconnecting of the circuit of collector 2;First single-phase electric energy meter 3, the first three-phase electric energy meter 4,
Second single-phase electric energy meter 7, the second three-phase electric energy meter 8 are respectively provided with communication interface and power interface, the communication of the first three-phase electric energy meter 4
Interface, the communication interface of the second three-phase electric energy meter 8, the communication interface of the first single-phase electric energy meter 3, the second single-phase electric energy meter 7 it is logical
Believe that interface connects the communication interface of collector 2 using RS485 cables;Power interface, the first three-phase of first single-phase electric energy meter 3
The power interface of electric energy meter 4, the power interface of the second single-phase electric energy meter 7, the power interface of the second three-phase electric energy meter 8 pass through
One switch 5 connects power supply;First carrier module and the communication module for inserting SIM card, collector are installed inside concentrator 1
The second carrier module matched with first carrier module is installed inside 2.
First single-phase electric energy meter 3, the first three-phase electric energy meter 4, the second single-phase electric energy meter 7, the inside of the second three-phase electric energy meter 8 are each
The family table carrier module matched with first carrier module is installed, wherein, the first single-phase electric energy meter 3 and the first three-phase electric energy meter
Family table carrier module inside 4 meets Q/GDW354-2009 intelligent electric energy meter functional specifications;Second single-phase electric energy meter the 7, the 2nd 3
Family table carrier module inside phase electric energy meter 8 meets Q/GDW 1354-2013 intelligent electric energy meter functional specifications.Second single-phase electric energy
Table 7, the second three-phase electric energy meter 8 compatible can meet the family table carrier module of Q/GDW354-2009 intelligent electric energy meter functional specifications,
First single-phase electric energy meter 3 and the first three-phase electric energy meter 4 can not compatibility meet Q/GDW 1354-2013 intelligent electric energy meter functional specifications
Family table carrier module.
The device also includes bottom plate 9, and the surface of bottom plate 9 is provided with many one slide rails 10, the back side of collector 2, the first single-phase electricity
The back side, the back side of the first three-phase electric energy meter 4, the back side of the second single-phase electric energy meter 7, the back side of the second three-phase electric energy meter 8 of energy table 3
It is provided with the dismountable buckle structure being flexibly connected with slide rail 10.
The surface of bottom plate 9 is additionally provided with the LCDs 13 for teaching, and the power line of LCDs 13 passes through first
Switch 5 connects power supply.The device, which also includes many, is used to storing the cabling channels 11 of RS485 cables and power line, cabling channel 11 with
The outside clamping of slide rail 10, the outer surface of cabling channel 11 is provided with the LED 12 of strip.
The utility model can be used for whether detection SIM card can normally use, judge concentrator communication module or carrier wave
Whether module is normal, the judgement of family table carrier module quality, detect the compatibility of intelligent electric meter carrier module, and simulates hand-held
Terminal filed stops power transmission function.
Those skilled in the art can carry out various modifications and variations to the utility model embodiment, if these are changed
With modification within the scope of the utility model claim and its equivalent technologies, then these modifications and variations are also new in this practicality
Within the protection domain of type.
The prior art that the content not being described in detail in specification is known to the skilled person.
Claims (5)
1. a kind of intelligent electric meter gathers O&M actual training device, the device includes power supply, concentrator (1), collector (2), the first list
Phase electric energy meter (3), the first three-phase electric energy meter (4), it is characterised in that:The device also include first switch (5), second switch (6),
Second single-phase electric energy meter (7), the second three-phase electric energy meter (8), combined connection box (14), the end of incoming cables of the combined connection box (14)
Power supply, the leading-out terminal connection concentrator (1) of the combined connection box (14) are connected by first switch (5);The collector (2)
With power interface, communication interface, the power interface of the collector (2) connects power supply, described second by first switch (5)
Switch (6) is connected with the collector (2);First single-phase electric energy meter (3), the first three-phase electric energy meter (4), the second single-phase electricity
Energy table (7), the second three-phase electric energy meter (8) are respectively provided with communication interface and power interface, the communication of first three-phase electric energy meter (4)
Interface, the communication interface of the second three-phase electric energy meter (8), the communication interface of the first single-phase electric energy meter (3), the second single-phase electric energy meter
(7) communication interface is using the communication interface of RS485 cables connection collector (2);The electricity of first single-phase electric energy meter (3)
Source interface, the power interface of the first three-phase electric energy meter (4), the power interface of the second single-phase electric energy meter (7), the second three-phase electric energy meter
(8) power interface connects power supply by first switch (5);Be provided with inside the concentrator (1) first carrier module and
The second carrier module matched with first carrier module, the first single-phase electricity are installed inside communication module, the collector (2)
Can table (3), the first three-phase electric energy meter (4), the second single-phase electric energy meter (7), be respectively provided with inside the second three-phase electric energy meter (8) and the
The family table carrier module that one carrier module matches.
