CN206399193U - A kind of central cooler sub-controlling unit - Google Patents

A kind of central cooler sub-controlling unit Download PDF

Info

Publication number
CN206399193U
CN206399193U CN201720019041.4U CN201720019041U CN206399193U CN 206399193 U CN206399193 U CN 206399193U CN 201720019041 U CN201720019041 U CN 201720019041U CN 206399193 U CN206399193 U CN 206399193U
Authority
CN
China
Prior art keywords
central cooler
central
cooler
high temperature
temperature resistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720019041.4U
Other languages
Chinese (zh)
Inventor
潘龙
寿宏飚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201720019041.4U priority Critical patent/CN206399193U/en
Application granted granted Critical
Publication of CN206399193U publication Critical patent/CN206399193U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of central cooler sub-controlling unit, belongs to metallurgical industry observation and control technology field;Including:High-temp. object-position scanner, central cooler speed detector, data acquisition unit and central controller;Central controller is used to calculate control interval, and in process of production, calculate by the material block product below sintering machine material thickness detector with, by the material block volume ratio below high temperature resistant thing bit scan instrument, joint debugging proportional jitter signal being sent to plantwide control system according to volume ratio and control interval relation in same time after the t1 times;The feedover condition that the utility model is adjusted according to actual material as air-cooler air output, in time compensation improves control quality because of demand of the cooling inventory change to cooling air quantity;Sintering machine central cooler speed joint debugging ratio offer amendment foundation is turned to the change of circular cooler trolley upper volume on sintering pallet by contrasting material.

Description

A kind of central cooler sub-controlling unit
Technical field
The utility model belongs to metallurgical industry observation and control technology field, and in particular to a kind of central cooler sub-controlling unit.
Background technology
In sintering production process, batch sinters blocking on sintering pallet, and fritter is broken into through single roll crusher Drop on circular cooler trolley, in the process, the heap ratio of material is changed.The cooling of material is main on circular cooler trolley It is constantly to convey ozone to the material on circular cooler trolley to reach air-cooled effect by each section of air-cooler, central cooler Cooling effect influence factor is a lot, mainly there is central cooler feeding coal, central cooler feed temperature, air-cooler air output, central cooler speed Degree etc..General, according to whole technique productions situation, central cooler speed is interlocked with sintering machine speed above, i.e., with burning Knot production capacity matches, and the guarantee of cooling effect is substantially by adjusting air-cooler air output to realize.Cool down wind The regulation of machine air output is substantially the larger regulation of extensive, related to temperature time delay.
Sintering machine central cooler speed joint debugging relies primarily on theoretical calculation and does ratio joint debugging, it is impossible to carried out for doses change real Adjustment is applied, because travel time of the material on sintering pallet is very long, this control mode inventory on central cooler does not have also Begin to adjust central cooler speed when changing, occur over control, unnecessary disturbance is brought down to frequency to central cooler control Numerous operation air door, increases unnecessary workload.
Utility model content
The deficiency existed for above-mentioned prior art, the utility model provides a kind of central cooler sub-controlling unit.
The technical solution of the utility model:
A kind of central cooler sub-controlling unit, including:
High temperature resistant thing bit scan instrument, central cooler speed detector and central cooler pilot controller;The central cooler auxiliary Controller includes:Data acquisition unit and central controller;
The high temperature resistant thing bit scan instrument is arranged on the top of circular cooler trolley, central cooler speed detector by support On central cooler gearing friction plate;The output end of the high temperature resistant thing bit scan instrument and central cooler speed detector it is defeated Go out end and central controller input, central controller connection plantwide control system are connected by data acquisition unit respectively.
The height of the high temperature resistant thing bit scan instrument enables the scanning range of high temperature resistant thing bit scan instrument to cover whole ring Cold machine trolley.
Beneficial effect:A kind of central cooler sub-controlling unit of the present utility model compared with prior art, with following excellent Gesture:
(1) feedover condition adjusted according to actual material as air-cooler air output, in time compensation becomes because of cooling inventory Change the demand to cooling air quantity, improve control quality, reduce dynamic deviation, the feedback control of combination temperature detection ensures that ring is cold The operational effect of machine;
(2) sintering machine-central cooler is turned to the change of circular cooler trolley upper volume by contrasting material on sintering pallet Speed joint debugging ratio provides amendment foundation;By the detection of volume of material, one is provided rationally reliably for cooling blower air output Feedover condition, improve control efficiency and precision, make the cooling of central cooler more efficient.
Brief description of the drawings
A kind of a kind of central cooler sub-controlling unit structural representation of embodiment of Fig. 1 the utility model;
A kind of top view of the central cooler of embodiment of Fig. 2 the utility model;
A kind of sectional view of the central cooler of embodiment of Fig. 3 the utility model;
A kind of top view of the sintering machine of embodiment of Fig. 4 the utility model;
A kind of sectional view of the sintering machine of embodiment of Fig. 5 the utility model;
In figure:1- high temperature resistant thing bit scan instrument, 2- central cooler speed detectors, 3- central cooler pilot controllers, 4- rings Cold machine trolley, 5- material thickness detecting device for sintering platform trolley, 6- sintering pallets, 7- supports;
A kind of a kind of central cooler auxiliary control method flow chart of embodiment of Fig. 6 the utility model.
Embodiment
A kind of embodiment of the present utility model is elaborated below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of central cooler sub-controlling unit of present embodiment, including:
High temperature resistant thing bit scan instrument, central cooler speed detector and central cooler pilot controller;The central cooler auxiliary Controller includes:Data acquisition unit and central controller;
The high temperature resistant thing bit scan instrument output end and central cooler speed detector output end pass through data acquisition respectively Unit connects central controller, and central controller is connected with plantwide control system.
As Figure 2-3, the high temperature resistant thing bit scan instrument 1 is arranged on the top of circular cooler trolley 4 by support 7, its Scanning range is highly set to cover whole circular cooler trolley, shape and height for detecting solid accumulation;Central cooler is aided in Controller 3 is placed near circular cooler trolley.Central cooler speed detector 2 is arranged on central cooler gearing friction plate.
As illustrated in figures 4-5, material thickness detecting device for sintering platform trolley 5 is installed on above the sintering car of board 6, for detecting sintering Expect thick in machine trolley, and be sent to plantwide control system.
The high temperature resistant thing bit scan instrument uses model APM-3D level meter;The central cooler speed detector makes With Patent No. ZL 2013.2.053698.8 speed detector, patent application day is on 08 22nd, 2013;Data are adopted It is that I/O units use IBIL24AI4-PAC to collect unit;Central controller uses ILC470ETH1TX.
As shown in fig. 6, using the central cooler auxiliary control method of central cooler sub-controlling unit, comprising the following steps:
Step 1:Parameter preset is set in the central controller, and the parameter preset includes:Sintering pallet structure, sintering Machine trolley size, circular cooler trolley structure, circular cooler trolley size;
Step 2:It is high that high temperature resistant thing bit scan instrument and central cooler speed detector gather charge level in central cooler in real time respectively Shape and central cooler speed are spent, and central controller is sent to by data acquisition unit;
Step 3:Central controller receives charge level height form and central cooler speed in central cooler;
Step 4:Central controller receives the sintering pallet material thickness and sintering machine speed that plantwide control system is sent;
Step 5:In the case that production stabilization is raw material proportioning and Sintering Yield keeps constant, central controller is calculated Sintering pallet and circular cooler trolley material block volume ratio K, and control interval K ± 5% is obtained according to this:
Step 5-1:Central controller according to sintering pallet structure, sintering pallet size, sintering pallet material it is thick with And sintering machine speed v1 is calculated in the t times by the material block product V1 below sintering machine material thickness detector;It is simultaneously cold according to ring Board bassinet structure, central cooler size, charge level height form and central cooler speed v2, which are calculated, passes through the resistance to height of central cooler in the t times Material block product V2 below warm thing bit scan instrument;Wherein, the t times are according to the default time parameter of operating mode;In present embodiment, In the case where producing stabilization, the nominal time is that t is 1 hour, terminates automatically after the completion of demarcation, switches into occurrence state.
Step 5-2:Central controller repeats step 5-1, obtains multigroup V1 and V2, and calculates V1 and V2 ratio respectively Value, obtains multiple K*=V1/V2;
Step 5-3:Central controller calculates multiple K* average value K, and is stored K ± 5% as control interval.
Step 6:Central controller is according to sintering machine speed v1 material blocks identical with central cooler speed v2 calculating from sintering machine material The delay time t1 below high temperature resistant thing bit scan instrument is sent to below thickness detector;
Step 7:In production process, central controller is according to sintering pallet structure, sintering pallet size, sintering board Car material is thick and sintering machine speed v1 is calculated in the t ' times by the material block product below sintering machine material thickness detector in real time After V1 ', the t1 time, central cooler pilot controller is according to circular cooler trolley structure, central cooler size, charge level height form and ring Cold speed v2 is calculated in the t ' times by the material block product V2 ' below high temperature resistant thing bit scan instrument in real time;
Step 8:Whether central controller calculates V1 '/V2 ', and judge V1 '/V2 ' at control interval [K-5%, K+5%] It is interior, it is to perform step 10, otherwise, sends joint debugging proportional jitter signal to plantwide control system, and perform step 9;
Step 9:Plantwide control system is adjusted according to joint debugging proportional jitter signal to central cooler speed v2:When V1 '/ During V2 ' > K+5%, plantwide control system progressively reduces central cooler speed v2 according to joint debugging proportional jitter signal, makes sintering machine-ring Cold joint debugging scaling signal S increases;As V1 '/V2 ' < K-5%, plantwide control system progressively increases according to joint debugging proportional jitter signal Plus central cooler speed v2, reduce sintering machine-central cooler joint debugging scaling signal S;The S=v1/v2.
Step 10:V2 ' is sent to plantwide control system by central controller, and plantwide control system is according to V2 ' and cooling wind Seat in the plane is put adjusts each air-cooler air output in real time.

