CN206334718U - Cool down colloid mill - Google Patents

Cool down colloid mill Download PDF

Info

Publication number
CN206334718U
CN206334718U CN201621145796.0U CN201621145796U CN206334718U CN 206334718 U CN206334718 U CN 206334718U CN 201621145796 U CN201621145796 U CN 201621145796U CN 206334718 U CN206334718 U CN 206334718U
Authority
CN
China
Prior art keywords
colloid mill
cooling water
cooling
water pipe
filter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621145796.0U
Other languages
Chinese (zh)
Inventor
谢义芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Kang Hongsheng Generation Industrial Co Ltd
Original Assignee
Tianjin Kang Hongsheng Generation Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Kang Hongsheng Generation Industrial Co Ltd filed Critical Tianjin Kang Hongsheng Generation Industrial Co Ltd
Priority to CN201621145796.0U priority Critical patent/CN206334718U/en
Application granted granted Critical
Publication of CN206334718U publication Critical patent/CN206334718U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

Colloid mill is cooled down the utility model discloses one kind, its drip irrigation device is to include platform, rotary electric machine, pan feeding housing and colloid mill body, the rotary electric machine is inverted and is fixed on platform upper surface, colloid mill body is placed on rotary electric machine upper surface, pan feeding housing is fixed on colloid mill body and communicated with colloid mill body interior, this body side surface of colloid mill is provided with discharging opening, in colloid mill body outer surface, vertically screw-casing is provided with cooling water pipe, suction pump is installed with platform, the two ends of cooling water pipe are fixed on suction pump and control the cooling water circulation in cooling water pipe by suction pump, having reached cools down colloid mill body, the purpose for preventing colloid rotten.