2. intelligent electric meter as claimed in claim 1 gathers O&M actual training device, it is characterised in that:The device also includes bottom plate
(9), bottom plate (9) surface is provided with many one slide rails (10), the back side of the collector (2), the first single-phase electric energy meter (3)
The back side, the back side of the first three-phase electric energy meter (4), the back side of the second single-phase electric energy meter (7), the back side of the second three-phase electric energy meter (8)
It is provided with the dismountable buckle structure being flexibly connected with slide rail (10).
3. intelligent electric meter as claimed in claim 2 gathers O&M actual training device, it is characterised in that:Bottom plate (9) surface is also
The LCDs (13) for teaching is provided with, the power line of the LCDs (13) is connected by first switch (5)
Power supply.
4. intelligent electric meter as claimed in claim 3 gathers O&M actual training device, it is characterised in that:The device also include many with
In the cabling channel (11) for storing RS485 cables and power line, the cabling channel (11) and the outside clamping of the slide rail (10).
5. intelligent electric meter as claimed in claim 4 gathers O&M actual training device, it is characterised in that:Outside the cabling channel (11)
Surface is provided with the LED (12) of strip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621262788.4U CN206411997U (en) | 2016-11-21 | 2016-11-21 | Intelligent electric meter gathers O&M actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621262788.4U CN206411997U (en) | 2016-11-21 | 2016-11-21 | Intelligent electric meter gathers O&M actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206411997U true CN206411997U (en) | 2017-08-15 |
Family
ID=59547856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621262788.4U Expired - Fee Related CN206411997U (en) | 2016-11-21 | 2016-11-21 | Intelligent electric meter gathers O&M actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206411997U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107797008A (en) * | 2017-11-20 | 2018-03-13 | 国家电网公司 | New acquisition terminal testing stand |
-
2016
- 2016-11-21 CN CN201621262788.4U patent/CN206411997U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107797008A (en) * | 2017-11-20 | 2018-03-13 | 国家电网公司 | New acquisition terminal testing stand |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201654106U (en) | Multiple-group electric-power measurement transmission device with full-time and multiplex time-sharing measurement | |
CN204166050U (en) | Can the anti-electricity-theft intelligent power gauging table of remote meter reading | |
CN201247276Y (en) | Intelligent power utilization metering monitoring instrument | |
CN107843781A (en) | Electric energy quality monitoring analysis system | |
CN205158609U (en) | Transformer platform district user identification system | |
CN204089167U (en) | A kind of box type transformer protection supervisory equipment | |
CN2921839Y (en) | Antistealing electric power device | |
CN206411997U (en) | Intelligent electric meter gathers O&M actual training device | |
CN112366535B (en) | Low-voltage electric energy metering device | |
CN106526314A (en) | Metering module special for charging pile | |
CN103318225B (en) | For the protection box of railway phase detecting track circuit | |
CN203332152U (en) | Protection box for railroad phase-sensitive track circuit | |
CN206327171U (en) | A kind of Portable AC charging pile for electric automobile | |
CN206057436U (en) | Without phase of line volt-ampere tester | |
CN205930326U (en) | Multi -functional electric automobile alternating -current charging system | |
CN213521403U (en) | Host device of low-voltage transformer area topology rapid identification instrument | |
CN203289167U (en) | Charger used for electric automobile | |
CN106527413A (en) | Field fault diagnosis system | |
CN103199599A (en) | Battery charger for electric vehicle | |
CN203101504U (en) | Single-phase intelligent electric energy meter | |
CN206684937U (en) | A kind of centralized meter reading terminal failure detector | |
CN204439694U (en) | A kind of optomagnetic combination electricity anti-stealing gauging table | |
CN207301202U (en) | Low-voltage distribution network circuit health status monitors device on-line | |
CN207717911U (en) | A kind of detecting fault line for un-ground neutral power system | |
CN206992687U (en) | A kind of electrical management device based on power line communication technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |