CN206364469U - A kind of intensive energy saving bus duct - Google Patents

A kind of intensive energy saving bus duct Download PDF

Info

Publication number
CN206364469U
CN206364469U CN201720025186.5U CN201720025186U CN206364469U CN 206364469 U CN206364469 U CN 206364469U CN 201720025186 U CN201720025186 U CN 201720025186U CN 206364469 U CN206364469 U CN 206364469U
Authority
CN
China
Prior art keywords
hole
housing
bus duct
energy saving
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720025186.5U
Other languages
Chinese (zh)
Inventor
何飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Su Electric Technology Co Ltd
Original Assignee
Jiangsu Su Electric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Su Electric Technology Co Ltd filed Critical Jiangsu Su Electric Technology Co Ltd
Priority to CN201720025186.5U priority Critical patent/CN206364469U/en
Application granted granted Critical
Publication of CN206364469U publication Critical patent/CN206364469U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model discloses a kind of intensive energy saving bus duct, including housing, the housing is internally provided with bus group, described positive one end of housing offers two first through hole, the bus group is located between two first through hole, the front of the housing offers two the second through holes, the bus group is located between two the second through holes, the inside of the first through hole is connected with the first clamp no less than two, the two sides of the first through hole inwall offer the first wave groove, and the front of each first clamp offers third through-hole.The intensive energy saving bus duct, pass through the cooperation of first through hole, the second through hole, the first clamp, the first wave groove, third through-hole, the second clamp, the second wave groove, fourth hole and the 3rd wave groove, so as to increase the contact area of housing and air, rapid radiating can be realized by making the surrounding of bus group, the radiating efficiency of bus group is improved, so as to ensure that the service life of bus duct.

