CN206408128U - Plant's cement pre-fabricated panel and its plant - Google Patents

Plant's cement pre-fabricated panel and its plant Download PDF

Info

Publication number
CN206408128U
CN206408128U CN201621346268.1U CN201621346268U CN206408128U CN 206408128 U CN206408128 U CN 206408128U CN 201621346268 U CN201621346268 U CN 201621346268U CN 206408128 U CN206408128 U CN 206408128U
Authority
CN
China
Prior art keywords
plate body
plant
fabricated panel
cement pre
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621346268.1U
Other languages
Chinese (zh)
Inventor
王振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CANGZHOU CITY LAND NORTH AND SOUTH FARMING AND ANIMAL HUSBANDRY MACHINERY Co Ltd
Original Assignee
CANGZHOU CITY LAND NORTH AND SOUTH FARMING AND ANIMAL HUSBANDRY MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CANGZHOU CITY LAND NORTH AND SOUTH FARMING AND ANIMAL HUSBANDRY MACHINERY Co Ltd filed Critical CANGZHOU CITY LAND NORTH AND SOUTH FARMING AND ANIMAL HUSBANDRY MACHINERY Co Ltd
Priority to CN201621346268.1U priority Critical patent/CN206408128U/en
Application granted granted Critical
Publication of CN206408128U publication Critical patent/CN206408128U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to a kind of plant's cement pre-fabricated panel, and it includes being used to be laid on the plate body below plant floor, and the cross section of the top surface of the plate body is to be provided with two longitudinally disposed water guide grooves on W shapes, the top surface of plate body.In use, the excrement and debris that are fallen above plate body are collected by plate body, then it is cleaned in time, the domatic and bottom of slope of the pouring groove of W types is easily cleaned up, can effectively prevents bacteria breed, prevent epidemic situation hidden danger, with beneficial to the remarkable advantage such as raising and management.In addition, prefabricated board of the present utility model is easy for installation, and it is module suffixation of a nonsyllabic "r" design, dismounts all very convenient.

