CN206320930U - Energy-saving pulverized coal boiler - Google Patents

Energy-saving pulverized coal boiler Download PDF

Info

Publication number
CN206320930U
CN206320930U CN201621447490.0U CN201621447490U CN206320930U CN 206320930 U CN206320930 U CN 206320930U CN 201621447490 U CN201621447490 U CN 201621447490U CN 206320930 U CN206320930 U CN 206320930U
Authority
CN
China
Prior art keywords
energy
saving
descending branch
exhaust gases
economizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621447490.0U
Other languages
Chinese (zh)
Inventor
汤庆现
李玉华
朱树起
牛俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAISHAN GROUP CO Ltd
Original Assignee
TAISHAN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAISHAN GROUP CO Ltd filed Critical TAISHAN GROUP CO Ltd
Priority to CN201621447490.0U priority Critical patent/CN206320930U/en
Application granted granted Critical
Publication of CN206320930U publication Critical patent/CN206320930U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Combustion Of Fluid Fuel (AREA)

Abstract

A kind of energy-saving pulverized coal boiler, it includes burner hearth and is arranged at the burner and drum of roof of the furnace, burner hearth enclosed by water-cooled piping rock mechanism wall construction form, burner hearth is internally formed U-shaped exhaust gases passes, burner is provided with the top of U-shaped exhaust gases passes descending branch, convection device and superheater are provided with the U-shaped exhaust gases passes ascent stage, convection device is located at superheater top;Drum is connected by connecting piping and convection device, superheater, economizer, condensing energy-saving device with water-cooled piping;The U-shaped exhaust gases passes ascent stage end be provided with exhanst gas outlet, exhanst gas outlet is connected with flue, flue includes the first descending branch, ascent stage and the second descending branch, economizer is provided with the first descending branch, sack cleaner is provided with the ascent stage, condensing energy-saving device is provided with the second descending branch.This programme finds the thermal efficiency of existing pulverized-coal fired boiler can be improved into 3%~5% by actual test, hence it is evident that reduce energy waste and environmental pollution.

Description

Energy-saving pulverized coal boiler
Technical field
This programme is related to Industrial Boiler field, and in particular to a kind of energy-saving pulverized coal boiler.
Background technology
Pulverized-coal fired boiler be it is a kind of with combusting coal fines or based on coal dust while the boiler plant for other fuel that adulterate.Fuel Particularity is doomed it has significant difference with traditional coal-burning boiler or gas fired-boiler.Wherein it is topmost difference one of be exactly In its combustion product be high-temperature flue gas in carry substantial amounts of dust granules.The situation of a large amount of dust is carried in this high-temperature flue gas Coal-fired, gas fired-boiler never runs into, therefore pulverized-coal fired boiler has to configure high-efficiency dust remover to avoid producing seriously Environmental pollution.To reach requirement increasingly strict environmental emission standard, the whole configuration sack cleaners of existing pulverized-coal fired boiler, in cloth Electrostatic precipitator is arranged after bag dust collector again.Because sack cleaner operating temperature is required, general work temperature is 100 ~190 DEG C, therefore it limits the exhaust gas temperature of existing pulverized-coal fired boiler, have impact on the thermal efficiency of boiler, and then cause energy wave Take.
Utility model content
The purpose of this programme is to propose a kind of energy-saving pulverized coal boiler.
To achieve the above object, a kind of energy-saving pulverized coal boiler of this programme, it includes burner hearth and is arranged at the combustion of roof of the furnace Burner and drum, burner hearth enclosed by water-cooled piping rock mechanism wall construction form, burner hearth is internally formed U-shaped exhaust gases passes, in U Be provided with burner at the top of font exhaust gases passes descending branch, be provided with the U-shaped exhaust gases passes ascent stage convection device and Superheater, convection device is located at superheater top;Drum is by connecting piping and convection device, superheater, economizer, condensing Energy-saving appliance is connected with water-cooled piping;The U-shaped exhaust gases passes ascent stage end be provided with exhanst gas outlet, exhanst gas outlet connects with flue Logical, flue includes the first descending branch, ascent stage and the second descending branch, economizer is provided with the first descending branch, in the ascent stage On be provided with sack cleaner, condensing energy-saving device is provided with the second descending branch.
The specific feature of this programme also has, and membrane wall structure is the Welding flat steel formation wooden partition structure between pipeline.
Pipeline in condensing energy-saving device and economizer is series connection, and water inlet and the boiler feed water valve of condensing energy-saving device connect Logical, condensing energy-saving device delivery port is connected with the water inlet of economizer, and the delivery port of economizer is connected with drum water inlet;Drum Delivery port is connected by down-comer with water-cooled piping and convection device.
Condensing energy-saving device is multiple, is connected in series.
The beneficial effect of this programme is:This programme compares traditional pulverized-coal fired boiler and both takes full advantage of low-temperature flue gas, and not shadow Ring dust pelletizing system normal work.This New-type boiler system finds that the thermal efficiency of existing pulverized-coal fired boiler can be improved by actual test 3%~5%, hence it is evident that reduce energy waste and environmental pollution.
Brief description of the drawings
Fig. 1 is energy-saving pulverized coal boiler structure schematic diagram.
In figure:1- burners;2- water-cooled pipings;3- convection devices;4- superheaters;5- connection pipings;6- drums;7- saves coal Device;8- sack cleaners;9- condensing energy-saving devices.
Embodiment
As shown in figure 1, a kind of energy-saving pulverized coal boiler, it includes burner hearth and is arranged at the burner 1 and drum of roof of the furnace 6, burner hearth enclosed by the rock mechanism wall construction of water-cooled piping 2 form, burner hearth is internally formed U-shaped exhaust gases passes, in U-shaped flue gas Burner 1 is provided with the top of passage descending branch, convection device 3 and superheater are provided with the U-shaped exhaust gases passes ascent stage 4, convection device 3 is located at the top of superheater 4;Drum 6 is by connecting piping 5 and convection device 3, superheater 4, economizer 7, condensation Formula energy-saving appliance 9 is connected with water-cooled piping 2;The U-shaped exhaust gases passes ascent stage end be provided with exhanst gas outlet, exhanst gas outlet and cigarette Road is connected, and flue includes the first descending branch, ascent stage and the second descending branch, economizer 7 is provided with the first descending branch, upper Rise and be provided with sack cleaner 8 in section, condensing energy-saving device 9 is provided with the second descending branch.
Membrane wall structure is the Welding flat steel formation wooden partition structure between pipeline.
Pipeline in condensing energy-saving device and economizer is series connection, and water inlet and the boiler feed water valve of condensing energy-saving device connect Logical, condensing energy-saving device delivery port is connected with the water inlet of economizer, and the delivery port of economizer is connected with drum water inlet;Drum Delivery port is connected by down-comer with water-cooled piping and convection device.
Condensing energy-saving device is multiple, is connected in series.
The flue gas flow of novel energy-saving high-efficiency pulverized-coal fired boiler described in this programme is such:Coal burner is arranged in pot Furnace roof portion, coal dust mixes with air outside burner hearth, burn after spray into the U-shaped exhaust gases passes in burner hearth, reach U-shaped flue gas and lead to During road descending branch end after-flame and turn to it is upward, the high-temperature flue gas of generation flow through successively superheater 4, convection device 3, economizer 7, Sack cleaner 8 and condensing energy-saving device 9, complete diabatic process.
The medium flow of this programme is divided into Water flow-path, steam water interface flow and steam flow.Idiographic flow is such: A) boiler feedwater initially enters condensing energy-saving device, then enters back into economizer and finally reaches drum;B) water in drum passes through Down-comer enters water-cooled piping 2 and convection device 3, arrives first lower header into the water in water-cooled piping 2, is then arrived by membrane wall Up to upper collecting chamber;C) steam water interface generated in upper collecting chamber is again introduced into drum;D) vapor in drum enters Ji Qiji Superheater is entered back into after case and carries out reheating generation superheated steam, superheated steam enters outside by super-heater exit case Pipe network.

