CN206369479U - A kind of transition parapet structure in cement kiln cooler portion - Google Patents

A kind of transition parapet structure in cement kiln cooler portion Download PDF

Info

Publication number
CN206369479U
CN206369479U CN201720029864.5U CN201720029864U CN206369479U CN 206369479 U CN206369479 U CN 206369479U CN 201720029864 U CN201720029864 U CN 201720029864U CN 206369479 U CN206369479 U CN 206369479U
Authority
CN
China
Prior art keywords
blockwork
cooler
parapet
cement
transition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720029864.5U
Other languages
Chinese (zh)
Inventor
徐金福
孙杰
李开龙
周慧
仝超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Wuhu Conch Construction and Installation Co Ltd
Original Assignee
Anhui Wuhu Conch Construction and Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Wuhu Conch Construction and Installation Co Ltd filed Critical Anhui Wuhu Conch Construction and Installation Co Ltd
Priority to CN201720029864.5U priority Critical patent/CN206369479U/en
Application granted granted Critical
Publication of CN206369479U publication Critical patent/CN206369479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of transition parapet structure in cement kiln cooler portion, including the parapet side wall in cement kiln cooler and cement-kiln grate-cooler blind plate part, it is characterised in that:The blockwork group that described transition parapet structure is provided in the brick plate structure on cement-kiln grate-cooler blind plate part top and set between the top of brick plate structure and the side wall steel plate of cooler, fixed between the junction steel plate of blockwork group and parapet side wall provided with compartment anchoring piece, ramming sarking is provided between brick plate structure.The beneficial effects of the utility model:1st, work progress is controllable;2nd, performance is greatly improved;3rd, accelerating construction progress;4th, complicated shape is manufactured;5th, risk is reduced;6th, adaptability is improved;7th, the repair time can be shortened, the energy is saved.

Description

A kind of transition parapet structure in cement kiln cooler portion
Technical field
The utility model is related to cement kiln field, more particularly, to a kind of transition parapet structure in cement kiln cooler portion.
Background technology
At present, the cement rotary kiln cooler parapet position main Wear cause of refractory material is erosion and the mill of clinker Damage, maintenance is frequent.The current position is cast-in-place using castable, because heat is difficult to reach during baking, once clinker kiln discharge, temperature Degree is drastically raised again, easily causes explosion.Therefore it is larger per Year's consumption, cause cost increase.
Utility model content
The purpose of this utility model is to provide one kind, solves optimization design structure, takes to refractory material prebake conditions, be made The problem of module, convenient maintenance, reduction production cost.
The utility model solves the technical scheme that its technical problem used:
A kind of transition parapet structure in cement kiln cooler portion, including parapet side wall and cement in cement kiln cooler Kiln grate-cooler blind plate part, it is characterised in that:Described transition parapet structure is provided on cement-kiln grate-cooler blind plate part The brick plate structure in portion and the blockwork group set between the top of brick plate structure and the side wall steel plate of cooler, Fixed between the junction steel plate of blockwork group and parapet side wall provided with compartment anchoring piece, ramming is provided between brick plate structure Sarking.
Described blockwork group includes upper strata blockwork part, middle level blockwork part, lower floor's blockwork part;
Described upper strata blockwork part is rectangular, and transition arcs, the centre bit in its underpart are provided with the top of its left end The first connection recess is installed;
Described middle level blockwork part is rectangular, the first connection double wedge is provided with the center on top, in its underpart Center provided with connection recess;
Described lower floor's blockwork part is rectangular, and the second connection double wedge is provided with the center on top.
The bottom of cement kiln grate cooler toe wall employs the structure of brick plate, and shop fixtures bed course is made using special ramming mass; Three layers of blockwork combination are taken to build by laying bricks or stones in top.It is mutually twisted between each layer building block on top using foregoing tongue and groove, Then fixed between building block sub-assembly and side wall steel plate using compartment anchoring piece.When blind plate is changed, it is only necessary to by what is served as a contrast under brick plate Ramming sarking is pumped, you can convenient operation, convenient rapid without removing parapet refractory material.
The beneficial effects of the utility model:
1st, work progress is controllable:The links such as prefabricated component cast, maintenance, baking are completed all in factory, are had ready conditions into professional etiquette Generalized, institutionalization operational control, can avoid influence of the live many unfavorable factors to construction quality.
2nd, performance is greatly improved:In prefabricated component manufacturing process, to amount of water, mixing time, time of vibration, care environments, Baking condition has strict demand, can be that the performance of material is played to greatest extent.
3rd, accelerating construction progress:Because prefabricated component has completed to be poured into whole production links of baking when dispatching from the factory, existing It need to only carry out building installation by laying bricks or stones and can come into operation during construction, without maintenance, baking, a large amount of engineering times can be saved.
4th, complicated shape is manufactured:Site operation, due to being limited by condition, adds construction speed requirement, side, angle, arch etc. Complex region construction is difficult to precisely, or does not also reach very high accuracy even if completing, but in factory, possesses accuracy system The condition of work, can meet the making of complicated shape product.
5th, risk is reduced:The maintenance of cement production enterprise, the overwhelming majority belongs to repairing property, and curing time often occurs Not enough, the phenomenon such as occur bursting when drying kiln, there is security-hidden trouble, and can just be avoided using prefabricated component.
6th, adaptability is improved:Change the influence of winter construction climate change, the field operation preference temperature of castable is 5 DEG C ~ 35 DEG C, when environment temperature is above or below this scope, the construction quality of castable will be influenceed, is produced according to prefabricated component Product, then do not have the worry of this respect.
7th, the repair time can be shortened, the energy is saved:Prefabricated component is in use, just completed baking program, production system During operation, baking kiln speed can be improved, shortening to dry can go into operation rapidly in kiln time, short time.Prefabricated component can be used in combination Position working condition, is fabricated to composite product, i.e. working lining using traditional castable, inoperative layer uses light thermal-insulation material Expect that the production method being combined has more preferable heat insulation and preservation effect, reduce heat loss, reduce energy waste.
Below with reference to drawings and examples, the utility model is described in detail.
Brief description of the drawings
Fig. 1 is existing cement rotary kiln cooler parapet position organigram.
Fig. 2 is the transition parapet structural representation in cement kiln cooler portion.
Fig. 3 is the structural representation of middle level blockwork part.
Fig. 4 is the structural representation of lower floor's blockwork part.
Fig. 5 cools down layout structure figure for the transition parapet in cement kiln cooler portion in cement kiln.
In figure:1. parapet side wall, 2. cement-kiln grate-cooler blind plate parts, 3. castables in cement kiln cooler, 4. brick plate structure, 5. side wall steel plates, 6. compartment anchoring pieces, 7. ramming sarkings, 8. upper strata blockwork parts, 9. Middle level blockwork part, 10. lower floor's blockwork parts, 11. transition arcs, 12. first connection recesses, 13. first connections are convex Tooth, 14. second connection recesses, 15. second connection double wedges, 16. refractory brick, 17. cement kiln coolers.
Embodiment
As shown in figure 1, at present, the parapet position main Wear cause of refractory material of cement rotary kiln cooler 17 is cement The erosion and abrasion of clinker, maintenance are frequent.Parapet side wall 1 and cement-kiln grate-cooler blind plate part 2 in cement kiln cooler The position is cast-in-place using castable 3, because heat is difficult to reach during baking, once clinker kiln discharge, temperature is drastically raised again, easily Cause explosion.Therefore it is larger per Year's consumption, cause cost increase.
Embodiment 1, as shown in Fig. 2 a kind of transition parapet structure in cement kiln cooler portion, including in cement kiln cooler Parapet side wall 1 and cement-kiln grate-cooler blind plate part 2, it is characterised in that:Described transition parapet structure is provided in water The brick plate structure 4 on the top of stall grate-cooler blind plate part 2 and the side wall in the top of brick plate structure 4 and parapet side wall 1 The blockwork group set between steel plate 5, is anchored between the junction steel plate of blockwork group and parapet side wall provided with compartment Part 6 is fixed, and 7 are provided between brick plate structure 4.
Described blockwork group includes upper strata blockwork part 8, middle level blockwork part 9, lower floor's blockwork part 10;
Described upper strata blockwork part 8 is rectangular, and transition arcs 11, the center in its underpart are provided with the top of its left end Position is provided with the first connection recess 12;
As shown in figure 3, described middle level blockwork part 9 is rectangular, the center on top is convex provided with the first connection Tooth 13, the second connection recess 14 is provided with the center of its underpart;
As shown in figure 4, described lower floor's blockwork part 10 is rectangular, the center on top is convex provided with the second connection Tooth 15.
As shown in Fig. 2,5, the bottom of cement kiln grate cooler toe wall employs the structure of brick plate, using special ramming mass Make shop fixtures bed course;Top takes three layers of blockwork combination to build by laying bricks or stones, provided with resistance in the overall kiln that blockwork combination top is set Firebrick 16 or refractory material.Be mutually twisted between each layer building block on top using foregoing tongue and groove, building block sub-assembly with Then fixed between side wall steel plate using compartment anchoring piece.When blind plate is changed, it is only necessary to take out the ramming sarking served as a contrast under brick plate Go, you can convenient operation, it is convenient rapid without removing parapet refractory material.
Applied to the prefabricated special form brick of unshape refractory of new type nonaqueous cement rotary kiln grate cooler sunk fence, with high-quality alum Soil is aggregate, adds a variety of composite superfine micro mists, using pure calcium aluminate cement as the Low Cement Castable of bonding agent it is prefabricated and Into with apparent porosity is low, intensity is high, wearability good, eutectic is few, anti-slag and the number of advantages such as corrosion resistance is strong.
The parapet that the prefabricated section is built into, is easily installed and dismantles, with globality, steadiness and anti abrasive feature, no It is long using only the time, and emergency repair time is short, so as to advantageously reduce number of times and the time of cement kiln repairing refractory material, improves The running rate of cement kiln.
The parapet of new dry process rotary kiln grate-cooler is gradually damaged by the abrasion of clinker, if parapet is brick with fire resisting Build, after the fragment of brick of parapet bottom is worn, top fragment of brick loosens and come off therewith;If parapet is poured with unshape refractory Note, though globality is good, the engineering time is long, and need formwork, cast, maintenance and dry, it is frayed after be difficult repair, even if repairing Mend, the refractory material that also damage can be made to cut near face sustains damage, so as to influence the effect of repairing.
Have the advantages that to be easily installed by developing special form brick and dismantle, the edge of the fragment of brick have semicircular fin and There is anchor hole at groove, rear portion, so as to ensure that installation and removal the characteristics of facilitate, and in turn ensure that the globality and stably of brick body Property, and service life is more than 2 years.
Embodiment above is only that preferred embodiment of the present utility model is described, not to the utility model Scope be defined, on the premise of the utility model design spirit is not departed from, this area ordinary skill technical staff to this Various modifications and improvement that the technical scheme of utility model is made, all should fall into the guarantor that claims of the present utility model are determined In the range of shield.
The utility model is not directed to partly same as the prior art or can realized using prior art.

Claims (2)

1. a kind of transition parapet structure in cement kiln cooler portion, including parapet side wall and cement kiln in cement kiln cooler Grate-cooler blind plate part, it is characterised in that:Described transition parapet structure is provided in cement-kiln grate-cooler blind plate part top Brick plate structure and the blockwork group that is set between the top of brick plate structure and the side wall steel plate of cooler, pre- Fixed between the junction steel plate of building block group processed and parapet side wall provided with compartment anchoring piece, ramming mass is provided between brick plate structure Bed course.
2. the transition parapet structure in cement kiln cooler portion as claimed in claim 1, it is characterised in that:Described blockwork Group includes upper strata blockwork part, middle level blockwork part, lower floor's blockwork part;
Described upper strata blockwork part is rectangular, and transition arcs are provided with the top of its left end, and the centre bit in its underpart is installed There is the first connection recess;
Described middle level blockwork part is rectangular, the first connection double wedge is provided with the center on top, in its underpart Heart position is provided with connection recess;
Described lower floor's blockwork part is rectangular, and the second connection double wedge is provided with the center on top.
CN201720029864.5U 2017-01-11 2017-01-11 A kind of transition parapet structure in cement kiln cooler portion Active CN206369479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720029864.5U CN206369479U (en) 2017-01-11 2017-01-11 A kind of transition parapet structure in cement kiln cooler portion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720029864.5U CN206369479U (en) 2017-01-11 2017-01-11 A kind of transition parapet structure in cement kiln cooler portion

Publications (1)

Publication Number Publication Date
CN206369479U true CN206369479U (en) 2017-08-01

Family

ID=59391782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720029864.5U Active CN206369479U (en) 2017-01-11 2017-01-11 A kind of transition parapet structure in cement kiln cooler portion

Country Status (1)

Country Link
CN (1) CN206369479U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106643184A (en) * 2017-01-11 2017-05-10 安徽芜湖海螺建筑安装工程有限责任公司 Transition low-wall structure of cement kiln cooler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106643184A (en) * 2017-01-11 2017-05-10 安徽芜湖海螺建筑安装工程有限责任公司 Transition low-wall structure of cement kiln cooler

Similar Documents

Publication Publication Date Title
CN201423442Y (en) Compound safety ladle lining
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN102584304B (en) Large blast furnace swing spout
CN101957139A (en) Furnace lining repairing technology
CN201837225U (en) Inner lining structure of fire-proof material
CN202519709U (en) Precast block post-cast strip structure of foundation slab
CN102251066B (en) Cooling wall with pre-coated slag crust
CN208151833U (en) A kind of construction of novel RC-masonry combination arch bridge
CN108374320A (en) A kind of construction and construction method of novel RC-masonry combination arch bridge
CN206369479U (en) A kind of transition parapet structure in cement kiln cooler portion
CN106595314A (en) Rotary kiln liner structure and laying method
CN208514696U (en) The angle the roofing R prefabricated board of falling flashing rapid processing mold
CN108643133B (en) Detachable arch dam and construction and dismantling method thereof
CN102183146A (en) Integral casting technology of vertical limekiln working lining
CN103791726A (en) Cement kiln grate cooler toe wall structure capable of saving energy
CN106643184A (en) Transition low-wall structure of cement kiln cooler
CN201922036U (en) Novel working lining structure of tundish
CN202182612U (en) Lining structure of vertical lime pit
CN204535408U (en) A kind of prevent rotary kiln fall brick and reduce gas consumption build body structure by laying bricks or stones
CN202166320U (en) Refractory block
CN104153302A (en) Method for reinforcing concrete bridge floor beam
CN106630550A (en) Brick binding operation method for tank wall brick of large-tonnage melting furnace
CN104294994B (en) Walling unit and forming method thereof
CN201828147U (en) Combined side wall and anchoring bricks thereof
CN202482338U (en) Large blast furnace swing flow nozzle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant