CN206397432U - A kind of vertical rock is bored - Google Patents
A kind of vertical rock is bored Download PDFInfo
- Publication number
- CN206397432U CN206397432U CN201720000892.4U CN201720000892U CN206397432U CN 206397432 U CN206397432 U CN 206397432U CN 201720000892 U CN201720000892 U CN 201720000892U CN 206397432 U CN206397432 U CN 206397432U
- Authority
- CN
- China
- Prior art keywords
- drill bit
- piston body
- ratchet
- swingle
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model is related to a kind of vertical rock and bored, include the shell body of a tubular structure, shell body front end sets joint after front connector, rear end setting, air inlet is set on joint afterwards, drill bit mounting hole is provided with front connector, gas circuit switching mechanism, air rammer mechanism and drill bit are set gradually in the shell body between rear joint and front connector;When the work air rammer mechanism cock body of air rammer mechanism travels forward, piston body leading section does impulsive motion to drill bit, when piston body is moved backward, and the swivel nut being embedded in piston body drives swingle and connecting rod one-directional rotation, and then drives bit.The utility model can with spontaneous rotation, its mobility is high, the consumption energy is low, operating efficiency is high, produce that dust is few, can need not keep an eye on operation.
Description
Technical field
The utility model belongs to construction technology in geotechnical engineering field, and in particular to a kind of vertical rock is bored.
Background technology
Rock drilling machinery, is the professional work that the current country is widely used for engineering the drilling construction and mine quarrying slab quarrying stone
Tool.Its Drilling on rock stratum goes out borehole, goes to blow rock to be put into explosive, so as to complete quarrying stone or other cubic meter of stone works
Journey.Conventional rock drilling machinery includes following several classes at present:
(One), rock drill:Such a machinery is that, using bit shank strike, drill bit must be through drill steel from pricker to the strike work(of rock surface
Tail is transferred to acting position-bore bit or drill bit, with the intensification of drilling, and the growth strike work(of drill steel can be by the elastic shape of drill steel
Change is absorbed, and causes a large amount of losses for hitting work(, in addition, the exhaust mode that it is used is exhaust outside hole, that is after acting
Waste gas discharged outside hole, the waste gas of discharge still has larger compression potential energy, and this has resulted in the wave of mechanism energy itself
Take, outside the air-flow blowout hole that the aggregate chips produced by strike must be through drill steel centre bore, the center bore of general drill steel is Ф 8, this
Aperture is after drill steel length is more than 3 meters, and vapour lock increase causes not smooth, deslagging poor effect, it is impossible to effectively slag tap of ventilating, because
The Puncturing Limit depth of this rock drill is 3-5 meters.
(Two), mountain region bore:Mountain region drilling tool has faster cutting rate and preferable rock drilling effect, and industry construction can be done in the wild
When it has unavoidable defect, be mainly reflected in the following aspects:1. unit volume is big, equipment overall weight is big(300-
1000kg), therefore it is excessively poor in the complicated landform mobility such as mountain area, jungle, abrupt slope, workman takes in handling process, effort, danger
Dangerous coefficient is high, easily occurs personal injury;2. equipment needs to install support frame in work process(Pylon)Or vehicle frame is determined
Industry is done in position, and construction is laborious compared with complicated and time consumption, due to needing larger work top, substantially can not in forest zone and steep hills
Construction, can not even reach in more specifically shaped area and do industry point;3. because bit needs the extra rotation of offer to move
The device of power, the usually rotary motor mutually independent with gas impact machine or hydraulic gyration mechanism, therefore the overall energy of equipment disappears
Consumption is high, and recruitment quantity is big(The people of standard configuration 6);
Also it can independently realize that impact rotating, the scale of construction are small and applicable without extra support, rig without a on the market at present
In the full-automatic rock drilling machinery of complicated landform.
The content of the invention
The purpose of this utility model is to provide a kind of full automatic vertical rock and bored, and solving rock drilling machinery in the prior art can not be certainly
Tuorbillion turns, mobility is poor, the consumption energy height, inefficiency, produce dust greatly, many people of needs are the problems such as keep an eye on operation.
In order to solve the above problems, the technical solution of the utility model is:
A kind of vertical rock is bored, and includes the shell body of a tubular structure, and shell body front end sets front connector, rear end to set and be followed by
Set on head, rear joint and drill bit mounting hole is provided with air inlet, front connector, in the shell body between rear joint and front connector
Set gradually gas circuit switching mechanism, air rammer mechanism and drill bit, described gas circuit switching mechanism include non-return valve, spring base,
Valve block and gas path distributor;Described non-return valve is arranged in the air inlet of rear joint;It is provided with described spring base with after
Multiple longitudinal through holes of joint air admission hole connection, the front end face center of spring base, which is provided with a shrinkage pool, shrinkage pool, to be set
Spring is put, spring forward extends out spring base and is embedded in described non-return valve;The front end face of the spring base presses gas circuit point
Orchestration, is provided with multiple clear openings and half-via on gas path distributor, and the valve block is arranged on spring base and gas path distributor
Between;
Described air rammer mechanism includes cylinder, ratchet and pawl arrangement, piston body, swingle and connecting rod;Cylinder is set
Put in shell body, air gap is left between cylinder and shell body;Air gap is connected with the half-via of gas path distributor, air gap and cylinder
Preceding air cavity connection;The rear air cavity of cylinder is connected with the half-via of gas path distributor;Described ratchet and pawl arrangement includes ratchet
And ratchet, ratchet is fixedly installed in shell body, between gas path distributor and cylinder rear port;Described swingle is arranged on gas
Cylinder cental axial position, the rear end of swingle is rigidly connected ratchet, and ratchet is arranged in described ratchet and coordinated with ratchet;Rotation
The stage casing of bar, which is provided with screw thread, described piston body, is embedded swivel nut, and piston body is set on swingle and therewith by swivel nut
Screw thread coordinates;The rear end of connecting rod described in the front end connection of swingle, the front end of connecting rod is connected with described drill bit, drill bit
In the drill bit mounting hole of front connector.
When piston body travels forward, piston body leading section does impulsive motion, when piston body is moved backward, piston body to drill bit
The swivel nut being inside embedded drives swingle and connecting rod one-directional rotation, and then drives bit, ratchet and pawl arrangement control drill bit
Unidirectional positioning and accurate indexing.
Described piston body is dual segment structure, including leading portion and back segment, leading portion diameter are less than back segment diameter;In front connector and
Guide sleeve is provided with shell body between cylinder, piston body leading portion is moveable in guide sleeve, is provided with guide sleeve discouraged
Hole, bleeder port is connected with described air gap.
Described drill bit, connecting rod, the longitudinal central aperture that connection is respectively provided with swingle, longitudinal central aperture are distributed with gas circuit
The clear opening connection of device.
The swingle back segment is provided with limited block, and the stroke range of piston body is between limited block and guide sleeve.
Described chisel edge carbide inserts tooth.
