CN206382541U - Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting - Google Patents

Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting Download PDF

Info

Publication number
CN206382541U
CN206382541U CN201621386397.3U CN201621386397U CN206382541U CN 206382541 U CN206382541 U CN 206382541U CN 201621386397 U CN201621386397 U CN 201621386397U CN 206382541 U CN206382541 U CN 206382541U
Authority
CN
China
Prior art keywords
formwork
hollow cylinder
double
casting
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621386397.3U
Other languages
Chinese (zh)
Inventor
严元众
陈良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huapei Digital Energy Technology Group Co ltd
Original Assignee
Shanghai Hua Pei Power Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hua Pei Power Polytron Technologies Inc filed Critical Shanghai Hua Pei Power Polytron Technologies Inc
Priority to CN201621386397.3U priority Critical patent/CN206382541U/en
Application granted granted Critical
Publication of CN206382541U publication Critical patent/CN206382541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to a kind of double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting, it is characterized in that:Formwork structure is double-decker, and outer layer is shell body, and internal layer is hollow barrel structure, and hollow cylinder is connected by intermediate connector with shell body;Molten steel circulation road is provided between hollow cylinder and shell body, molten steel circulation road is connected by running channel with the formwork casting being located on the outside of shell body, the upper end of formwork structure is provided with platform, and the lower end of formwork structure is provided with reinforcement structure.The formwork of this structure is applied in high-temperature alloy process for suction casting, and safety coefficient is high;Cast structure is fine and close, and crystal grain is tiny, and shrinkage porosity defect of contraction cavity is relatively low, obtains material rate and is likely to reach more than 90%, and saves the casting energy more than 80%.

Description

Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting
Technical field
The utility model is related to the technical field of hot investment casting, specifically a kind of to be used for high-temperature alloy suction pouring The double-layer hollow cylinder fusible pattern formwork structure of technique.
Background technology
Suction pouring belongs to Special Processes of Metal Castings technique, is a kind of advanced foundry engieering.Because its liquid metals utilization rate is high, casting Precision is high, quality is high, save the energy, low cost and other advantages, and commercial machine, mechanical part, vapour are widely used in developed country In many important precision casting manufactures such as turbine blade, guided missile wing.The technology is taken for 1975 by Hitchiner companies of the U.S. Patent is obtained, and realizes core technology block.At present, suction pouring is mainly used in the essence of the low-temperature alloys such as aluminium alloy in China Close casting, is rarely applied to the hot investment casting of high-temperature alloy.
Formwork for suction pouring had both required that higher intensity also required that certain gas permeability, so just can guarantee that and fills type Stage smoothly draws alloy solution, and formwork is full of Stability Analysis of Structures after alloy solution.But the intensity of totally-enclosed formwork structure and Gas permeability is a pair of conflicting performances, and it is difficult to be adapted to high temperature resistant conjunction that this, which results in most of formwork structure in the market, Golden suction pouring.Easily there are various perils if produced by force.
The content of the invention
The purpose of this utility model is to provide a kind of improved bilayer sky for high-temperature alloy process for suction casting Heart cylinder fusible pattern formwork structure, it can overcome in the prior art in the market most of formwork structure be difficult to be adapted to high temperature resistant conjunction The some shortcomings of golden suction pouring.
To achieve these goals, the technical solution of the utility model is:One kind is used for high-temperature alloy suction pouring work The double-layer hollow cylinder fusible pattern formwork structure of skill, it is characterised in that:Described formwork structure is double-decker, and outer layer is shell body, Internal layer is hollow barrel structure, and described hollow cylinder is connected by intermediate connector with shell body;Set between hollow cylinder and shell body There is molten steel circulation road, molten steel circulation road is connected by running channel with the formwork casting being located on the outside of shell body, the upper end of formwork structure Provided with platform, the lower end of formwork structure is provided with reinforcement structure.
It is preferred that, formwork casting is distributed with the surrounding of formwork structure, and each formwork casting passes through a running channel and molten steel stream Passage is connected;Described running channel includes elbow running channel.
It is preferred that, 6-20 intermediate connector is evenly distributed between internal layer and outer layer, described intermediate connector is in piece Shape structure, middle part is tiltedly located between inside and outside layer provided with bending groove, intermediate connector, the angle model of intermediate connector and outer layer Enclose for 20-50 degree.
Further, the lower end of formwork structure is provided with base, and base is provided with reinforcement structure, and described reinforcement structure is reinforcement Muscle;The upper end of formwork structure is provided with the platform stretched out, and the center of platform is provided with horn-like connecting hole, described connecting hole It is connected with hollow cylinder, the top of hollow cylinder is provided with symmetrically arranged through-hole structure, and described through-hole structure is in horn-like, through hole The big opening end of structure inside hollow cylinder with being connected, and the small openend of through-hole structure is connected with molten steel circulation road.
In use, the utility model sets hollow barrel structure in formwork, and connect by intermediate connector and formwork outer wall Connect, its object is to reduce process for suction casting fill the type stage need to alloy solution amount;Formwork bottom design has reinforcement Improve the intensity of formwork;Formwork upper end design platform and vent hole structure are respectively intended to compress formwork and exhaust;Casting portion according to Connected by elbow running channel and hollow via-hole, complete feeding running channel and fill the connection of type running channel, its object is to fill type and form benefit Contracting.Designed formwork structure is changed into wax-pattern structure, the line that puts into production carries out penetrating wax, group tree, shell processed, dewaxing, then will The formwork made is calcined to after 500-1200 DEG C the production for being put into and the small-sized casting of high-temperature alloy being carried out in suction pouring equipment.It is resistance to High temperature alloy includes high temperature resistant stainless steel, steel alloy, titanium alloy, titanium-aluminium alloy etc..The formwork of this structure is closed applied to high temperature resistant In golden process for suction casting, safety coefficient is high;Cast structure is fine and close, and crystal grain is tiny, and shrinkage porosity defect of contraction cavity is relatively low, obtains material rate and very may be used More than 90% can be reached, and saves the casting energy more than 80%.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the utility model one.
Fig. 2 is the structural representation of the utility model molten steel direction of motion.
Fig. 3 is the sectional view of the utility model formwork casting.
Fig. 4 is the top view of the utility model formwork structure.
Embodiment
The utility model will be further described with reference to the accompanying drawings and examples.
1st, base, 2 internal layers, 3 reinforcement structures, 4 platforms, 5 elbow running channels, 6 formwork casting, 7 intermediate connectors, 8 molten steel lead to Road, 9 hollow cylinders, 10 outer layers;
701 bending grooves, 501 hollow via-holes, 401 connecting holes.
A kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting described in the utility model Structure, its difference with the prior art is:Described formwork structure is double-decker, and outer layer is shell body, and internal layer is hollow cylinder Structure, described hollow cylinder is connected by intermediate connector with shell body;Molten steel circulation road is provided between hollow cylinder and shell body, Molten steel circulation road is connected by running channel with the formwork casting being located on the outside of shell body, and the upper end of formwork structure is provided with platform, formwork The lower end of structure is provided with reinforcement structure.
Optionally, formwork casting is distributed with the surrounding of formwork structure, and each formwork casting passes through a running channel and molten steel stream Passage is connected;Described running channel includes elbow running channel.One end of described elbow running channel and molten steel circulation road vertical connection, it is another End is connected with the casting gate of formwork casting, and intermediate connector need to be avoided at the setting of elbow running channel.Elbow running channel passes through hollow Through hole is connected with formwork casting, and hollow via-hole outwardly convex is simultaneously connected with the bottom of elbow running channel.
Optionally, 6-20 intermediate connector is evenly distributed between internal layer and outer layer, described intermediate connector is in piece Shape structure, middle part is tiltedly located between inside and outside layer provided with bending groove, intermediate connector, the angle model of intermediate connector and outer layer Enclose for 20-50 degree.The bottom of described hollow cylinder, which is provided with semicircular structure, semicircular structure, is provided with runner control piece, described Runner control piece be arranged at the outside of hollow cylinder, the setting of runner control piece be molten steel circulation road initiating terminal.Centre connects Fitting is in one group of molten steel circulation road for being arranged at intervals between internal layer and outer layer with 3, adjacent two groups of intermediate connectors it Between spacing it is equal.Every three intermediate connectors are uniformly distributed on the circumferential section of hollow cylinder, connection in the middle of laminated structure Part bottom be provided with column supporting part, it is possible to decrease process for suction casting fill the type stage need to alloy solution amount.
Optionally, the lower end of formwork structure is provided with base, and base is provided with reinforcement structure, and described reinforcement structure is reinforcement Muscle;The upper end of formwork structure is provided with the platform stretched out, and the center of platform is provided with horn-like connecting hole, described connecting hole It is connected with hollow cylinder, the top of hollow cylinder is provided with symmetrically arranged through-hole structure, and described through-hole structure is in horn-like, through hole The big opening end of structure inside hollow cylinder with being connected, and the small openend of through-hole structure is connected with molten steel circulation road.
Embodiment 1
Described formwork structure is double-decker, and outer layer is shell body, and internal layer is hollow barrel structure, and described hollow cylinder leads to Intermediate connector is crossed with shell body to be connected;Molten steel circulation road is provided between hollow cylinder and shell body, molten steel circulation road passes through running channel It is connected with the formwork casting being located on the outside of shell body, the upper end of formwork structure is provided with platform, and the lower end of formwork structure is provided with reinforcement Structure.
12 intermediate connectors are evenly distributed between internal layer and outer layer, intermediate connector is one group of interval setting with 3 In molten steel circulation road between internal layer and outer layer, the spacing between two groups of adjacent intermediate connectors is equal.Described centre Connector structure in the form of sheets, middle part is tiltedly located between inside and outside layer provided with bending groove, intermediate connector, intermediate connector with it is outer The angle of layer is 35 degree.
By designed formwork change into wax-pattern structure put into production line carry out penetrate wax, group tree, shell processed, dewaxing, roasting, its The shell processed of middle formwork includes one kind or several in zircon sand, mullite, magnesia, silica sand using 6 layers of hanging sand process for making shell with sand material Kind;Wherein formwork sintering temperature is 500-1200 DEG C of any temperature.Roasting formwork is put into suction pouring equipment crystallisation chamber In, lower end coordinates with stalk, and upper end makes formwork and stalk be in tight engagement under compressing member effect.Fill type rank Section, hollow via-hole structure is to fill type running channel and be vented rapidly to make high temperature alloy liquid rise and fill the casting that type is in suspension status.Bottom Portion's reinforcement ensures stable full of high temperature alloy liquid formwork structure.High temperature alloy liquid under pressure release state in hollow via-hole is quickly returned Stream, but the aluminium alloy being in suspension status casting will be unable to backflow.Elbow dealings provides feeding for casting and improves casting quality. It is used for by the formwork of this structure in process for suction casting, production safety coefficient is high, and the high-temperature alloy casting produced Dense structure, crystal grain is tiny, and shrinkage porosity defect of contraction cavity is relatively low, obtains material rate and is likely to reach more than 90%, and saves the casting energy 80% More than.
Embodiment 2
Described formwork structure is double-decker, and outer layer is shell body, and internal layer is hollow barrel structure, and described hollow cylinder leads to Intermediate connector is crossed with shell body to be connected;The design of hollow cylinder is the rising falling and gas discharge for alloy solution.Ensure The smooth rising of casting filling stage alloy solution and the pressure release stage hollow quick backflow by interior alloy solution.
Molten steel circulation road is provided between hollow cylinder and shell body, molten steel circulation road is by running channel and is located on the outside of shell body Formwork casting is connected, and the upper end of formwork structure is provided with platform, and the lower end of formwork structure is provided with reinforcement structure.The surrounding of formwork structure Formwork casting is distributed with, each formwork casting is connected by a running channel with molten steel circulation road;Described running channel is poured including elbow Road.The lower end of formwork structure is provided with base, and base is provided with reinforcement structure, and described reinforcement structure is reinforcement;Formwork structure Upper end be provided with the platform that stretches out, the center of platform is provided with horn-like connecting hole, described connecting hole and hollow cylinder phase Connection, the top of hollow cylinder is provided with symmetrically arranged through-hole structure, and described through-hole structure is in horn-like, and the big of through-hole structure is opened Mouth end inside hollow cylinder with being connected, and the small openend of through-hole structure is connected with molten steel circulation road.
Embodiment 3
It is evenly distributed with 6-20 intermediate connector between internal layer and outer layer, described intermediate connector structure in the form of sheets, Middle part is tiltedly located between inside and outside layer provided with bending groove, intermediate connector, and the angular range of intermediate connector and outer layer is 20- 50 degree, the ratio between thickness between internal layer and outer layer is 1:0.8-1.2, double-layer hollow barrel structure is thus constituted, the purpose is to In order to reduce fill the type stage need to alloy solution amount and reach best temperature control effect.The bottom of described hollow cylinder is provided with semicircle Runner control piece is provided with shape structure, semicircular structure, described runner control piece is arranged at the outside of hollow cylinder, runner control It is the initiating terminal of molten steel circulation road at the setting of part.
The purpose of formwork bottom design reinforcing rib structure is to improve form strength.Ensure form strength full of alloy solution In the case of do not rupture still.
The platform and the purpose of vent hole structure that formwork upper end is designed are to compress formwork and exhaust.Ensure that respectively formwork and It is completely embedded between stalk and formwork exhaust.
The design structure that casting portion is connected by elbow running channel and hollow via-hole, completes feeding running channel and fills type running channel Connection, its object is to conveniently fill type and form feeding.Ensure that the molten steel for flowing into parts will not flow back, cause misrun to lack Fall into.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that the utility model specific implementation is confined to these above-mentioned explanations.For the common skill of the utility model art For art personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should It is considered as belonging to protection domain of the present utility model.

Claims (8)

1. a kind of double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting, it is characterised in that:It is described Formwork structure be double-decker, outer layer is shell body, and internal layer is hollow barrel structure, and described hollow cylinder passes through intermediate connector It is connected with shell body;
Molten steel circulation road is provided between hollow cylinder and shell body, molten steel circulation road passes through running channel and the formwork being located on the outside of shell body Casting is connected, and the upper end of formwork structure is provided with platform, and the lower end of formwork structure is provided with reinforcement structure.
2. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 1 Structure, it is characterised in that:Formwork casting is distributed with the surrounding of formwork structure, and each formwork casting is circulated by a running channel and molten steel Road is connected;
Described running channel includes elbow running channel.
3. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 1 Structure, it is characterised in that:6-20 intermediate connector is evenly distributed between internal layer and outer layer, described intermediate connector is in the form of sheets Structure, middle part is tiltedly located between inside and outside layer provided with bending groove, intermediate connector, the angular range of intermediate connector and outer layer For 20-50 degree.
4. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 1 Structure, it is characterised in that:The lower end of formwork structure is provided with base, and base is provided with reinforcement structure, and described reinforcement structure is reinforcement Muscle;
The upper end of formwork structure is provided with the platform stretched out, and the center of platform is provided with horn-like connecting hole, described connection Hole is connected with hollow cylinder, and the top of hollow cylinder is provided with symmetrically arranged through-hole structure, and described through-hole structure leads in horn-like The big opening end of pore structure inside hollow cylinder with being connected, and the small openend of through-hole structure is connected with molten steel circulation road.
5. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 3 Structure, it is characterised in that:The bottom of described hollow cylinder, which is provided with semicircular structure, semicircular structure, is provided with runner control piece, institute The runner control piece stated is arranged at the initiating terminal for molten steel circulation road at the outside of hollow cylinder, the setting of runner control piece.
6. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 2 Structure, it is characterised in that:One end of described elbow running channel and molten steel circulation road vertical connection, the casting of the other end and formwork casting Mouth is connected, and intermediate connector need to be avoided at the setting of elbow running channel.
7. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 2 Structure, it is characterised in that:Elbow running channel is connected by hollow via-hole with formwork casting, hollow via-hole outwardly convex and and elbow running channel Bottom be connected.
8. a kind of double-layer hollow cylinder fusible pattern formwork knot for high-temperature alloy process for suction casting according to claim 3 Structure, it is characterised in that:Intermediate connector is phase in one group of molten steel circulation road being arranged at intervals between internal layer and outer layer with 3 Spacing between two groups of adjacent intermediate connectors is equal.
CN201621386397.3U 2016-12-16 2016-12-16 Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting Active CN206382541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621386397.3U CN206382541U (en) 2016-12-16 2016-12-16 Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621386397.3U CN206382541U (en) 2016-12-16 2016-12-16 Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting

Publications (1)

Publication Number Publication Date
CN206382541U true CN206382541U (en) 2017-08-08

Family

ID=59488786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621386397.3U Active CN206382541U (en) 2016-12-16 2016-12-16 Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting

Country Status (1)

Country Link
CN (1) CN206382541U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513635A (en) * 2016-12-16 2017-03-22 上海华培动力科技有限公司 Double-layer hollow cylinder fusion mold shell structure for heat-resistant alloy vacuum suction casting technology
CN108097926A (en) * 2018-01-02 2018-06-01 上海华培动力科技股份有限公司 A kind of wax-pattern structure for suction pouring

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513635A (en) * 2016-12-16 2017-03-22 上海华培动力科技有限公司 Double-layer hollow cylinder fusion mold shell structure for heat-resistant alloy vacuum suction casting technology
CN106513635B (en) * 2016-12-16 2019-02-05 上海华培动力科技股份有限公司 Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting
CN108097926A (en) * 2018-01-02 2018-06-01 上海华培动力科技股份有限公司 A kind of wax-pattern structure for suction pouring
CN108097926B (en) * 2018-01-02 2024-03-01 上海华培数能科技(集团)股份有限公司 Wax mould structure for vacuum suction casting

Similar Documents

Publication Publication Date Title
CN100577324C (en) Casting method for heavy combustion engine II-stage diverter blade
CN206382541U (en) Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting
CN105834363B (en) A kind of low pressure loses the close casting system of cerotin
CN109175307A (en) A kind of 3D printing sand mold antigravity casting forming method
CN109550903A (en) A kind of hot investment casting manufacturing process of thin-walled variable cross-section casting
CN106475522B (en) The running gate system and pouring procedure of heavy castings
CN107745081A (en) The differential pressure running gate system and differential pressure pouring procedure of U-shaped magnesium alloy member
CN107855467A (en) The model casting system and investment casting method of U-shaped magnesium alloy member
CN107116179B (en) Annular tooling and the formative method that sand using amount is reduced using annular tooling
CN110125331A (en) A kind of shape casting technique of casting complicated inner cavity
CN110238347B (en) Casting system for lost foam casting cam shaft
CN106513635B (en) Double-layer hollow cylinder fusible pattern formwork structure for high-temperature alloy process for suction casting
CN108015225A (en) A kind of method for casting aluminium alloy of composite mould
CN106513636B (en) Hollow via-hole fusible pattern formwork structure for high-temperature alloy process for suction casting
CN201030420Y (en) Magnesium alloy metal mold casting mold
CN206382542U (en) Hollow via-hole fusible pattern formwork structure for high-temperature alloy process for suction casting
CN105945258B (en) A kind of low pressure investment precision casting technology
CN209110156U (en) Shell moulded casting device of the vacuum in conjunction with pressure
CN206382543U (en) A kind of wax-pattern structure for high-temperature alloy suction pouring
CN106166607A (en) The suction pouring device of cast magnesium alloy
CN106623787B (en) A kind of preparation method of aluminium alloy Melt casting and its binder used
CN108580809A (en) A kind of three valve body of monoblock type and its casting technique
CN210547852U (en) Pouring system for lost foam casting camshaft
CN114632913A (en) Casting method
CN106563785A (en) Counter-gravity casting method for large-sized complicated thin-wall aluminum matrix composite material tube-shaped piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 20106 Three Workshops on No. 218 Songxiu Road, Qingpu District, Shanghai

Patentee after: Shanghai Huapei Power Technology (Group) Co.,Ltd.

Address before: Song Xiu road Qingpu District Shanghai city 201703 Building No. 218 3

Patentee before: SHANGHAI SINOTEC Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 201706 factory building 3, 218 songxiu Road, Qingpu District, Shanghai

Patentee after: Shanghai Huapei Digital Energy Technology (Group) Co.,Ltd.

Country or region after: China

Address before: 201706 factory building 3, 218 songxiu Road, Qingpu District, Shanghai

Patentee before: Shanghai Huapei Power Technology (Group) Co.,Ltd.

Country or region before: China