CN206308955U - Stone material terrace makes somebody a mere figurehead pre- assembling structure - Google Patents

Stone material terrace makes somebody a mere figurehead pre- assembling structure Download PDF

Info

Publication number
CN206308955U
CN206308955U CN201621303948.5U CN201621303948U CN206308955U CN 206308955 U CN206308955 U CN 206308955U CN 201621303948 U CN201621303948 U CN 201621303948U CN 206308955 U CN206308955 U CN 206308955U
Authority
CN
China
Prior art keywords
stone material
hole
connecting hole
threaded sleeve
terrace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621303948.5U
Other languages
Chinese (zh)
Inventor
王辉平
连珍
刘淳
陈帅
陈莹
周漪芳
江旖旎
赵礼
马宇哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Application granted granted Critical
Publication of CN206308955U publication Critical patent/CN206308955U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model makes somebody a mere figurehead pre- assembling structure, including the back of the body bolt screw that one end is fixed in connecting hole there is provided a kind of stone material terrace;Height-adjustable threaded sleeve, one end of threaded sleeve is connected with the one end for the back of the body bolt screw exposed outside connecting hole;It is opened in the hole on the concrete base layer of stone material terrace, in the other end insertion hole of threaded sleeve, by adjusting threaded sleeve, the height and levelness of stone material surface layer can be by manually adjusting repeatedly, it is capable of achieving stone material terrace directly live whole field walkthrough, effect reaches the construction that can directly carry out injecting cement mortar after design requirement, no longer need to pack up after stone material terrace block construction again, stone material floor construction no longer needs screed-coat, it is effectively reduced face height, during stone material terrace paving, requirement to concrete base layer is no longer strict, stone material paving also becomes possibility in metal staircase step.

Description

Stone material terrace makes somebody a mere figurehead pre- assembling structure
Technical field
The utility model belongs to building decoration engineering construction field, and more particularly to a kind of stone material terrace makes somebody a mere figurehead pre- assembling structure.
Background technology
Designer is frequently encountered in architectural engineering to be needed to check stone material terrace actual installation effect, overall walkthrough amount Greatly, and basic unit out-of-flatness influence walkthrough effect.Bartlit paving technique needs first to construct on the basis of concrete base layer Screed-coat, paving stone material thereon, in Practical Project, when occurring that enough face heights cannot be met, traditional handicraft behaviour Make difficulty big, and effect is bad.In order to solve above technical barrier, the utility model uses stone material overhead system, by walkthrough and Practice of construction integration operation, had both met the requirement that designer checks integral installation effect, it also avoid workload repeatedly. Slip casting cure system is used simultaneously, and solving the operation height provided in engineering cannot meet the problem of practice of construction height.
Utility model content
The purpose of this utility model is to provide a kind of stone material terrace to make somebody a mere figurehead pre- assembling structure, can solve the problem that Bartlit paving The obvious problem that overlays that workload is big, filling mortar working face thickness differs, stone material flakes in technique.
To solve the above problems, the utility model provides a kind of stone material terrace and makes somebody a mere figurehead pre- assembling structure, including:
It is opened in the connecting hole on stone material;
The back of the body bolt screw that one end is fixed in the connecting hole, the other end of the back of the body bolt screw exposes the connecting hole Outward;
Height-adjustable threaded sleeve, one end of the threaded sleeve and the back of the body bolt screw exposed outside the connecting hole One end connects;
It is opened in the hole on the concrete base layer of stone material terrace, the other end insertion described hole of the threaded sleeve In.
Further, in said structure, the connecting hole is interior big outer small hole.
Further, in said structure, the connecting hole is 50mm with a distance from the edge of stone material.
Further, in said structure, the connection hole depth 15mm.
Further, in said structure, the area of the stone material is less than or equal to 1m2, on 4 angles of the stone material respectively Offer a connecting hole.
Further, in said structure, epoxide-resin glue is also marked with connecting hole.
Further, in said structure, the threaded sleeve is fixed by epoxide-resin glue with described hole.
Further, in said structure, also including supporting spring, one end of the supporting spring is fixed on the back of the body bolt screw, The other end is extended to outside stone material.
Further, in said structure, the two ends of the supporting spring are provided with the fixation for wearing the back of the body bolt screw Hole.
Compared with prior art, the utility model includes:The back of the body bolt screw that one end is fixed in the connecting hole, the back of the body The other end of bolt screw exposes outside the connecting hole;Height-adjustable threaded sleeve, one end of the threaded sleeve with expose One end connection of the back of the body bolt screw outside the connecting hole;It is opened in the hole on the concrete base layer of stone material terrace, the screw thread In the other end insertion described hole of sleeve pipe;The cement mortar in the gap between stone material and concrete base layer is flow into, is passed through Regulation threaded sleeve, the height and levelness of stone material surface layer can be capable of achieving stone material terrace directly existing by manually adjusting repeatedly Whole field walkthrough, effect reaches the construction that can directly carry out injecting cement mortar after design requirement, it is no longer necessary to pack up stone material ground Block construction again behind level ground, stone material floor construction no longer needs screed-coat, is effectively reduced face height, stone material terrace paving When, the requirement to concrete base layer is no longer strict, and stone material paving also becomes possibility in metal staircase step.
Brief description of the drawings
Fig. 1 is that the stone material terrace of the embodiment of the utility model one makes somebody a mere figurehead the connecting hole schematic diagram of pre- assembling structure;
Fig. 2 is that the stone material terrace of the embodiment of the utility model one makes somebody a mere figurehead the connecting hole cut-away view of pre- assembling structure;
Fig. 3 be the embodiment of the utility model one stone material terrace make somebody a mere figurehead pre- assembling structure back of the body bolt screw scheme of installation;
Fig. 4 be the embodiment of the utility model one stone material terrace make somebody a mere figurehead pre- assembling structure threaded sleeve first installation illustrate Figure;
Fig. 5 be the embodiment of the utility model one stone material terrace make somebody a mere figurehead pre- assembling structure threaded sleeve second installation illustrate Figure;
Fig. 6 is that the stone material terrace of the embodiment of the utility model one makes somebody a mere figurehead the supporting spring scheme of installation of pre- assembling structure.
Specific embodiment
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool Body implementation method is described in further detail to the utility model.
The utility model provides a kind of stone material terrace and makes somebody a mere figurehead pre- assembling structure, including:
As illustrated in fig. 1 and 2, it is opened in the connecting hole 1 on stone material 6;
As shown in figure 3, the back of the body bolt screw 2 that one end is fixed in the connecting hole 1, the other end dew of the back of the body bolt screw 2 Go out outside the connecting hole 1;
As shown in figure 4, height-adjustable threaded sleeve 3, one end of the threaded sleeve 3 with expose the connecting hole 1 One end connection of outer back of the body bolt screw 2;Specifically, the one end of threaded sleeve 3 and back of the body bolt screw 2 expose one end connection, the other end is inserted Enter in the hole 4 of concrete base layer 5, the local height of stone material 6 is adjusted by rotating threaded sleeve 3;
As shown in figure 5, the hole 4 being opened on the concrete base layer 5 of stone material terrace, the other end of the threaded sleeve 3 In insertion described hole 4;
Flow into the cement mortar in the gap between stone material and concrete base layer.By adjusting screw thread in the utility model Sleeve pipe, the height and levelness of stone material surface layer can be by manually adjusting repeatedly, and directly live whole field is pre- to be capable of achieving stone material terrace Row, effect reaches the construction that can directly carry out injecting cement mortar after design requirement, it is no longer necessary to divide again after packing up stone material terrace Block is constructed, and stone material floor construction no longer needs screed-coat, is effectively reduced face height, during stone material terrace paving, to mixed The requirement of solidifying soil matrix layer is no longer strict, and stone material paving also becomes possibility in metal staircase step.
Preferably, as shown in Fig. 2 the connecting hole 1 is interior big outer small hole.Specifically, can first with the brill that regulation is thick Head beats the deep holes of 15mm, and reaming in hole is then carried out with target drill, forms interior big outer small connecting hole, back of the body bolt screw and stone material Connected by the connecting hole, after back of the body bolt screw is pacified in load hole, branch magnifies inside hole, form interior big outer small shape, Just preferably it is coincide with the hole on stone material.
Preferably, as illustrated in fig. 1 and 2, the connecting hole 1 is 50mm with a distance from the edge of stone material, so as to ensure to connect Connect the location-appropriate in hole, be unlikely to from the edge of stone material too close to, influence connecting hole quality, be also unlikely to from stone material too close to, shadow Ring height regulating effect.
Preferably, the connection hole depth 15mm, to ensure that depth is appropriate, one end of fully fixed back of the body bolt screw.
Preferably, as shown in figure 1, the area of the stone material is less than or equal to 1m2, opened up respectively on 4 angles of the stone material There is a connecting hole 1.Specifically, stone material area is less than or equal to 1m2If, 4 correspondence connection hole positions, more than 1m2When, according to stress Situation suitably increases the connection hole position on stone material.
Preferably, also it is marked with epoxide-resin glue in connecting hole.Specifically, before back of the body bolt screw installs connecting hole, injection Epoxide-resin glue, makes connector form good face with stone material and is connected, and epoxide-resin glue can also effectively prevent stone material hole side Sheared destruction.
Preferably, the threaded sleeve is fixed by epoxide-resin glue with described hole.Specifically, each by leveling stone material The threaded sleeve of individual hole position, regulation stone material height and levelness, after the height and levelness of stone material determine, irrigate in hole Epoxide-resin glue, fixed threaded sleeve.
Preferably, as shown in fig. 6, also including supporting spring 7, one end of the supporting spring 7 is fixed on the back of the body bolt screw 2, separately One end is extended to outside stone material 6.For the stone material B of specific position (border, centre), limited by working space, part connecting hole Position cannot meet Height Adjustable requirement, and this kind of situation can install supporting spring, and bearing capacity is transferred into adjacent stone material A, supporting spring Two pieces of back of the body bolt screws of stone material of connection, there is provided bearing capacity end can add nut to fix.For example, as shown in fig. 6, specific position stone material B When cannot adjust stone material height by threaded sleeve, supporting spring can be now installed, bearing capacity is transmitted to stone material A by stone material B by supporting spring, The nut that bearing capacity one end is A stone materials is provided and fixes supporting spring, the other end is that B stone materials need not be fixed, and the direct framves of stone material B are in supporting spring On, stone material B ends need not install threaded sleeve, not contacted with concrete base layer, and two pieces of stone material elevations are consistent.
Preferably, as shown in fig. 6, the two ends of the supporting spring are provided with the fixing hole 8 for wearing the back of the body bolt screw, from And realize that supporting spring 7 is convenient with back of the body bolt screw 2, reliable fixed.
Preferably, the cement mortar is non-shrinkage cement mortar.Specifically, the non-shrinkage cement mortar for using is for dual Shrinkage-compensating, high fluidity, accurate grouting material.During construction, it is only necessary to which add water mix, it is narrow that excellent mobility makes it easily be filled into Space, it is ensured that maximum loaded area.It is closely knit, ungauged regions characteristic make its without isolation, without sedimentation, it is ensured that all grouting surfaces with Equipment is closely contacted.
Preferably, the thickness of the cement mortar is 5mm to 100mm.Specifically, non-shrinkage cement mortar is general in flowing Under state, the thickness that can construct is 5mm to 100mm, and the too thin mobility that can influence cement mortar of thickness causes hollowing, too thick meeting Waste of materials.
Preferably, the height of the cement sand pulp at stone material gap is higher than stone material bottom surface 1cm, is easy to follow-up in stone material gap Interior fills up gap filler.
Preferably, also include:
Fill up in the gap filler in stone material gap, the gap filler covers the cement sand pulp.Specifically, ring can be used Oxygen gap filler, gap filler with scraper plate clamp-oned and filled up between stone material stitches, and with the same tooth scraper plate mouthful face, blows unnecessary joint filling off Agent.After joint filling completion, take advantage of before gap filler is not dried, the gap filler being stained with stone material is removed immediately, be sufficiently humidified so as to cleaning sponge Surface is cleaned, and should not be washed away with water.After the completion of joint filling work, at least conserved under good ventilation dry environment 2 days.
Above-mentioned stone material terrace makes somebody a mere figurehead the construction method of pre- assembling structure, including:
As illustrated in fig. 1 and 2, connecting hole 1 is opened up on stone material 6;
As shown in figure 3, the one end of back of the body bolt screw 2 is fixed in the connecting hole 1, by the other end of the back of the body bolt screw 2 Expose outside the connecting hole 1;
As shown in figure 4, by the one end of height-adjustable threaded sleeve 3 and the back of the body bolt screw 2 exposed outside the connecting hole 1 One end connects;Specifically, threaded sleeve one end and back of the body bolt screw expose one end connection, the other end inserts the hole of concrete base layer In, adjust stone material local height by rotating threaded sleeve;
As shown in figure 5, hole 4 is opened up on the concrete base layer 5 of stone material terrace, by the another of the threaded sleeve 3 In end insertion described hole 4, the local height of stone material 6 is adjusted by rotating threaded sleeve 3;
Cement mortar is injected in gap between stone material 6 and concrete base layer 5.It is mixed for horizontal plane in the utility model Stone material paving on solidifying soil matrix layer, there is provided it is a kind of easily and fast, efficient method, by adjusting threaded sleeve, stone material surface layer Height and levelness can be capable of achieving stone material terrace directly live whole field walkthrough by manually adjusting repeatedly, effect reaches and sets Meter directly carries out the construction of injection cement mortar after requiring, it is no longer necessary to pack up after stone material terrace block construction, stone material terrace again Construction no longer needs screed-coat, is effectively reduced face height, and during stone material terrace paving, the requirement to concrete base layer is not Strict again, stone material paving also becomes possibility in metal staircase step.
Preferably, as shown in Fig. 2 the connecting hole is interior big outer small hole.Specifically, can first with the drill bit that regulation is thick The deep holes of 15mm are beaten, reaming in hole is then carried out with target drill, form interior big outer small connecting hole, back of the body bolt screw and stone material are logical The connecting hole connection is crossed, after back of the body bolt screw is pacified in load hole, branch magnifies inside hole, form interior big outer small shape, with Hole on stone material just preferably coincide.
Preferably, as illustrated in fig. 1 and 2, the connecting hole is 50mm with a distance from the edge of stone material, so as to ensure connection The location-appropriate in hole, be unlikely to from the edge of stone material too close to, influence connecting hole quality, be also unlikely to, from the too near of stone material, to influence Height regulating effect.
Preferably, the connection hole depth 15mm, to ensure that depth is appropriate, one end of fully fixed back of the body bolt screw.
Preferably, connecting hole is opened up on stone material, including:
As shown in figure 1, the area of the stone material is less than or equal to 1m2, a company is opened up respectively on 4 angles of the stone material Connect hole.Specifically, stone material area is less than or equal to 1m2If, 4 correspondence connection hole positions, more than 1m2When, suitably increased according to stressing conditions Plus the connection hole position on stone material.
Preferably, before step back of the body bolt screw one end being fixed in the connecting hole, also include:
Epoxide-resin glue is injected in connecting hole.Specifically, before back of the body bolt screw installs connecting hole, injecting epoxy resin Glue, makes connector form good face with stone material and is connected, and epoxide-resin glue can also effectively prevent being broken for stone material hole side It is bad.
Preferably, after by the step in the other end insertion described hole of the threaded sleeve, also include:
After after the determination of stone material local height, epoxide-resin glue is injected in described hole, the threaded sleeve is fixed In in described hole.Specifically, by the threaded sleeve of each hole position of leveling stone material, adjusting stone material height and levelness, stone is treated After the height and levelness of material determine, to infusion epoxy resin glue in hole, fixed threaded sleeve.
Preferably, height-adjustable threaded sleeve one end is connected with the one end for the back of the body bolt screw exposed outside the connecting hole Before the step of connecing, also include:
One end of supporting spring is fixed on the back of the body bolt screw, the other end is extended to outside stone material;
Will extend into one end of supporting spring outside stone material and the back of the body bolt screw connection of another stone material.For specific position (border, It is middle) stone material, limited by working space, part connection hole site cannot meet Height Adjustable requirement, this kind of situation, Supporting spring can be installed, bearing capacity is transferred to adjacent stone material, supporting spring connects two pieces of back of the body bolt screws of stone material, there is provided bearing capacity end can add Nut is fixed.For example, as shown in fig. 6, when specific position stone material B cannot adjust stone material height by threaded sleeve, can now pacify Bearing capacity is transmitted to stone material A by dress supporting spring, stone material B by supporting spring, there is provided bearing capacity one end is that the nut of A stone materials fixes supporting spring, separately One end is that B stone materials need not be fixed, and on supporting spring, stone material B ends need not install threaded sleeve to the direct framves of stone material B, not with coagulation soil matrix Layer contact, two pieces of stone material elevations are consistent.
Preferably, as shown in fig. 6, the two ends of the supporting spring are provided with the fixing hole 8 for wearing the back of the body bolt screw, from And realize that supporting spring is convenient with back of the body bolt screw, reliable fixed.
Preferably, the cement mortar is non-shrinkage cement mortar.Specifically, the non-shrinkage cement mortar for using is for dual Shrinkage-compensating, high fluidity, accurate grouting material.During construction, it is only necessary to which add water mix, it is narrow that excellent mobility makes it easily be filled into Space, it is ensured that maximum loaded area.It is closely knit, ungauged regions characteristic make its without isolation, without sedimentation, it is ensured that all grouting surfaces with Equipment is closely contacted.
Preferably, the thickness of the cement mortar is 5mm to 100mm.Specifically, non-shrinkage cement mortar is general in flowing Under state, the thickness that can construct is 5mm to 100mm, and the too thin mobility that can influence cement mortar of thickness causes hollowing, too thick meeting Waste of materials.
Preferably, the height of the cement sand pulp at stone material gap is higher than stone material bottom surface 1cm, is easy to follow-up in stone material gap Interior fills up gap filler.
Preferably, cement mortar is injected in the gap between stone material and concrete base layer, including:
Prolong stone material edge, one setting is set every 50cm, cement mortar is uniformly sprayed into frame with gunite machine Empty stone material bottom, until the height in mortar face is higher than stone material bottom surface 1cm at stone material gap.Specifically, cement mortar is adopted when pouring Multiple spot slip casting is used, prolongs stone material edge, one setting is set every 50cm, uniformly sprayed into cement mortar with gunite machine Built on stilts stone material bottom, until the height in mortar face is higher than stone material bottom surface 1cm at stone material gap, it is ensured that stone material and concrete base layer it Between fully tamp.
Preferably, after the step of cement mortar is injected in the gap between stone material and concrete base layer, also include:
Gap filler is filled up in stone material gap, the gap filler covers the cement sand pulp, so as to play smooth gap Effect.
Preferably, gap filler is filled up in stone material gap, including:
Gap filler is clamp-oned and filled up between stone material stitches with scraper plate, with the same tooth scraper plate mouthful face, unnecessary joint filling is blown off Agent;
After joint filling completion, take advantage of before gap filler is not dried, the gap filler being stained with stone material is removed immediately, it is abundant with cleaning sponge Wetted surface is cleaned.Specifically, epoxy gap filler can be used, gap filler is clamp-oned and filled up between stone material stitches with scraper plate, with same One tooth of scraper plate mouthful face, blows unnecessary gap filler off.After joint filling completion, take advantage of before gap filler is not dried, remove on stone material immediately The gap filler being stained with, is sufficiently humidified so as to surface and cleans with cleaning sponge, should not be washed away with water.After the completion of joint filling work, good At least conserved under aeration-drying environment 2 days.
Preferably, before the step of opening up connecting hole on stone material, also include:
Debris on concrete base layer are cleaned out;
Stone material terrace absolute altitude control line is ejected on metope, every piece of control of stone material paving position is ejected on concrete base layer Line processed, ejection concrete base layer opens up the hole position point of hole;
Stone material paving direction, the scheme of layup sequence are formulated, stone material is numbered, so as to ensure the height of subsequent construction Imitate, carry out in order.
It is detailed, it is as follows the step of the utility model is implemented in the specific application example of the utility model one:
The first step:Concrete base layer treatment, the debris on concrete base layer are cleaned out;
Second step:Snap the line is positioned, and stone material terrace absolute altitude control line is ejected on metope, and every piece is ejected on concrete base layer The control line of stone material paving position, ejection concrete base layer opens up the hole position point of hole;
3rd step:Stone material paving direction, the scheme of layup sequence are formulated, stone material is numbered;
4th:According to stone material paving position, stone material is pre-processed:Including opening up connecting hole, beaten in connecting hole Enter epoxide-resin glue, back of the body bolt screw connection, supporting spring connection, threaded sleeve connection, while according to the hole position point to coagulation soil matrix Layer corresponding aperture site opens up hole;
5th step:According to the stone material paving direction, the scheme frame paver material of layup sequence.By fixed supporting spring and rotation Threaded sleeve, comes fixing stone height and levelness.After whole field frame has spread, design effect, design fine setting are checked.
6th step:After concrete base layer is prewetted, with gunite machine multiple spot operation, non-shrinkage cement mortar is circulated into stone In gap between material and concrete base layer, until mortar face is higher than stone material bottom surface 1cm at stone material gap.
7th step:Epoxy gap filler is inserted between stone material.
8th step:Construction is completed, maintenance.
In sum, the utility model includes:The back of the body bolt screw that one end is fixed in the connecting hole, the back of the body bolt screw The other end expose outside the connecting hole;Height-adjustable threaded sleeve, one end of the threaded sleeve with expose the company Connect one end connection of the back of the body bolt screw outside hole;The hole on the concrete base layer of stone material terrace is opened in, the threaded sleeve In other end insertion described hole;The cement mortar in the gap between stone material and concrete base layer is flow into, by adjusting spiral shell Line sleeve pipe, the height and levelness of stone material surface layer can be capable of achieving stone material terrace directly live whole field by manually adjusting repeatedly Walkthrough, effect reaches the construction that can directly carry out injecting cement mortar after design requirement, it is no longer necessary to pack up after stone material terrace again Block construction, stone material floor construction no longer needs screed-coat, is effectively reduced face height, right during stone material terrace paving The requirement of concrete base layer is no longer strict, and stone material paving also becomes possibility in metal staircase step.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out various changes to utility model and modification is new without deviating from this practicality The spirit and scope of type.So, if it is of the present utility model these modification and modification belong to the utility model claim and its Within the scope of equivalent technologies, then the utility model is also intended to including including these changes and modification.

Claims (9)

1. a kind of stone material terrace makes somebody a mere figurehead pre- assembling structure, it is characterised in that including:
It is opened in the connecting hole on stone material;
The back of the body bolt screw that one end is fixed in the connecting hole, the other end of the back of the body bolt screw exposes outside the connecting hole;
Height-adjustable threaded sleeve, one end of one end of the threaded sleeve and the back of the body bolt screw exposed outside the connecting hole Connection;
The hole on the concrete base layer of stone material terrace is opened in, in the other end insertion described hole of the threaded sleeve.
2. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the connecting hole is interior big outer small Hole.
3. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the connecting hole is from the edge of stone material Distance be 50mm.
4. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the connection hole depth 15mm.
5. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the area of the stone material is less than or equal to 1m2, a connecting hole is offered respectively on 4 angles of the stone material.
6. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that be also marked with epoxy resin in connecting hole Glue.
7. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the threaded sleeve passes through asphalt mixtures modified by epoxy resin Fat glue is fixed with described hole.
8. stone material terrace as claimed in claim 1 makes somebody a mere figurehead pre- assembling structure, it is characterised in that also including supporting spring, the supporting spring One end is fixed on the back of the body bolt screw, and the other end is extended to outside stone material.
9. stone material terrace as claimed in claim 8 makes somebody a mere figurehead pre- assembling structure, it is characterised in that the two ends of the supporting spring are provided with use In the fixing hole for wearing the back of the body bolt screw.
CN201621303948.5U 2016-07-29 2016-11-30 Stone material terrace makes somebody a mere figurehead pre- assembling structure Active CN206308955U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201620814847 2016-07-29
CN2016208148478 2016-07-29

