CN206409233U - A kind of underground excavating gear of colliery operation - Google Patents

A kind of underground excavating gear of colliery operation Download PDF

Info

Publication number
CN206409233U
CN206409233U CN201621427379.5U CN201621427379U CN206409233U CN 206409233 U CN206409233 U CN 206409233U CN 201621427379 U CN201621427379 U CN 201621427379U CN 206409233 U CN206409233 U CN 206409233U
Authority
CN
China
Prior art keywords
installing pipe
spade
rotation section
handler
awl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621427379.5U
Other languages
Chinese (zh)
Inventor
刘飞
赵爱华
刘佃同
崔恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xinhe Mining Co Ltd
Original Assignee
Shandong Xinhe Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xinhe Mining Co Ltd filed Critical Shandong Xinhe Mining Co Ltd
Priority to CN201621427379.5U priority Critical patent/CN206409233U/en
Application granted granted Critical
Publication of CN206409233U publication Critical patent/CN206409233U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model is related to a kind of underground excavating gear of colliery operation, including scoop, also include aid, scoop includes spade and shovel board, spade one end is provided with disposed thread, shovel board is provided with external threaded post, it is mutually coupled, and shovel board front end is provided with being obliquely installed, and its both sides is equipped with side plate, aid includes installing pipe and awl, installing pipe inner hollow, the front of installing pipe is provided with rotation section, and rotation section is provided with port, installation cavity and turn hole, installing pipe is mounted with handler provided with matching somebody with somebody in interface, installation cavity for being connected with the port that rotation section is provided with;The utility model effectively stirs loose colliery by aid, it is easy to the excavation of scoop, improves the service efficiency of colliery operation underground excavation.

