CN206308894U - Steel building assembled plate - Google Patents

Steel building assembled plate Download PDF

Info

Publication number
CN206308894U
CN206308894U CN201621303698.5U CN201621303698U CN206308894U CN 206308894 U CN206308894 U CN 206308894U CN 201621303698 U CN201621303698 U CN 201621303698U CN 206308894 U CN206308894 U CN 206308894U
Authority
CN
China
Prior art keywords
plate body
attachment means
stick
plate
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621303698.5U
Other languages
Chinese (zh)
Inventor
方翠兰
易德勇
陈淑珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201621303698.5U priority Critical patent/CN206308894U/en
Application granted granted Critical
Publication of CN206308894U publication Critical patent/CN206308894U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of steel building assembled plate, including the first plate body, described first plate body one end is provided with stick, the other end of first plate body is connected with stick under L-shaped, the upper stick is provided with the first attachment means near the one side of lower stick, the lower stick includes vertical section and horizontal segment, the horizontal segment is identical with upper stick, the horizontal segment is provided with the second attachment means near the one side of upper stick, first plate body is provided with the blind hole coordinated with vertical section near one end of upper stick, the blind hole is directed away from stick, the 3rd attachment means are formed after first attachment means are chimeric with the second attachment means, the cross section of the 3rd attachment means is regular hexagon.Using this scheme, the stability of assembling steel plate structure is greatly increased, this assembling steel plate and fitting connection are easy for installation and removal.

