CN206290260U - A kind of reserved filling air return system air shaft in mine - Google Patents

A kind of reserved filling air return system air shaft in mine Download PDF

Info

Publication number
CN206290260U
CN206290260U CN201621293656.8U CN201621293656U CN206290260U CN 206290260 U CN206290260 U CN 206290260U CN 201621293656 U CN201621293656 U CN 201621293656U CN 206290260 U CN206290260 U CN 206290260U
Authority
CN
China
Prior art keywords
mine
described cylinder
return system
air shaft
circular hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621293656.8U
Other languages
Chinese (zh)
Inventor
郭慧高
邹龙
陈仲杰
贾峰
陈振耀
韩冰
李奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Nickel Cobalt Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201621293656.8U priority Critical patent/CN206290260U/en
Application granted granted Critical
Publication of CN206290260U publication Critical patent/CN206290260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of reserved filling air return system air shaft in mine, it is related to the reserved filling air return system technical field in mine, the reserved filling air return system air shaft in more particularly to a kind of mine, including cylinder, described cylinder is the rectangular structure being welded to form by vertical angle steel head and the tail by four blocks of steel plates, circular hole is provided with four walls of described cylinder, circular hole connection corresponding with transversal ventilation pipe, angle cleat square circle is provided with described cylinder two ends edge, and it is provided with connecting hole in angle cleat square circle, Bolted angle connection ring is provided with circular hole on described cylinder, and it is provided with mounting hole on Bolted angle connection ring, the cement barrel that the utility model solves existing structure air shaft is that the construction duct supporting of complete docile is built and built, modular cannot change, after coming into operation in process of production cannot maintenance and repair problem.

