CN206310894U - Tunnel sterilizing and drying machine - Google Patents

Tunnel sterilizing and drying machine Download PDF

Info

Publication number
CN206310894U
CN206310894U CN201621435774.8U CN201621435774U CN206310894U CN 206310894 U CN206310894 U CN 206310894U CN 201621435774 U CN201621435774 U CN 201621435774U CN 206310894 U CN206310894 U CN 206310894U
Authority
CN
China
Prior art keywords
section
bringing
hot
pipe
preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621435774.8U
Other languages
Chinese (zh)
Inventor
熊森冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chutian Intelligent Robot (changsha) Co Ltd
Original Assignee
Chutian Intelligent Robot (changsha) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chutian Intelligent Robot (changsha) Co Ltd filed Critical Chutian Intelligent Robot (changsha) Co Ltd
Priority to CN201621435774.8U priority Critical patent/CN206310894U/en
Application granted granted Critical
Publication of CN206310894U publication Critical patent/CN206310894U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

A kind of tunnel sterilizing and drying machine of the present utility model, including being sequentially arranged and the preheating section that is connected, bringing-up section and cooling section, preheating section is provided with preheating section blast pipe, bringing-up section is provided with bringing-up section secondary air channel and bringing-up section dehumidifier air draft component, cooling section is provided with surface cooler, the delivery port of surface cooler is equiped with for the hot water of surface cooler to be guided into preheating section blast pipe and bringing-up section secondary air channel, and the hot water water conservancy diversion exchange component of heat exchange is carried out in this place, the air outlet of bringing-up section dehumidifier air draft component is equiped with for bringing-up section hot blast to be guided into preheating section blast pipe and bringing-up section secondary air channel, and the hot blast water conservancy diversion exchange component of heat exchange is carried out in this place.The utility model has the advantages that energy-conserving and environment-protective, can reduce thermal explosion bottle rate.

Description

Tunnel sterilizing and drying machine
Technical field
The utility model relates generally to food, pharmacy package packing machine field, more particularly to a kind of tunnel sterilizing and drying machine.
Background technology
Tunnel sterilizing and drying machine is generally divided into Wind-cooling type dryer and water-cooling type dryer, and wherein water-cooling type tunnel type goes out Bacterium drying machine is generally divided into three job steps, and it is preheating section, bringing-up section, cooling section, and preheating section uses outer circulation pattern, i.e., from Fresh air is adopted in indoor or outdoor, and corresponding PROCESS FOR TREATMENT heel row is being carried out to container medicine bottle to outdoor, bringing-up section and cooling section Using interior circulation, i.e., a small amount of from the outside to mend wind, the most hot-air of high temperature section and cooling section major part cold air are circulated Utilize.Cooler device wherein is set in cooling fragment position, for lowering the temperature to circulated air.
There is following defect and deficiency in the drying machine of said structure:1st, the origin of heat of its preheating section is the heat sky of high temperature section Gas but pressure difference stabilization in order to ensure each section and distinguished and admirable is not wadded a quilt with cotton by the air door overflow of preheating section and high temperature section Disorderly, throttle opening can not be opened infinitely greatly, thus the thermal Finite for overflowing, cause the temperature of preheating section relatively low, medicine bottle enters high Due to there is larger temperature difference after temperature section, it is easy to cause the phenomenon of thermal explosion bottle, especially for the container medicine bottle of thin-walled, but Preheating section typically is inconvenient to set heater because being limited by its space, causes this phenomenon not can solve.2nd, table is cold The water of device outlet pipe is by having temperature higher after certain heat exchange(Usually 60 to 80 spend), and this high-temperature water is often Arranged to outdoor by external water pipe, do not carry out effective heat energy recycle;In addition the benefit of the air intake of preheating section and high temperature section Wind is also all to adopt cold wind from indoor or outdoor, on the premise of corresponding dry and sterilizing is met, necessarily increases heating tube Energy ezpenditure.Therefore such effective utilization for being unfavorable for the energy, fail to play the effect of energy-conserving and environment-protective.3rd, high temp dehumidifying exhaust outlet The hot and humid air of discharge(Temperature is at 200 to 250 °)Energy is not directly carried out to outdoor by exhaust duct heel row Energy saving is reclaimed, is unfavorable for energy-conserving and environment-protective.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies in the prior art, there is provided a kind of energy-conserving and environment-protective, can be dropped The tunnel sterilizing and drying machine of low-heat bottle explosion rate.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of tunnel sterilizing and drying machine, including preheating section, bringing-up section and the cooling section for being sequentially arranged and being connected, it is described pre- Hot arc is provided with preheating section blast pipe, and the bringing-up section is provided with bringing-up section secondary air channel and bringing-up section dehumidifier air draft component, the cooling Section is provided with surface cooler, and the delivery port of the surface cooler is equiped with for the hot water of surface cooler being guided into preheating section blast pipe and being added Hot arc secondary air channel and carry out in this place heat exchange hot water water conservancy diversion exchange component, the air-out of the bringing-up section dehumidifier air draft component Mouth is equiped with for bringing-up section hot blast to be guided into preheating section blast pipe and bringing-up section secondary air channel and heat exchange is carried out in this place Hot blast water conservancy diversion exchanges component.
As the further improvement of above-mentioned technical proposal:
The hot water water conservancy diversion exchanges component includes hot water mozzle and heat exchanger, and described hot water mozzle one end is cold with table The delivery port connection of device, the other end are extended in preheating section blast pipe and bringing-up section secondary air channel and are equiped with the heat exchange respectively Device.
The hot water mozzle is connected including cooling section drainpipe, preheating section water inlet pipe, bringing-up section water inlet pipe and hot water three Head, the heat exchanger includes preheating section heat exchanger and bringing-up section heat exchanger, and described cooling section drainpipe one end is cold with table The delivery port of device is connected, the other end and hot water three-way connection are connected, and described preheating section water inlet pipe one end connects with hot water three-way connection Connect, the other end is extended in preheating section blast pipe and is connected with preheating section heat exchanger, described bringing-up section water inlet pipe one end and hot water Three-way connection connection, the other end are extended in bringing-up section secondary air channel and are connected with bringing-up section heat exchanger.
Hot water stream control valve is provided with the preheating section water inlet pipe and bringing-up section water inlet pipe.
Hot water thermal insulating sleeve pipe is coated with outside the cooling section drainpipe, preheating section water inlet pipe and bringing-up section water inlet pipe.
The hot blast water conservancy diversion exchanges component includes hot blast mozzle, preheating section warm-air pipe, bringing-up section warm-air pipe and hot blast three Pass joint, described hot blast mozzle one end is connected with bringing-up section dehumidifier air draft component, the other end and hot blast three-way connection are connected, institute State that preheating section warm-air pipe one end is connected with hot blast three-way connection, the other end is extended in preheating section blast pipe and extend out to outside, institute State that bringing-up section warm-air pipe one end is connected with hot blast three-way connection, the other end is extended in bringing-up section secondary air channel and extend out to outside.
Hot air flow control valve is provided with the preheating section warm-air pipe and bringing-up section warm-air pipe.
Hot blast thermal insulation casing is coated with outside the hot blast mozzle, preheating section warm-air pipe and bringing-up section warm-air pipe.
In the preheating section, bringing-up section and cooling section a shared active conveying bottle track is provided with by bottom position.
Compared with prior art, the utility model has the advantage of:
Tunnel sterilizing and drying machine of the present utility model, in the structure, hands over from the hot water of surface cooler discharge through hot water water conservancy diversion Change component carries out heat exchange at preheating section blast pipe and bringing-up section secondary air channel with distinguished and admirable, preheating section is entered after distinguished and admirable intensification and is added Hot arc, effectively the heat energy to surface cooler recycled, decrease the load of bringing-up section heater, so effectively The loss for reducing energy, be conducive to the recycling of heat;The air quantity for preheating fragment position can be heated up, and be substantially increased The laminar flow air temperature of preheating section container medicine bottle position chamber, so as to improve the temperature of container medicine bottle, reduces and enters bringing-up section Temperature difference afterwards, greatly reduces by thermal explosion bottle probability caused by excessive temperature differentials;Also, from the discharge of bringing-up section dehumidifier air draft component Hot-air exchange component at preheating section blast pipe and bringing-up section secondary air channel with distinguished and admirable to carry out heat exchange secondary through hot blast water conservancy diversion Heat exchange, enters preheating section and bringing-up section after distinguished and admirable intensification, effectively the heat energy to bringing-up section discharge is recycled.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model tunnel sterilizing and drying machine.
Fig. 2 is the structural representation of each laminar flow section connection of the utility model tunnel sterilizing and drying machine.
Each label is represented in figure:
1st, preheating section;11st, preheating section blast pipe;12nd, low efficient filter component is preheated;13rd, preliminary heating zone flow fan;14th, it is pre- Air bells cap;15th, high efficiency particulate air filter is preheated;16th, exhaust outlet is preheated;2nd, bringing-up section;21st, bringing-up section secondary air channel;22nd, heated seats group Part;23rd, resisting blower;24th, bringing-up section fan housing component;25th, hi-temp hi-effective filter;26th, return air mount structure;27th, bringing-up section Dehumidifier air draft component;3rd, cooling section;31st, surface cooler;32nd, cooling section secondary air channel;321st, cooling section heat exchanger;33rd, cooling section Low efficient filter;34th, cooling layer flow fan component;35th, cooling section fan housing component;36th, cooling section high efficiency particulate air filter;37th, return certainly Wind component;38th, pressure balance air draft component;4th, hot water water conservancy diversion exchanges component;41st, hot water mozzle;411st, cooling section drainpipe; 412nd, preheating section water inlet pipe;413rd, bringing-up section water inlet pipe;414th, hot water three-way connection;42nd, heat exchanger;421st, preheating section heat is handed over Parallel operation;422nd, bringing-up section heat exchanger;43rd, hot water stream control valve;44th, hot water thermal insulating sleeve pipe;5th, active conveying bottle track;6th, hot blast is led Stream exchanges component;61st, hot blast mozzle;62nd, preheating section warm-air pipe;63rd, bringing-up section warm-air pipe;64th, hot blast three-way connection;65、 Hot air flow control valve;66th, hot blast thermal insulation casing.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.
As depicted in figs. 1 and 2, a kind of embodiment of the utility model tunnel sterilizing and drying machine, including be sequentially arranged simultaneously Preheating section 1, bringing-up section 2 and the cooling section 3 being connected, preheating section 1 are provided with preheating section blast pipe 11, and bringing-up section 2 is provided with bringing-up section benefit Airduct 21 and bringing-up section dehumidifier air draft component 27, cooling section 3 are provided with surface cooler 31, and the delivery port of surface cooler 31 is equiped with for inciting somebody to action The hot water of surface cooler 31 is guided to preheating section blast pipe 11 and bringing-up section secondary air channel 21 and carries out the hot water of heat exchange in this place and leads Stream exchanges component 4, and the air outlet of bringing-up section dehumidifier air draft component 27 is equiped with and enters for the hot blast of bringing-up section 2 to be guided into preheating section Airduct 11 and bringing-up section secondary air channel 21 simultaneously carry out the hot blast water conservancy diversion of heat exchange and exchange component 6 in this place.It is cold from table in the structure The hot water of the discharge of device 31 exchanges component 4 and is carried out with distinguished and admirable at preheating section blast pipe 11 and bringing-up section secondary air channel 21 through hot water water conservancy diversion Heat exchange, enters preheating section 1 and bringing-up section 2 after distinguished and admirable intensification, effectively the heat energy to surface cooler 31 is recycled, The load of the heater of bringing-up section 2 is reduced, the loss of energy is so effectively reduced, is conducive to the recycling of heat; The air quantity of the position of preheating section 1 can be heated up, and substantially increase the laminar flow air temperature of the container medicine bottle position chamber of preheating section 1, from And the temperature of container medicine bottle is improve, and the temperature difference into after bringing-up section 2 is reduced, greatly reduce by caused by excessive temperature differentials Thermal explosion bottle probability;Also, component 6 is exchanged in preheating section through hot blast water conservancy diversion from the hot-air of the discharge of bringing-up section dehumidifier air draft component 27 The secondary heat exchange of heat exchange is carried out with distinguished and admirable at blast pipe 11 and bringing-up section secondary air channel 21, the He of preheating section 1 is entered after distinguished and admirable intensification Bringing-up section 2, is effectively recycled to the heat energy that bringing-up section 2 is discharged.
In the present embodiment, hot water water conservancy diversion exchanges component 4 includes hot water mozzle 41 and heat exchanger 42, hot water mozzle 41 One end is connected with the delivery port of surface cooler 31, the other end extends preheating section blast pipe 11 respectively and bringing-up section secondary air channel 21 interior and equal It is equiped with heat exchanger 42.In the structure, the hot water discharged from the delivery port of surface cooler 31 flow to preheating through hot water mozzle 41 In heat exchanger 42 in section blast pipe 11 and bringing-up section secondary air channel 21, i.e., with this at distinguished and admirable carry out heat exchange, distinguished and admirable intensification Enter preheating section 1 and bringing-up section 2 afterwards, effectively the heat energy to surface cooler 31 is recycled, decrease bringing-up section 2 and add The load of thermal, while reducing by thermal explosion bottle probability caused by excessive temperature differentials.
In the present embodiment, hot water mozzle 41 includes that cooling section drainpipe 411, preheating section water inlet pipe 412, bringing-up section are intake Pipe 413 and hot water three-way connection 414, heat exchanger 42 include preheating section heat exchanger 421 and bringing-up section heat exchanger 422, cold But the one end of section drainpipe 411 is connected with the delivery port of surface cooler 31, the other end and hot water three-way connection 414 are connected, and preheating section enters The one end of water pipe 412 is connected with hot water three-way connection 414, the other end is extended in preheating section blast pipe 11 and with preheating section heat exchanger 421 connections, the one end of bringing-up section water inlet pipe 413 is connected with hot water three-way connection 414, the other end is extended in bringing-up section secondary air channel 21 simultaneously It is connected with bringing-up section heat exchanger 422.In the structure, the hot water discharged from the delivery port of surface cooler 31 is through cooling section drainpipe 411 form shunting at hot water three-way connection 414, and heated section of water inlet pipe 413 of a part of hot water enters bringing-up section heat exchanger 422 carry out heat exchange, and then preheated section of water inlet pipe 412 carries out heat exchange to another part hot water into preheating section heat exchanger 421.
In the present embodiment, hot water stream control valve is provided with preheating section water inlet pipe 412 and bringing-up section water inlet pipe 413 43.The hot water stream control valve 43 is used to control the size of preheating section water inlet pipe 412 and the water of bringing-up section water inlet pipe 413, i.e., in fact Show to each section of control of amount of heat of feeding.
In the present embodiment, coated outside cooling section drainpipe 411, preheating section water inlet pipe 412 and bringing-up section water inlet pipe 413 There is hot water thermal insulating sleeve pipe 44.The hot water thermal insulating sleeve pipe 44 is insulation material, can prevent heat losses, further increases heat Utilization rate.
In the present embodiment, hot blast water conservancy diversion exchanges component 6 includes hot blast mozzle 61, preheating section warm-air pipe 62, bringing-up section heat Airduct 63 and hot blast three-way connection 64, the one end of hot blast mozzle 61 is connected with bringing-up section dehumidifier air draft component 27, the other end with heat Wind three-way connection 64 is connected, and the one end of preheating section warm-air pipe 62 is connected with hot blast three-way connection 64, the other end extends preheating section air intake Pipe 11 is interior and extend out to outside, and the one end of bringing-up section warm-air pipe 63 is connected with hot blast three-way connection 64, the other end extends bringing-up section benefit Airduct 21 is interior and extend out to outside.In the structure, the hot blast from the discharge of bringing-up section dehumidifier air draft component 27 is through hot blast mozzle 61 Derive, then preheating section warm-air pipe 62 and bringing-up section warm-air pipe 63, i.e. hot blast are respectively enterd by the shunting of hot blast three-way connection 64 Can be with preheating section blast pipe 11 and the air of bringing-up section secondary air channel 21 when flowing through preheating section warm-air pipe 62 and bringing-up section warm-air pipe 63 Second heat exchange is carried out, outdoor is then then exhausted from.
In the present embodiment, hot air flow control valve 65 is provided with preheating section warm-air pipe 62 and bringing-up section warm-air pipe 63. The hot air flow control valve 65 is used to control the size of preheating section warm-air pipe 62 and the air quantity of bringing-up section warm-air pipe 63, that is, it is right to realize Each section of control of amount of heat of feeding.
In the present embodiment, heat is coated with outside hot blast mozzle 61, preheating section warm-air pipe 62 and bringing-up section warm-air pipe 63 Wind thermal insulation casing 66.The hot blast thermal insulation casing 66 is insulation material, can prevent heat losses, further increases the utilization of heat Rate.
In the present embodiment, a shared active conveying bottle track is provided with by bottom position in preheating section 1, bringing-up section 2 and cooling section 3 5.In the structure, the continuous service of active conveying bottle track 5, bottle be placed on active conveying bottle track 5 preheated section 1 successively, bringing-up section 2 and cooling Section 3 carries out laminar flow treatment.
Laminar flow control method based on above-mentioned tunnel sterilizing and drying machine of the present utility model, starts hot water water conservancy diversion and exchanges The system layer stream of component 4 and preheating section 1, bringing-up section 2 and cooling section 3, the hot water of surface cooler 31 on cooling section 3 is led through hot water Stream exchanges component 4 and respectively enters preheating section blast pipe 11 and bringing-up section secondary air channel 21, meanwhile, 2 heated sections of dehumidifier rows of bringing-up section The hot blast of the discharge of wind component 27 exchanges component 6 and respectively enters preheating section blast pipe 11 and bringing-up section secondary air channel by hot blast water conservancy diversion 21, the hot-air after heat exchange twice is carried out in this place, and after bottle effect, heated section 2 of the heating in preheating section 1 pairs is added Bottle effect in hot arc 2, corresponding laminar-flow air is acted on the bottle in cooling section 3 in cooling section 3.Discharged from surface cooler 31 Hot water through hot water water conservancy diversion exchange component 4 carry out heat exchange with distinguished and admirable at preheating section blast pipe 11 and bringing-up section secondary air channel 21, Enter preheating section 1 and bringing-up section 2 after distinguished and admirable intensification, effectively the heat energy to surface cooler 31 is recycled, and is decreased The load of the heater of bringing-up section 2, is so effectively reduced the loss of energy, is conducive to the recycling of heat;Preheating section 1 The air quantity of position can be heated up, and the laminar flow air temperature of the container medicine bottle position chamber of preheating section 1 be substantially increased, so as to improve The temperature of container medicine bottle, reduces the temperature difference into after bringing-up section 2, greatly reduces general by thermal explosion bottle caused by excessive temperature differentials Rate;Also, component 6 is exchanged in preheating section blast pipe 11 through hot blast water conservancy diversion from the hot-air of the discharge of bringing-up section dehumidifier air draft component 27 The secondary heat exchange of heat exchange is carried out with distinguished and admirable with bringing-up section secondary air channel 21, preheating section 1 and bringing-up section 2 is entered after distinguished and admirable intensification, Effectively the heat energy to the discharge of bringing-up section 2 is recycled.
The laminar flow control of preheating section 1 is as follows:
The distinguished and admirable use outer circulation pattern of preheating section 1, from preheated section of heat exchange of air that preheating section blast pipe 11 enters The effect of device 421 forms hot-air, while the damp-heat air after the Laminar Flow of bringing-up section 2 passes through bringing-up section dehumidifier air draft component 27th, hot blast mozzle 61, preheating section warm-air pipe 62 carry out second heat exchange with the air in preheating section blast pipe 11, by pre- Enter the vacuum chamber residing for preliminary heating zone flow fan 13 after the preliminary filtering of hot low efficient filter component 12, in preheating laminar winds Enter pre- air bells cap 14 under the absorption load of machine 13 and uniform vertical blows to preheating high efficiency particulate air filter 15, by the layer of high efficiency filter Stream air vertically blows to the mobile container medicine bottle in the top of active conveying bottle track 5, the pre-heating technique treatment for carrying out solar heat protection bottle explosion to it, hereafter Laminar winds are discharged preheating section 1 by preheating exhaust outlet 16 into the slag air draft hull assembly of each section of bottom.
The laminar flow control of bringing-up section 2 is as follows:
The distinguished and admirable use interior circulation pattern of bringing-up section 2, the air for entering from the position of bringing-up section secondary air channel 21 a little(It is heated Section heat exchanger 422 and the effect of bringing-up section warm-air pipe 63 form hot-air)With substantial amounts of circulate in the wind by heating holder assembly 22 Heating after entered under the absorption load of resisting blower 23 in bringing-up section fan housing component 24 and vertically blow to hi-temp hi-effective Filter 25, the mobile container medicine bottle in the top of active conveying bottle track 5 is vertically blowed to by the laminar-flow air of high efficiency filter, and it is done The PROCESS FOR TREATMENT of thermal source is gone in dry and sterilizing, and hereafter laminar winds are by entering next operation after the return air mount structure 26 of bringing-up section 2 Circulation.Wherein because the air humidity of the beginning portion position of bringing-up section 2 is larger, bottom sets bringing-up section dehumidifier air draft component 27 by portion Hot and humid air is divided to be discharged recycling.
The laminar flow control of cooling section 3 is as follows:
The distinguished and admirable use interior circulation pattern of cooling section 3, a small amount of extraneous air enters and through cold from cooling section secondary air channel 32 But cold air is formed after the cooling of section heat exchanger 321, by after the preliminary filtering of cooling section low efficient filter 33 and substantial amounts of Inner loop wind enters in cooling section fan housing component 35 and vertically blows to cold under the absorption load of cooling layer flow fan component 34 But section high efficiency particulate air filter 36, the mobile container medicine bottle in the top of active conveying bottle track 5 is vertically blowed to by the laminar-flow air of high efficiency filter, right Its PROCESS FOR TREATMENT for cooling down, hereafter laminar winds cooling section from the presence of return air component 37 by surface cooler 31 Enter next work cycle after cooling.In addition whole machine pressure balance air draft component 38 is provided with the afterbody of cooling section 3, for putting down Weigh whole machine(Especially preheating section 1 and cooling section 3)Inside blast size.
Although the utility model is disclosed as above with preferred embodiment, but is not limited to the utility model.It is any Those of ordinary skill in the art, in the case where technical solutions of the utility model scope is not departed from, all using the disclosure above Technology contents technical solutions of the utility model are made with many possible variations and modification, or be revised as the equivalent of equivalent variations Embodiment.Therefore, every content without departing from technical solutions of the utility model, it is real to more than according to the utility model technical spirit Any simple modification, equivalent variation and modification that example is done are applied, all should be fallen in the range of technical solutions of the utility model protection.

Claims (9)

1. a kind of tunnel sterilizing and drying machine, including the preheating section for being sequentially arranged and being connected(1), bringing-up section(2)And cooling section (3), the preheating section(1)It is provided with preheating section blast pipe(11), the bringing-up section(2)It is provided with bringing-up section secondary air channel(21)And heating Section dehumidifier air draft component(27), the cooling section(3)It is provided with surface cooler(31), it is characterised in that:The surface cooler(31)Go out The mouth of a river is equiped with for by surface cooler(31)Hot water be guided to preheating section blast pipe(11)With bringing-up section secondary air channel(21)And The hot water water conservancy diversion that heat exchange is carried out at this exchanges component(4), the bringing-up section dehumidifier air draft component(27)Air outlet be equiped with For by bringing-up section(2)Hot blast is guided to preheating section blast pipe(11)With bringing-up section secondary air channel(21)And hot friendship is carried out in this place The hot blast water conservancy diversion for changing exchanges component(6).
2. tunnel sterilizing and drying machine according to claim 1, it is characterised in that:The hot water water conservancy diversion exchanges component(4) Including hot water mozzle(41)And heat exchanger(42), the hot water mozzle(41)One end and surface cooler(31)Delivery port connect Connect, the other end extends preheating section blast pipe respectively(11)With bringing-up section secondary air channel(21)It is interior and be equiped with the heat exchanger (42).
3. tunnel sterilizing and drying machine according to claim 2, it is characterised in that:The hot water mozzle(41)Including cold But section drainpipe(411), preheating section water inlet pipe(412), bringing-up section water inlet pipe(413)With hot water three-way connection(414), the heat Exchanger(42)Including preheating section heat exchanger(421)With bringing-up section heat exchanger(422), the cooling section drainpipe(411) One end and surface cooler(31)Delivery port connection, the other end and hot water three-way connection(414)Connection, the preheating section water inlet pipe (412)One end and hot water three-way connection(414)Connection, the other end extend preheating section blast pipe(11)It is interior and with preheating section heat exchange Device(421)Connection, the bringing-up section water inlet pipe(413)One end and hot water three-way connection(414)Connection, the other end extend bringing-up section Secondary air channel(21)It is interior and with bringing-up section heat exchanger(422)Connection.
4. tunnel sterilizing and drying machine according to claim 3, it is characterised in that:The preheating section water inlet pipe(412)With Bringing-up section water inlet pipe(413)On be provided with hot water stream control valve(43).
5. tunnel sterilizing and drying machine according to claim 4, it is characterised in that:The cooling section drainpipe(411), it is pre- Hot arc water inlet pipe(412)With bringing-up section water inlet pipe(413)Outside is coated with hot water thermal insulating sleeve pipe(44).
6. tunnel sterilizing and drying machine according to any one of claim 1 to 5, it is characterised in that:The hot blast water conservancy diversion Exchange component(6)Including hot blast mozzle(61), preheating section warm-air pipe(62), bringing-up section warm-air pipe(63)With hot blast three-way connection (64), the hot blast mozzle(61)One end and bringing-up section dehumidifier air draft component(27)Connection, the other end and hot blast three-way connection (64)Connection, the preheating section warm-air pipe(62)One end and hot blast three-way connection(64)Connection, the other end extend preheating section air intake Pipe(11)It is interior and extend out to outside, the bringing-up section warm-air pipe(63)One end and hot blast three-way connection(64)Connection, the other end are stretched To bringing-up section secondary air channel(21)It is interior and extend out to outside.
7. tunnel sterilizing and drying machine according to claim 6, it is characterised in that:The preheating section warm-air pipe(62)With plus Hot arc warm-air pipe(63)On be provided with hot air flow control valve(65).
8. tunnel sterilizing and drying machine according to claim 7, it is characterised in that:The hot blast mozzle(61), preheating Section warm-air pipe(62)With bringing-up section warm-air pipe(63)Outside is coated with hot blast thermal insulation casing(66).
9. tunnel sterilizing and drying machine according to any one of claim 1 to 5, it is characterised in that:The preheating section (1), bringing-up section(2)And cooling section(3)It is interior to be provided with a shared active conveying bottle track by bottom position(5).
CN201621435774.8U 2016-12-26 2016-12-26 Tunnel sterilizing and drying machine Active CN206310894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621435774.8U CN206310894U (en) 2016-12-26 2016-12-26 Tunnel sterilizing and drying machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621435774.8U CN206310894U (en) 2016-12-26 2016-12-26 Tunnel sterilizing and drying machine

Publications (1)

Publication Number Publication Date
CN206310894U true CN206310894U (en) 2017-07-07

Family

ID=59246729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621435774.8U Active CN206310894U (en) 2016-12-26 2016-12-26 Tunnel sterilizing and drying machine

Country Status (1)

Country Link
CN (1) CN206310894U (en)

Similar Documents

Publication Publication Date Title
CN109099718A (en) A kind of rotary kiln residual neat recovering system
CN206300425U (en) A kind of plate dryer
CN106766831A (en) Tunnel sterilizing and drying machine and laminar flow control method
CN205316352U (en) RTO system with tail gas waste heat recovery function
CN106196125B (en) A kind of exhaust-gas treatment structure applied to incinerator
CN201803367U (en) Energy saving quaternary body
CN206291702U (en) Tunnel sterilizing and drying machine
CN201926290U (en) Energy-saving electrothermal tunnel kiln
CN104359325B (en) Kiln heat energy from waste gas Two-way Cycle recovery method and device
CN209101827U (en) A kind of rotary kiln residual neat recovering system
CN205718515U (en) A kind of drying oven for spraying control system
CN206310894U (en) Tunnel sterilizing and drying machine
CN206056191U (en) A kind of tunnel sterilizing and drying machine
CN108507293B (en) A kind of energy-saving biomass drying equipment
CN102042750A (en) Energy-saving electrothermal tunnel kiln
CN206018671U (en) A kind of exhaust-gas treatment structure for being applied to incinerator
CN206033783U (en) Solid heat carrier waste heat utilization system
CN204752784U (en) Converter coal gas processing system
CN209279688U (en) A kind of aluminum-bar heating furnace with waste gas recovering device
CN208952418U (en) A kind of gas heat conducting oil furnace
CN206257929U (en) A kind of tunnel sterilizing and drying machine
CN207797092U (en) A kind of gas-fired boiler high effective flue gas depth waste heat recovery and demister system
CN206613680U (en) A kind of waste heat recovery and baking finish drying device
CN106196973A (en) A kind of tunnel sterilizing and drying machine and laminar flow control method
CN206056186U (en) Tunnel sterilizing and drying machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: TRUKING TECHNOLOGY Ltd.

Assignor: TRUKING INTELLIGENT ROBOT (CHANGSHA) Co.,Ltd.

Contract record no.: X2023980047829

Denomination of utility model: Tunnel sterilization and drying machine

Granted publication date: 20170707

License type: Common License

Record date: 20231122