The beneficial effects of the utility model:
1. save the energy:Air rammer mechanism of the present utility model is alternately changed using air pressure, can drive drill bit impact
Acting, also drives bit using the backhaul of piston body, without additional independent rotary system compared with mountain region is bored, therefore
Save about 2/3rds the energy;
2. full landform operation and without extra support:Vertical rock of the present utility model is bored compared with existing rock drilling machinery, structure
Greatly simplify, can be worked without support frame, alleviate the labor intensity of workman, enhance the mobility of equipment, main screw lift
Only 25 kilograms, industry is done in the punching for being particularly suitable for use in the extremely complex landform of the landform such as field mountain area, jungle, abrupt slope;
3. perforating efficiency is high:Vertical rock of the present utility model bore compare with rock drill of the prior art more efficient, economy,
Pore-forming is deeper, and it uses piston directly to hit acting position(That is drill bit)Mode, it is to avoid single hits the loss of work(, uses
The mode of bottom hole exhaust, is removed the gred, perforating efficiency is higher, blow speed using the still waste gas with certain potential energy after strike acting
It is 2 times of rock drill;In addition, this equipment is bored in the interval achievable people's multimachine series connection operation simultaneously of a punching with respect to mountain region
Can only unit punching do industry effect speed and can lift several times;
4. environment protection health:The structure design that the utility model founds rock brill makes it be participated in operation process without workman, only
Need observation in sighting distance;The health hazard of noise, dust to workman can so have been subtracted less significantly.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
In figure, 1- shell bodies, 2- front connectors, joint after 3-, 4- non-return valves, 5- spring bases, 6- valve blocks, the distribution of 7- gas circuits
Device, 8- cylinders, 9- ratchet and pawl arrangements, 10- swivel nuts, 11- piston bodies, 12- swingles, 13- connecting rods, 14- air gaps, 15- is bored
Head, 16- guide sleeves, 17- limited blocks, 18- hard-metal inserts, 19- springs.
Embodiment
The utility model is further detailed below in conjunction with the accompanying drawings, a kind of vertical rock shown in Figure 1 is bored, bag
The shell body 1 of a tubular structure is included, the front end of shell body 1 sets and set on joint 3 after front connector 2, rear end setting, rear joint 3
Drill bit mounting hole is provided with air inlet, front connector 2, gas is set gradually in the shell body 1 between rear joint 3 and front connector 2
Road switching mechanism, air rammer mechanism and drill bit 15,
Described gas circuit switching mechanism includes non-return valve 4, spring base 5, valve block 6 and gas path distributor 7;Described non-return valve
4 are arranged in the air inlet of rear joint 3;When air inlet starts, air pressure pushes non-return valve 4 open in working condition, realizes air inlet, if
It is standby to start working;When interrupting air inlet, non-return valve 4 resets, and realizes that equipment is died, equipment is stopped;Set on described spring base 5
The through hole of 6 longitudinal directions connected with the rear air admission hole of joint 3 is equipped with, responsible gas is descending, and the front end face centre bit of spring base 5 is installed
It is equipped with a shrinkage pool, shrinkage pool and spring 19 is set, spring 19 forward extends out spring base 5 and is embedded in described non-return valve 4, bullet
Spring abutment 5 is responsible for opening and the reset of non-return valve 4;The front end face of the spring base 5 presses gas path distributor 7, in gas path distributor 7
On be provided with multiple clear openings and half-via, the valve block 6 is arranged between spring base 5 and gas path distributor 7, and valve block 6 can be past
Air cavity before multiple upset is realized(The air cavity formed between piston body 11 and the leading portion of cylinder 8)With rear air cavity(After piston body 11 and cylinder 8
The air cavity formed between section)Switching;
Described air rammer mechanism includes cylinder 8, ratchet and pawl arrangement 9, swivel nut 10, piston body 11, swingle 12, led
To set 16 and connecting rod 13;Cylinder 8 is arranged in shell body 1, and air gap 14 is left between cylinder 8 and shell body 1;Air gap 14 and gas
The half-via connection of distributor 7, air gap 14 is connected with the leading portion of cylinder 8;The rear port of cylinder 8 and the half of gas path distributor 7
Through hole is connected;Described ratchet and pawl arrangement 9 includes ratchet and pawl, and ratchet and pawl arrangement 9 coordinates the reciprocal fortune of swingle 12
It is dynamic to realize unidirectional positioning and accurate indexing;Ratchet is fixedly installed in shell body 1, gas path distributor 7 and the rear port of cylinder 8 it
Between;Described swingle 12 is arranged on the cental axial position of cylinder 8, and the rear end of swingle 12 is rigidly connected ratchet, and ratchet is arranged on
Coordinate in described ratchet and with ratchet;The stage casing of swingle 12 is provided with screw thread, and swivel nut 10, piston are embedded in piston body 11
Body 11 is set on swingle 12 by swivel nut 10 and screw thread coordinates therewith;After the front end connection connecting rod 13 of swingle 12
End, the front end of connecting rod 13 is connected with described drill bit 15, and drill bit 15 is arranged in the drill bit mounting hole of front connector 2.
Described piston body 11 is dual segment structure, including leading portion and back segment, leading portion diameter are less than back segment diameter;In front connector
2 and cylinder 8 between shell body 1 in be provided with guide sleeve 16, guide sleeve 16, which is primarily served, is held one's breath to cylinder 8 and to work
The effect that cock body 11 is oriented to;The leading portion of piston body 11 is moveable in guide sleeve 16, is provided with bleeder port on guide sleeve 16, is let out
Stomata is connected with described air gap 14.
Described drill bit 15, connecting rod 13, the longitudinal central aperture that connection is respectively provided with swingle 12, longitudinal central aperture and gas
The clear opening connection of distributor 7.
The back segment of swingle 12 is provided with limited block 17, and the stroke range of piston body 11 is in limited block 17 and guide sleeve 16
Between.
The described front end carbide inserts tooth of drill bit 15.
Use process of the present utility model is described below:
Gas is entered by the air inlet of rear joint 3, is pushed open after non-return valve 4 by the through hole of 6 longitudinal directions on spring base 5
After continue traveling downwardly, when by gas path distributor 7 when gas be divided into three tunnels:Gas passes through spring base 5, gas path distributor respectively all the way
7th, swingle 12, connecting rod 13, the centre bore of drill bit 15 realize that bottom hole blows slag through to bottom hole, make outside rock slag tap;Separately
Gas enters the rear air cavity that piston body 11 is constituted with the back segment of cylinder 8 by the half-via of gas path distributor 7 all the way, with air inflow
Increase after air cavity pressure continue to increase, promote piston body 11 descending, the small end of piston body 11 enters guide sleeve 16 and closes guiding
The gas circuit closing of the bleeder port of set 16, at this moment preceding air cavity;Before 3rd road gas is entered by the air gap 14 of cylinder 8 and shell body 1
Air cavity, at this moment the bleeder port of preceding air cavity is in closed state, and with the air inflow increase of preceding air cavity, its air pressure also increases therewith
Plus, when the air pressure of current air cavity is more than rear air cavity, by the upward jack-up of piston body 11, now it is positioned on gas path distributor 7 valve
Piece 6 is opened by top, rear air cavity pressure release, and piston body 11 accelerates to run up, and the drawback movement of piston body 11 is realized, when piston body 11 connects
When closely running to rear air cavity top, the small end of piston body 11 departs from guide sleeve 16, and preceding air cavity opens exhaust, and preceding air cavity pressure release causes valve
Piece 6 switches, air cavity after connection, and gas constantly enters rear air cavity by the half-via of gas path distributor 7, when after air cavity pressure it is big
When preceding air cavity, the downward acceleration of piston body 11 realizes stroke movement until final strike drill bit 15, realizes broken rock.Now, by
Having been enter into air cavity before guide sleeve 16 is closed again in piston body 11 causes the pressure of preceding air cavity to be continuously increased, the pressure of current air cavity
During more than rear air cavity, the upward jack-up of piston body 11 is realized the drawback movement of piston body 11 by air pressure, completes a cycle period.It is living
When cock body 11 travels forward, the leading section of piston body 11 does impulsive motion, when piston body 11 is moved backward, piston body 11 to drill bit 15
The swivel nut 13 being inside embedded drives swingle 12 and the one-directional rotation of connecting rod 14, and then drives drill bit 14 to rotate, ratchet and pawl arrangement 9
Control drill bit 15 unidirectionally positioning and accurate indexing.What the vertical rock of realization was bored praises first 14 strike and rotational motion parallel, improves broken rock effect
Rate.
