CN206348982U - A kind of gas fueling station system simulation training platform - Google Patents

A kind of gas fueling station system simulation training platform Download PDF

Info

Publication number
CN206348982U
CN206348982U CN201621191077.2U CN201621191077U CN206348982U CN 206348982 U CN206348982 U CN 206348982U CN 201621191077 U CN201621191077 U CN 201621191077U CN 206348982 U CN206348982 U CN 206348982U
Authority
CN
China
Prior art keywords
voltage relay
panel
training platform
low
station system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621191077.2U
Other languages
Chinese (zh)
Inventor
高昕东
杨霞霞
杨艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Gas Engineering Technical School
Original Assignee
Shanxi Gas Engineering Technical School
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Gas Engineering Technical School filed Critical Shanxi Gas Engineering Technical School
Priority to CN201621191077.2U priority Critical patent/CN206348982U/en
Application granted granted Critical
Publication of CN206348982U publication Critical patent/CN206348982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

A kind of gas fueling station system simulation training platform, including flow panel, PLC and master switch, light emitting diode and potentiometer are set on Row control panel, PLC includes central processing unit, switching quantity expanding module, analog input expansion module, analog output expansion module and PORT COM, electricity is set to drag panel by flow panel, electricity, which is dragged, sets motor, low-voltage relay, high-voltage relay on panel, low-voltage relay connects the switching quantity expanding module port, low-voltage relay controls the high-voltage relay, high-voltage relay controlled motor.The utility model is on the basis of existing training platform, add electricity and drag panel, greatly student is enriched in simulation and training to gas transmission and distribution and the understanding of aerating operation principle, breaker, fuse are added in circuit simultaneously, make teaching platform safer in use, fault rate is further reduced, and greatlys save maintenance cost.

Description

A kind of gas fueling station system simulation training platform
Technical field
The utility model is related to a kind of electric automatization teaching equipment, and more particularly to a kind of gas transmission and distribution Automated condtrol is put down Platform.
Background technology
In the teaching of gas transmission and distribution specialty, student's Need Hierarchy Theory could grasp knowledge and apply to being actually combined In work.Nowadays training resource is extremely limited on the spot, therefore most schools are imparted knowledge to students using simulation and training, and simulation and training religion mostly The teaching of gas transmission and distribution specialty can not be matched by learning platform.Fuel gas transmission technique control disclosed in Chinese patent ZL2015205027227 Training platform is intended in molding, and it utilizes control flow and each function in PLC and electronic-component analogs gas transmission and distribution station, But it is merely capable of simulating dispatch station, it is impossible to simulate the devices such as air pump, blower fan in gas station, such as utilize light emitting diode merely Mark is not vivid enough, is unfavorable for the understanding of student.
The content of the invention
In view of the shortcomings of the prior art, the utility model provides a kind of gas fueling station system simulation training platform.
The technical solution adopted in the utility model is:A kind of gas fueling station system simulation training platform, including flow face Light emitting diode and potentiometer, the PLC bag are set on plate, PLC and master switch, the Row control panel Central processing unit, switching quantity expanding module, analog input expansion module, analog output expansion module and PORT COM are included, Electricity is set to drag panel by the flow panel, the electricity drags and sets motor, low-voltage relay, high-voltage relay on panel, described Low-voltage relay connects the switching quantity expanding module port, and the low-voltage relay controls the high-voltage relay, the height Potential relay controls the motor.
A kind of described gas fueling station system simulation training platform, it is characterized in that:The current source, high-voltage relay, Motor matching has fuse, and the master switch matches breaker.
A kind of described gas fueling station system simulation training platform, it is characterized in that:Also include ammeter, the ammeter Equipped with current source.
A kind of described gas fueling station system simulation training platform, it is characterized in that:The PORT COM connects touch-screen And host computer.
The utility model adds electricity and drags panel, greatly enrich student in mould on the basis of existing training platform To gas transmission and distribution and the understanding of aerating operation principle during plan real training, while adding breaker, fuse in circuit, make teaching Platform is safer in use, and fault rate is further reduced, and greatlys save maintenance cost.
Brief description of the drawings
Fig. 1 is the utility model contour structures schematic diagram;
Fig. 2 is the utility model PLC digital module wiring schematic diagram;
Fig. 3 is the utility model PLC analog input expansion module wiring schematic diagram;
Fig. 4 is the utility model PLC analog output expansion module wiring schematic diagram;
Fig. 5 is the utility model circuit diagram;
In figure:1- flow panels, 2-PLC controllers, 3- light emitting diodes, 4- potentiometers, 5- low-voltage relays, 6- high pressures Relay, 7- ammeters, 8- current sources, 9- jacks, 10- motors, 11- electricity drags panel, and 12- master switch, 13- breakers, 14- becomes Depressor, 15- touch-screens, 16- fuses 16.
Embodiment
As shown in figure 1, a kind of gas fueling station system simulation training platform, including flow panel 1, PLC 2, electricity Stream source 8, electricity drags panel 11, touch-screen 15.Gas fueling station system simulation schematic diagram is decorated with flow panel 1, wherein, Mei Gefa The light emitting diode 3 of door marked position two different colours of setting, the open and-shut mode for showing valve, each fluid level transmitter, Temperature transmitter, pressure transmitter, valve position transmitter marked position set potentiometer 4.As shown in Figure 2,3, 4, PLC is used Siemens s7-200, including CPU226 CN AC/DC/RLY, EM223 16DI/16RLY, EM231 4AI, EM232 2AD, also Including two RS485 PORT COMs, two communication critical points connect touch-screen 15 and host computer respectively.Electricity drags and sets motor on panel 11 10th, low-voltage relay 5 and high-voltage relay 6.Each light emitting diode two-stage, each potentiometer two ends, PLC is each draws Pin is correspondingly arranged a jack 9 respectively.
As shown in Fig. 2 the 1L ends of PLC 2 and 1M connection 24V power supplys, the two ends of light emitting diode 3 connect 24V respectively Power supply low-pressure end and PLC Q0.0 ports, one resistance of series connection of light emitting diode 3, accord with light emitting diode both end voltage Itself rated voltage is closed, the coil two ends of low-voltage relay 5 connect 24V power supplys low-pressure end and PLC Q0.3 ports respectively.
As shown in figure 3, when using ammeter 7 as indicating meter, ammeter 7, current source 8 and potentiometer 4 are connected, it One end connection PLC analog input expansion module RA and A+ ports, other end connection A- ports now, can pass through The regulation resistance sizes of potentiometer 5 change the reading of ammeter 7.
As shown in figure 4, when using ammeter 7 as indicating meter, its two ends being connected into PLC analog outputs respectively and expanded Open up module M0 ports and I0 ports.
As shown in figure 5, installing breaker 13, master switch 12 between 380V AC power live wires L1, L2, L3 and master switch 12 For change-over switch, the coil two ends of high-voltage relay 6 connect L1, L2, the inductive switch of low-voltage relay 5 and the coil of high-voltage relay 6 Series connection, motor 10 is three phase electric machine, and respectively with L1, L2, L3 connections, the inductive switch of high-voltage relay 6 is series at the three-phase of motor 10 In circuit;PLC 2, the two ends of transformer 14 connect live wire L3 and zero line N respectively, and transformer 14 is 220V/24V transformers, The output end of transformer 14 connects current source 8 and touch-screen 15.The inductive switch of low-voltage relay 5 and high-voltage relay 6 is normal Switch, when the coil circuit of low-voltage relay 5 is connected, the inductive switch of low-voltage relay 5 closure, the coil of high-voltage relay 6 is obtained Electricity, the inductive switch of high-voltage relay 6 closure, motor 10 obtains electric rotate.The input of current source 8, the three-phase circuit middle high-pressure of motor 10 The coil two ends of relay 6 are respectively provided with fuse 16.
The present embodiment connected mode is universal connected mode of the identical function in same type port, rather than sole mode.
The utility model in use, in advance will in correspondence program input PLC and host computer, by touch-screen 8 or Host computer shows and controlled.Student, by the understanding to knowledge, jack will be connected using plug wire in study practice, will Each component is correctly connected with PLC, passes through the control of touch-screen and host computer, simulation open and-shut mode, pressure value, temperature The data such as angle value, liquid level, valve opening, also can pass through the controlled motor of high-voltage relay 6 by controlling low-voltage relay 5 10 start and stop, simulate filling machine, the start and stop of cooling blower etc., so as to reach the teaching purpose of simulation practice.

Claims (4)

1. a kind of gas fueling station system simulation training platform, including flow panel(1), PLC(2)And master switch (12), light emitting diode and potentiometer are set on the Row control panel, and the PLC includes central processing unit, opened Pass amount expansion module, analog input expansion module, analog output expansion module and PORT COM, it is characterized in that:The stream Electricity is set to drag panel by journey panel(11), the electricity, which is dragged, sets motor on panel(10), low-voltage relay(5), high-voltage relay (6), the low-voltage relay connection switching quantity expanding module port, the low-voltage relay control high-voltage relay Device, the high-voltage relay controls the motor.
2. a kind of gas fueling station system simulation training platform according to claim 1, it is characterized in that:Also include ammeter (7), the ammeter is equipped with current source(8).
3. a kind of gas fueling station system simulation training platform according to claim 2, it is characterized in that:The current source, High-voltage relay, motor matching have fuse, and the master switch matches breaker.
4. a kind of gas fueling station system simulation training platform according to claim 1,2 or 3, it is characterized in that:It is described logical Interrogate port connection touch-screen(15)And host computer.
CN201621191077.2U 2016-10-31 2016-10-31 A kind of gas fueling station system simulation training platform Expired - Fee Related CN206348982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621191077.2U CN206348982U (en) 2016-10-31 2016-10-31 A kind of gas fueling station system simulation training platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621191077.2U CN206348982U (en) 2016-10-31 2016-10-31 A kind of gas fueling station system simulation training platform

Publications (1)

Publication Number Publication Date
CN206348982U true CN206348982U (en) 2017-07-21

Family

ID=59316588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621191077.2U Expired - Fee Related CN206348982U (en) 2016-10-31 2016-10-31 A kind of gas fueling station system simulation training platform

Country Status (1)

Country Link
CN (1) CN206348982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109032066A (en) * 2018-10-30 2018-12-18 四川金星清洁能源装备股份有限公司 A kind of FAT test platform based on PLC controller

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109032066A (en) * 2018-10-30 2018-12-18 四川金星清洁能源装备股份有限公司 A kind of FAT test platform based on PLC controller

Similar Documents

Publication Publication Date Title
CN103208223B (en) Simple industrial automatic comprehensive practical training control system
CN100543800C (en) A kind of pressure-constant water supply cluster teaching system
CN106057005B (en) A kind of building power supply and distribution teaching processing simulation experience system
CN103208220B (en) Intelligent type low-voltage is for distribution training system and practical training method thereof
CN102736621B (en) Detection system of electrical equipment of urban rail vehicle
CN104966457B (en) A kind of maintenance electrician's intelligent training checking system based on MCGS interfaces
CN203931291U (en) Automobile circuit maintenance infrastest device based on fault diagnosis thinking training
CN103501000A (en) Comprehensive experiment platform device of low-voltage power distribution control system
CN105761569A (en) 10Kv distribution transformer simulation system
CN104835396A (en) Simulation system based on anti-electric-larceny skill training
CN204904704U (en) Maintenance electrician's intelligence training checking system based on MCGS interface
CN206348982U (en) A kind of gas fueling station system simulation training platform
CN205016094U (en) Real platform of instructing of technology control simulation is carried in gas
CN104091502B (en) Low-tension centralized meter reading and installation training device based on carrier technology
CN202584542U (en) Comprehensive practical training device of motor control system
CN204496798U (en) A kind of electric automatization actual training device
CN208889082U (en) A kind of optical guidance system training device peculiar to vessel
CN209560046U (en) A kind of integration railway signal relay life test apparatus
CN208141639U (en) A kind of operating device, proportioner and real training control system
CN215068708U (en) Marine oil separator real object simulation system
CN109859583A (en) A kind of electric integrated simulation and demo system
CN209657532U (en) A kind of electromechanical teaching actual training device
CN204215636U (en) A kind of experimental real-training synthetic instruction device based on industrial communication network
CN206148016U (en) Network type PLC programmable logic controler experimental apparatus
CN202795808U (en) Meshed plate type programmable controller experimental training device

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721

Termination date: 20211031

CF01 Termination of patent right due to non-payment of annual fee