CN206292011U - Transformer seal test device - Google Patents
Transformer seal test device Download PDFInfo
- Publication number
- CN206292011U CN206292011U CN201621340181.3U CN201621340181U CN206292011U CN 206292011 U CN206292011 U CN 206292011U CN 201621340181 U CN201621340181 U CN 201621340181U CN 206292011 U CN206292011 U CN 206292011U
- Authority
- CN
- China
- Prior art keywords
- air valve
- steel
- transformer
- construction part
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
The utility model discloses a kind of transformer seal test device:It is related to transformer technology field, it is characterised in that:At least include:Chassis, steel-tube construction part is provided with the upper surface on the chassis;The steel-tube construction part is hollow body;The lower end of the steel-tube construction part is welded with the upper surface on chassis, and the upper end of the steel-tube construction part is provided with air gauge;The chassis is hollow body structure;Air valve connecting tube;The air valve connecting tube is hollow valve body;One end of the air valve connecting tube is fixedly connected with the side wall of steel-tube construction part, and then causes that air valve connecting tube is connected with steel-tube construction part;The other end of the air valve connecting tube is connected by air valve with gas injection joint.By using above-mentioned technical proposal, the transformer seal test device has simple structure, and sealing that can be quickly and easily to transformer is detected.
Description
Technical field
The utility model is related to transformer technology field, more particularly to a kind of transformer seal test device.
Background technology
It is well known that voltage transformer (Potential transformer abbreviations PT, Voltage transformer
Abbreviation VT) and transformer it is very alike, be all the voltage on conversion line.But the purpose of transformer voltage of transformation be in order to
Conveying electric energy, therefore capacity is very big, typically all with kilovolt-ampere or megavolt-ampere be unit of account;And voltage transformer voltage of transformation
Purpose, be primarily used to be powered to measuring instrumentss and protective relaying device, for the voltage of measurement circuitry, power and electric energy,
Or for the expensive equipment in the protection circuit in line failure, motor and transformer, therefore voltage transformer appearance
Amount very little, typically all only several volt-amperes, tens volt-amperes, hundreds of volt-amperes.But in some Code in Hazardous Special Locations, then need kilovolt-ampere
Voltage transformer;In this kind of large-scale voltage transformer, it is the voltage transformer with fuse to have some;
Voltage transformer is one with transformer unshakable in one's determination.It is mainly made up of first and second coil, unshakable in one's determination and insulation.When
When applying a voltage U1 in first winding, a magnetic flux φ is just produced in iron core, according to the law of electromagnetic induction, then two
A secondary voltage U2 is just produced in secondary winding.Change once or Secondary Winding the number of turn, different primary voltages can be produced
With secondary voltage ratio, this can constitute voltage transformer not on year-on-year basis.High voltage is converted into voltage transformer low electricity in proportion
Pressure, i.e. 100V, voltage transformer primary side is connected on primary system, secondary side joint measuring instrumentss, relay protection etc.;Mainly electromagnetism
(capacitance type potential transformer is widely used) of formula, separately there is non electromagnetic, such as electronic type, photo-electric.
Full-enclosed oil-immersed transformer is made up of the part such as casing, insulator, oil level indicator, shunting switch, and each several part is to pass through
Welding, sealed using cushion rubber or glue bead, because of raw material deficiency in itself, along with the careless omission of operative, accidental meeting
The situation for having casing or sealing position leakage of oil occurs.Needs carry out leak check to the transformer after the completion of assembling.Cause
This, designs and develops a kind of transformer seal test device seems it is particularly important.
Utility model content
The technical problems to be solved in the utility model is:A kind of transformer seal test device is provided, the transformer is used
Seal test device has simple structure, and sealing that can be quickly and easily to transformer is detected.
The utility model is adopted the technical scheme that to solve technical problem present in known technology:
A kind of transformer seal test device, at least includes:
Chassis (7), steel-tube construction part (6) is provided with the upper surface of the chassis (7);The steel-tube construction part (6) is
Hollow body;The lower end of the steel-tube construction part (6) is welded with the upper surface on chassis (7), and the upper end of the steel-tube construction part (6) is installed
There is air gauge (1);The chassis (7) is hollow body structure;
Air valve connecting tube (2);The air valve connecting tube (2) is hollow valve body;One end of the air valve connecting tube (2) with
The side wall of steel-tube construction part (6) is fixedly connected, and then causes that air valve connecting tube (2) is connected with steel-tube construction part (6);The air valve
The other end of connecting tube (2) is connected by air valve (3) with gas injection joint (4).