Publications (1)

Publication Number Publication Date
CN206308955U true CN206308955U (en) 2017-07-07

Family

ID=59250050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621303948.5U Active CN206308955U (en) 2016-07-29 2016-11-30 Stone material terrace makes somebody a mere figurehead pre- assembling structure

Country Status (1)

Country Link
CN (1) CN206308955U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550008A (en) * 2020-04-23 2020-08-18 上海市建筑装饰工程集团有限公司 Keel-free high-adaptability raised floor structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111550008A (en) * 2020-04-23 2020-08-18 上海市建筑装饰工程集团有限公司 Keel-free high-adaptability raised floor structure and construction method

Similar Documents

Publication Publication Date Title
CN102535296B (en) Construction method of superheavy-load reinforcement-free large-area seamless epoxy self-leveling terrace
CN108952080A (en) Concrete dense curing agent abrasion-proof terrace monolithic construction method
CN106381980B (en) A kind of ground tile paving technique
CN206941636U (en) A kind of steel column fixing device
CN103758046B (en) The reinforcement means of CFST Arch Bridge main beam structure
CN104929365B (en) Refuse of refuse burning generating plant discharging platform combined type surface construction technology
CN107476149B (en) A kind of non-excavation type ballastless track mortar leafing seams seam processing method
CN108625252A (en) Urban road laying construction method
CN206308955U (en) Stone material terrace makes somebody a mere figurehead pre- assembling structure
CN206308964U (en) The built on stilts prepackage slip casting consolidated structures of stone material terrace
CN106639238A (en) Stone floor overhead prefabricating method
CN206308965U (en) The built on stilts prepackage slip casting consolidated structures of stone material terrace
CN106324223A (en) High-seepage stripe rock core model, and manufacturing method and device thereof
CN106836728A (en) The built on stilts prepackage slip casting consolidated structures of stone material terrace
CN101705655B (en) Depth crack pouring construction method of asphalt pavement longitudinal crack
CN110184880A (en) Pavement stone plate laying method and pavement construction method
CN206408889U (en) Stone material terrace makes somebody a mere figurehead pre- assembling structure
CN104264953A (en) Support, paving method for ground stone and cement mortar stirring and conveying all-in-one machine
CN106836727A (en) The built on stilts prepackage method of stone material terrace
CN106639237A (en) Stone floor overhead prefabricated structure
CN106812283A (en) The built on stilts prepackage slip casting curing of stone material terrace
CN106639239A (en) Stone floor overhead prefabrication and grouting solidification method
CN106812284A (en) Stone material terrace makes somebody a mere figurehead pre- assembling structure
CN215857071U (en) Concrete paving device for road construction
CN105986574A (en) Hollow grouting anchor rod construction process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant