CN206359378U - Water treatment facilities - Google Patents

Water treatment facilities Download PDF

Info

Publication number
CN206359378U
CN206359378U CN201621200643.1U CN201621200643U CN206359378U CN 206359378 U CN206359378 U CN 206359378U CN 201621200643 U CN201621200643 U CN 201621200643U CN 206359378 U CN206359378 U CN 206359378U
Authority
CN
China
Prior art keywords
water
liquid level
ozone
level sensor
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621200643.1U
Other languages
Chinese (zh)
Inventor
孙志伟
杨斌
钟社威
李林柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Defond Electech Co Ltd
Original Assignee
Dongguan Long Sound Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Long Sound Intelligent Technology Co Ltd filed Critical Dongguan Long Sound Intelligent Technology Co Ltd
Priority to CN201621200643.1U priority Critical patent/CN206359378U/en
Application granted granted Critical
Publication of CN206359378U publication Critical patent/CN206359378U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of water treatment facilities, it is characterised in that including control system, sedimentation basin, ozone pond, magnetizing assembly and outlet pipe;The top of the sedimentation basin is connected with the top in the ozone pond;The bottom in the ozone pond is provided with ozone generating-device, the ozone generating-device and the control system signal communication;The outlet pipe is connected with the ozone pond, and the magnetizing assembly is arranged on the outlet pipe.The water treatment facilities that the utility model is provided, the purified treatment of water is realized using physical method, is prevented effectively from disinfecting process and produces chemical agent residue, makes the water safety and reliability after processing.