Further:The junction of the air valve connecting tube (2) and air valve (3) is provided with O-ring seal (5).
Further:The junction of the steel-tube construction part (6) and air gauge (1) is provided with O-ring seal (5).
Further:The lower end of the chassis (7) is provided with O-ring seal (5).
The utility model has the advantages and positive effects that:
By using above-mentioned technical proposal, compared with conventional art, have the following advantages that:
1. simple structure, easy for installation, can be fastened directly to product box by screw thread and cover, rubber sealing.
2. pressure gauge is directly installed on device, convenient to read, directly perceived visual.
3. there is operability, through simple explanation testing crew can be made skillfully to grasp.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model preferred embodiment;
Fig. 2 is the partial structural diagram of the utility model preferred embodiment, is mainly used in showing the knot of air valve connecting tube
Structure;
Fig. 3 is the partial structural diagram of the utility model preferred embodiment, is mainly used in showing the structure of gas injection joint;
Fig. 4 is the partial structural diagram of the utility model preferred embodiment, is mainly used in showing the knot of steel-tube construction part
Structure;
Fig. 5 is the partial structural diagram of the utility model preferred embodiment, is mainly used in showing the structure on chassis.
Wherein:1st, air gauge;2nd, air valve connecting tube;3rd, air valve;4th, gas injection joint;5th, O-ring seal;6th, steel-tube construction part;
7th, chassis.
Specific embodiment
For utility model content of the present utility model, feature and effect can be further appreciated that, following examples are hereby enumerated, and
Accompanying drawing is coordinated to describe in detail as follows:
Refer to Fig. 1 to Fig. 5, a kind of transformer seal test device, including:Air gauge 1, air valve connecting tube 2, air valve
3rd, gas injection joint 4, O-ring seal 5, steel-tube construction part 6, chassis 7;Wherein:
Steel-tube construction part 6 is arranged at the upper surface on the chassis 7;The steel-tube construction part 6 is hollow body;The steel pipe knot
The lower end of component 6 is welded with the upper surface on chassis 7, and air gauge 1 is installed on the upper end of steel-tube construction part 6;The chassis 7 is hollow
Pipe structure;
The air valve connecting tube 2 is hollow valve body;One end of the air valve connecting tube 2 and the side wall of steel-tube construction part 6
It is fixedly connected, and then causes that air valve connecting tube 2 is connected with steel-tube construction part 6;The other end of the air valve connecting tube 2 passes through air valve
3 are connected with gas injection joint 4.
The junction of the air valve connecting tube 2 and air valve 3 is provided with O-ring seal 5.
The junction of the steel-tube construction part 6 and air gauge 1 is provided with O-ring seal 5.
The lower end on the chassis 7 is provided with O-ring seal 5.
In above preferred embodiment:Air valve connecting tube 2 is welded on steel-tube construction part 6, then this weldment is welded on
On chassis 7.Gas injection joint 4 and air valve 3 are by screw threads for fastening and sealing, and air valve connecting tube 2 and air valve 3 are close by screw thread and cushion rubber
Envelope, pressure gauge 1 is arranged on the top of steel-tube construction part 6 by screw thread and rubber sealing.
This examination seal test device after transformer other off-tests, dispatch from the factory before use.Oil level indicator is unloaded, by this
Device is arranged on oil level indicator seat, screwing hermetic.Air valve is opened, nitrogen tube is connected into gas injection joint, slowly pour nitrogen to pressure
Power expression value reaches test pressure, closes air valve and nitrogen cylinder valve, stands whether observation pressure gauge indicating value changes to check it
Sealing effectiveness.
The starting point of this utility model is the sealing of transformer, it is ensured that transformer is stored and do not have seepage in running
The situation of oil occurs, it is ensured that transformer oil quality is not by air impact and then the service life of extension transformer.
Embodiment of the present utility model has been described in detail above, but the content is only of the present utility model preferable
Embodiment, it is impossible to be considered as limiting practical range of the present utility model.It is all according to present utility model application scope made it is equal
Deng change and improvement etc., all should still belong within patent covering scope of the present utility model.
Claims (4)
1. a kind of transformer seal test device, it is characterised in that:At least include:
Chassis (7), steel-tube construction part (6) is provided with the upper surface of the chassis (7);The steel-tube construction part (6) is hollow
Body;The lower end of the steel-tube construction part (6) is welded with the upper surface on chassis (7), and the upper end of the steel-tube construction part (6) is provided with gas
Pressure table (1);The chassis (7) is hollow body structure;
Air valve connecting tube (2);The air valve connecting tube (2) is hollow valve body;One end of the air valve connecting tube (2) and steel pipe
The side wall of structural member (6) is fixedly connected, and then causes that air valve connecting tube (2) is connected with steel-tube construction part (6);The air valve connection
The other end for managing (2) is connected by air valve (3) with gas injection joint (4).
2. transformer seal test device according to claim 1, it is characterised in that:In the air valve connecting tube (2)
The junction of air valve (3) is provided with O-ring seal (5).
3. transformer seal test device according to claim 1, it is characterised in that:In the steel-tube construction part (6)
The junction of air gauge (1) is provided with O-ring seal (5).
4. the transformer seal test device according to claim any one of 1-3, it is characterised in that:On the chassis
(7) lower end is provided with O-ring seal (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621340181.3U CN206292011U (en) | 2016-12-08 | 2016-12-08 | Transformer seal test device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621340181.3U CN206292011U (en) | 2016-12-08 | 2016-12-08 | Transformer seal test device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206292011U true CN206292011U (en) | 2017-06-30 |
Family
ID=59096461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621340181.3U Expired - Fee Related CN206292011U (en) | 2016-12-08 | 2016-12-08 | Transformer seal test device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206292011U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109000858A (en) * | 2018-06-20 | 2018-12-14 | 国家电网公司 | The complete detection system of Multifunction transformer |
-
2016
- 2016-12-08 CN CN201621340181.3U patent/CN206292011U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109000858A (en) * | 2018-06-20 | 2018-12-14 | 国家电网公司 | The complete detection system of Multifunction transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203965521U (en) | Submersible pump high-tension motor winding insulation resistance on-line monitoring instrument | |
CN106531405B (en) | A kind of application method for carrying monitoring capsule seepage oil conservater | |
CN106990380B (en) | Fault detection method for on-site capacitor voltage transformer | |
CN204649369U (en) | A kind of oil tank of transformer leak detection tool equipment | |
CN104330733A (en) | Train roof insulation detection device | |
CN206292011U (en) | Transformer seal test device | |
CN103712547A (en) | Bearing monitor | |
CN103645366B (en) | A kind of individual struts built-up type optical transformer | |
CN202471806U (en) | On-line monitoring sensing device for transformer-core earth current | |
CN204405260U (en) | A kind of leakage test pressue device | |
CN203606083U (en) | Leakage testing device used for power transformer product sealing test | |
CN203163943U (en) | Oiling leakage check device for oil-immersed transformer | |
CN204514959U (en) | The single-phase withstand voltage test protective device of cable termination | |
CN204422571U (en) | A kind of inflatable testing transformer | |
CN106252032A (en) | A kind of oil-filled transformer | |
CN208366537U (en) | Oil-immersed power transformer seals anti-leak test device | |
CN204228896U (en) | Train Insulation monitoring control device | |
CN203204904U (en) | Training device for transformer preventive trial measuring inner total state | |
CN103364153A (en) | Air pressure leakage check method for transformer oil tank | |
CN202815060U (en) | Current sensor for high voltage line | |
CN202837419U (en) | Novel SF6-insulated AC high-voltage test transformer apparatus | |
CN206710485U (en) | A kind of capacitance type potential transformer of the special oil-leakage-prevention of power equipment | |
CN206022187U (en) | Pressure isolation knife and capacitance type potential transformer in one kind | |
CN210400330U (en) | Contact type magnetic thickness measurement detection probe | |
CN207636260U (en) | A kind of airtight test instrument of generator outlet casing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170630 Termination date: 20191208 |
|
CF01 | Termination of patent right due to non-payment of annual fee |