Description

Cool down colloid mill
Technical field
The utility model is related to a kind of equipment of industrial product, more particularly to a kind of cooling colloid mill.
Background technology
With the progress of society, the continuous improvement of industrial technology level, for product quality problem concern also increasingly It is many, the problem of due to apparatus overheat, often because apparatus overheat causes product to go bad, many times in process of producing product It is unable to ensure product quality, colloid mill is the equipment of industrial production colloid, and this equipment is also widely applied to the life of food In production, but equally because of heat is produced in mill processes colloid can be caused to go bad.
Existing to refer to the Chinese patent that application number is, it discloses a kind of colloid mill body, including colloid mill sheet Cooler is provided with above body, colloid mill body, the bottom of cooler is provided with cooling material corresponding with colloid mill body position of upper Outlet, the feeding port of cooler is connected by conveyance conduit with colloid mill body bottom portion, and conveyance conduit top set is provided with tremie pipe Road, conveyance conduit is provided with feeding valve, and blanking pipe is provided with blanking valve, and cooler is water cooler, including cooling water Valve is equipped with pipeline at set, cooling water inlet and coolant outlet, the outlet of cooling material, cooling water inlet and coolant outlet Door, the utility model is simple in construction, practical function, efficiently solves colloid mill body self-heating cooking problem.
But the flow velocity of this scheme current is not fast enough, radiating effect is not fine.
Utility model content
The purpose of this utility model is to provide a kind of different modes and is used to prevent that colloid from producing rotten cooling glue because of overheat Body is ground.
Above-mentioned technical purpose of the present utility model technical scheme is that:
One kind cooling colloid mill, including platform, rotary electric machine, pan feeding housing and colloid mill body, the rotary electric machine fall Put and be fixed on platform upper surface, colloid mill body is placed on rotary electric machine upper surface, pan feeding housing is fixed in colloid mill sheet Communicated on body and with colloid mill body interior, this body side surface of colloid mill is provided with discharging opening, it is perpendicular on colloid mill body outer surface edge Nogata is provided with cooling water pipe to screw-casing, suction pump is installed with platform, the two ends of cooling water pipe are fixed on suction pump simultaneously And the cooling water circulation in cooling water pipe is controlled by suction pump.
By using such scheme, when recirculated water flows through this body side surface of colloid mill with most of heat so that colloid The temperature drop of body is ground, prevents that the colloid milled by colloid mill from going bad, the quality of product is influenceed.
Preferably, the part that cooling water pipe dish is placed on colloid mill body outer surface passes through the adjacent phase of bolt by multistage water pipe Connect composition.
By using such scheme, colloid mill is easier to damage colloid mill in the course of the work, and cooling water pipe segmentation is torn open It can continue to remove colloid mill body, convenience relatively simple for structure, while colloid mill body and cooling water pipe can be avoided after removing It is fixedly connected the waste removed cause resource together.
Preferably, being provided with thermometer on cooling water pipe.
By using such scheme, the temperature of colloid mill body can be understood in real time by thermometer, if the temperature of mill Degree is higher it is contemplated that by changing cooling water or accelerating cooling water flow velocity, so that colloid mill body temperature declines, preventing Too high temperature causes the colloid milled to go bad.
Preferably, water storage box is connected with the cooling water pipe on platform, in the inside and cooling water pipe of water storage box Portion is communicated, and the water storage box is fixedly connected on platform.
By using such scheme, in the colloid mill course of work, cooling water pump also can be always on, after long-time use There is the temperature of water because the transmission of heat can be significantly improved, so understand some cooling water and become vapor so that cooling water Reduce, set water storage box can provide abundance cooling water, prevent because water be lost in and caused by equipment cooling effect reduction, increase The practicality effect of equipment is added.
Preferably, being provided with water inlet in water storage box upper surface.
By using such scheme, set water inlet to be added water in water storage box discharge reduction on water storage box, increase The practicality effect of equipment.
Preferably, being provided with overflow pipe above water storage box side.
By using such scheme, overflow pipe is set to prevent from causing water storage box to be filled from water inlet under the operation of mistake Overflowed at mouthful, be likely to result in the damage of some power equipments.
Transparent rubber pipe, rubber are installed with preferably, being provided with water storage box side vertical direction between two through holes, through hole The seal of tube is connected on through hole and with cistern interior inside it.
By using such scheme, the change of water level can be seen outside by transparent rubber pipe, storage can be increased in time Water in water tank, prevents that the cooling effect caused because of discharge reduction from reducing.
Preferably, the first filter box is installed with the cooling water pipe on platform, with cooling inside first filter box Communicated inside water pipe, filter is placed in the first filter box.
By using such scheme, set filter effectively to filter the foul in cooling water, prevent that some fouls from blocking up Plug cooling water pipe and cause the damage of equipment.
Preferably, the filter is cylindric and its bottom end face is seal face.
By using such scheme, filter can take out out of first filter box, and the impurity that cooling water pipe is produced can enter Filter interior, can be by taking out cleaning, Ran Houfang when plugged filter causes cooling effect to reduce by filter To enter continue in the first filter box and filter, saved trouble using more convenient.
Preferably, being provided with the second filter box by the first filter box, the first filter box and the second filter box are identical, in the second filter box Be placed with the filter identical filter in the first filter box, be provided with respectively on the cooling water pipe of the first filter box both sides logical Hole, is provided with inside guide pipe, guide pipe with being communicated inside cooling water pipe, the other end of guide pipe is installed in the second filter on through hole On case and with being communicated inside the second filter box, the first ball valve on the cooling water pipe between the first filter box and through hole, in guide pipe It is provided with the second ball valve.
By using such scheme, it can be taken out by the first ball valve of closing and clean the mistake being placed in the first filter box Filter, or close the second ball valve and take out and clean the filter being placed in the second filter box so that the operation of equipment not by Influence, adds the practicality effect of equipment.
In summary, the utility model has the advantages that:It can effectively prevent that colloid from going bad;Cooling device can be with Use for a long time;Good cooling results;It is simple to operate.
Brief description of the drawings
Fig. 1 is cooling colloid mill overall structure diagram;
Fig. 2 is A portions enlarged drawing in Fig. 1;
Fig. 3 is water storage box structural representation;
Fig. 4 is filter and filter structure schematic representation.
In figure, 1, platform;11st, suction pump;12nd, water storage box;121st, transparent rubber pipe;122nd, water inlet;123rd, overflow pipe; 13rd, the first filter box;131st, filter;14th, the second filter box;131st, filter;2nd, rotary electric machine;3rd, pan feeding housing;;4th, colloid mill Body;41st, cooling water pipe;411st, thermometer;412nd, the first ball valve;413rd, guide pipe;4131st, the second ball valve;414th, water pipe; 415th, bolt;42nd, discharging opening.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear" used below in description, "left", "right", "up" and "down" refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment 1:One kind cooling colloid mill, as shown in figure 1, including being platform 1, rotary electric machine 2, pan feeding housing 3 and glue Body grinds body 4, and rotary electric machine 2 is inverted and is fixed on the upper surface of platform 1, and colloid mill body 4 is placed in the upper surface of rotary electric machine 2 On, pan feeding housing 3 is fixed on colloid mill body 4 and with being communicated inside colloid mill body 4, and the side of colloid mill body 4 is provided with Discharging opening 42.
With reference to shown in Fig. 2, cooling water pipe 41 is connected in the outer surface helical disk of colloid mill body 4, cooling water pipe 41 includes many Duan Shuiguan 414 and bolt 415, adjacent water pipe 414 are connected with each other by bolt 415.
Fig. 1 is reviewed, thermometer 411 is fixedly connected with the tube wall of the upper end of cooling water pipe 41, it is real-time by thermometer 411 Observe the temperature of cooling water.
Suction pump 11 is provided with the platform 1, and the suction pump 11 is fixedly connected on platform 1 by screw.
With reference to shown in Fig. 3, water storage box 12, institute are fixedly connected with platform 1 of the side of suction pump 11 away from rotary electric machine 2 State and two through holes are vertically provided with side of the water storage box 12 away from suction pump 11, transparent rubber is provided between two through holes Sebific duct 121, the two ends of transparent rubber pipe 121 are sealed respectively to be fixed on two through holes, in transparent rubber pipe 121 and water storage box 12 Portion is communicated.
Water inlet 122 is provided with the upper surface of water storage box 12, cooling can be injected into water storage box 12 by water inlet 122 Water, is connected with an overflow pipe 123, the inside of overflow pipe 123 and water storage box 12 in the side of water storage box 12 close to the place on upper edge Portion is communicated.
With reference to shown in Fig. 1, Fig. 4, the first filter box 13 is connected with the platform 1 between water storage box 12 and rotary electric machine 2, Filter 131 is placed with first filter box 13, the filter 131 is cylindric and its bottom end face is seal face.
Cooling water pipe 41 positioned at the upper end of colloid mill body 4 is connected with cooling water pump, the filter box of water storage box 12 and first in turn 13 and finally it is connected with the cooling water pipe 41 positioned at the lower end of colloid mill body 4, the cooling water pump, water storage box 12 and first Filter box 13 is interconnected by cooling water pipe 41 and constitutes a circulation.
The first ball valve 412 is connected with the cooling water pipe 41 positioned at the two ends of the first filter box 13, is controlled by the first ball valve 412 Cooling water flow processed changes filter 131 to control.
The second filter box 14, the first filter box 13 and the complete phase of the second filter box 14 are provided with the platform 1 on the side of the first filter box 13 Together, be placed with the second filter box 14 with the identical filter 131 of filter 131 in the first filter box, respectively in the first filter box Through hole is provided with the cooling water pipe 41 of 13 both sides, guide pipe 413, the inside of guide pipe 413 and cooling water pipe 41 are provided with through hole Inside is communicated, the other end of two guide pipes 413 be respectively and fixedly connected on the upper side wall of the second filter box 14 and with the second filter box 14 Portion is communicated, and the second ball valve 4131 is provided with guide pipe 413.
Specific work process is as follows:
Open colloid mill power switch control rotary electric machine 2 to rotate, colloid raw material is then put into cooling from pan feeding housing 3 Colloid mill is milled colloid, and the colloid after milling is discharged from discharging opening.
Suction pump 11 is controlled to work by drive device while colloid mill work is cooled down, current are since suction pump 11 Water storage box 12, the first filter box 13 and the second filter box 14 are passed sequentially through, finally by being coiled in cooling water pipe 41 on colloid mill body 4 Suction pump 11 is returned to, circulation is completed.
When changing filter 131, close the first ball valve 412 and open the second ball valve 4131, can take out and clean and put The filter 131 in the first filter box 13 is put, and makes the use of equipment unaffected, or closes the second ball valve 4131 and is beaten simultaneously The first ball valve 412 is opened, takes out and cleans the filter 13 being placed in the second filter box 14, enable a device to stable operation.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (10)

1. one kind cooling colloid mill, including platform(1), rotary electric machine(2), pan feeding housing(3)With colloid mill body(4), it is described Rotary electric machine(2)Inversion is fixed in platform(1)On upper surface, colloid mill body(4)It is placed in rotary electric machine(2)On upper surface, Pan feeding housing(3)It is fixed in colloid mill body(4)It is upper and with colloid mill body(4)Inside is communicated, colloid mill body(4)Sideways Provided with discharging opening(42), it is characterised in that:In colloid mill body(4)Vertically screw-casing is provided with cooling water pipe for outer surface (41), in platform(1)On be installed with suction pump(11), cooling water pipe(41)Two ends be fixed on suction pump(11)Go up and pass through Suction pump(11)Control cooling water pipe(41)In cooling water circulation.
2. cooling colloid mill according to claim 1, it is characterised in that:Cooling water pipe(41)Disk is placed on colloid mill body (4)Part on outer surface is by multistage water pipe(414)Pass through bolt(415)It is adjacent to be connected with each other composition.
3. cooling colloid mill according to claim 1, it is characterised in that:In cooling water pipe(41)It is provided with thermometer (411).
4. cooling colloid mill according to claim 1, it is characterised in that:Positioned at platform(1)On cooling water pipe(41) On be connected with water storage box(12), water storage box(12)Inside and cooling water pipe(41)Inside is communicated, the water storage box(12)It is fixed It is connected to platform(1)On.
5. cooling colloid mill according to claim 4, it is characterised in that:In water storage box(12)Upper surface is provided with water inlet (122).
6. cooling colloid mill according to claim 4, it is characterised in that:In water storage box(12)Side top is provided with overflow pipe (123).
7. cooling colloid mill according to claim 4, it is characterised in that:In water storage box(12)Side vertical direction is provided with two Transparent rubber pipe is installed between individual through hole, through hole(121), rubber tube(121)It is sealed on through hole and its internal and retaining Case(12)Inside connection.
8. cooling colloid mill according to claim 1, it is characterised in that:Positioned at platform(1)On cooling water pipe(41) On be installed with the first filter box(13), first filter box(13)Internal and cooling water pipe(41)Inside is communicated, in the first filter box (13)Inside it is placed with filter(131).
9. cooling colloid mill according to claim 8, it is characterised in that:The filter(131)For it is cylindric and its Bottom end face is seal face.
10. cooling colloid mill according to claim 9, it is characterised in that:In the first filter box(13)Side is provided with the second filter Case(14), the first filter box(13)With the second filter box(14)It is identical, in the second filter box(14)Inside it is placed with and the first filter box(13)It is interior Filter(131)Identical filter(131), respectively in the first filter box(13)The cooling water pipe of both sides(41)On be provided with it is logical Hole, is provided with guide pipe on through hole(413), guide pipe(413)Internal and cooling water pipe(41)Inside is communicated, guide pipe(413) The other end be installed in the second filter box(14)It is upper and with the second filter box(14)Inside is communicated, in the first filter box(13)With through hole it Between cooling water pipe(41)Upper first ball valve(412), in guide pipe(413)It is provided with the second ball valve(4131).
CN201621145796.0U 2016-10-21 2016-10-21 Cool down colloid mill Expired - Fee Related CN206334718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621145796.0U CN206334718U (en) 2016-10-21 2016-10-21 Cool down colloid mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621145796.0U CN206334718U (en) 2016-10-21 2016-10-21 Cool down colloid mill

Publications (1)

Publication Number Publication Date
CN206334718U true CN206334718U (en) 2017-07-18

Family

ID=59299240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621145796.0U Expired - Fee Related CN206334718U (en) 2016-10-21 2016-10-21 Cool down colloid mill

Country Status (1)

Country Link
CN (1) CN206334718U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108339642A (en) * 2018-01-31 2018-07-31 王幼建 A kind of high-shear colloid mill
CN112121979A (en) * 2020-07-22 2020-12-25 郑亮 Pig feed processing is with integration stirring screening edulcoration equipment
CN117380354A (en) * 2023-11-24 2024-01-12 陕西中立合创能源科技有限责任公司 Multistage gel dispersion reinforced polymer and surfactant compound oil displacement preparation device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108339642A (en) * 2018-01-31 2018-07-31 王幼建 A kind of high-shear colloid mill
CN112121979A (en) * 2020-07-22 2020-12-25 郑亮 Pig feed processing is with integration stirring screening edulcoration equipment
CN117380354A (en) * 2023-11-24 2024-01-12 陕西中立合创能源科技有限责任公司 Multistage gel dispersion reinforced polymer and surfactant compound oil displacement preparation device

Similar Documents

Publication Publication Date Title
CN206334718U (en) Cool down colloid mill
CN206232674U (en) A kind of waste heat recovery of lubricating oil processing steam and impurity treatment system
CN108437272A (en) Plastics cool down equipment
CN203776085U (en) Circulating device of large food salting machine
CN207282672U (en) A kind of electric automobile power battery cooling device
CN103985511B (en) Install the transformer heat exchanger of oil cleaner additional
CN105215015A (en) A kind of cleaning device
CN106273620A (en) Plastic sheeting particle dehydration squeezer
CN206184205U (en) Integrative device of high -efficient environmental protection defogging dust removal
CN205056576U (en) Cleaning device
CN212120208U (en) Pyraclostrobin suspending agent low-temperature grinding device
CN209093507U (en) A kind of ball milling device for industrial art processing
CN211192601U (en) Encapsulation casing product welding cooling device
CN206302293U (en) A kind of incrustation scale cleaning plant for air water cooling but motor
CN210762279U (en) Production is with cement jar doffer
CN209158874U (en) It is a kind of it is easy to disassemble transport installation plastic cement production use double screw extruder
CN207509709U (en) A kind of device for plastic pipe cooling
CN207787611U (en) A kind of circulating cooling system
CN207536536U (en) A kind of temporary storage tank of milk processing
CN107537609A (en) A kind of grain cooling storage box
CN207734642U (en) A kind of chemical industry crystallizing tank
CN104057598A (en) Double-layer circulation cooling device of extruder for producing halogen-free crosslinking line
CN205448751U (en) Contraflow cooler
CN210758716U (en) Cooling device of sticky tape production usefulness
CN210394288U (en) Corn oil leaching cooling recovery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170718

Termination date: 20181021

CF01 Termination of patent right due to non-payment of annual fee