CN206299901U - A kind of electric power line pole tower ventilation duct fastener - Google Patents

A kind of electric power line pole tower ventilation duct fastener Download PDF

Info

Publication number
CN206299901U
CN206299901U CN201621096598.XU CN201621096598U CN206299901U CN 206299901 U CN206299901 U CN 206299901U CN 201621096598 U CN201621096598 U CN 201621096598U CN 206299901 U CN206299901 U CN 206299901U
Authority
CN
China
Prior art keywords
fixing hole
legs
ventilation pipe
angle steel
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621096598.XU
Other languages
Chinese (zh)
Inventor
钱江
周丽丽
柳运华
王慧阳
雷洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201621096598.XU priority Critical patent/CN206299901U/en
Application granted granted Critical
Publication of CN206299901U publication Critical patent/CN206299901U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

本实用新型涉及一种通风管紧固装置,具体涉及电力线路杆塔通风管紧固装置;所要解决的技术问题是提供一种结构均简单、安装方便的杆塔通风管紧固装置;采用的技术方案为:电力线路杆塔通风管紧固装置,包括一对铆固件和一个紧箍件,所述铆固件为U型弯头,所述U型弯头的两支脚一长一短,短支脚为铆固支脚,且所述铆固支脚的长度大于杆塔用角钢的宽度;长支脚的尾端设置有下固定孔;长支脚与短支脚之间的间距与角钢的厚度相适应;所述紧箍件为U型抱箍,所述U型抱箍的两支脚尾端处设置有上固定孔。

The utility model relates to a ventilation pipe fastening device, in particular to a power line pole tower ventilation pipe fastening device; the technical problem to be solved is to provide a pole tower ventilation pipe fastening device with simple structure and convenient installation; the adopted technical scheme It is: a fastening device for the ventilation pipe of a power line pole tower, including a pair of riveting parts and a tightening hoop. The riveting part is a U-shaped elbow. fixed legs, and the length of the riveted legs is greater than the width of the angle steel used for the tower; the tail end of the long legs is provided with a lower fixing hole; the distance between the long legs and the short legs is adapted to the thickness of the angle steel; It is a U-shaped hoop, and upper fixing holes are arranged at the tail ends of the two legs of the U-shaped hoop.

Description

一种电力线路杆塔通风管紧固装置A fastening device for ventilation pipe of power line tower

技术领域technical field

本实用新型涉及一种通风管紧固装置,具体涉及一种电力线路杆塔通风管紧固装置。The utility model relates to a ventilation pipe fastening device, in particular to a power line tower ventilation pipe fastening device.

背景技术Background technique

目前,常用通风管紧固装置是由U型抱箍、螺栓及螺母组成,由于角钢塔结构特殊以及距地面较高,该通风管紧固方式在角钢塔上安装使用困难。虽然现有技术中也贡献了一些紧固装置,如左、右半抱箍体紧固形式等,但仍存在着需多组部件装配使用,结构复杂且成本高,安装使用繁琐,高空作业不便,工作性能不理想等技术缺陷。授权公告号为CN203273014U的专利“通信基站角钢塔通风管紧固装置”对角钢塔用的通风管紧固装置进行了改进,但是依然存在螺母旋进不方便的问题。并且该技术的紧固装置没有与角钢的固定卡接结构,使用时间长了,U型卡口和螺栓连接松动,在风力等作用下,很容易造成通风管的偏斜。At present, the commonly used ventilation pipe fastening device is composed of U-shaped hoops, bolts and nuts. Due to the special structure of the angle steel tower and the high distance from the ground, it is difficult to install and use this ventilation pipe fastening method on the angle steel tower. Although some fastening devices have also been contributed in the prior art, such as the fastening form of the left and right half hoop bodies, etc., there are still many parts that need to be assembled and used, the structure is complicated and the cost is high, the installation and use are cumbersome, and it is inconvenient to work at heights , unsatisfactory working performance and other technical defects. The authorized announcement number is CN203273014U patent "communication base station angle steel tower ventilation pipe fastening device" has improved the ventilation pipe fastening device for angle steel tower, but there is still the problem of inconvenient screwing in of nuts. Moreover, the fastening device of this technology does not have a fixed clamping structure with the angle steel. After a long time of use, the U-shaped bayonet and the bolt connection become loose. Under the action of wind force, etc., it is easy to cause the deflection of the ventilation pipe.

实用新型内容Utility model content

本实用新型克服现有技术的不足,所要解决的技术问题是提供一种结构均简单、安装方便的杆塔通风管紧固装置。The utility model overcomes the deficiencies of the prior art, and the technical problem to be solved is to provide a fastening device for the ventilation pipe of a tower with a simple structure and convenient installation.

为解决上述技术问题,本实用新型所采用的技术方案为:一种电力线路杆塔通风管紧固装置,包括一对铆固件和一个紧箍件,所述铆固件为U型弯头,所述U型弯头的两支脚一长一短,短支脚为铆固支脚,且所述铆固支脚的长度大于杆塔用角钢的宽度;长支脚的尾端设置有下固定孔;长支脚与短支脚之间的间距与角钢的厚度相适应;所述紧箍件为U型抱箍,所述U型抱箍的两支脚尾端处设置有上固定孔;In order to solve the above technical problems, the technical solution adopted by the utility model is: a fastening device for the ventilation pipe of a power line tower, including a pair of riveting parts and a tightening hoop, the riveting parts are U-shaped elbows, and the The two legs of the U-shaped elbow are long and short, and the short leg is a riveted leg, and the length of the riveted leg is greater than the width of the angle steel used for the tower; the tail end of the long leg is provided with a lower fixing hole; the long leg and the short leg The spacing between them is adapted to the thickness of the angle steel; the tightening hoop is a U-shaped hoop, and upper fixing holes are arranged at the tail ends of the two legs of the U-shaped hoop;

并且在使用状态下,长支脚插入角钢垂直面开设的铆固孔中,U型抱箍的两支脚抵住角钢垂直面的外侧,上固定孔与下固定孔对准并通过螺栓和螺母连接,且角钢垂直面的外侧到U型抱箍内侧的最大距离等于通风管的外径。And in the state of use, the long leg is inserted into the riveting hole opened on the vertical surface of the angle steel, the two legs of the U-shaped hoop are against the outside of the vertical surface of the angle steel, the upper fixing hole is aligned with the lower fixing hole and connected by bolts and nuts, And the maximum distance from the outside of the vertical surface of the angle steel to the inside of the U-shaped hoop is equal to the outer diameter of the ventilation pipe.

使用时,首先要在杆塔上角钢的相应开孔,将两个铆固件的长支脚穿过开孔插入,然后将U型抱箍插入U型弯头的长短支脚与角钢侧面形成的槽中(优选的,还可以在长脚前面上端面设置凸起,在U型抱箍位置相应的下端面设置凹坑),这样U型抱箍可以在自身重力作用和槽的卡钳作用下保持不下落,减少人为扶持的必要性,简化螺栓连接的难度。When using, first of all, in the corresponding opening of the angle steel on the pole tower, insert the long legs of the two riveting components through the opening, and then insert the U-shaped hoop into the groove formed by the long and short legs of the U-shaped elbow and the side of the angle steel ( Preferably, a protrusion can also be provided on the upper end surface in front of the long leg, and a pit can be set on the corresponding lower end surface of the U-shaped hoop position), so that the U-shaped hoop can be kept from falling under the action of its own gravity and the action of the caliper of the groove. Reduce the necessity of artificial support and simplify the difficulty of bolt connection.

进一步的,为了防止U型抱箍与通风管的不完全匹配导致的安装困难或者通风管卡箍不紧松动的问题,将所述长支脚设置下固定孔的部分和U型抱箍的两支脚设置上固定孔压扁为固定孔开设平台,下固定孔和上固定孔均开设在平台上且均为长孔,两个平台之间设置有环形垫片以及楔子,通过螺栓穿过环形垫片的孔将上下固定孔连接后,在上下两个平台凹陷错位的两角楔入楔子,就能够保证安装的牢固性。Further, in order to prevent the installation difficulty caused by the incomplete match between the U-shaped hoop and the ventilation pipe or the problem that the ventilation pipe hoop is not tight or loose, the long legs are set at the part of the lower fixing hole and the two legs of the U-shaped hoop Set the upper fixing hole and flatten it to set up a platform for the fixing hole. Both the lower fixing hole and the upper fixing hole are set on the platform and are both long holes. There are ring gaskets and wedges between the two platforms, and the bolts pass through the ring gaskets. After connecting the upper and lower fixing holes, wedging wedges at the two corners of the upper and lower platforms are sunken and misaligned to ensure the firmness of the installation.

与现有技术相比本实用新型具有以下有益效果。Compared with the prior art, the utility model has the following beneficial effects.

本实用新型结构简单,安装方便将通风管上下固定后,一名工人即可完成其余卡箍的安装。并且能够适应抱箍尺寸与通风管尺寸的小幅度不吻合,保证安装的牢固性。The utility model has the advantages of simple structure and convenient installation. After the ventilation pipe is fixed up and down, one worker can complete the installation of the remaining clamps. And it can adapt to the small discrepancy between the size of the hoop and the size of the ventilation pipe to ensure the firmness of the installation.

附图说明Description of drawings

下面结合附图对本实用新型作进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1的俯视图。FIG. 2 is a top view of FIG. 1 .