Description

Water treatment facilities
Technical field
The utility model is related to technical field of water body purification, more particularly to a kind of water treatment facilities.
Background technology
At present, all trades and professions such as planting industry, animal husbandry, industry increasingly increase severely to the demand of water.Used generally for irrigating The water demands such as water, raising water, industrial water, can use the water after sterilization to be supplied.
The more common method of water body disinfection is carried out disinfection using chemical reagent.Water body disinfection is carried out using chemical reagent Method is easily caused the chemical reagent that residual fraction in water is used to sterilize, and the chemical reagent of these residuals to a certain extent can be right Crops or livestock adversely affect.
Utility model content
A purpose of the present utility model is:A kind of water treatment facilities is provided, realized using physical method to the net of water Change is handled, and is prevented effectively from disinfecting process and is produced chemical agent residue, makes the water safety and reliability after processing.
For up to this purpose, the utility model uses following technical scheme:
A kind of water treatment facilities, including control system, sedimentation basin, ozone pond, magnetizing assembly and outlet pipe;The sedimentation basin Top connected with the top in the ozone pond;The bottom in the ozone pond is provided with ozone generating-device;The outlet pipe and institute The connection of ozone pond is stated, the magnetizing assembly is arranged on the outlet pipe.
Specifically, water is subjected to preliminary sedimentation by sedimentation basin, it is heavy to stay in impurity larger in water and particulate matter The bottom in shallow lake pond, the more clear water in upper strata then enters in ozone pond.Water sterilization is sterilized using ozone in ozone pond, then utilized The high magnetic of magnetizing assembly provided with permanent magnet changes the structure of hydrone., can be more preferable by the hydrone of magnetization treatment Absorption and utilization.What can be dissolved in the water of nutriment or medicine after treatment is more abundant, so as to improve nutriment or medicine The efficiency being absorbed and used by plants.
As a preferred embodiment, also include the first water pump, first water pump and the control system signal Connection;The outlet of first water pump is connected with the top of the sedimentation basin.
Specifically, moisturizing is carried out from the top of sedimentation basin by the first water pump, it is possible to prevente effectively from being deposited in sedimentation basin The impurity and particulate matter of bottom are interfered and diffused in supernatant.
As a preferred embodiment, the ozone generating-device includes ozone machine, tracheae and afrodite, the ozone Machine is provided with exhaust outlet;One end of the tracheae is connected with the exhaust outlet;The other end of the tracheae is connected with the afrodite.
Specifically, after the completion of ozone pond adds water, ozonization program is started, the air with ozone is passed through gas by ozone machine Pipe is transported to the bottom in ozone pond, is passed through in the pore of afrodite.Ozone is gasificated into tiny bubble after afrodite, tiny Bubble floats from the bottom in ozone pond to the water surface, finally resolves into oxygen.Ozone is contacted during floating with water body, Harmful organism in water kills, and realizes sterilization.
As a preferred embodiment, the ozone pond is provided with the first liquid level sensor and the second liquid level sensor, First liquid level sensor and second liquid level sensor and the control system signal communication;First level sensing Device is arranged on the top in the ozone pond, and second liquid level sensor is arranged on the lower section of first liquid level sensor.
Specifically, when the liquid level in ozone pond drops to the detection zone of the second liquid level sensor, the second level sensing Device sends a signal to control system, and the clear water that control system controls water supplement apparatus to be carried out to sedimentation basin in moisturizing, sedimentation basin enters In ozone pond, the liquid level in ozone pond is begun to ramp up.When the liquid level in ozone pond rises to the detection zone of the first liquid level sensor, First liquid level sensor sends a signal to control system, stops the moisturizing to sedimentation basin, and then stop the moisturizing to ozone pond.
As a preferred embodiment, being additionally provided with water tower, the ozone between the ozone pond and the outlet pipe Pond is connected with the top of the water tower, and the outlet pipe is connected with the bottom of the water tower.
Specifically, water tower is also set up between ozone pond and outlet pipe, intelligent water can be played a part of.When user needs When water is little, the water that purified treatment is crossed can be stored in water tower;When user's water requirement is larger, then pass through water tower Supplied water to user.Such design can effectively solve water treatment facilities disposal ability and user water requirement it is unmatched Problem, strengthens the adaptability of water treatment facilities.
As a preferred embodiment, also include the second water pump, second water pump and the control system signal Connection;The import of second water pump is connected with the bottom in the ozone pond, outlet and the water tower of second water pump Top is connected.
Specifically, by setting the second water pump, it is possible to which water tower is arranged on to higher position, in electricity consumption peak interval of time, Using the second water pump by treated water transport into the water tower of eminence;In the peak of power consumption period, directly pass through water tower and user The liquid level difference of side is supplied water.Realization is used electricity in off-peak hours, and can effectively reduce the electricity charge, rationally utilizes electric resources.
As a preferred embodiment, the water tower is provided with the 3rd liquid level sensor and the 4th liquid level sensor, 3rd liquid level sensor and the 4th liquid level sensor and the control system signal communication;3rd level sensing Device is arranged on the top of the water tower, and the 4th liquid level sensor is arranged on the lower section of the 3rd liquid level sensor.
Specifically, when the liquid level in water tower drops to the detection zone of the 4th liquid level sensor, the 4th liquid level sensor hair The number of delivering letters is to control system, and control system control water supplement apparatus carries out the liquid level in moisturizing, water tower to water tower and begun to ramp up.Work as water When liquid level in tower rises to the detection zone of the 3rd liquid level sensor, the 3rd liquid level sensor sends a signal to control system, Stop the moisturizing to water tower.Control system is by recording the 3rd liquid level sensor and the 4th liquid level sensor in upper period Changing rule, it is possible to predict the watering law of user in subsequent time period, and then got ready in advance in ozone pond and water tower suitable The water of amount.
As a preferred embodiment, being additionally provided with disinfection by ultraviolet light dress between the ozone pond and the magnetizing assembly Put.
Specifically, apparatus for ultraviolet disinfection is set up, further can carry out disinfection purified treatment to water, strengthened purification effect Really.
As a preferred embodiment, also include electric power system, the electric power system include solar panel and Illuminance inductor, the electric power system and the control system signal communication.
Specifically, electric power system is set to solar electric power supply system and power network electric power system hybrid power supply.Work as illuminance When inductor light sensing intensity is stronger, illuminance inductor sends a signal to control system, and control system is controlled at whole water Plant running is managed, ozone pond is in full water state.When illuminance inductor light sensing intensity is weaker, illuminance inductor Control system is sent a signal to, control system controls whole water treatment facilities operation, in the case where ensureing user's water consumption, to the greatest extent Amount makes ozone pond be in relatively low water level.Thus the water process amount during cloudy day can be reduced sufficiently using solar powered, And then reduce the electric energy of the power network electric power system consumed during the cloudy day.
As a preferred embodiment, also including terminal, the control system is believed by internet and the terminal Number connection.
Specifically, control system is made to be connected by internet with terminal signaling, client can just pass through terminal a long way off The running status and operational factor of the various pieces of water treatment facilities are solved, remote control, side can also be carried out to water treatment facilities Just it is quick.
The beneficial effects of the utility model be there is provided a kind of water treatment facilities, by being precipitated to water, ozonization, The processing such as magnetization, is purified water:
1) Applied Physics method carries out disinfection sterilization to water, reduces chemical agent residue in water, and live by magnetization technology Change water quality, improve plant to the absorption efficiency for the nutriment being dissolved in water;
2) in terms of soilless culture, nutrient solution needs to be used for a long time, and the nutrient solution containing residual chemical agents easily produces green The problems such as algae growth, bacteria breed, nutritional ingredient sedimentation crystallization;And the water handled using physical method is then asked in the absence of these Topic;
3) the utility model can effectively reduce the rotten probability of nutrient solution and improve the absorption efficiency of Plant To Nutrient liquid.
Brief description of the drawings
The utility model is described in further detail below according to drawings and examples.
Fig. 1 is the schematic diagram of the water treatment facilities described in embodiment.
In figure:
1st, solar panel;2nd, electric power system;3rd, illuminance inductor;4th, control system;5th, the first water pump;6th, precipitate Pond;7th, ozone generating-device;8th, the second water pump;9th, ozone pond;10th, apparatus for ultraviolet disinfection;11st, the first liquid level sensor;12、 Second liquid level sensor;13rd, the 3rd liquid level sensor;14th, the 4th liquid level sensor;15th, water tower;16th, magnetizing assembly;17th, go out Water pipe.
Embodiment
Further illustrate the technical solution of the utility model below in conjunction with the accompanying drawings and by embodiment.
As shown in figure 1, a kind of water treatment facilities, including control system 4, the first water pump 5, sedimentation basin 6, ozone pond 9, second Water pump 8, apparatus for ultraviolet disinfection 10, water tower 15, magnetizing assembly 16 and outlet pipe 17;Wherein, the first water pump 5 and the second water pump 8 With the signal communication of control system 4.
The outlet of first water pump 5 is connected with the top of sedimentation basin 6, can be the moisturizing of sedimentation basin 6;The top of sedimentation basin 6 with Upper strata clear water in the top connection in ozone pond 9, sedimentation basin 6 can be hence into ozone pond 9;The bottom in ozone pond 9 is provided with Ozone generating-device 7, the ozone of generation is used for carrying out disinfection sterilization to the water in ozone pond 9;Second water pump 8 is immersible pump, if The bottom in ozone pond 9 is put, the outlet of the second water pump 8 is connected with the top of water tower 15, the second water pump 8 can be by ozone pond 9 Water transport transport in water tower 15;Pipeline between the outlet of second water pump 8 and the top of water tower 15 is filled provided with disinfection by ultraviolet light 10 are put, disinfection by ultraviolet light is carried out to water;The bottom of water tower 15 is connected with outlet pipe 17, and outlet pipe 17 is provided with magnetizing assembly 16, Water after magnetization continues through outlet pipe 17 and transported at user for users to use.
Water is subjected to preliminary sedimentation by sedimentation basin 6, impurity larger in water and particulate matter sedimentation basin 6 can be stayed in Bottom, the more clear water in upper strata then enters in ozone pond 9.Water sterilization is sterilized using ozone in ozone pond 9, then with ultraviolet pair Water carries out disinfection processing, then changes the structure of hydrone using the high magnetic of the magnetizing assembly 16 provided with permanent magnet.By magnetic Change the hydrone of processing, preferably can be absorbed and utilized.It can be dissolved more in the water of nutriment or medicine after treatment Fully, so as to improve the efficiency that nutriment or medicine are absorbed and used by plants.Water tower is set between ozone pond 9 and outlet pipe 17 15, intelligent water can be played a part of.When user's water requirement is little, the water that purified treatment is crossed can be stored in water In tower 15;When user's water requirement is larger, then supplied water by water tower 15 to user.Such design can be solved effectively at water The disposal ability and the unmatched problem of water requirement of device are managed, strengthens the adaptability of water treatment facilities.
It is preferred that, water tower 15 is arranged on to higher position, will be treated using the second water pump 8 in electricity consumption peak interval of time Water transport into the water tower 15 of eminence;In the peak of power consumption period, directly supplied by water tower 15 and the liquid level difference of user side Water.Realization is used electricity in off-peak hours, and can effectively reduce the electricity charge, rationally utilizes electric resources.
Wherein, ozone generating-device 7 includes ozone machine, tracheae and afrodite, and ozone machine is provided with exhaust outlet;One end of tracheae with Exhaust outlet is connected;The other end of tracheae is connected with afrodite.After the completion of ozone pond 9 adds water, start ozonization program, ozone machine handle Air with ozone is transported to by tracheae in the bottom in ozone pond 9, the pore for being passed through the afrodite of the bottom of ozone pond 9.Ozone After afrodite, tiny bubble is gasificated into, tiny bubble floats from bottom of pond to the water surface, finally resolves into air.Ozone exists During floating, contacted with water body, the harmful organism in water is killed, realize sterilization.
As shown in figure 1, water treatment facilities also includes electric power system 2, electric power system 2 and the signal communication of control system 4, for control System 4 processed is powered.2 points of electric power system is two parts:Solar electric power supply system and power network electric power system, solar electric power supply system bag Include solar panel 1 and illuminance inductor 3.When illuminance inductor 3 sense light it is stronger when, supplied using solar energy Electric system is powered;When illuminance inductor 3 sense light it is weaker when, be powered using power network electric power system.When When the light sensing intensity of illuminance inductor 3 is stronger, illuminance inductor 3 sends a signal to control system 4, and control system 4 is controlled Whole water treatment facilities operation is made, ozone pond 9 and water tower 15 is in full water state.When the light sensing of illuminance inductor 3 is strong When degree is weaker, illuminance inductor 3 sends a signal to control system 4, and control system 4 controls whole water treatment facilities to run, In the case of ensureing user's water consumption, ozone pond 9 and water tower 15 is set to be in relatively low water level as far as possible.Thus can be sufficiently sharp With solar powered, it is to avoid water process amount when cloudy far surpasses the water requirement of user, and then reduce the power network consumed during the cloudy day and supply The electric energy of electric system.
The first liquid level sensor 11 and the second liquid level sensor 12, the He of the first liquid level sensor 11 are additionally provided with ozone pond 9 Second liquid level sensor 12 and the signal communication of control system 4;First liquid level sensor 11 is arranged on the top in ozone pond 9, second Liquid level sensor 12 is arranged on the bottom in ozone pond 9.When the liquid level in ozone pond 9 drops to the detection of the second liquid level sensor 12 During region, the second liquid level sensor 12 sends a signal to control system 4, and control system 4 controls the first water pump 5 to enter sedimentation basin 6 Clear water in row moisturizing, sedimentation basin 6 enters in ozone pond 9, and the liquid level in ozone pond 9 is begun to ramp up.When in the liquid level in ozone pond 9 The detection zone of the first liquid level sensor 11 is risen to, the first liquid level sensor 11 sends a signal to control system 4, stops to precipitation The moisturizing in pond 6, and then stop the moisturizing to ozone pond 9.
The 3rd liquid level sensor 13 and the 4th liquid level sensor 14, the 3rd liquid level sensor 13 and are additionally provided with water tower 15 Four liquid level sensors 14 and the signal communication of control system 4;3rd liquid level sensor 13 is arranged on the top of water tower 15, the 4th liquid level Sensor 14 is arranged on the bottom of water tower 15.When the liquid level in water tower 15 drops to the detection zone of the 4th liquid level sensor 14 When, the 4th liquid level sensor 14 sends a signal to control system 4, and control system 4 controls the second water pump 8 to mend water tower 15 Liquid level in water, water tower 15 is begun to ramp up.When the liquid level in water tower 15 rises to the detection zone of the 3rd liquid level sensor 13, Three liquid level sensors 13 send a signal to control system 4, stop the moisturizing to water tower 15.Control system 4 is upper for the moment by record Between (one day or one week or one month etc., be set by the user) the 3rd liquid level sensor 13 and the 4th liquid level sensor 14 in section Changing rule, it is possible to predict the watering law of user in subsequent time period, and then standby in ozone pond 9 and water tower 15 in advance Good appropriate water.
Control system 4 can also be connected by internet with the terminal signaling of mobile phone or custom-made, and client just can be with The running status and operational factor of the various pieces of water treatment facilities are understood by the terminal of mobile phone or custom-made a long way off, The water level height of such as ozone pond 9 and water tower 15, such as the start and stop situation of the first water pump 5 and the second water pump 8.Can also be to water Processing unit carries out remote control, controls whole water treatment facilities or the start and stop of some part etc., convenient and swift.
Handling process:
1) control system 4 is after user's enabled instruction is received, full water setting time that time is up, and water treatment facilities starts fortune Make.If running into fine day, water treatment facilities can utilize the water in solar energy self-purging ozone pond 9.
2) water level monitoring, the first liquid level sensor 11, the second liquid level sensor 12, the 3rd liquid level sensor 13 and the 4th liquid The signal of water level conditions is transmitted to control system 4 by level sensor 14, and control system 4 calculates the water in ozone pond 9 and water tower 15 Whether amount meets the current water requirement of user.If be unsatisfactory for, water purification action starts.
3) the first water pump 5 starts, and water transport is settled into sedimentation basin 6, and the water level in sedimentation basin 6 is begun to ramp up, Larger impurity sinks to bottom of pond with particulate matter in water, and upper strata clear water is then transferred to ozone pond 9.Water level reaches in ozone pond 9 During one 11 corresponding water level of liquid level sensor, the first water pump 5 and the second water pump 8 are stopped, and ozone generating-device 7 starts work Make, the air with ozone is transported to by tracheae the bottom in ozone pond 9, be passed through in the pore of afrodite.Ozone passes through afrodite Afterwards, tiny bubble is gasificated into, tiny bubble floats from the bottom in ozone pond 9 to the water surface, finally resolves into air.Ozone exists During floating, contacted with water body, the harmful organism in water is killed, realize sterilization.The time of ozonization is half an hour, The capacity that the quantity of ozone generating-device 7 regards ozone pond 9 increases and decreases.From disinfectant program startup, in two hours, the first water pump 5 Do not run with the second water pump 8.Stand 2 hours and wait ozone decomposed sterilization, after ozone decomposed sterilization, in addition it is also necessary to stand 30 minutes, Remaining ozone automatic classifying in water is allowed into oxygen.
4) after the completion of ozonization, when the water level in water tower 15 is less than the 4th 14 corresponding water level of liquid level sensor, the Two water pumps 8 start, and the apparatus for ultraviolet disinfection 10 in water pipe also starts, and water passes through disinfection by ultraviolet light, then flows into water Store standby in tower 15.
5) when user needs to use water, the water in water tower 15 is by the magnetizing assembly 16 being enclosed on outside outlet pipe 17, water body quilt After magnetization, hydrone diminishes, and some salt in water also become not allowing free settling, improve the quality of water.
6) under the sensing of illuminance inductor 3, ensure that ozone pond 9 and water tower 15 keep full water state in fine day, subtract The electric energy of power network electric power system is consumed during few cloudy day.
By the water treatment facilities of the present embodiment, following beneficial effect can be reached:
Avoid the chemical residue in water after chemical agent sterilization;The energy is saved, the use of chemosterilant is reduced;Activation Water quality, it is beneficial to body, improve absorption efficiency of the plant to nutrient;Using luminous energy, the energy is saved;The standby water of intelligence, with water It is before peak period that water process is good;User can be with the situation of remote monitoring water treatment facilities.
" first ", " second ", " the 3rd ", " 4th " herein in description just for the sake of being distinguish between, not Special implication.
It is to be understood that, above-mentioned embodiment is only preferred embodiment of the present utility model and institute's application technology Principle, in technical scope disclosed in the utility model, what any one skilled in the art was readily apparent that Change or replacement, should all cover in protection domain of the present utility model.

Claims (10)

1. a kind of water treatment facilities, it is characterised in that including control system, sedimentation basin, ozone pond, magnetizing assembly and outlet pipe;
The top of the sedimentation basin is connected with the top in the ozone pond;The bottom in the ozone pond is provided with ozone generating-device, The ozone generating-device and the control system signal communication;
The outlet pipe is connected with the ozone pond, and the magnetizing assembly is arranged on the outlet pipe.
2. water treatment facilities according to claim 1, it is characterised in that
Also include the first water pump, first water pump and the control system signal communication;The import of first water pump with it is outer The accessing pending water connection in portion, the outlet of first water pump is connected with the top of the sedimentation basin.
3. water treatment facilities according to claim 1, it is characterised in that the ozone generating-device includes ozone machine, gas Pipe and afrodite, the ozone machine are provided with exhaust outlet;
One end of the tracheae is connected with the exhaust outlet;The other end of the tracheae is connected with the afrodite.
4. water treatment facilities according to claim 1, it is characterised in that the ozone pond provided with the first liquid level sensor and Second liquid level sensor, first liquid level sensor and second liquid level sensor and the control system signal communication;
First liquid level sensor is arranged on the top in the ozone pond, and second liquid level sensor is arranged on described first The lower section of liquid level sensor.
5. water treatment facilities according to claim 1, it is characterised in that also set between the ozone pond and the outlet pipe There is water tower, the ozone pond is connected with the top of the water tower, and the outlet pipe is connected with the bottom of the water tower.
6. water treatment facilities according to claim 5, it is characterised in that also including the second water pump, second water pump with The control system signal communication;
The import of second water pump is connected with the ozone pond, and the outlet of second water pump at the top of the water tower with connecting It is logical.
7. water treatment facilities according to claim 5, it is characterised in that the water tower be provided with the 3rd liquid level sensor and 4th liquid level sensor, the 3rd liquid level sensor and the 4th liquid level sensor and the control system signal communication;
3rd liquid level sensor is arranged on the top of the water tower, and the 4th liquid level sensor is arranged on the 3rd liquid The lower section of level sensor.
8. water treatment facilities according to claim 1, it is characterised in that between the ozone pond and the magnetizing assembly also Provided with apparatus for ultraviolet disinfection.
9. water treatment facilities according to claim 1, it is characterised in that also including electric power system, the electric power system bag Include solar panel and illuminance inductor, the electric power system and the control system signal communication.
10. water treatment facilities according to claim 1, it is characterised in that also including terminal, the control system passes through mutual Networking is connected with the terminal signaling.
CN201621200643.1U 2016-11-04 2016-11-04 Water treatment facilities Active CN206359378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621200643.1U CN206359378U (en) 2016-11-04 2016-11-04 Water treatment facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621200643.1U CN206359378U (en) 2016-11-04 2016-11-04 Water treatment facilities

Publications (1)

Publication Number Publication Date
CN206359378U true CN206359378U (en) 2017-07-28

Family

ID=59369051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621200643.1U Active CN206359378U (en) 2016-11-04 2016-11-04 Water treatment facilities

Country Status (1)

Country Link
CN (1) CN206359378U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021057556A1 (en) * 2019-09-29 2021-04-01 中国环境科学研究院 System and method for remediation of river/lake water body by means of floating water purification facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021057556A1 (en) * 2019-09-29 2021-04-01 中国环境科学研究院 System and method for remediation of river/lake water body by means of floating water purification facility

Similar Documents

Publication Publication Date Title
US20220315501A1 (en) Soil enrichment systems and methods
CN104003580A (en) System for treatment of wetland-produced electricity from domestic sewage and electrochemical disinfection of wetland effluent
CN105692778B (en) Deep ultraviolet water body intelligent sterilizing device and deep ultraviolet intelligent sterilizing system
CN203399622U (en) Self-controlled circulating water cultivation system
CN204039135U (en) The device that a kind of landscape water body self-purging and water quality ensure
CN206359378U (en) Water treatment facilities
CN106007100B (en) Sewage-treatment plant and its treatment process
CN105060648A (en) Industrial circulating water fish-culture denitrification zero-emission system
CN202953908U (en) Integrated treatment device for seawater toilet-flushing sewage
CN204705057U (en) Solar water container self-cleaning system
CN106277549A (en) Water treatment facilities
CN207904032U (en) A kind of digestion clear liquid concentration systems
CN201305526Y (en) Ecosystem box
CN107352628A (en) A kind of solar wind-energy purifier
CN205575708U (en) Dark purple outer water intelligence sterilizing equipment and dark purple outer intelligent sterilization system
CN203912983U (en) A kind of culturing pool seawater mercury removal device
CN205528320U (en) Buried waste water treatment system for treating sewage
CN209403328U (en) Stereo chamber type cultivation equipment
CN203692218U (en) Factory aquaculture device
CN206260582U (en) A kind of fishery cultivating Water warfare circulatory system
CN201770577U (en) Ecological purifying box
CN206428043U (en) A kind of water body cleaning machine
CN205973954U (en) Portable sewage treatment device and sewage treatment system
CN211620268U (en) Energy-efficient rural domestic sewage biological treatment system
CN110467277B (en) Rural domestic sewage treatment facility goes out water normal position resourceful utilization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190725

Address after: 523160 Guangdong city of Dongguan Province Hong Mei Town Industrial Zone second

Patentee after: De Fengdian Polytron Technologies Inc

Address before: 523160 Guangdong city of Dongguan Province Hong Mei Zhen Dang Yong Cun Hong Mei Road (plant P15) five layer region

Patentee before: Dongguan long sound intelligent technology Co., Ltd.