Description

Steel building assembled plate
Technical field
The utility model belongs to E04C2/08:The technical field of sheet metal.
Background technology
Steel construction, is exactly the structure based on steel making, is one of main building construction types.The characteristics of steel is Intensity is high, from heavy and light, integral rigidity be good, deformability is strong, it is therefore special for building large span and superelevation, the building of superduty Suitably;Material homogeneity and isotropism are good, belong to perfect elastic body, best suit the basic assumption of common engineering mechanics;Material is moulded Property, good toughness, can there is moderate finite deformation, can well bear dynamic load;Construction period is short;Its industrialization degree is high, can carry out Mechanization degree Virtual production high.
At present, steel construction is widely used in the construction of house and factory building, but because part house is built in architectural process Building needs large span floor(Usually 6 meters -8 meters), because the width of transport vehicle is generally between 2.4m-2.55m, it is easy to just Superelevation overloads, it is impossible to transport;If to Site Welding assembling after steel construction plate is split, or expecting scene system by former material Make, can cause that workload is huge, cost is high, and the unmanageable problem of quality.
Patent announcement number discloses a kind of steel construction plate for the Chinese utility model patent of CN204715613U, including some Individual square plate, a side top edge of each steel plate is provided with button, and its relative side lower edge is provided with lower button;Adjacent institute Steel plate is stated to be fastened through upper and lower buckle clasp.In such scheme, adjacent steel plate is fastened to be also easy to produce and slid laterally by upper and lower buckle clasp, is led Cause steel plate extremely unstable.
Utility model content
The utility model is intended to provide a kind of steel building assembled plate, extremely unstable to solve the problems, such as assembling steel plate.
Steel building assembled plate in this programme, including the first plate body, described first plate body one end are provided with stick, institute The other end for stating the first plate body is connected with stick under L-shaped, and the upper stick is provided with the first attachment means near the one side of lower stick, The lower stick includes vertical section and horizontal segment, and the horizontal segment is identical with upper stick, and the horizontal segment is close to the one of upper stick Face is provided with the second attachment means, and first plate body is provided with the blind hole coordinated with vertical section near one end of upper stick, described blind Hole is directed away from stick, and the 3rd attachment means are formed after first attachment means are chimeric with the second attachment means, described The cross section of the 3rd attachment means is regular hexagon.
The operation principle of above-mentioned technical proposal and have the beneficial effect that:By one piece of first vertical section insertion of the lower stick of plate body In another piece of blind hole of the first plate body, this connection is prevented from vertically moving for adjacent two blocks of steel plates, the first of upper stick surface Attachment means are chimeric with the second attachment means of horizontal segment plane to form the 3rd attachment means that cross section is regular hexagon, positive six Side shape is prevented from adjacent two blocks of steel plates and is moved to all directions, greatly increases the stability of assembling steel plate structure, this assembling steel Plate and fitting connection, are easy for installation and removal.
Prioritization scheme one, used as the further optimization to base case, first attachment means are protrusive board, the protrusive board Cross section be honeycombed, second attachment means are the die cavity corresponding with protrusive board.Honeycombed die cavity has several recessed Convex chamber, is combined by with protrusive board, can prevent from assembling the slip of steel plate from all directions, further improves the entirety of assembling steel plate Stability and intensity.
Prioritization scheme two, used as the further optimization to prioritization scheme one, also including the second plate body, first plate body is leaned on The one side of nearly second plate body is provided with groove, and towards the second plate body, second plate body is near the first plate body for the opening of the groove One side be provided with corresponding with groove raised, first plate body is provided with the 3rd attachment means, institute near the one side of the second plate body State the second plate body and the 4th attachment means coordinated with the 3rd attachment means are provided near the one side of the first plate body.By the first plate body with Second plate body overlaps assembling, and makes between the first plate body and the second plate body to be carried out by groove and projection chimeric, prevents two plate bodys Between vertically move, be then further connected with the 4th attachment means by the 3rd attachment means, prevent between two plate bodys Generation transverse shifting.
Prioritization scheme three, as the further optimization to prioritization scheme two, the 3rd attachment means for it is some it is uniform between Every the dividing plate for setting, the 4th attachment means are two articles of relative broken line plates, the angle of adjacent two broken lines of the broken line plate It is 120 ° to spend, and the cavity corresponding with dividing plate is additionally provided with second plate body.Dividing plate on first plate body is inserted into the second plate Cavity on body, makes the first plate body and the second plate body perfect cooperation form assembled plate, and the coupling part of this assembled plate has some Individual broken line and cavity, several cavitys can stop that any one plate body thinks that any direction is moved, and further improve this assembled plate Stability, and this connected mode is easy for installation and removal.
Prioritization scheme four, used as the further optimization to prioritization scheme three, the groove sets away from a side of slot opening There is centre hole.By setting centre hole, when needing to dismantle assembled plate, by thimble to falling.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model steel building assembled plate embodiment 1;
Fig. 2 is the upward view of upper stick in Fig. 1;
Fig. 3 is the top view of lower stick in Fig. 1;
Fig. 4 is the structural representation of the utility model steel building assembled plate embodiment 2;
Fig. 5 is the upward view of the first plate body in Fig. 4;
Fig. 6 is the top view of the second plate body in Fig. 4.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference in Figure of description includes:First plate body 10, upper stick 11, lower stick 12, blind hole 13, protrusive board 14th, die cavity 15, groove 16, dividing plate 17, centre hole 18, the second plate body 20, raised 21, broken line plate 22, cavity 23.
Embodiment 1:
Embodiment 1 is substantially as shown in Figure 1:Steel building assembled plate, including the first plate body 10, the right side of the first plate body 10 End top is provided with stick 11, and the left end bottom of the first plate body 10 is provided with the lower stick 12 of L-shaped, as shown in Fig. 2 upper stick 11 lower surface is provided with the protrusive board 14 of honeycombed, and this honeycombed protrusive board 14 is made up of the protrusive board 14 of several regular hexagons, such as Fig. 3 Shown, lower stick 12 includes vertical section and horizontal segment, and horizontal segment is identical with upper stick 11, and the upper surface of horizontal segment is provided with honeycombed Die cavity 15, the right-hand member of the first plate body 10 is provided with the blind hole 13 coordinated with vertical section, the direction of the blind hole 13 downwards, one piece the The upper stick 11 of one plate body 10 is chimeric by the protrusive board 14 and die cavity 15 of honeycombed with another piece of lower stick 12 of the first plate body 10 It is fixed.
During installation, the vertical section of one piece of first upper stick 11 of plate body 10 is inserted into another piece of blind hole 13 of the first plate body 10 In, this structure is prevented from that transverse shifting occurs between two boards body, then applies pressure to upper stick 11 and lower stick 12, makes The protrusive board 14 of the honeycombed of the upper stick 11 of the first plate body 10 is inserted in the die cavity 15 of the lower stick 12 of adjacent first plate body 10, this Structure is prevented from that the movement of all directions occurs between two boards body.
Embodiment 2:
Implement 2 substantially as shown in Figure 4, with differing only in for embodiment 1:Also include the second plate body 20, the first plate body 10 lower surface left part is provided with groove 16, and towards the second plate body 20, the top of groove 16 is provided with centre hole for the opening of groove 16, the The left part top of two plate bodys 20 is provided with corresponding with groove 16 raised 21, as shown in figure 5, the lower surface of the first plate body 10 is installed There are some dividing plates 17 being uniformly arranged, as shown in fig. 6, the upper surface of the second plate body 20 is horizontally installed with two relative broken lines Plate 22, the angle of adjacent two broken lines of broken line plate 22 is 120 °, and the upper surface of the second plate body 20 is also provided with corresponding to dividing plate 17 Cavity 23.
During installation, after several lateral connections of the first plate body 10 are fixed, the second plate body 20 is then positioned over the first plate The lower section of body 10, the cavity 23 on the second plate body 20 is inserted by the dividing plate 17 on the first plate body 10, makes the first plate body 10 and second The perfect cooperation of plate body 20 forms assembled plate, and the coupling part of this assembled plate has several broken lines and cavity 23, several cavitys 23 can stop that any one plate body thinks that any direction is moved, and further improve the stability of this assembled plate, and this connection side Formula is easy for installation and removal.
Above-described is only embodiment of the present utility model, the general knowledge such as known concrete structure and/or characteristic in scheme Excessive description is not made herein.It should be pointed out that for a person skilled in the art, before the utility model structure is not departed from Put, some deformations and improvement can also be made, these should also be considered as protection domain of the present utility model, and these are all without shadow Ring effect and practical applicability that the utility model is implemented.This application claims protection domain should be with its claim Appearance is defined, and specific embodiment in specification etc. records the content that can be used for explaining claim.

Claims (5)

1. a kind of steel building assembled plate, it is characterised in that including the first plate body(10), first plate body(10)One end sets There is upper stick(11), first plate body(10)The other end be connected with stick under L-shaped(12), the upper stick(11)Under Stick(12)One side be provided with the first attachment means, the lower stick includes vertical section and horizontal segment, the horizontal segment and upper bar Block is identical, and the upper surface of the horizontal segment is provided with the second attachment means, first plate body(10)Near upper stick(11)One End is provided with the blind hole coordinated with vertical section(13), the blind hole(13)Be directed away from stick(11), the first connection dress Put it is chimeric with the second attachment means after form the 3rd attachment means, the cross section of the 3rd attachment means is regular hexagon.
2. steel building assembled plate according to claim 1, it is characterised in that first attachment means are protrusive board (14), the protrusive board(14)Cross section be honeycombed, second attachment means are and protrusive board(14)Corresponding die cavity (15).
3. steel building assembled plate according to claim 2, it is characterised in that also including the second plate body(20), it is described First plate body(10)Near the second plate body(20)One side be provided with groove(16), the groove(16)Opening towards the second plate body (20), second plate body(20)Near the first plate body(10)One side be provided with and groove(16)It is corresponding raised(21), it is described First plate body(10)Near the second plate body(20)One side be provided with the 3rd attachment means, second plate body(20)Near the first plate Body(10)One side be provided with the 3rd attachment means coordinate the 4th attachment means.
4. steel building assembled plate according to claim 3, it is characterised in that the 3rd attachment means for it is some Even spaced dividing plate(17), the 4th attachment means are two articles of relative broken line plates(22), the broken line plate(22)'s The angle of adjacent two broken lines is 120 °, second plate body(20)On be additionally provided with and dividing plate(17)Corresponding cavity(23).
5. steel building assembled plate according to claim 4, it is characterised in that the groove(16)Away from groove(16) One side of opening is provided with centre hole(18).
CN201621303698.5U 2016-11-30 2016-11-30 Steel building assembled plate Expired - Fee Related CN206308894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621303698.5U CN206308894U (en) 2016-11-30 2016-11-30 Steel building assembled plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621303698.5U CN206308894U (en) 2016-11-30 2016-11-30 Steel building assembled plate

Publications (1)

Publication Number Publication Date
CN206308894U true CN206308894U (en) 2017-07-07

Family

ID=59249833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621303698.5U Expired - Fee Related CN206308894U (en) 2016-11-30 2016-11-30 Steel building assembled plate

Country Status (1)

Country Link
CN (1) CN206308894U (en)

Similar Documents

Publication Publication Date Title
CN204262644U (en) Steel reinforcement cage welding jig
CN204183688U (en) A kind of flue mould
CN206308894U (en) Steel building assembled plate
CN202248467U (en) Stereoscopic suspended ceiling
CN204266433U (en) A kind of card slot type curtain skeleton linkage
CN205058543U (en) A stock mould for door and window PVC wood -plastic profile extrusion tooling that bordures
CN206458031U (en) A kind of plain brick wall for external decoration of high-rise building
CN103485456A (en) Non-coplanar inclined unit curtain wall system
CN205014844U (en) Novel reinforce fire -resistant compound decking
CN207058844U (en) A kind of vertical one-shot forming partition wall board assembly line mould
CN203307983U (en) Ceiling keel component
CN208658514U (en) A kind of screen decorative ceramic plate
CN201755732U (en) Boiler tube bank lifting beam processing device
CN205349133U (en) Linkage glass mat piece
CN206607792U (en) A kind of bright frame plate fastening frame
CN204382490U (en) The cross pipe demolding structure of subway trapezoidal track board steel form
CN204626747U (en) A kind of building block
CN205763159U (en) A kind of reinforcing bar indentation arrangements
CN204923874U (en) A fire -resistant prefab for cement kiln
CN216722238U (en) Three-dimensional city gardens ecological landscape wall
CN202787590U (en) Support structure for building glass curtain wall
CN204418589U (en) A kind of wall-hung type erecting of panel button
CN204665898U (en) Tunnel cave furred ceiling
CN204001554U (en) Indoor decoration stripe board
CN215631240U (en) Integrated assembled split brick dry-hanging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20181130