Description

Plant's cement pre-fabricated panel and its plant
Technical field
The utility model is related to livestock breeding water mud prefabricated board technical field, more particularly to plant's cement pre-fabricated panel And its plant.
Background technology
Built up, be used for a long time using cement pre-fabricated panel more than the plant of current existing pig farm and cattle and sheep livestock Cheng Zhong, because excrement and ponding can not be discharged or clean out in time, causes the air-dispersion of plant foul smell, be unfavorable for through Often the workman's in the environment is healthy, while also easily bringing very big harm for the healthy growth of livestock.
And current cement products be used for a long time process, animal wastes can slowly intrusion cement pre-fabricated panel inside, even if Cleaned repeatedly with water, it is also difficult to remove internal excrement molecule totally, thus this bring a large amount of bacteriums micro- on prefabricated board Accumulate in fine pore, be that the healthy growth of livestock brings sufferer to endanger.
Utility model content
To solve the above problems, the utility model provide a kind of plant's cement pre-fabricated panel, formula, preparation method and Its plant, to solve the above problems.
To achieve the above object, the utility model provide the concrete prefabricated plate prescription of plant, including it is following by weight The raw material of meter:
340-383 parts of cement, 115-128 parts of miberal powders, 74-82 parts of LP blades pulvis, 184-204 parts of water, 646-715 parts of sand Son, 934-1034 parts of stones, 6.9-7.7 parts of additives;
Wherein, the LP blades pulvis is mixed by flyash and swelling agent, and wherein pressing for flyash and swelling agent weighs The proportioning of gauge is 2.5~3.5: 1.
Further, the proportioning by weight of flyash and swelling agent is 3: 1 in the LP blades pulvis.
Further, the concrete prefabricated plate prescription of the plant, including following raw material by weight:
365 parts of cement, 121 parts of miberal powders, 82 parts of LP blades pulvis, 195 parts of water, 680 parts of sands, 984 parts of stones, 7.3 parts Additive.
Further, the plant is with concrete prefabricated plate prescription, and water-cement ratio is 0.34, and the ratio of mud is 0.4, and sand coarse aggregate ratio is 0.41。
Further, the cement grade is not less than PO42.5, that is, intensity is not less than after theing cement solidifies 28 days 42.5MPa;
The flyash:FI-FII;
Miberal powder activity index >=95% of 28 days.
Further, the sand is the middle sand that modulus of fineness is 2.4-3.1.
Further, the stone includes by weight:15% 05-10 stones, 65% 10-20 stones, 20% 16-31.5 stones.
Further, the additive includes by weight:70% high efficiency water reducing agent, 10% air entraining agent and 20% Slump retaining agent;The solid content of additive is 25%-30%.
The invention also discloses a kind of preparation method of plant's cement pre-fabricated panel, it possesses including following step Suddenly:
S1. sand described in 1cm aperture sieves is used, the impurity such as grass roots, weeds, cobble in sand are screened out;
Sand is rinsed with water, was rinsed once at interval of 3-4 hours, is rinsed 5-10 times altogether, it is no longer muddy with the infiltration of sand heap Untill, soil in sand is removed completely;
Stone is rinsed with water, the dust in stone is removed;
S2. stone and sand dry standby;
S3. under 15 DEG C of -25 DEG C of states of normal temperature, weighted stone, sand was put into sandstone in 3 minutes by proportioning and stirred Device is mixed, it is pre- to stir 8-10 minutes until stirring;
S4. sand and stone feed intake stirring 8-10 minute after input cement, flyash, stirring 5-10 minutes, to four components Stir;
S5. additive and water are mixed, the two is merged using agitator stirring;
S6. after cement, flyash input sandstone agitator are stirred 10 minutes, the additive being stirred and water are put into institute State in sandstone agitator, stirring various raw material is stirred within 15 minutes, it is desirable to go out the machine slump control 80-100mm it Between, obtain the concrete of mould to be entered;
S7. the concrete stirred operating is delivered at mould, is equably laid in mold bottom, thickness reaches mould At highly 1/3rd, vibrated simultaneously using some vibrating heads, it is ensured that vibrated and finish in three minutes, it is desirable to concrete surface without Bubble emersion, stone does not sink to slurry face all, prevents shake, it is to avoid cause lamination;
Second of stone, concrete is added at mold height 2/3rds, and 0.5 meter of vibrating spear interval is vibrated, and is inserted Enter depth more than the height of mould 1/3rd, i.e., vibrating spear is inserted into below first time stone slurry face, but vibrating spear lower end is not inserted To mold bottom;
Third time stone, mould highest point is added to by concrete, and 0.5 meter of vibrating spear interval is vibrated, and insertion depth surpasses The height of mould 1/3rd is crossed, i.e., vibrating spear is inserted into below second of stone slurry face, but the lower end of vibrating spear can not insert the Below stone slurry face;
S8. after three stones, concrete surface is wiped one's face, concrete surface is covered with stuffiness film, it is to avoid skin Split phenomenon;
S9. the 4th stone is carried out after half an hour, mould is filled up with concrete, the shape handles is carried out, makes up to technology It is required that;
S10. mud jacking, troweling processing are carried out in 4-5 hours after the completion of step S6 to concrete surface;
S11. covered with airtight film, it is to avoid moisture evaporation, it is ensured that consistent inside and outside cement setting, prevent cracking; 3-5 days after concreting, the demoulding obtains finished product.
Further, steel bar framework is preset with the mould, steel bar framework is embedded in the inside concrete.
Plant disclosed in the utility model concrete prefabricated plate prescription and preparation method, using matching somebody with somebody using more uniqueness Composition and division in a proportion is designed and strict preparation process, and the prefabricated board being prepared from has following features:
1. slurry amount is high --- goes to report concrete density, any surface finish is smooth after amendment;
2. additive to be compound, can ensure simultaneously diminishing, guarantor collapse, workability it is good;
3. concrete strength standard is high, more than the 150% of design standard can reach;
4. increasing the compactness of product using swelling agent part substitution flyash, impervious effect is improved;Can effectively it reduce During use in the hole of excrement molecule immersion prefabricated board, so as to be conducive to maintaining the environmental sanitation of plant.
In addition, pre- with cement using plant made from above-mentioned formula and preparation method the invention also discloses one kind Making sheet, it includes being used to be laid on the plate body below plant floor, and the cross section of the top surface of the plate body is W shapes, plate body Two longitudinally disposed water guide grooves are provided with top surface.
Further, it is provided with the top surface of the plate body in hole for hoist, hole for hoist and is provided with threaded sleeve;Threaded sleeve Inside it is provided with the internal thread coordinated with suspender.
Further, several described holes for hoist are symmetricly set on the top surface of the plate body.
Further, the plant also includes the filling for being used to blocking and filling and leading up the hole for hoist with cement pre-fabricated panel Block, filling block is removably inserted into the hole for hoist.
Further, the bottom of the plate body sets the built-in fitting on locating slot, plant's ground to insert the locating slot It is interior, the plate body is fixed.
Further, the built-in fitting is to be arranged on the reserved steel bar below plate body.
Further, it is embedded with steel bar framework in the plate body.
A kind of plant built up using above-mentioned prefabricated board, the plate body is laid on plant ground, is laid on plate body There is the through hole being provided with floor, floor for the excrement that leaks down.
Further, the water guide on plate body in plate body packet arrangement, plate body in every group longitudinal arrangement successively, group Groove head and the tail are connected;And it is arranged in parallel between plate body group.
Further, the side of the plant is provided with the water leg connected with water guide groove.
In use, the excrement and debris that are fallen above plate body are collected by plate body, then it is cleaned in time, the pouring of W types The domatic and bottom of slope of groove is easily cleaned up, and can effectively prevent bacteria breed, prevents epidemic situation hidden danger, with beneficial to raising and pipe The remarkable advantages such as reason.In addition, prefabricated board of the present utility model is easy for installation, and it is module suffixation of a nonsyllabic "r" design, dismounts all very convenient.
Brief description of the drawings
Fig. 1 be the utility model embodiment 2 in without filling block when prefabricated plate structure schematic diagram;
Fig. 2 is Fig. 1 top view;
Fig. 3 is two prefabricated board splicing construction schematic diagrames in the utility model embodiment 2.
Embodiment
Embodiment of the present utility model is described in further detail with reference to the accompanying drawings and examples.Following examples For illustrating the utility model, but it can not be used for limiting scope of the present utility model.
, it is necessary to which explanation, unless otherwise indicated, " multiple " are meant that two or two in description of the present utility model More than individual;The instruction such as term " on ", " under ", "left", "right", " interior ", " outer ", " front end ", " rear end ", " head ", " afterbody " Orientation or position relationship are, based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplification Description, rather than indicate or imply that the device or element of meaning must have specific orientation, with specific azimuth configuration and behaviour Make, therefore it is not intended that to limitation of the present utility model.In addition, term " first ", " second ", " the 3rd " etc. are only used for description Purpose, and it is not intended that indicating or implying relative importance.
In description of the present utility model, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " peace Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary. For the ordinary skill in the art, the above-mentioned term of visual concrete condition understanding specifically containing in the utility model Justice.
Embodiment 1
The concrete prefabricated plate prescription of a kind of plant that the present embodiment is provided, including following raw material by weight:
365 parts of cement, 121 parts of miberal powders, 82 parts of LP blades pulvis, 195 parts of water, 680 parts of sands, 984 parts of stones, 7.3 parts Additive.
Wherein, LP blades pulvis is mixed by flyash and swelling agent, and wherein flyash and swelling agent is by weight Proportioning be 3: 1.
Plant is with concrete prefabricated plate prescription, and water-cement ratio is 0.34, and the ratio of mud is 0.4, and sand coarse aggregate ratio is 0.41.Cement grade It is not less than PO42.5, that is, intensity is not less than 42.5MPa after theing cement solidifies 28 days;
Flyash:FI-FII;
Miberal powder activity index >=95% of 28 days.Sand is the middle sand that modulus of fineness is 2.4-3.1.Stone is wrapped by weight Include:15% 05-10 stones, 65% 10-20 stones, 20% 16-31.5 stones.
Additive includes by weight:70% high efficiency water reducing agent, 10% air entraining agent and 20% slump retaining agent;Additive Solid content be 25%-30%.
The invention also discloses a kind of preparation method of plant's cement pre-fabricated panel, it possesses including following step Suddenly:
S1. 1cm aperture sieve sands are used, the impurity such as grass roots, weeds, cobble in sand are screened out;
Sand is rinsed with water, was rinsed once at interval of 4 hours or so, is rinsed 5-10 times altogether, is seeped water with sand heap no longer muddy Untill turbid, soil in sand is removed completely;
Stone is rinsed with water, the dust in stone is removed;
S2. stone and sand dry standby;
S3. under 15 DEG C of -25 DEG C of states of normal temperature, weighted stone, sand was put into sandstone in 3 minutes by proportioning and stirred Device is mixed, it is pre- to stir 8-10 minutes until stirring;
S4. sand and stone feed intake stirring 8-10 minute after input cement, flyash, stirring 5-10 minutes, to four components Stir;
S5. additive and water are mixed, the two is merged using agitator stirring;
S6. after cement, flyash input sandstone agitator are stirred 10 minutes, the additive being stirred and water are put into sand In stone agitator, stirring makes various raw material stir in 15 minutes, it is desirable to goes out the control of the machine slump between 80-100mm, obtains Obtain the concrete of mould to be entered;
S7. the concrete stirred operating is delivered at mould, is equably laid in mold bottom, thickness reaches mould At highly 1/3rd, vibrated simultaneously using some vibrating heads, it is ensured that vibrated and finish in three minutes, it is desirable to concrete surface without Bubble emersion, stone does not sink to slurry face all, prevents shake, it is to avoid cause lamination;
Second of stone, concrete is added at mold height 2/3rds, and 0.5 meter of vibrating spear interval is vibrated, and is inserted Enter depth more than the height of mould 1/3rd, i.e., vibrating spear is inserted into below first time stone slurry face, but vibrating spear lower end is not inserted To mold bottom;
Third time stone, mould highest point is added to by concrete, and 0.5 meter of vibrating spear interval is vibrated, and insertion depth surpasses The height of mould 1/3rd is crossed, i.e., vibrating spear is inserted into below second of stone slurry face, but the lower end of vibrating spear can not insert the Below stone slurry face;
S8. after three stones, concrete surface is wiped one's face, concrete surface is covered with stuffiness film, it is to avoid skin Split phenomenon;
S9. the 4th stone is carried out after half an hour, mould is filled up with concrete, the shape handles is carried out, makes up to technology It is required that;
S10. mud jacking, troweling processing are carried out in 4-5 hours after the completion of step S6 to concrete surface;
S11. covered with airtight film, it is to avoid moisture evaporation, it is ensured that consistent inside and outside cement setting, prevent cracking; 3-5 days after concreting, the demoulding obtains finished product.
To embody the beneficial effects of the utility model, applicant is made with reference to prefabricated using the preparation method of existing prefabricated board Plate sample, the sample is divided into as follows using two kinds of reference formulations:
The formula of reference sample 1:Binder materials rise 5%,
Cement:383 parts, miberal powder:127 parts, flyash:82 parts, water:201 parts, sand:645 parts, stone:984 parts, addition Agent:7.7 part.
The formula of reference sample 2:Binder materials declines 5%,
Cement:346 parts, miberal powder:116 parts, flyash:74 parts, water:182 parts, sand:720 parts, stone:984 parts, addition Agent:7.0 part.
20 parts of prefabricated board samples are made using the utility model formula and preparation method simultaneously, to the hardness of 20 parts of prefabricated boards Measured value such as following table:
Meanwhile, the slump of 20 groups of prefabricated samples of the utility model formula and preparation method is 100-150mm;Edge without Moisture overflows, and water-retaining property is excellent;Sandstone is evenly distributed, and workability is protruded;Slurry is full simultaneously.
The pre- of prior art is significantly better than in terms of intensity, the slump, water-retaining property, workability and slurry turgor Panel.
In addition, in the experiment plant that will be made using the utility model prefabricated board, under the conditions of same maintenance, this reality With the bacterial content index of the new plant built up, relatively existing plant have dropped 70-90%.
Embodiment 2
Disclose a kind of using plant's cement pre-fabricated panel made from above-mentioned formula and preparation method in the present embodiment.
As Figure 1-3, plant's cement pre-fabricated panel includes being used to be laid on the plate body 1 below plant floor, plate The cross section of the top surface of body 1 is to be provided with two longitudinally disposed water guide groove 1a on W shapes, the top surface of plate body 1.
It is provided with the top surface of plate body 1 in hole for hoist 3, hole for hoist 3 and is provided with threaded sleeve 4;It is provided with threaded sleeve 4 The internal thread coordinated with suspender.
Several holes for hoist 3 are symmetricly set on the top surface of plate body 1.
Plant also includes the filling block 5 for being used to blocking and filling and leading up hole for hoist 3 with cement pre-fabricated panel, and filling block 5 is detachable Ground is inserted into hole for hoist 3.
The bottom of plate body 1 is set in the built-in fitting insertion locating slot 2 on locating slot 2, plant's ground, and plate body 1 is fixed Firmly.
Built-in fitting is the reserved steel bar for being arranged on the lower section of plate body 1.
Steel bar framework is embedded with plate body 1.
The invention also discloses a kind of plant built up using above-mentioned prefabricated board, plate body 1 is laid on farming site On face, the through hole being provided with floor, floor for the excrement that leaks down is equipped with plate body 1.
The packet arrangement of plate body 1, as shown in figure 3, the water guide on plate body 1 in plate body 1 in every group longitudinal arrangement successively, group Groove 1a head and the tail are connected;And it is arranged in parallel between 1 group of plate body.
The side of plant is provided with the water leg connected with water guide groove 1a.
In use, the excrement and debris that are fallen from the top of plate body 1 are collected by plate body 1, then it is cleaned in time, W types fall The domatic and bottom of slope of water groove is easily cleaned up, and can effectively prevent bacteria breed, prevents epidemic situation hidden danger, with beneficial to raising and The remarkable advantages such as management.In addition, prefabricated board of the present utility model is easy for installation, and it is module suffixation of a nonsyllabic "r" design, dismounts all very square Just.
Embodiment of the present utility model in order to example and description for the sake of and provide, and be not exhaustively or will The utility model is limited to disclosed form.Many modifications and variations are aobvious and easy for the ordinary skill in the art See.Selection and description embodiment are, in order to more preferably illustrate principle of the present utility model and practical application, and to make this area Those of ordinary skill is it will be appreciated that the utility model is so as to design the various embodiments with various modifications suitable for special-purpose.

Claims (9)

1. a kind of plant's cement pre-fabricated panel, it is characterised in that it includes being used to be laid on the plate body below plant floor, The cross section of the top surface of the plate body is to be provided with two longitudinally disposed water guide grooves on W shapes, the top surface of plate body;
It is provided with the top surface of the plate body in hole for hoist, hole for hoist and is provided with threaded sleeve;It is provided with and hangs in threaded sleeve Has the internal thread coordinated.
2. plant's cement pre-fabricated panel according to claim 1, it is characterised in that several described holes for hoist are symmetrically set Put on the top surface of the plate body.
3. plant's cement pre-fabricated panel according to claim 1, it is characterised in that plant's cement pre-fabricated panel Also include the filling block for being used to blocking and filling and leading up the hole for hoist, filling block is removably inserted into the hole for hoist.
4. plant's cement pre-fabricated panel according to claim 1, it is characterised in that the bottom of the plate body sets positioning Built-in fitting on groove, plant's ground is inserted in the locating slot, and the plate body is fixed.
5. plant's cement pre-fabricated panel according to claim 4, it is characterised in that the built-in fitting is to be arranged on plate body The reserved steel bar of lower section.
6. plant's cement pre-fabricated panel according to claim 1, it is characterised in that be embedded with reinforcing steel bar frame in the plate body Frame.
7. the plant that the plant described in a kind of any one of claim 1-6 is built up with cement pre-fabricated panel, it is characterised in that institute State plate body to be laid on plant ground, the through hole being provided with floor, floor for the excrement that leaks down is equipped with plate body.
8. plant according to claim 7, it is characterised in that the plate body packet is arranged, and the plate body in every group is successively Water guide groove head and the tail on plate body in longitudinal arrangement, group are connected;And it is arranged in parallel between plate body group.
9. plant according to claim 8, it is characterised in that the side of the plant is provided with to be connected with water guide groove Logical water leg.
CN201621346268.1U 2016-12-07 2016-12-07 Plant's cement pre-fabricated panel and its plant Expired - Fee Related CN206408128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621346268.1U CN206408128U (en) 2016-12-07 2016-12-07 Plant's cement pre-fabricated panel and its plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621346268.1U CN206408128U (en) 2016-12-07 2016-12-07 Plant's cement pre-fabricated panel and its plant

Publications (1)

Publication Number Publication Date
CN206408128U true CN206408128U (en) 2017-08-15

Family

ID=59549773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621346268.1U Expired - Fee Related CN206408128U (en) 2016-12-07 2016-12-07 Plant's cement pre-fabricated panel and its plant

Country Status (1)

Country Link
CN (1) CN206408128U (en)

Similar Documents

Publication Publication Date Title
CN106747087A (en) Plant concrete prefabricated plate prescription and preparation method
DE112016005031T5 (en) A dry construction composition which is wet sprayable by means of a screw pump and which contains a binder and a filler from a biological source and the preparation and uses of such a composition
DE112017005550T5 (en) A dry building material composition sprayable by wet way by means of a screw pump and comprising a binder and a bio-based filler - preparation and applications of such a composition
EP2154117A1 (en) Material or dry blend with vegetable aggregate
CN110041027A (en) A kind of clear-water concrete material and preparation method
KR101180304B1 (en) Composition for structure rooting plants on their surface by having permeation and a method for manufacturing the structure using thereof
CN206408128U (en) Plant's cement pre-fabricated panel and its plant
CN213971852U (en) Automatic concrete batching device
Ramonu et al. Compressive strength analysis of conventional design concrete mix ratio; 1: 2: 4 and non-conventional concrete mix ratio; 1: 3: 3 for the construction industry in Nigeria
EP2028170B1 (en) Method for making light-weight concrete
CN108264286A (en) A kind of preparation method of loam wall
US20110094421A1 (en) Dry Application Papercrete
Elango et al. Properties of PPC binder pervious concrete
JPH0366274B2 (en)
US10150705B2 (en) Dry application papercrete
CN209649122U (en) A kind of precast concrete wall panel raw material blending device
CN216181611U (en) Automatic preservative adding device for concrete production
US9475731B2 (en) Dry application papercrete
CN207415703U (en) A kind of anti-excessive device of additive
JP4411159B2 (en) Porous concrete molded body using shell, porous concrete block for seawall and porous concrete block for artificial reef
CN210645944U (en) Quantitative mixing device for concrete additive
CN109571760A (en) A kind of preparation method of fast hardening concrete for building
CN210342701U (en) Construction concrete supporting device
CN115354674B (en) Ecological slope structure and slope protection method thereof
CN210964991U (en) Building site construction is with polycarboxylate water reducing agent's material device of throwing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20191207

CF01 Termination of patent right due to non-payment of annual fee