Description

A kind of reserved filling air return system air shaft in mine
Technical field
The utility model is related to the reserved filling air return system technical field in mine, and more particularly to a kind of mine is reserved to be filled back Wind system air shaft.
Background technology
Exploiting field is the back production unit of pit mining, and each exploiting field is an independent mining operations area, and an exploiting field can Constituted with by one or more faces.The normal back production in each exploiting field(Production)It has been both needed to endlessly fresh air Each operating location of exploiting field is sent to supply operator breathing, dilution and exclude the various toxic and harmfuls in underground and mine dust, wound Make environment in good ore deposit, ensure the healthy and labor safety of operating personnel in exploiting field.To supplying fresh sky in exploiting field Gas and good air feed system are undivided.
At present, the air feed system of mining unit often uses both wings air intake, central exhaust ventilation mode, wherein, center Extract out work be by air shaft realize, and air shaft be using chosen on stope or gallery under dig by the way of formed, and By artificial making cement supporting, form what cement barrel was completed, due to production, stope or stoping operation plane it is continuous under Drop, the height of air shaft is also being continuously increased, and now, the air shaft borehole wall is influenceed by ground pressure and mining exploitation so that in it The cement barrel deformation failure in portion is serious, back wind resistance increase, has a strong impact on return air amount, and cement barrel is complete docile construction Duct supporting builds what is built, it is impossible to modular replacing, therefore, can only again excavate structure ventilating system safe and efficient to ensure Production, and ventilating system is rebuild, difficulty of construction is big, high cost.
The content of the invention
The utility model provides a kind of mine reserved filling air return system air shaft, for existing structure air shaft Cement barrel be that the construction duct supporting of complete docile is built and built, it is impossible to modular replacing, in production process after coming into operation In cannot maintenance and repair problem.
To achieve these goals, the technical solution of the utility model is specific as follows:
A kind of reserved filling air return system air shaft in mine, including cylinder, described cylinder is to be led to by four blocks of steel plates Cross the rectangular structure that vertical angle steel head and the tail are welded to form, be provided with circular hole on four walls of described cylinder, the circular hole with Transversal ventilation pipe correspondence is connected.
In order that cylinder is easily installed, repairs each other, angle cleat side is provided with described cylinder two ends edge Circle, and it is provided with connecting hole in angle cleat square circle.
In order that cylinder can be connected with each other with the cooperating therewith air pipeline for using, on the circular hole on described cylinder It is provided with Bolted angle connection ring, and Bolted angle connection ring and is provided with mounting hole.
Principle of the present utility model is:Cement barrel according to existing structure air shaft is complete docile construction duct branch Shield builds what is built, it is impossible to the problem of modular replacing, and the cement barrel of tradition is designed as that four pieces of surfaces are provided with φ The steel plate of the circular hole of 2.0m is welded into the square tube of 2012mm × 2062mm × 1700mm by vertical angle steel head and the tail, and in square tube Upper and lower ends are provided with the angle cleat square circle with linkage function, for being fixedly connected between square tube, the circle in square tube Bolted angle connection ring is set on hole, for the connection of this air shaft and transversal ventilation pipeline, when the air shaft borehole wall by press and Mining exploitation influences so that after its air shaft deformation failure, and maintenance personal enters in the air shaft that air shaft will be damaged Vertical angle steel from damage steel plate on pull down, then the steel plate of damage is pulled down from rectangular structure, change new steel plate, It is welded and fixed again by vertical angle steel, realizes that the modularization of air shaft is changed.
The beneficial effects of the utility model are:The application of the present apparatus, greatly reduces filling method mine in reserved filling Difficulty during air shaft, improves construction efficiency, reduces construction cost, and after construction terminates, the stability of a system preferably, is improved The protection of air feed system, is mine safety efficiently produces the condition innovated, and with the increase of stope mining depth, by ground Pressure is acted on and mining exploitation, and the deformation of vertical shaft can be repaired as soon as possible, reduce maintenance difficulties, which reduce flowing resistance, Be conducive to Mine Safety in Production.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A direction views of Fig. 1.
Fig. 3 is the B direction views of Fig. 1.
Fig. 4 is the C direction views of Fig. 1.
Fig. 5 is sectional view of the present utility model.
Fig. 6 is the sectional view of Bolted angle connection ring of the present utility model.
Specific embodiment
As shown in Figures 1 to 6, a kind of reserved filling air return system air shaft in mine, including cylinder 1, described cylinder Body 1 is by the vertical angle steel rectangular structure that is welded to form of head and the tail, to be respectively provided with four walls of described cylinder 1 by four blocks of steel plates There is circular hole, circular hole connection corresponding with transversal ventilation pipe is provided with angle cleat square circle 2 on the described two ends edge of cylinder 1, And connecting hole is provided with angle cleat square circle 2, Bolted angle connection ring 3 is provided with the circular hole on described cylinder 1, and angle steel connects Connect and be provided with mounting hole on ring 3.
This air shaft when in use, is put into and tunneled in the vertical shaft hole for completing by the utility model by hanging device, According to hole depth, in putting some air shafts into hole successively, the angle cleat set using air shaft upper and lower ends Square circle 2, some air shafts are interconnected by M10 bolts, are smeared sternly with cement at gap, anti-leak-stopping ash, keep ventilation perpendicular Circular hole on well with and the transversal ventilation hole that is connected of vertical shaft hole it is corresponding, and using the Bolted angle connection ring 3 on circular hole with Transversal ventilation pipeline in transversal ventilation hole is bolted.
When the air shaft borehole wall by press and influenceed with mining exploitation so that after its air shaft deformation failure, maintenance personal Vertical angle steel in air shaft into air shaft first by damage is pulled down from the steel plate for damaging, then the steel plate that will be damaged Pulled down from rectangular structure, change new steel plate, be welded and fixed again by vertical angle steel, realize the modularization of air shaft Change.

Claims (3)

1. a kind of mine is reserved fills air return system air shaft, it is characterised in that including cylinder(1), described cylinder(1) It is the rectangular structure being welded to form by vertical angle steel head and the tail by four blocks of steel plates, described cylinder(1)Four walls on be respectively provided with There are circular hole, circular hole connection corresponding with transversal ventilation pipe.
2. a kind of mine according to claim 1 is reserved fills air return system air shaft, it is characterised in that described Cylinder(1)Angle cleat square circle is provided with the edge of two ends(2), and angle cleat square circle(2)On be provided with connecting hole.
3. a kind of mine according to claim 1 is reserved fills air return system air shaft, it is characterised in that described Cylinder(1)On circular hole on be provided with Bolted angle connection ring(3), and Bolted angle connection ring(3)On be provided with mounting hole.
CN201621293656.8U 2016-11-29 2016-11-29 A kind of reserved filling air return system air shaft in mine Active CN206290260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621293656.8U CN206290260U (en) 2016-11-29 2016-11-29 A kind of reserved filling air return system air shaft in mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621293656.8U CN206290260U (en) 2016-11-29 2016-11-29 A kind of reserved filling air return system air shaft in mine

Publications (1)

Publication Number Publication Date
CN206290260U true CN206290260U (en) 2017-06-30

Family

ID=59096589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621293656.8U Active CN206290260U (en) 2016-11-29 2016-11-29 A kind of reserved filling air return system air shaft in mine

Country Status (1)

Country Link
CN (1) CN206290260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810216A (en) * 2020-06-24 2020-10-23 临沂矿业集团菏泽煤电有限公司 Vertical ventilation sleeve and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810216A (en) * 2020-06-24 2020-10-23 临沂矿业集团菏泽煤电有限公司 Vertical ventilation sleeve and construction method thereof

Similar Documents

Publication Publication Date Title
CN1932240B (en) Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method
CN202325233U (en) Crawler-type hydraulic anchor rod drill carriage
CN103485717B (en) The all-hydraulic anchor shaft anchor cable drill carriage of a kind of four arm
CN105626089A (en) Method and device for in-tunnel demounting of master drive of shield tunneling machine
CN103670420A (en) Full-fracture-surface vertical shaft drilling machine
CN205400737U (en) Demolish main drive arrangement in hole of shield structure machine
CN203626843U (en) Heading machine suitable for drilling shaft with pilot shaft
CN204002818U (en) A kind of modularization assemble housing for super-large diameter pipe jacking tunnelling machine
CN103850685A (en) Heading machine applicable to drill vertical well through pioneer well
CN212225295U (en) Assembled special-shaped air duct for long-distance tunnel construction ventilation
CN206290260U (en) A kind of reserved filling air return system air shaft in mine
CN104314577A (en) Disassembling and assembling method for shield tunneling machine in tunnel
CN2900787Y (en) Small coal mine tunnel tunnelling machine
CN104196446A (en) Six-arm full hydraulic anchor rod and anchor cable drill carriage used in cooperation with continuous miner
CN111550245A (en) Hydraulic mechanical coal mining method for steep coal seam
CN204152431U (en) A kind of transhipment anchor shaft anchor cable eight arm drill carriage
CN104002863B (en) Mining loader for mine and assembly and disassembly methods thereof
CN203603910U (en) Full-face vertical shaft drill
CN201407040Y (en) Automatic coal shovel
CN102720429B (en) Hydraulic-driven drilling device
CN210422684U (en) Quick pushing device suitable for blasting mining driving face reversed loader
CN202300200U (en) Spiral deep-hole drilling machine with large hole diameter
CN202187785U (en) Suspended type temporary supporting device for laneway tunneling
CN212154858U (en) A cup joint formula underground conveyor for tailing lotion fills
CN212225294U (en) Assembled special-shaped air duct for long-distance tunnel construction ventilation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240206

Address after: 737100 No. 2 Lanzhou Road, Beijing Road Street, Jinchuan District, Jinchang City, Gansu Province

Patentee after: Jinchuan Group Nickel Cobalt Co.,Ltd.

Country or region after: China

Address before: 737103 No. 98, Jinchuan Road, Jinchang, Gansu

Patentee before: JINCHUAN GROUP Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right