CN206289961U - A kind of wall is poured uses template - Google Patents

A kind of wall is poured uses template Download PDF

Info

Publication number
CN206289961U
CN206289961U CN201621406259.7U CN201621406259U CN206289961U CN 206289961 U CN206289961 U CN 206289961U CN 201621406259 U CN201621406259 U CN 201621406259U CN 206289961 U CN206289961 U CN 206289961U
Authority
CN
China
Prior art keywords
plate
template
framed
strip bulge
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621406259.7U
Other languages
Chinese (zh)
Inventor
王广涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621406259.7U priority Critical patent/CN206289961U/en
Application granted granted Critical
Publication of CN206289961U publication Critical patent/CN206289961U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Poured the utility model discloses a kind of wall and use template, including in open framed in cuboid and upper end, framed being enclosed by front side board, back side panel, left plate, right plate and base plate forms, the bottom surface of the base plate is burnishing surface, the first strip bulge for setting in left-right direction is provided with back side panel, the first strip groove being adapted with the first strip bulge is provided with front side board, the second strip bulge for setting along the longitudinal direction is provided with right plate, the second strip groove being adapted with the second strip bulge is provided with left plate;Using the transition arc connection for concaving, the central angle of the transition arc is 90 ° for four framed corners;The circular hole that screw rod through walls will be originally used for placing is disposed on four framed corners, so as to reduce the destruction to template overall performance, increased access times, it is to avoid this template and band use angle bar transition to connect reaching seamless connection between pouring the beam column of wall both sides.

Description

A kind of wall is poured uses template
Technical field
The utility model belongs to building template technical field, and more particularly to a kind of wall is poured uses template.
Background technology
Wall in the market is poured with the structure generally cuboid of template, and brill is offered in the centre of cuboid Hole, then carries out assembled assembling by screw rod through walls to multiple template in the borehole, and wall is then carried out between two groups of templates Grouting is poured.But existing template be present, template cannot be existed because screw rod through walls is located at the centre of template The dislocation movement of direction of rotation control effectively, and can produce measuring pressure to template in grouting so as to cause template with template There is the mobile spillage of dislocation, the flatness and quality of the wall having a strong impact in junction;On the other hand because template carries out assembly Periphery after assembling is more I haven't seen you for ages there is space cannot be seamless spliced, presently mainly blocked by way of batten is matched in order to avoid Grouting is exposed, however this mode often it is careless in time blocked and caused spillage even quick-fried mould phenomenon generation, exist Potential safety hazard.
The content of the invention
The utility model purpose is proposed a kind of wall and pours use to solve above-mentioned problems of the prior art Template, the utility model is adopted the technical scheme that to solve the above problems:A kind of wall is poured uses template, including in rectangular Open framed in the bodily form and upper end, framed being enclosed by front side board, back side panel, left plate, right plate and base plate forms, described The bottom surface of base plate is burnishing surface, and the first strip bulge for setting in left-right direction is provided with back side panel, is provided with front side board The first strip groove being adapted with the first strip bulge, is provided with the second bar shaped for setting along the longitudinal direction convex on right plate Rise, the second strip groove being adapted with the second strip bulge is provided with left plate;Four framed corners use The transition arc connection for concaving, the central angle of the transition arc is 90 °.
Preferably, be fixed with reinforcing plate on base plate, the reinforcing plate with it is framed be integrally formed and reinforcing plate and front side board, The inwall of back side panel, left plate or right plate is integrally formed connection.
Preferably, the perforation for colligation, the front side board are provided with front side board, back side panel, left plate and right plate On perforation it is corresponding with the position of the perforation on back side panel, the position of the perforation on perforation on the left plate and right plate It is corresponding.
The utility model have the advantage that for:Due to the first strip bulge and the cooperation chain of the first strip groove Connect, the cooperation of the second strip bulge and the second strip groove links the dislocation movement that effectively prevent between template and template, from And ensure that the overall leveling of form walls;On the other hand will be originally used for placing screw rod through walls circular hole be disposed on it is framed Four corners, so as to reduce the destruction to template overall performance, increased access times, at the same can also prevent template with Dislocation movement between template;It is last to use angle bar transition to connect to reach between this template and band pour the beam column of wall both sides To seamless connection, so as to avoid this template and use angle bar transition to connect to reach nothing between band pours the beam column of wall both sides Seam connection.
Brief description of the drawings
Fig. 1 is dimensional structure diagram of the present utility model.
Specific embodiment
The utility model is further described below in conjunction with the accompanying drawings.
As shown in figure 1, the utility model is included in open framed in cuboid and upper end, it is described it is framed by front side board 4, Back side panel 8, left plate 2, right plate 7 and base plate 5 are enclosed and formed, and the bottom surface of the base plate 5 is working face for burnishing surface, rear Side plate 8 is provided with the first strip bulge 9 for setting in left-right direction, is provided with front side board 4 and is adapted with the first strip bulge 9 The first strip groove, the second strip bulge for setting along the longitudinal direction is provided with right plate 2, be provided with left plate 2 with The second strip groove 1 that second strip bulge is adapted;Four framed corners are using the transition arc 10 for concaving Connection, the central angle of the transition arc is 90 °.
In order to strengthen the deadweight of reduction while framed intensity itself, reinforcing plate 6, the reinforcement are fixed with base plate 5 Plate 6 is integrally formed and the inwall of reinforcing plate 6 and front side board 4, back side panel 8, left plate 2 or right plate 7 is integrally formed company with framed Connect.
In template splicing assembling is carried out, in order to further enhance the fastness between template and template, front side board 4, Back side panel 8, left plate 2 and right plate 7 are provided with the perforation 3 for colligation, in the perforation on the front side board 4 and back side panel 8 Perforation position it is corresponding, the perforation on the left plate 2 is corresponding with the position of the perforation on right plate 7.
Multiple this template assembly when in use, are assembled into front mould board wall, the institute in assembling is spliced by the utility model first State the first strip groove that the first strip bulge 9 on this template back side panel 8 is located on another this template front side board 4 Interior, the second bar shaped that the second strip bulge on one template right plate 2 is located on another this template left plate 2 is recessed In groove, the like so as to ensure that the bottom surface i.e. working face of the base plate 5 of each this template is generally aligned in the same plane in, then using pricking The perforation 3 of taut band through adjacent forms is further reinforced;Because the central angle of transition arc 10 is 90 °, so adjacent four The corresponding transition arc 10 of individual template surrounds a circular port.
The splicing assembling process of rear mold board wall is identical with the splicing assembling process of front mould board wall, repeats no more, as long as ensureing The circular port of rear mold board wall is corresponding with the circular hole site of front mould board wall, then passes through front mould board wall using screw rod through walls The circular port corresponding with rear mold board wall is fixed so as to the position to front mould board wall and rear mold board wall;This template is poured with band Angle bar transition is used to connect to reach seamless connection between the beam column of wall both sides.
Due to cooperation link, the second strip bulge and second strip groove 1 of the first strip bulge 9 and the first strip groove Cooperation link effectively prevent between template and template dislocation movement, so as to ensure that the overall leveling of form walls;Separately On the one hand the circular hole that will be originally used for placing screw rod through walls is disposed on four framed corners, so as to reduce to template The destruction of overall performance, increased access times, while can also prevent the dislocation between template and template from moving;Finally in this mould Plate and band use angle bar transition to connect to reach seamlesss connection between pouring the beam column of wall both sides, so as to avoid this template and Band uses angle bar transition to connect to reach seamless connection between pouring the beam column of wall both sides.
In description of the present utility model, it is to be understood that term "front", "rear", "left", "right", " level ", The orientation or position relationship of the instruction such as " bottom ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, be only for ease of Description the utility model and simplify describe, rather than indicate or infer meaning device or element must have specific orientation, It is specific azimuth configuration and operation, thus it is not intended that protecting the limitation of content to the utility model.
If the words such as " first ", " second " are used herein to limit parts, those skilled in the art should This knows:" first ", the use of " second " are intended merely to facilitate description the utility model and simplify and describe, such as without other sound Bright, above-mentioned word does not have special implication.

Claims (3)

1. a kind of wall is poured and uses template, it is characterised in that including in open framed in cuboid and upper end, it is described it is framed by Front side board, back side panel, left plate, right plate and base plate are enclosed and formed, and the bottom surface of the base plate is burnishing surface, is set on back side panel There is the first strip bulge for setting in left-right direction, the first bar shaped being adapted with the first strip bulge is provided with front side board recessed Groove, is provided with the second strip bulge for setting along the longitudinal direction on right plate, is provided with left plate and the second strip bulge phase Second strip groove of adaptation;Four framed corners are using the transition arc connection for concaving, the transition arc Central angle be 90 °.
2. wall according to claim 1 is poured and uses template, it is characterised in that reinforcing plate is fixed with base plate, described Reinforcing plate is integrally formed and reinforcing plate is integrally formed with the inwall of front side board, back side panel, left plate or right plate and is connected with framed.
3. wall according to claim 1 and 2 is poured and uses template, it is characterised in that in front side board, back side panel, left plate The perforation for colligation is provided with right plate, the perforation on the front side board is corresponding with the position of the perforation on back side panel, Perforation on the left plate is corresponding with the position of the perforation on right plate.
CN201621406259.7U 2016-12-21 2016-12-21 A kind of wall is poured uses template Expired - Fee Related CN206289961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621406259.7U CN206289961U (en) 2016-12-21 2016-12-21 A kind of wall is poured uses template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621406259.7U CN206289961U (en) 2016-12-21 2016-12-21 A kind of wall is poured uses template

Publications (1)

Publication Number Publication Date
CN206289961U true CN206289961U (en) 2017-06-30

Family

ID=59105594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621406259.7U Expired - Fee Related CN206289961U (en) 2016-12-21 2016-12-21 A kind of wall is poured uses template

Country Status (1)

Country Link
CN (1) CN206289961U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630004A (en) * 2019-09-06 2019-12-31 浙江华铁建筑安全科技股份有限公司 Construction concatenation formula aluminum alloy template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630004A (en) * 2019-09-06 2019-12-31 浙江华铁建筑安全科技股份有限公司 Construction concatenation formula aluminum alloy template

Similar Documents

Publication Publication Date Title
CN206289961U (en) A kind of wall is poured uses template
CN202299396U (en) Composite building template
CN204934980U (en) Bar splicing plumb joint assistor
CN202370244U (en) Plastic building template
CN202247903U (en) Soft stratum open-cut tunnel with deformation joints having anti-shearing functions
CN203485284U (en) T-shaped beam steel formwork structure
CN203129587U (en) Screen type multi-angle combined support template
CN203066128U (en) Basement wall repairing structure
CN204326519U (en) Mark time tooth raft formula from fissure of displacement flat formwork
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN206346339U (en) Partition wall batten steel card
CN209603195U (en) A kind of poured band of outer wall of basement prefab-form structure
CN110836006A (en) Pin-connected panel building steel construction moulding board
CN208219873U (en) Cast-in-place concrete floor roof post-cast strip and construction joint side form shaping equipment
CN205604577U (en) Strenghthened type angle steel structure
CN205296815U (en) Aluminium alloy aluminum mould board for building
CN205654077U (en) Utilize cross -section characteristic to prevent frame section bar of connected node upset
CN209892006U (en) Universal corner piece for window frame
CN212506434U (en) Temperature-induced groove structure and waterproof structure of ultra-long reinforced concrete wall
CN205013454U (en) Novel curb plate connecting piece
CN208792763U (en) Subsided rest room molding die
CN204920161U (en) Wall flattening chi for building
CN221095394U (en) Concrete column connection node
CN209369316U (en) Plastic building template with anticollision, drip-preventing function
CN204059956U (en) Steel wood composite keel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20191221