The characteristics of the utility model is maximum be:1. in use without extra support, it is only necessary to which early stage workman looks for
Quasi- punching place, helps vertical rock to bore punching certain depth downwards, vertical rock, which is bored, can voluntarily continue to continue to punch downwards, and traditional
Rock drilling machinery must build drilling cramp, not only expend huge, also limit the operating environment of punching.2. piece tracheae of a need provides dynamic
Power can complete two work of drill bit impact and bit, and traditional rock drilling machinery typically uses Pneumatic immpacting, electronic rotation, sheet
Utility model is greatly saved the consumption of the energy, enormously simplify the labyrinth of traditional rock drilling machinery.3. because this practicality
New is simple in construction, lightweight, is easy to carry to different different areas of activity, is not limited by complicated landform, scope of application pole
It is big to expand.4. the utility model is guarded without personnel, multimachine series connection common operational, perforating efficiency can be shunted by a tracheae
Injury of the dust during rock drilling to staff is avoided while high.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality
Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model
Cover.
Claims (5)
1. a kind of vertical rock is bored, include the shell body of a tubular structure(1), shell body(1)Front end sets front connector(2), rear end
Joint after setting(3), rear joint(3)Upper setting air inlet, front connector(2)On be provided with drill bit mounting hole, in rear joint(3)With
Front connector(2)Between shell body(1)Inside set gradually gas circuit switching mechanism, air rammer mechanism and drill bit(15), its feature
It is:
Described gas circuit switching mechanism includes non-return valve(4), spring base(5), valve block(6)And gas path distributor(7);Described is inverse
Only valve(4)It is arranged on rear joint(3)Air inlet in;Described spring base(5)On be provided with and rear joint(3)Air admission hole is connected
Multiple longitudinal through holes, spring base(5)Front end face center be provided with a shrinkage pool, spring is set in shrinkage pool(20),
Spring(20)Forward extend out spring base(5)And it is embedded in described non-return valve(4)It is interior;The spring base(5)Front end face press
Gas path distributor(7), in gas path distributor(7)On be provided with multiple clear openings and half-via, the valve block(6)It is arranged on spring
Seat(5)And gas path distributor(7)Between;
Described air rammer mechanism includes cylinder(8), ratchet and pawl arrangement(9), piston body(11), swingle(12)And connection
Bar(13);Cylinder(8)It is arranged on shell body(1)It is interior, cylinder(8)And shell body(1)Between leave air gap(14);Air gap(14)With
Gas path distributor(7)Half-via connection, air gap(14)With cylinder(8)Preceding air cavity connection;Cylinder(8)Rear air cavity and gas circuit
Distributor(7)Half-via connection;Described ratchet and pawl arrangement(9)Including ratchet and pawl, ratchet is fixedly installed on shell
Body(1)Interior, gas path distributor(7)And cylinder(8)Between rear port;Described swingle(12)It is arranged on cylinder(8)Central shaft
Position, swingle(12)Rear end be rigidly connected ratchet, ratchet is arranged in described ratchet and coordinated with ratchet;Swingle
(12)Stage casing be provided with screw thread, described piston body(11)Inside it is embedded swivel nut(10), piston body(11)Pass through swivel nut(10)Set
It is located at swingle(12)Upper and screw thread cooperation therewith;Swingle(12)The described connecting rod of front end connection(13)Rear end, even
Extension bar(13)Front end and described drill bit(15)Connection, drill bit(15)Installed in front connector(2)Drill bit mounting hole in;
Piston body(11)When travelling forward, piston body(11)Leading section is to drill bit(15)Do impulsive motion, piston body(11)Backward
During motion, piston body(11)The swivel nut being inside embedded(10)Drive swingle(12)And connecting rod(13)One-directional rotation, and then drive
Drill bit(15)Rotation, ratchet and pawl arrangement(9)Control drill bit(15)Unidirectional positioning and accurate indexing.
2. vertical rock according to claim 1 is bored, it is characterised in that:Described piston body(11)For dual segment structure, including it is preceding
Section and back segment, leading portion diameter are less than back segment diameter;In front connector(2)And cylinder(8)Between shell body(1)Inside it is provided with guiding
Set(16), piston body(11)Leading portion is moveable to guide sleeve(16)It is interior, guide sleeve(16)On be provided with bleeder port, bleeder port and institute
The air gap stated(14)Connection.
3. vertical rock according to claim 1 or 2 is bored, it is characterised in that:Described drill bit(15), connecting rod(13), rotation
Bar(12)On be respectively provided with the longitudinal central aperture of connection, longitudinal central aperture and gas path distributor(7)Clear opening connection.
4. vertical rock according to claim 3 is bored, it is characterised in that:The swingle(12)Back segment is provided with limited block
(17), piston body(11)Stroke range in limited block(17)And guide sleeve(16)Between.
5. vertical rock according to claim 4 is bored, it is characterised in that:Described drill bit(15)Front end carbide inserts tooth
(18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720000892.4U CN206397432U (en) | 2017-01-03 | 2017-01-03 | A kind of vertical rock is bored |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720000892.4U CN206397432U (en) | 2017-01-03 | 2017-01-03 | A kind of vertical rock is bored |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206397432U true CN206397432U (en) | 2017-08-11 |
Family
ID=59517296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720000892.4U Expired - Fee Related CN206397432U (en) | 2017-01-03 | 2017-01-03 | A kind of vertical rock is bored |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206397432U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639867A (en) * | 2017-01-03 | 2017-05-10 | 西安众晟岩土工程有限公司 | Standing rock drill |
-
2017
- 2017-01-03 CN CN201720000892.4U patent/CN206397432U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639867A (en) * | 2017-01-03 | 2017-05-10 | 西安众晟岩土工程有限公司 | Standing rock drill |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453704B (en) | A kind of hydraulic drill rig top hammer formula impact rotary power head | |
CN104033101B (en) | A kind of large-diameter DTH air hammer with Sleeve drill | |
CN201526271U (en) | Crawler-type all-hydraulic tunnel drilling machine | |
CN103244051A (en) | Combined down-hole hammer drilling tool and pile forming construction method thereof | |
CN204851057U (en) | Hyperbar is soon towards down --hole churn drilling tools | |
CN105156025B (en) | A kind of hyperbar rushes down-hole percussion drill tool soon | |
CN104165025B (en) | The drilling tool that a kind of long screw drill rod is combined with down-hole hammer | |
CN206397432U (en) | A kind of vertical rock is bored | |
CN211201821U (en) | Percussion rotary drilling core drill for complex bedrock under ice | |
GB1296476A (en) | ||
CN203531745U (en) | Bunched type inverse well pneumatic down-hole hammer | |
CN203531744U (en) | Bunched type normal circulation pneumatic down-hole hammer | |
CN105156024B (en) | One kind rushes wear-resistant high life down-the-hole churn drilling tools soon | |
CN101319598A (en) | Hole bottom annular spacing strong suction device of through type down-the-hole hammer | |
CN202194567U (en) | Hydraulic rotating pneumatic impact rock drill | |
CN102900355B (en) | Quick-drill pneumatic hard rock drill | |
CN208267762U (en) | A kind of compound rock drill | |
CN106639867A (en) | Standing rock drill | |
CN209637685U (en) | A kind of revolution beater mechanism of Pneumatic anchor rod machine | |
CN202660919U (en) | Combined hydraulic mud gun and hydraulic opening integrated machine | |
CN203939428U (en) | The drilling tool that a kind of long screw drill rod and down-hole hammer combine | |
CN102937000A (en) | Inner-cylinder rotary type hydraulic pressure rock drill | |
CN104265596B (en) | High-pressure gas-liquid mixing piston pump and using method | |
CN108843238A (en) | A kind of revolution beater mechanism of Pneumatic anchor rod machine | |
CN202850851U (en) | Pneumatic rock drill capable of drilling hard rock rapidly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20190103 |
|
CF01 | Termination of patent right due to non-payment of annual fee |