Description

A kind of intensive energy saving bus duct
Technical field
The utility model is related to power transmission and distribution facility technology field, specially a kind of intensive energy saving bus duct.
Background technology
Modern high-rise building and large-scale workshop need huge electric energy, and in face of hundreds and thousands of peaces needed for this huge load The powerful electric current of training will select safe and reliable transmission equipment, and bus-bar system is good selection.Bus duct system is one The power distribution equipment of individual efficient conveying electric current, has especially adapted to higher and higher building and large-scale plant economical rationality distribution Need.
Bus duct is developed by the U.S., and it, with non-alkene insulating supporting, is then attached to using copper or aluminium as conductor Novel conductor formed by metallic channel.It is that bus duct was obtained from then in Showa 29 years in Japanese real practical application Development.Nowadays into indispensable wiring mode on the electrical equipments such as skyscraper, factory and power system.
Due to building and factory etc. it is various building electric power the need for, and it is this need increased trend year by year, use Circuit wiring pattern originally, i.e. poling mode, bring many difficulties during construction, moreover, when distribution system to be changed, to make It becomes simple, and some are nearly impossible, however, if using bus duct, being very easy to just achieve the goal, separately Also building can be made to become more attractive in appearance outside.
At present, in the market intensive energy saving bus duct when in use, can produce substantial amounts of heat, if arranging these heats Go out, bus duct can be damaged, so that the service life reduction of bus duct.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of intensive energy saving bus duct, solves current city Intensive energy saving bus duct when in use, can produce substantial amounts of heat on field, if discharging these heats, can damage bus duct It is bad, so that the problem of service life of bus duct is reduced.
(2) technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of intensive energy saving bus duct, including shell Body, the housing is internally provided with bus group, and described positive one end of housing offers two first through hole, the bus group Between two first through hole, the front of the housing offers two the second through holes, and the bus group is located at two second Between through hole, the inside of the first through hole is connected with the first clamp no less than two, the both sides of the first through hole inwall Face offers the first wave groove, and the front of each first clamp offers third through-hole, the inside of second through hole The second clamp no less than two is connected with, the upper and lower surface of the inwall of second through hole offers the second ripple Groove, and the front of each second clamp offers fourth hole.
It is preferred that, the upper and lower surface of the housing offers the 3rd wave groove.
It is preferred that, the third through-hole is shaped as circle, a diameter of 2 centimetres of the third through-hole, and third through-hole Quantity be four.
It is preferred that, the fourth hole is shaped as rectangle, and the quantity of the fourth hole is four.
It is preferred that, the thickness of the first through hole is equal to 2/3rds of distance between bus group and housing side outer wall.
It is preferred that, the thickness of second through hole be equal to distance between bus group and housing lower surface outer wall five/ Four.
(3) beneficial effect
The utility model provides a kind of intensive energy saving bus duct, possesses following beneficial effect:
(1), the intensive energy saving bus duct, passes through first through hole, the second through hole, the first clamp, the first wave groove, the 3rd Through hole, the second clamp, the second wave groove, the cooperation of fourth hole and the 3rd wave groove, so as to increase connecing for housing and air Contacting surface is accumulated, and rapid radiating can be realized by making the surrounding of bus group, improve the radiating efficiency of bus group, so as to ensure that mother The service life of wire casing.
(2), the intensive energy saving bus duct, compact conformation is reasonable in design, practical.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model is faced.
In figure:1 housing, 2 bus groups, 3 first through hole, 4 second through holes, 5 first clamps, 6 first wave grooves, 7 threeways Hole, 8 second clamps, 9 second wave grooves, 10 fourth holes, 11 the 3rd wave grooves.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
As shown in figure 1, the utility model provides a kind of technical scheme:A kind of intensive energy saving bus duct, including housing 1, Housing 1 is internally provided with bus group 2, and the upper and lower surface of housing 1 offers the 3rd wave groove 11, the front of housing 1 One end offer two first through hole 3, bus group 2 is located between two first through hole 3, and the thickness of first through hole 3 is equal to mother 2/3rds of distance between line group 2 and the side outer wall of housing 1, the front of housing 2 offers two the second through holes 4, bus group 2 Between two the second through holes 4, by setting the through hole 4 of first through hole 3 and second, increase the contact area of bus duct and air Greatly, so that the radiating of bus duct more facilitates, the inside of first through hole 3 is connected with the first clamp 5 no less than two, first The two sides of the inwall of through hole 3 offer the first wave groove 6, and the front of each first clamp 5 offers third through-hole 7, Third through-hole 7 is shaped as circle, a diameter of 2 centimetres of third through-hole 7, and the quantity of third through-hole 7 is four, the second through hole 4 inside is connected with the second clamp 8 no less than two, and the upper and lower surface of the inwall of the second through hole 4 offers Two wave grooves 9, the thickness of the second through hole 4 is equal to 4/5ths of distance between bus group 2 and the lower surface outer wall of housing 1, and often The front of individual second clamp 8 offers fourth hole 10, and fourth hole 10 is shaped as rectangle, and the quantity of fourth hole 10 is Four, pass through first through hole 3, the second through hole 4, the first clamp 5, the first wave groove 6, third through-hole 7, the second clamp 8, the second ripple The cooperation of groove 9, the wave groove 11 of fourth hole 10 and the 3rd, so as to increase the contact area of housing 1 and air, makes bus group 2 surrounding can realize rapid radiating, improve the radiating efficiency of bus group 2, so as to ensure that the use longevity of bus duct Life.
It can to sum up obtain, the intensive energy saving bus duct, pass through first through hole 3, the second through hole 4, the first clamp 5, first wave Groove 6, third through-hole 7, the second clamp 8, the second wave groove 9, the cooperation of the wave groove 11 of fourth hole 10 and the 3rd, so as to increase The contact area of housing 1 and air, to make the surrounding of bus group 2 can realize rapid radiating, improve dissipating for bus group 2 The thermal efficiency, so as to ensure that the service life of bus duct.
Meanwhile, the intensive energy saving bus duct, compact conformation is reasonable in design, practical.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of intensive energy saving bus duct, including housing (1), the housing (1) is internally provided with bus group (2), and it is special Levy and be:The positive one end of the housing (1) offers two first through hole (3), and the bus group (2) is located at two first and led to Between hole (3), the front of the housing (1) offers two the second through holes (4), and the bus group (2) is located at two second and led to Between hole (4), the inside of the first through hole (3) is connected with the first clamp (5) no less than two, the first through hole (3) The two sides of inwall offer the first wave groove (6), and the front of each first clamp (5) offers third through-hole (7), The inside of second through hole (4) is connected with the second clamp (8) no less than two, the inwall of second through hole (4) it is upper Surface and lower surface offer the second wave groove (9), and the front of each second clamp (8) offers fourth hole (10)。
2. a kind of intensive energy saving bus duct according to claim 1, it is characterised in that:The upper surface of the housing (1) The 3rd wave groove (11) is offered with lower surface.
3. a kind of intensive energy saving bus duct according to claim 1, it is characterised in that:The shape of the third through-hole (7) Shape for circle, a diameter of 2 centimetres of the third through-hole (7), and third through-hole (7) quantity be four.
4. a kind of intensive energy saving bus duct according to claim 1, it is characterised in that:The shape of the fourth hole (10) Shape is rectangle, and the quantity of the fourth hole (10) is four.
5. a kind of intensive energy saving bus duct according to claim 1, it is characterised in that:The thickness of the first through hole (3) Degree is equal to 2/3rds of distance between bus group (2) and housing (1) side outer wall.
6. a kind of intensive energy saving bus duct according to claim 1, it is characterised in that:The thickness of second through hole (4) Degree is equal to 4/5ths of distance between bus group (2) and housing (1) lower surface outer wall.
CN201720025186.5U 2017-01-10 2017-01-10 A kind of intensive energy saving bus duct Expired - Fee Related CN206364469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720025186.5U CN206364469U (en) 2017-01-10 2017-01-10 A kind of intensive energy saving bus duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720025186.5U CN206364469U (en) 2017-01-10 2017-01-10 A kind of intensive energy saving bus duct

Publications (1)

Publication Number Publication Date
CN206364469U true CN206364469U (en) 2017-07-28

Family

ID=59380198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720025186.5U Expired - Fee Related CN206364469U (en) 2017-01-10 2017-01-10 A kind of intensive energy saving bus duct

Country Status (1)

Country Link
CN (1) CN206364469U (en)

Similar Documents

Publication Publication Date Title
CN105280739B (en) Heat-dissipation split-type conjunction box used for solar assembly and solar cell assembly thereof
CN205453028U (en) Copper bus duct of corner formula
CN206364469U (en) A kind of intensive energy saving bus duct
CN104339826A (en) Solar cell main grid hollow positive electrode screen
CN203313581U (en) Novel electrical cabinet
CN106207915A (en) A kind of totally-enclosed composite resin poured bus slot
CN206850378U (en) A kind of Al-Mg-Mn alloy bus duct
CN206117069U (en) Totally -closed composite resin casting bus groove
CN206650405U (en) The exposed spool protection device of electrical engineering
CN203118519U (en) Large-area self- heat-dissipation copper busbar
CN207320772U (en) A kind of pouring type water proof bus bar slot
CN206947590U (en) Novel wire arranging connector construction
CN206225712U (en) A kind of low pressure feeder pillar copper busbar
CN204205224U (en) A kind of big current connects busbar
CN204558953U (en) A kind of hydroelectric station Special distribution cabinet
CN214379939U (en) Energy-saving environment-friendly air-reinforced insulation type bus duct
CN204089109U (en) A kind of intensive copper-aluminum compound bus duct
CN215772316U (en) Practical hot galvanizing wire slot
CN203549124U (en) Cable bridge
CN203950946U (en) power connector input module
CN211127027U (en) Power transmission and distribution bus duct for power equipment
CN213093825U (en) High-protection pouring bus duct
CN204012066U (en) Three two oblate inserting and three full conjuncted structures of five hole socket/switch sleeves
CN203358023U (en) Positive electrode screen with hollow main grid for solar cell
CN218827960U (en) Bus duct and jack box grafting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728