Claims (3)

1. a kind of central cooler sub-controlling unit, it is characterised in that including:
High temperature resistant thing bit scan instrument, central cooler speed detector and central cooler pilot controller;
The high temperature resistant thing bit scan instrument is arranged on the top of circular cooler trolley by support, and central cooler speed detector is installed On central cooler gearing friction plate;High temperature resistant thing bit scan instrument output end and central cooler speed detector the output end difference Central cooler pilot controller is connected, central cooler pilot controller is connected with plantwide control system.
2. central cooler sub-controlling unit according to claim 1, it is characterised in that the high temperature resistant thing bit scan instrument The scanning range of high temperature resistant thing bit scan instrument is highly set to cover whole circular cooler trolley.
3. central cooler sub-controlling unit according to claim 1, it is characterised in that the central cooler pilot controller bag Include:Data acquisition unit and central controller;The output end and central cooler speed detector of the high temperature resistant thing bit scan instrument Output end respectively pass through data acquisition unit connect central controller, central controller connection plantwide control system.
CN201720019041.4U 2017-01-09 2017-01-09 A kind of central cooler sub-controlling unit Active CN206399193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720019041.4U CN206399193U (en) 2017-01-09 2017-01-09 A kind of central cooler sub-controlling unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720019041.4U CN206399193U (en) 2017-01-09 2017-01-09 A kind of central cooler sub-controlling unit

Publications (1)

Publication Number Publication Date
CN206399193U true CN206399193U (en) 2017-08-11

Family

ID=59512470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720019041.4U Active CN206399193U (en) 2017-01-09 2017-01-09 A kind of central cooler sub-controlling unit

Country Status (1)

Country Link
CN (1) CN206399193U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106705672A (en) * 2017-01-09 2017-05-24 中冶北方(大连)工程技术有限公司 Auxiliary control device and method for ring cold machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106705672A (en) * 2017-01-09 2017-05-24 中冶北方(大连)工程技术有限公司 Auxiliary control device and method for ring cold machine
CN106705672B (en) * 2017-01-09 2022-10-28 中冶北方(大连)工程技术有限公司 Auxiliary control device and method for circular cooler

Similar Documents

Publication Publication Date Title
CN103028480B (en) Intelligent control system for vertical mill based on fuzzy PID (proportion integration differentiation) algorithm
CN111701698B (en) Cement mill system and automatic optimization control system and method thereof
CN103876277B (en) A kind of control device of mass flow and method
CN106077553B (en) Weighing method is determined in continuous casting steel billet weight intelligent control diced system and continuous casting steel billet cutting
CN104384009B (en) A kind of cement combination grinding forecast Control Algorithm controlled based on Bang Bang
CN103787052B (en) A kind of even feeding device and even method of feeding thereof
CN206399193U (en) A kind of central cooler sub-controlling unit
CN102241087A (en) System for producing rubber powder and its operation method
CN104441209A (en) Automatic water distribution system for brick manufacturing device
CN104407573B (en) A kind of automatic control system and method suitable for closed circuit cement combination grinding
CN109357539A (en) Novel intelligent cement sinter leaching control system
CN203473864U (en) Distributing bin automatic switching device for sintering production
CN205708618U (en) A kind of feeder controls device
CN111443597A (en) Device and method for controlling granularity of vertical mill mineral powder
CN106017636A (en) Calcium carbide raw material accurate batching control system and method
CN109634104A (en) The intelligent optimal control device and its control method of cement raw mix proportioning process
CN204388581U (en) A kind of quantitative feed system of dry method cement rotary kiln raw material of improvement
CN106705672A (en) Auxiliary control device and method for ring cold machine
CN113262871A (en) Intelligent control method for balanced crushing of fine crushing workshop in machine-made gravel
CN104786347A (en) Compact type control system for vacuum brick extruding machine
CN202766420U (en) Automatic control system for gas-burning lime shaft kiln production process
CN111169941A (en) Quantitative pipe flow control method based on different material height conversion rates
CN113102088B (en) Full-automatic autonomous centralized control device and method for large-scale blast furnace pulverizing system
CN1154749C (en) System for controlling cooling of agglomerate
JPH11253832A (en) Controller for pulverizer