图3为本实用新型的局部剖视图。Fig. 3 is a partial sectional view of the utility model.

图中:1为铆固件,2为铆固支脚,3为上固定孔,4为下固定孔,5为紧箍件,6为角钢,7为通风管,8为环形垫片,9为楔子。In the figure: 1 is the riveting piece, 2 is the riveting foot, 3 is the upper fixing hole, 4 is the lower fixing hole, 5 is the clamp, 6 is the angle steel, 7 is the ventilation pipe, 8 is the ring gasket, 9 is the wedge .

具体实施方式detailed description

以下结合具体实施例对本实用新型作进一步说明。Below in conjunction with specific embodiment the utility model is further described.

如图1-图3所示:一种电力线路杆塔通风管紧固装置,包括一对铆固件1和一个紧箍件5,所述铆固件1为U型弯头,所述U型弯头的两支脚一长一短,短支脚为铆固支脚2,且所述铆固支脚2的长度大于杆塔用角钢6的宽度;长支脚的尾端设置有下固定孔4;长支脚与短支脚之间的间距与角钢6的厚度相适应;所述紧箍件5为U型抱箍,所述U型抱箍的两支脚尾端处设置有上固定孔3;As shown in Figures 1-3: a fastening device for a power line pole tower ventilation pipe, including a pair of rivets 1 and a hoop 5, the rivets 1 are U-shaped elbows, and the U-shaped elbows The two legs are long and short, and the short leg is a riveted leg 2, and the length of the riveted leg 2 is greater than the width of the angle steel 6 for the tower; the tail end of the long leg is provided with a lower fixing hole 4; the long leg and the short leg The spacing between them is adapted to the thickness of the angle steel 6; the tightening hoop 5 is a U-shaped hoop, and upper fixing holes 3 are provided at the tail ends of the two legs of the U-shaped hoop;

并且在使用状态下,长支脚插入角钢6垂直面开设的铆固孔中,U型抱箍的两支脚抵住角钢6垂直面的外侧,上固定孔3与下固定孔4对准并通过螺栓和螺母连接,且角钢6垂直面的外侧到U型抱箍内侧的最大距离等于通风管7的外径。And in the state of use, the long leg is inserted into the riveting hole provided on the vertical surface of the angle steel 6, the two legs of the U-shaped hoop are against the outside of the vertical surface of the angle steel 6, the upper fixing hole 3 is aligned with the lower fixing hole 4 and passed through the bolt It is connected with a nut, and the maximum distance from the outside of the vertical surface of the angle steel 6 to the inside of the U-shaped hoop is equal to the outer diameter of the ventilation pipe 7.

所述长支脚设置下固定孔4的部分和U型抱箍的两支脚设置上固定孔3压扁为固定孔开设平台,下固定孔4和上固定孔3均开设在平台上且均为长孔,两个平台之间设置有环形垫片8以及楔子9。The part of the lower fixing hole 4 and the two legs of the U-shaped hoop are set on the long legs and the upper fixing hole 3 is flattened to provide a platform for the fixing hole. The lower fixing hole 4 and the upper fixing hole 3 are all set on the platform and are long. hole, and an annular gasket 8 and a wedge 9 are arranged between the two platforms.

上面结合附图对本实用新型的实施例作了详细说明,但是本实用新型并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The above embodiments of the utility model have been described in detail in conjunction with the accompanying drawings, but the utility model is not limited to the above-mentioned embodiments. Make various changes below.

Claims (2)

1.一种电力线路杆塔通风管紧固装置,其特征在于:包括一对铆固件(1)和一个紧箍件(5),所述铆固件(1)为U型弯头,所述U型弯头的两支脚一长一短,短支脚为铆固支脚(2),且所述铆固支脚(2)的长度大于杆塔用角钢(6)的宽度;长支脚的尾端设置有下固定孔(4);长支脚与短支脚之间的间距与角钢(6)的厚度相适应;所述紧箍件(5)为U型抱箍,所述U型抱箍的两支脚尾端处设置有上固定孔(3);1. A power line tower ventilation pipe fastening device, characterized in that it includes a pair of rivets (1) and a hoop (5), the rivets (1) are U-shaped elbows, and the U The two legs of the elbow are long and the other is short, the short leg is a riveted leg (2), and the length of the riveted leg (2) is greater than the width of the angle steel (6) for the tower; the tail end of the long leg is provided with a lower Fixing hole (4); the distance between the long leg and the short leg is adapted to the thickness of the angle steel (6); the tightening hoop (5) is a U-shaped hoop, and the tail ends of the two legs of the U-shaped hoop There is an upper fixing hole (3); 并且在使用状态下,长支脚插入角钢(6)垂直面开设的铆固孔中,U型抱箍的两支脚抵住角钢(6)垂直面的外侧,上固定孔(3)与下固定孔(4)对准并通过螺栓和螺母连接,且角钢(6)垂直面的外侧到U型抱箍内侧的最大距离等于通风管(7)的外径。And when in use, the long leg is inserted into the riveting hole set on the vertical surface of the angle steel (6), the two legs of the U-shaped hoop are against the outside of the vertical surface of the angle steel (6), and the upper fixing hole (3) and the lower fixing hole (4) Align and connect with bolts and nuts, and the maximum distance from the outside of the vertical surface of the angle steel (6) to the inside of the U-shaped hoop is equal to the outer diameter of the ventilation pipe (7). 2.根据权利要求1所述的一种电力线路杆塔通风管紧固装置,其特征在于:所述长支脚设置下固定孔(4)的部分和U型抱箍的两支脚设置上固定孔(3)压扁为固定孔开设平台,下固定孔(4)和上固定孔(3)均开设在平台上且均为长孔,两个平台之间设置有环形垫片(8)以及楔子(9)。2. A power line tower ventilation pipe fastening device according to claim 1, characterized in that: the part where the long leg is provided with the lower fixing hole (4) and the two legs of the U-shaped hoop are provided with the upper fixing hole ( 3) Flatten to set up a platform for the fixing hole, the lower fixing hole (4) and the upper fixing hole (3) are both set on the platform and are long holes, and an annular gasket (8) and a wedge ( 9).
CN201621096598.XU 2016-09-30 2016-09-30 A kind of electric power line pole tower ventilation duct fastener Withdrawn - After Issue CN206299901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621096598.XU CN206299901U (en) 2016-09-30 2016-09-30 A kind of electric power line pole tower ventilation duct fastener

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621096598.XU CN206299901U (en) 2016-09-30 2016-09-30 A kind of electric power line pole tower ventilation duct fastener

Publications (1)

Publication Number Publication Date
CN206299901U true CN206299901U (en) 2017-07-04

Family

ID=59202206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621096598.XU Withdrawn - After Issue CN206299901U (en) 2016-09-30 2016-09-30 A kind of electric power line pole tower ventilation duct fastener

Country Status (1)

Country Link
CN (1) CN206299901U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402496A (en) * 2016-09-30 2017-02-15 国网山西省电力公司运城供电公司 Power line tower ventilation pipe fastening device
CN112856043A (en) * 2020-12-31 2021-05-28 四川省泰龙建设集团有限公司 Tool and method for installing and fixing assembly type toilet wallboard pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106402496A (en) * 2016-09-30 2017-02-15 国网山西省电力公司运城供电公司 Power line tower ventilation pipe fastening device
CN112856043A (en) * 2020-12-31 2021-05-28 四川省泰龙建设集团有限公司 Tool and method for installing and fixing assembly type toilet wallboard pipeline

Similar Documents

Publication Publication Date Title
CN203560217U (en) An adjustable semicircle hoop
CN203836393U (en) Concrete pump pipe fixing clamp for concrete floor
CN206299901U (en) A kind of electric power line pole tower ventilation duct fastener
CN204042199U (en) A kind of yoke configurations for fixing tube
CN109494658B (en) A cable fixing device and a wind turbine
CN106402496A (en) Power line tower ventilation pipe fastening device
CN202797307U (en) Binding post hoop of automobile storage battery
CN206054926U (en) A kind of angle steel tower ventilation duct clamp device
CN102583147B (en) Valve seat assembly tool of turbine
CN218759159U (en) Guard rail fixing fastener convenient to dismantle
CN204252518U (en) Scaffold mounting structure
CN211290137U (en) A connection structure of induced draft fan for power plant boiler that is easy to align and assemble
CN206789986U (en) It is a kind of to utilize wedge structure Fast Installation, the device of fixed cable
CN203208568U (en) Safety belt hanger
CN209585777U (en) A connection structure for connecting steel of transmission iron tower
CN203383969U (en) Thrust collar installing device used during medium and large hydroelectric generating set maintenance
CN214220551U (en) High-altitude in-place platform device
CN205921298U (en) First anticreep staple bolt of composite insulator bowl
CN207161916U (en) A kind of anchor ear
CN218103000U (en) A high-efficiency installation device for cable structure photovoltaic modules
CN220435718U (en) Anti-leakage flexible connecting device
CN205618861U (en) General oiling flange device of transformer
CN203233109U (en) Foldable cable head fixing support
CN105490203A (en) Cross-arm bracket and method for replacing cross arm through employing same
CN219169667U (en) Drilling clamp for flange plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170704

Effective date of abandoning: 20190111

AV01 Patent right actively abandoned