Description

A kind of underground excavating gear of colliery operation
Technical field
The utility model is related to colliery instrument, more particularly to a kind of underground excavating gear of colliery operation.
Background technology
In coal mine, coal miner is in the operation process of colliery, it is necessary to complete underground excavation using colliery instrument Scoop and awl are most commonly used that in work, colliery instrument, coal ore can be excavated by scoop, excavation can be had by awl The coal ore of certain difficulty strikes pine, contributes to the excavation of scoop, plays a part of aid, however, existing colliery Scoop is mutually used separately with awl, so using the troublesome poeration for adding coal miner, meanwhile, add intricate operation Degree, and instrument carries also inconvenient.
Utility model content
The utility model can effectively stir loose coal there is provided one kind in order to solve problem of the prior art by aid Ore deposit, it is easy to the excavation of scoop, improves the underground excavating gear of the colliery operation of the service efficiency of colliery operation underground excavation.
Concrete technical scheme of the present utility model is as follows:A kind of underground excavating gear of colliery operation, including scoop, are also wrapped Aid is included, the scoop includes spade and shovel board, and described spade one end is provided with disposed thread, and the shovel board is provided with external spiral shell Line post, it is mutually coupled, and the shovel board front end is inclined to set, and its both sides is equipped with side plate, and the aid includes installing Pipe and awl, the installing pipe inner hollow, the front of the installing pipe are provided with rotation section, the rotation section provided with port, Installation cavity and turn hole, the installing pipe are provided with the interface of matching somebody with somebody being connected with the port that rotation section is provided with, and the installation cavity is interior to be installed Handler, the two ends of the handler are provided with rotating shaft, and it is inserted in the turn hole that rotation section is provided with respectively, set on the handler There is screw, the awl is arranged in installing pipe, and the awl includes tip and taper shank, and tip is located at the front end of taper shank, Arranged on the taper shank horizontal thread, the horizontal thread that the taper shank is provided with and the screw that handler is provided with are matched.
It is attached technical scheme of the present utility model below.
Preferably, the tail end of the spade is provided with handle, and clamp, the clamp have been welded in the bottom of the handle Two pieces of fixed plates and connecting plate are included, between the fixing plates, fixed plate is provided with screw, and it is distinguished by screw for the connecting plate connection It is fixed on spade.
Preferably, the two ends of the installing pipe are equipped with inserted block, and the spade is provided with and inserted block is matched inserts Mouthful, the two ends of the inserted block are equipped with inserting column, and the socket both sides are provided with intubation, and the inserting column is respectively inserted in fixed in intubation.
Technique effect of the present utility model:A kind of underground excavating gear of colliery operation of the present utility model, passes through auxiliary The setting of instrument so that the horizontal thread of handler and awl is easy to mating so that awl can be moved up and down in installation cavity, side Just auxiliary is used, and the inserted block that aid is provided with is easily installed in the intubation that socket is provided with so that the peace of aid Dress is simple, whole design, simple in construction, easy to use, loose colliery can be effectively stirred by aid, it is easy to the digging of scoop Pick, improves the service efficiency of colliery operation underground excavation.
Brief description of the drawings
Fig. 1 is a kind of decomposition texture schematic diagram of the underground excavating gear of colliery operation of the utility model embodiment.
Fig. 2 is a kind of structural representation of the underground excavating gear of colliery operation of the utility model embodiment.
Fig. 3 is the grip structure schematic diagram of the utility model embodiment.
In figure:Scoop 1, spade 2, disposed thread 21, socket 22, intubation 221, handle 4, clamping plate 41, fixed plate 411, spiral shell Hole 412, screw 413, connecting plate 414, shovel board 3, external threaded post 31, side plate 32, aid 5, installing pipe 6, with interface 61, Inserted block 62, rotation section 7, port 70, installation cavity 71, turn hole 72, awl 8, tip 81, taper shank 82, horizontal thread 83, handler 9, spiral lamination 91, rotating shaft 92.
Embodiment
Below, substantive distinguishing features of the present utility model and advantage are further described with reference to example, but this practicality is new Type is not limited to listed embodiment.
As shown in Figure 1 to Figure 3, a kind of underground excavating gear of colliery operation of the present embodiment, including scoop 1, in addition to Aid 5, the scoop 1 includes spade 2 and shovel board 3, and the tail end of the spade 2, which is provided with handle 4, the handle 4, to be installed Clamping plate 4, the clamping plate 4 includes two pieces of fixed plates 411 and connecting plate 414, the connecting plate 414 be connected to fixed plate 411 it Between, two pieces of fixed plates 411 are equipped with screw 412, and it is separately fixed on spade by screw 413, and handle is connected firmly to The tail end of spade.Described spade one end is provided with disposed thread 21 (as indicated by a broken line in fig. 1), and the shovel board 3 is provided with external threaded post 31, it is mutually coupled so that shovel board is arranged on the front end of spade, and the front end of the shovel board 5 is inclined to set, and its both sides is equipped with Side plate 32, convenient to take coal ore by shovel board shovel, side plate prevents coal ore from sliding, and the aid 5 includes installing pipe 6 and cone Son, the inner hollow of installing pipe 6, the front of the installing pipe 6 is mounted with rotation section 7, and the rotation section 7 is provided with port 70, installation cavity 71 (as indicated by the dashed lines) and turn hole 72, the installing pipe 6, which is provided with, matches somebody with somebody interface 61, and it is connected with port 70, By rotation section provided with port be welded on installing pipe be provided with interface while, and with port to be connected with interface, For the spiral lamination that is provided with handler with being connected on the horizontal thread that taper shank is provided with so that awl in installing pipe on move down Dynamic, auxiliary is used, and the awl 8 includes tip 81 and taper shank 82, and tip 81 is located on the front end of taper shank 82, the taper shank 82 and arranged Handler 9 is mounted with cloth horizontal thread 83, the installation cavity 71, the two ends of the handler 9 are provided with rotating shaft 92, and it is inserted respectively Enter in the turn hole 72 that rotation section 7 is provided with, the handler 9 is provided with screw 91, the screw that the handler is provided with 91 by port 70 and with interface 61, and matched with horizontal thread that taper shank is provided with, the spiral being provided with by rotary motion handle Screw thread causes awl to be moved up and down in installation cavity, when it is desired to be used, can rotate clockwise handler, and thus awl is to moving down It is dynamic, conversely, awl is moved up.The two ends of the installing pipe 6 are provided with inserted block 62, and the spade 2 is provided with socket 22, described to insert The both sides of block are provided with inserting column 621, and the both sides of socket 22 are provided with intubation 221, and the inserting column 621 is respectively inserted in solid in intubation 221 It is fixed, when needing to use aid, it can install so that easy for installation.
A kind of underground excavating gear of colliery operation of the present embodiment, during specifically used, coal miner is by shovel board On spade, meanwhile,, can when needing to use aid by handle by clamping plate by being threadedly secured in spade tail end The inserted block that aid is provided with is arranged on the socket that spade is provided with and is inserted in by inserting column in the intubation that socket is provided with, will Awl is inserted in installation cavity, and handler is arranged in installation cavity, and the spiral lamination mating awl being provided with by handler is provided with Horizontal thread so that awl is moved up and down in installing pipe.
A kind of underground excavating gear of colliery operation of the present utility model, passes through the setting of aid so that handler It is easy to mating with the horizontal thread of awl so that awl can be moved up and down in installation cavity, facilitate auxiliary to use, and backman Have the inserted block being provided with to be easily installed in the intubation that socket is provided with so that the installation of aid is simple, whole design, structure letter It is single, it is easy to use, loose colliery can be effectively stirred by aid, it is easy to the excavation of scoop, improve the digging of colliery operation underground The service efficiency of pick.It is pointed out that above-mentioned preferred embodiment is only explanation technical concepts and features of the present utility model, its Purpose is person skilled in the art can understand content of the present utility model and according to this implement, can not limited with this Protection domain of the present utility model.All equivalent change or modifications made according to the utility model Spirit Essence, should all cover Within protection domain of the present utility model.

Claims (3)

1. a kind of underground excavating gear of colliery operation, including scoop, it is characterised in that also including aid, the scoop Including spade and shovel board, described spade one end is provided with disposed thread, and the shovel board is provided with external threaded post, and it is mutually coupled, institute State shovel board front end to be inclined to set, its both sides is equipped with side plate, the aid includes installing pipe and awl, the installing pipe Inner hollow, the front of the installing pipe is provided with rotation section, and the rotation section is provided with port, installation cavity and turn hole, the peace Tubulature is mounted with handler, the handler provided with matching somebody with somebody in interface, the installation cavity for being connected with the port that rotation section is provided with Two ends be provided with rotating shaft, it is inserted in the turn hole that rotation section is provided with respectively, the handler be provided with screw, the awl In installing pipe, the awl includes tip and taper shank, and tip is located on the front end of taper shank, the taper shank horizontal spiral shell of arranging Line, the horizontal thread that the taper shank is provided with and the screw that handler is provided with are matched.
2. a kind of underground excavating gear of colliery operation as claimed in claim 1, it is characterised in that the tail end of the spade is set There is handle, clamp has been welded in the bottom of the handle, and the clamp includes two pieces of fixed plates and connecting plate, and the connecting plate is connected to Between fixed plate, fixed plate is provided with screw, and it is separately fixed on spade by screw.
3. a kind of underground excavating gear of colliery operation as claimed in claim 1, it is characterised in that the two ends of the installing pipe Inserted block is equipped with, the spade is provided with the socket matched with inserted block, and the two ends of the inserted block are equipped with inserting column, the socket two Side is equipped with intubation, and the inserting column is respectively inserted in fixed in intubation.
CN201621427379.5U 2016-12-23 2016-12-23 A kind of underground excavating gear of colliery operation Expired - Fee Related CN206409233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621427379.5U CN206409233U (en) 2016-12-23 2016-12-23 A kind of underground excavating gear of colliery operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621427379.5U CN206409233U (en) 2016-12-23 2016-12-23 A kind of underground excavating gear of colliery operation

Publications (1)

Publication Number Publication Date
CN206409233U true CN206409233U (en) 2017-08-15

Family

ID=59553124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621427379.5U Expired - Fee Related CN206409233U (en) 2016-12-23 2016-12-23 A kind of underground excavating gear of colliery operation

Country Status (1)

Country Link
CN (1) CN206409233U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107471161A (en) * 2017-09-07 2017-12-15 东莞市北扬工业设计有限公司 A kind of multi-functional fire-fighting shovel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107471161A (en) * 2017-09-07 2017-12-15 东莞市北扬工业设计有限公司 A kind of multi-functional fire-fighting shovel
CN107471161B (en) * 2017-09-07 2019-10-11 江苏百仕得科技有限公司 A kind of multi-functional fire-fighting shovel

Similar Documents

Publication Publication Date Title
CN207379744U (en) A kind of sampler for subterranean coal exploration
CN206409233U (en) A kind of underground excavating gear of colliery operation
CN201112589Y (en) Grounding pole
CN104343383A (en) Drilling device for earthen archaeological site
CN201460395U (en) Combined geological tent supporting rod
CN203129151U (en) Grouting head capable of drilling and grouting synchronously
CN210317185U (en) Colliery drilling rod with sample structure
CN107100618A (en) A kind of orientable novel and multifunctional earth boring auger
CN107524139B (en) A kind of assembled steel pipe concrete-pile
CN204920795U (en) Combined broaching bit for mine
CN208767588U (en) A kind of mounting device for right angle setting flexible ground body
CN107654255A (en) A kind of extraction borehole pinpoints guard aperture anti-collapse device
CN209924918U (en) A direction slip casting drill bit for horizontal slip casting rig
CN107478464A (en) Ore geological sampler
CN206477793U (en) A kind of drill bit of mining
CN204371348U (en) Special-shaped pipe jacking tunnelling machine
CN210003230U (en) Coal mine geological drilling sampling device
CN108301405B (en) The connection structure of assembled steel pipe concrete-pile and reinforced beam
CN206571499U (en) A kind of tunnel piercing away drill cuttings attachment means
CN205400767U (en) A pore -forming device that is used for stock or anchor rope of rubble soil layer
CN211221447U (en) Simple type foam brick wall hole taking device
CN104196465A (en) Connection mode of down-hole hammer and drill stem generally used in rotary drilling rig and application thereof
CN203188259U (en) Electric shovel tool
CN204782767U (en) Tunnel country rock dowelling jig utensil of preventing collapsing
CN217462032U (en) Multipurpose rotary drilling bucket for efficient and rapid pore-forming of large-diameter pile hole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20171223

CF01 Termination of patent right due to non-payment of annual fee