CN206309023U - Fast easy-to-closing in net stencil - Google Patents
Fast easy-to-closing in net stencil Download PDFInfo
- Publication number
- CN206309023U CN206309023U CN201621428287.9U CN201621428287U CN206309023U CN 206309023 U CN206309023 U CN 206309023U CN 201621428287 U CN201621428287 U CN 201621428287U CN 206309023 U CN206309023 U CN 206309023U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- fast
- easy closing
- steel
- vertical support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程技术领域,具体地说是一种快易收口网模板。The utility model relates to the technical field of construction engineering, in particular to a quick and easy closing net template.
背景技术Background technique
随着经济的日益发展,城市土地资源日趋紧张,近年来超高层建筑在国内建造数量开始增多,其基础底板的厚度及钢筋直径、用量也越来越大。由于超高层塔楼与裙楼高度差较大,设计一般在塔楼与裙楼交接处的底板上设置了沉降后浇带,以避免建筑物在建造过程中产生不均匀沉降对基础底板造成破坏。超高层基础底板的后浇带由于深度大、穿过后浇带的钢筋排数多、操作空间狭窄,按通常模板施工工艺难以保证该类后浇带在底板混凝土浇筑时不漏浆、不涨模及跑模,且漏浆、跑模后,多排钢筋之间混凝土浆液的清理困难。With the development of the economy, urban land resources are becoming more and more tense. In recent years, the number of super high-rise buildings built in China has begun to increase, and the thickness of the foundation floor and the diameter and amount of steel bars are also increasing. Due to the large height difference between the super high-rise tower and the podium, the design generally sets a post-settlement pouring belt on the floor at the junction of the tower and the podium to avoid damage to the foundation floor caused by uneven settlement during the construction of the building. Due to the large depth of the post-cast belt of the super-high-rise foundation floor, the large number of steel bars passing through the post-cast belt, and the narrow operating space, it is difficult to ensure that this type of post-cast belt does not leak grout and does not expand the formwork during the concrete pouring of the bottom slab according to the usual formwork construction technology. And mold running, and after grout leakage and mold running, it is difficult to clean the concrete grout between multiple rows of steel bars.
发明内容Contents of the invention
本实用新型的技术任务是解决现有技术的不足,提供一种快易收口网模板。The technical task of the utility model is to solve the deficiencies of the prior art and provide a quick and easy closure net template.
本实用新型的技术方案是按以下方式实现的,该快易收口网模板,其结构包括立面浇筑砼、竖向支撑柱、快易收口网,The technical solution of the utility model is realized in the following manner. The quick and easy closing net formwork, its structure includes facade pouring concrete, vertical support columns, quick and easy closing net,
立面浇筑砼的立面上固定设置有支撑木方,支撑木方竖直设置,On the façade where the concrete is poured on the façade, there are fixed support wooden cubes, and the support wooden cubes are vertically arranged.
在支撑木方上竖直方向上等距间隔的设置有纵列排列的钢管撑,钢管撑水平设置且垂直于支撑木方,钢管撑朝向竖向支撑柱;Steel pipe braces arranged in columns are arranged at equidistant intervals in the vertical direction on the supporting wooden square, the steel pipe braces are arranged horizontally and perpendicular to the supporting wooden square, and the steel pipe braces face the vertical supporting columns;
钢管撑内穿接有螺栓,螺栓头探出钢管撑并与竖向支撑柱固定连接;There are bolts pierced through the steel pipe support, and the bolt head sticks out of the steel pipe support and is fixedly connected with the vertical support column;
螺栓的螺纹栓身上旋接有螺母;螺母与钢管撑管口顶接,螺母旋进或退出调节螺栓相对于钢管撑的外露伸缩长度;Nuts are screwed on the threaded bolts of the bolts; the nuts are connected to the top of the steel pipe support, and the nuts are screwed in or out to adjust the exposed expansion and contraction length of the bolt relative to the steel pipe support;
纵列排列的钢管撑支撑竖向支撑柱,使竖向支撑柱与立面浇筑砼的立面相平行;The vertical support columns are supported by steel pipe braces arranged in columns, so that the vertical support columns are parallel to the façade where the concrete is poured on the façade;
竖向支撑柱的外侧设置有水平横向钢管;水平横向钢管由竖向支撑柱的上部至下部等距间隔平行排列;The outer side of the vertical support column is provided with horizontal and horizontal steel pipes; the horizontal and horizontal steel pipes are arranged in parallel at equal intervals from the upper part to the lower part of the vertical support column;
水平横向钢管与螺栓头的位置相水平对应;The horizontal transverse steel pipe corresponds horizontally to the position of the bolt head;
水平横向钢管所在平面外侧面设置有竖向受力钢筋骨架,The outer side of the plane where the horizontal and transverse steel pipes are located is provided with a vertical reinforced steel skeleton.
快易收口网设置在竖向受力钢筋骨架平面外侧面上;The fast and easy closing net is set on the outer surface of the vertically stressed steel skeleton plane;
快易收口网由上方延伸到底部后浇带底板钢筋底部;The fast and easy closing net extends from the top to the bottom of the post-cast bottom plate reinforcement;
快易收口网的上缘向上延伸穿出顶板钢筋并由顶板钢筋上表面的压口木方压接;The upper edge of the fast and easy closing net extends upwards through the roof reinforcement and is crimped by the crimping wood square on the upper surface of the roof reinforcement;
快易收口网的底部位置上敷设有防锈钢丝网;The bottom of the fast and easy closing net is laid with anti-rust steel wire mesh;
底部的快易收口网和防锈钢丝网向下穿过底板钢筋连接到底板钢筋下方的橡胶止水带上;The quick-easy closure net at the bottom and the anti-rust steel wire mesh go down through the bottom plate reinforcement and connect to the rubber waterstop under the bottom plate reinforcement;
底板钢筋的底层下表面和橡胶止水带之间设置有砼挡浆条;A concrete grout bar is arranged between the lower surface of the bottom layer of the bottom plate reinforcement and the rubber waterstop;
橡胶止水带水平的铺设在建筑底板上。The rubber waterstop is laid horizontally on the building floor.
竖向支撑柱采用钢管或方木。The vertical support column adopts steel pipe or square wood.
防锈钢丝网采用镀锌防锈钢丝网。Anti-rust steel wire mesh adopts galvanized anti-rust steel wire mesh.
螺栓头部埋设固定在竖向支撑柱的柱身上。The head of the bolt is buried and fixed on the column body of the vertical support column.
竖向支撑柱的顶端向上延伸并探出顶板钢筋。The top of the vertical support column extends upwards and protrudes out of the roof reinforcement.
本实用新型与现有技术相比所产生的有益效果是:Compared with the prior art, the utility model has the following beneficial effects:
该快易收口网模板对传统模板施工技术进行了改进和创新,采用在钢筋底部设混凝土条挡浆、多排钢筋之间设快易收口网+镀锌钢丝网堵缝、快易收口网+钢筋支架模板、对拉螺栓拉结+钢管顶撑加固的模板综合施工技术,解决了超厚底板后浇带施工难的问题,后浇带施工质量得到有效保证。The fast and easy closing mesh formwork has improved and innovated the traditional formwork construction technology. It adopts concrete bar grouting at the bottom of the steel bars, quick and easy closing mesh + galvanized steel wire mesh caulking, and quick and easy closing mesh + The comprehensive construction technology of formwork with steel support formwork, tension bolt tie + steel pipe top brace reinforcement solves the problem of difficult construction of post-cast strips with super thick bottom slabs, and the construction quality of post-cast strips is effectively guaranteed.
该方法通过在第一排钢筋下设置现浇混凝土挡浆条、多排钢筋之间快易收口网、镀锌钢丝网等措施,解决了穿过后浇带多排钢筋之间易漏浆、封堵难、清理难的问题;底板上、下皮钢筋之间设置快易收口网+钢筋支架模板体系,采用对拉螺栓拉结+钢管顶撑加固方法,解决了因后浇带深度大,底板混凝土浇筑时对后浇带模板产生较大的侧压力,易出现涨模、跑模的问题。This method solves the problem of grout leakage and sealing between multiple rows of steel bars passing through the post-casting belt by setting cast-in-situ concrete grout bars, quick-easy closing nets between multiple rows of steel bars, and galvanized steel wire mesh under the first row of steel bars. Difficult to block and difficult to clean; the quick-easy closure mesh + steel support formwork system is installed between the bottom plate and the lower skin steel bars, and the double-tension bolt tie + steel pipe top support method is adopted to solve the problem of deep post-casting belt and bottom plate. When the concrete is poured, a large lateral pressure is generated on the post-cast belt formwork, which is prone to the problems of mold expansion and run-out.
底板混凝土浇筑完毕后,快易收口网表面能够自然形成麻面,无需拆模及凿毛,还解决了因后浇带内钢筋密集,操作面狭窄,新、老混凝土结合面凿毛困难的问题。After the bottom slab concrete is poured, the surface of the quick-easy closing net can naturally form a pockmarked surface, without the need to remove the formwork and chiseling. It also solves the problem of difficulty in chiseling the joint surface of new and old concrete due to the dense reinforcement in the post-casting belt and the narrow operating surface. .
实施该该快易收口网模板适用于厚度大、钢筋密集、排数多的基础底板后浇带、加强带及施工缝位置的模板施工,对一般厚度的底板后浇带、加强带及施工缝位置的模板施工也适用。The implementation of this quick and easy closing mesh formwork is suitable for the formwork construction of the post-cast belt, reinforcement belt and construction joint position of the foundation floor with large thickness, dense steel bars, and many rows. The formwork construction of the location is also suitable.
该快易收口网模板设计合理、结构简单、安全可靠、使用方便、易于维护,具有很好的推广使用价值。The fast and easy closing net template is reasonable in design, simple in structure, safe and reliable, convenient to use and easy to maintain, and has good promotion and use value.
附图说明Description of drawings
附图1是本实用新型的结构示意图。Accompanying drawing 1 is the structural representation of the utility model.
附图中的标记分别表示:The marks in the accompanying drawings indicate respectively:
1、立面浇筑砼,2、支撑木方,3、钢管撑,4、螺栓,5、螺栓头,1. Pouring concrete on the facade, 2. Supporting wooden squares, 3. Steel pipe support, 4. Bolts, 5. Bolt heads,
6、竖向支撑柱,6. Vertical support column,
7、螺母,7. Nut,
8、水平横向钢管,9、竖向受力钢筋骨架,10、快易收口网,8. Horizontal and horizontal steel pipes, 9. Vertical reinforced steel skeleton, 10. Quick and easy closing net,
11、后浇带,12、底板钢筋,13、顶板钢筋,14、压口木方,11. Post-pouring tape, 12. Bottom plate reinforcement, 13. Top plate reinforcement, 14. Crimping wood square,
15、防锈钢丝网,16、橡胶止水带,17、砼挡浆条,18、建筑底板;15. Anti-rust steel wire mesh, 16. Rubber waterstop, 17. Concrete retaining grout, 18. Building floor;
19、水平构造筋,20、附加钢筋。19. Horizontal structural reinforcement, 20. Additional reinforcement.
具体实施方式detailed description
下面结合附图对本实用新型的快易收口网模板作以下详细说明。Below in conjunction with accompanying drawing, the fast and easy closure net template of the present utility model is described in detail below.
如附图所示,本实用新型的快易收口网模板,其结构包括立面浇筑砼、竖向支撑柱、快易收口网,As shown in the accompanying drawings, the quick and easy closing net formwork of the present utility model has a structure including pouring concrete on the facade, a vertical support column, and a quick and easy closing net.
立面浇筑砼1的立面上固定设置有支撑木方2,支撑木方2竖直设置,On the façade of the façade pouring concrete 1, a support wooden cube 2 is fixedly arranged, and the support wooden cube 2 is arranged vertically,
在支撑木方2上竖直方向上等距间隔的设置有纵列排列的钢管撑3,钢管撑3水平设置且垂直于支撑木方2,钢管撑3朝向竖向支撑柱6;Steel pipe braces 3 arranged in columns are arranged at equidistant intervals in the vertical direction on the supporting wooden square 2, the steel pipe braces 3 are arranged horizontally and perpendicular to the supporting wooden square 2, and the steel pipe braces 3 face the vertical supporting column 6;
钢管撑3内穿接有螺栓4,螺栓头5探出钢管撑并与竖向支撑柱6固定连接;The steel pipe support 3 is pierced with a bolt 4, and the bolt head 5 sticks out of the steel pipe support and is fixedly connected with the vertical support column 6;
螺栓4的螺纹栓身上旋接有螺母7;螺母7与钢管撑3管口顶接,螺母7旋进或退出调节螺栓相对于钢管撑的外露伸缩长度;A nut 7 is screwed on the threaded bolt of the bolt 4; the nut 7 is connected to the mouth of the steel pipe support 3, and the nut 7 is screwed in or out to adjust the exposed telescopic length of the bolt relative to the steel pipe support;
纵列排列的钢管撑3支撑竖向支撑柱6,使竖向支撑柱3与立面浇筑砼1的立面相平行;The vertical support columns 6 are supported by the steel pipe supports 3 arranged in columns, so that the vertical support columns 3 are parallel to the façade of the façade pouring concrete 1;
竖向支撑柱6的外侧设置有水平横向钢管8;水平横向钢管8由竖向支撑柱6的上部至下部等距间隔平行排列;The outer side of the vertical support column 6 is provided with horizontal horizontal steel pipes 8; the horizontal horizontal steel pipes 8 are arranged in parallel at equal intervals from the upper part to the lower part of the vertical support column 6;
水平横向钢管8与螺栓头5的位置相水平对应;The horizontal transverse steel pipe 8 corresponds horizontally to the position of the bolt head 5;
水平横向钢管8所在平面外侧面设置有竖向受力钢筋骨架9,The outer side of the plane where the horizontal horizontal steel pipe 8 is located is provided with a vertical reinforced steel skeleton 9,
快易收口网10设置在竖向受力钢筋骨架9平面外侧面上;The fast and easy closing net 10 is arranged on the outer surface of the plane of the vertical stressed steel skeleton 9;
快易收口网10由上方延伸到底部后浇带11底板钢筋12底部;The fast and easy closing net 10 extends from the top to the bottom of the post-casting belt 11 and the bottom of the steel bar 12;
快易收口网10的上缘向上延伸穿出顶板钢筋13并由顶板钢筋上表面的压口木方14压接;The upper edge of the fast and easy closing net 10 extends upwards through the roof reinforcement 13 and is crimped by the crimping wooden square 14 on the upper surface of the roof reinforcement;
快易收口网10的底部位置上敷设有防锈钢丝网15;An antirust steel wire mesh 15 is laid on the bottom position of the fast and easy closing net 10;
底部的快易收口网10和防锈钢丝网15向下穿过底板钢筋12连接到底板钢筋下方的橡胶止水带16上;The fast and easy closing net 10 and the antirust steel wire mesh 15 at the bottom pass downward through the steel bar 12 of the bottom plate and are connected to the rubber waterstop 16 below the steel bar of the bottom plate;
底板钢筋12的底层下表面和橡胶止水带16之间设置有砼挡浆条17;A concrete grout bar 17 is arranged between the lower surface of the bottom layer of the bottom plate steel bar 12 and the rubber waterstop 16;
橡胶止水带16水平的铺设在建筑底板18上。The rubber waterstop 16 is laid horizontally on the building base 18.
竖向支撑柱6采用钢管或方木。Vertical support column 6 adopts steel pipe or square wood.
防锈钢丝网15采用镀锌防锈钢丝网。Anti-rust steel wire mesh 15 adopts galvanized anti-rust steel wire mesh.
螺栓头部埋设固定在竖向支撑柱6的柱身上,并与竖向支撑柱6固定连接。螺栓头固定,使螺栓本身不会发生转动。The head of the bolt is buried and fixed on the column body of the vertical support column 6, and is fixedly connected with the vertical support column 6. The bolt head is fixed so that the bolt itself cannot rotate.
竖向支撑柱6的顶端向上延伸并探出顶板钢筋13。The top of the vertical support column 6 extends upwards and protrudes out of the roof steel bar 13 .
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621428287.9U CN206309023U (en) | 2016-12-24 | 2016-12-24 | Fast easy-to-closing in net stencil |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621428287.9U CN206309023U (en) | 2016-12-24 | 2016-12-24 | Fast easy-to-closing in net stencil |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206309023U true CN206309023U (en) | 2017-07-07 |
Family
ID=59245658
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621428287.9U Expired - Fee Related CN206309023U (en) | 2016-12-24 | 2016-12-24 | Fast easy-to-closing in net stencil |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206309023U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577377A (en) * | 2018-11-29 | 2019-04-05 | 成都建工第二建筑工程有限公司 | Basement post-pouring zone structure and its construction method |
| CN110820696A (en) * | 2019-11-22 | 2020-02-21 | 北京金河水务建设集团有限公司 | Synchronous pouring construction method for rock-fill concrete pond dam |
-
2016
- 2016-12-24 CN CN201621428287.9U patent/CN206309023U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577377A (en) * | 2018-11-29 | 2019-04-05 | 成都建工第二建筑工程有限公司 | Basement post-pouring zone structure and its construction method |
| CN110820696A (en) * | 2019-11-22 | 2020-02-21 | 北京金河水务建设集团有限公司 | Synchronous pouring construction method for rock-fill concrete pond dam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
| CN102691411A (en) | Beam plate post-cast strip template support system and construction method thereof | |
| CN202627495U (en) | Beam slab late poured band template supporting system | |
| CN202441060U (en) | Construction structure of reinforced concrete frame beam columns | |
| CN103321421A (en) | Construction method for one-time formation of concrete pool wall | |
| CN205296584U (en) | Be applied to assembled constructional column of aerated concrete block infilled wall | |
| CN206245730U (en) | A kind of cast-in-place pitched roof double template structure | |
| CN103590603A (en) | Large-span multi-curvature thin shell reinforced concrete structure construction method | |
| CN103556819B (en) | A construction method for reserving structural column holes on beam slabs | |
| CN202644976U (en) | Slope roof double-side formwork support structure | |
| CN205669281U (en) | A kind of cast-in-place integral concrete frame wall filled with masonry system | |
| CN207177329U (en) | A kind of prefabricated hollow floor bracing means | |
| CN207063522U (en) | A kind of frame column high-supported formwork | |
| CN204326100U (en) | The Preserved node of covered back-digging side wall bar splice | |
| CN204001705U (en) | Outer wall of basement single surface formwork constructing structure based on earth anchor truss | |
| CN204000936U (en) | Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss | |
| CN204662742U (en) | The movable surface construction structure of a kind of pitched roof | |
| CN203905331U (en) | Cast-in-place plate-type staircase with seamless steps | |
| CN203334661U (en) | Scaffold-hole-free formwork construction device for brick-concrete structure construction column | |
| CN102912894A (en) | Sandwich wall with straw insulation boards | |
| CN206769199U (en) | After wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
| CN203559505U (en) | Cast-in-place light steel bar truss wall | |
| CN204266216U (en) | Bamboo beam anchoring and supporting structure of side slope | |
| CN105019656A (en) | Construction method for floor system concrete post-cast strip suspended formwork | |
| CN104746521B (en) | The application of oversized cross-section slope cushion layer constructing structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170707 |