Claims (4)

1. a kind of energy-saving pulverized coal boiler, it includes burner hearth and is arranged at the burner and drum of roof of the furnace, and burner hearth is by water cooling tube System formed membrane wall structure enclose form, burner hearth is internally formed U-shaped exhaust gases passes, on the top of U-shaped exhaust gases passes descending branch Portion is provided with burner, and convection device and superheater are provided with the U-shaped exhaust gases passes ascent stage, and convection device is located at overheat Device top;Drum is connected by connecting piping and convection device, superheater, economizer, condensing energy-saving device with water-cooled piping; The U-shaped exhaust gases passes ascent stage, end was provided with exhanst gas outlet, and exhanst gas outlet is connected with flue, and flue includes the first descending branch, Ascent stage and the second descending branch, are provided with economizer in the first descending branch, sack cleaner are provided with the ascent stage, Condensing energy-saving device is provided with two descending brancies.
2. energy-saving pulverized coal boiler according to claim 1, it is characterized in that membrane wall structure is the Welding flat steel between pipeline Form wooden partition structure.
3. energy-saving pulverized coal boiler according to claim 1, it is characterized in that the pipeline in condensing energy-saving device and economizer is Series connection, the water inlet of condensing energy-saving device is connected with boiler feed water valve, the water inlet of condensing energy-saving device delivery port and economizer Connection, the delivery port of economizer is connected with drum water inlet;Drum delivery port passes through down-comer and water-cooled piping and convection device Connection.
4. energy-saving pulverized coal boiler according to claim 1, it is characterized in that condensing energy-saving device is multiple, is connected in series.
CN201621447490.0U 2016-12-27 2016-12-27 Energy-saving pulverized coal boiler Active CN206320930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621447490.0U CN206320930U (en) 2016-12-27 2016-12-27 Energy-saving pulverized coal boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621447490.0U CN206320930U (en) 2016-12-27 2016-12-27 Energy-saving pulverized coal boiler

Publications (1)

Publication Number Publication Date
CN206320930U true CN206320930U (en) 2017-07-11

Family

ID=59260084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621447490.0U Active CN206320930U (en) 2016-12-27 2016-12-27 Energy-saving pulverized coal boiler

Country Status (1)

Country Link
CN (1) CN206320930U (en)

Similar Documents

Publication Publication Date Title
CN103453521B (en) A kind of CFBB of the Petiolus Trachycarpi slag that burns
CN201392103Y (en) Mine heated furnace flue-gas waste-heat generating system
CN205605255U (en) Biomass waste pot furnace assembly integrated power production system
CN103344124A (en) Lime kiln waste gas waste heat electricity generating system with by-product coal gas afterburning function
CN107559813A (en) A kind of super-pressure reheat vapor cycle fluidized-bed combustion boiler of burning-used biologic mass fuel
CN102242647A (en) Waste heat power generation system of multiple glass kilns
CN105953231A (en) High-parameter waste incineration boiler with reheating function
WO2021258647A1 (en) Natural circulation box structure for ferrosilicon waste heat boiler
CN102364244A (en) Ultra supercritical boiler with parameter of more than 700 DEG C having secondary re-heating function
CN107388221A (en) A kind of ultralow nitrogen condensation horizontal steam boiler of four backhauls
CN109708096A (en) A kind of intersection mixed flow superheater
CN203464262U (en) Circulating fluidized bed boiler for combusting palm dreg
CN207514899U (en) A kind of super-pressure reheat vapor cycle fluidized-bed combustion boiler of burning-used biologic mass fuel
CN201339497Y (en) Sintering surplus-heat power generating system with byproduct gas afterburning
CN103528386B (en) Multi-variant phase change waste heat boiler system
CN206320930U (en) Energy-saving pulverized coal boiler
CN203443378U (en) Improved lime kiln waste gas residual heat power generation system with byproduct gas afterburning
CN109990257B (en) High-temperature ultrahigh-pressure reheating waste heat boiler of heat recovery coke oven
CN211952779U (en) Energy-saving and environment-friendly treatment system for mixed combustion and incineration of industrial three wastes
CN212377955U (en) Box structure of natural circulation ferrosilicon waste heat boiler
CN106705421A (en) Energy-saving pulverized coal boiler
CN209371203U (en) A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
CN209541168U (en) Coal dust organic heat carrier furnace in bulk
CN207035091U (en) CFBB and recirculating fluidized bed combined cycle system
CN204201858U (en) A kind of heat recovery steam boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant