- Publication number
- CN206289840U CN206289840U CN201621432365.2U CN201621432365U CN206289840U CN 206289840 U CN206289840 U CN 206289840U CN 201621432365 U CN201621432365 U CN 201621432365U CN 206289840 U CN206289840 U CN 206289840U
- Authority
- CN
- China
- Prior art keywords
- waterproof construction
- ventilation waterproof
- building
- roofing
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 238000009423 ventilation Methods 0.000 title claims abstract description 32
- 238000004891 communication Methods 0.000 claims abstract description 6
- 238000007789 sealing Methods 0.000 claims description 26
- 239000012141 concentrate Substances 0.000 claims description 5
- 238000004078 waterproofing Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 12
- 230000003247 decreasing effect Effects 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 239000007789 gas Substances 0.000 description 33
- 150000001875 compounds Chemical class 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000007872 degassing Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of roofing ventilation waterproof construction of building, including roof boarding, and also include some respectively with the breather pipe of corresponding pipeline communication within doors, and connected with each breather pipe, for the gas concentration in each breather pipe to be transported into discharge outside the roof boarding.Gas in each breather pipe is delivered to building external by discharge, so, only a corresponding through hole need to be opened up on roof boarding, implementing water-proofing treatment at the lead to the hole site again can complete the waterproof homework of whole roof boarding, compared to need in the prior art at each lead to the hole site implement water-proofing treatment, roofing ventilation waterproof construction provided by the utility model need to only open up the through hole of discharge, and the waterproofing work amount of building is greatly decreased, and builds integrally-built good water-proof effect.The utility model is also disclosed a kind of building, including wall and the roofing ventilation waterproof construction being arranged on the wall simultaneously, and roofing ventilation waterproof construction has above-mentioned beneficial effect.
Description
Technical field
The utility model is related to architectural design technical field, the roofing ventilation waterproof construction of more particularly to a kind of building.This
Utility model further relates to a kind of building of waterproof construction of being ventilated including above-mentioned roofing.
Background technology
As building trade is developed rapidly, the structural stability of building is not only pursued, meanwhile, also pay attention to building more and more
Economy, the aesthetic property built.
At present, the top roofing of all kinds of buildings is designed to sloping roof structure mostly, and sloping roof structure is conducive to building top
Draining, meanwhile, sloping roof structure can strengthen the overall aesthetic property of building.The downcomers such as toilet, the kitchen of all kinds of buildings
Road will set passage in the tip position of building, and these passages will pass through roofing and air contact.So that every
Passage, while to carry out the water-proofing treatment of hole, especially will be arranged on slope room by a piece breather pipe in roofing reserving hole
When on face, each one end of breather pipe connects with sewer pipe within doors, and the other end is arranged on pitched roof and reaches outer
Boundary.Because the sewer pipe quantity in building is various, and broad categories, therefore need correspondence to open up substantial amounts of on pitched roof
Through hole, so that each breather pipe stretches out, in this way, difficulty of construction and construction volume are greatly, and can cause waterproof effect poor, and
The overall cost of building increases therewith.
Therefore, how on the basis of ensureing that each gas of breather pipe is normally discharged to building beyond the region of objective existence so that pitched roof
Good waterproof effect is still kept, is those skilled in the art's technical problem urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of roofing ventilation waterproof construction of building, can ensure each breather pipe
In gas be normally discharged to building beyond the region of objective existence on the basis of so that pitched roof still keeps good waterproof effect.This practicality is new
The another object of type is to provide a kind of building of waterproof construction of being ventilated including above-mentioned roofing.
In order to solve the above technical problems, the utility model provides a kind of roofing ventilation waterproof construction of building, including roofing
Plate, also including some respectively with the breather pipe of corresponding pipeline communication within doors, and connected with each breather pipe, for will be each
Gas in the breather pipe concentrates the discharge being transported to outside the roof boarding.
Preferably, be also connected including the outer wall with the discharge, for forming gas storage between the roof boarding at itself
The sealing plate of room.
Preferably, steam vent is provided with the roof boarding, and the steam vent is connected with the air storage chamber.
Preferably, the first sealing for forming liquid-tight envelope to the air storage chamber is provided with the side wall of the steam vent
Circle.
Preferably, the first sealing for forming liquid-tight envelope to the air storage chamber is provided with the side wall of the steam vent
Circle.
Preferably, the compoboard that the roof boarding includes some pieces horizontal by predetermined inclination angle and splices mutually.
Preferably, each discharge is set along the inwall of the corresponding compoboard respectively.
The utility model also provides a kind of building, including wall and the roofing ventilation waterproof knot being arranged on the wall
Structure, wherein, the roofing ventilation waterproof construction is the roofing ventilation waterproof construction described in above-mentioned any one.
The roofing ventilation waterproof construction of building provided by the utility model, mainly including roof boarding, breather pipe and collection
Tracheae.Wherein, breather pipe is arranged on building interior, each pipeline communication in its one end and building, mainly for delivery of pipe
The gas in road.Discharge is connected with each breather pipe, is mainly used in the gas collection that will be conveyed in each breather pipe, and will collect
Gas concentrate be transported to outside roof boarding, namely discharge by after the gas collection in each breather pipe and concentrate be transported to building outward
Portion.In actual application, be delivered to the gas in the corresponding pipeline being connected in discharge by each breather pipe, gas collection
Gas that pipe will collect is concentrated and is delivered to building external, in this way, need to only be opened up on roof boarding one it is corresponding with the discharge
Through hole, then implementation water-proofing treatment can complete the waterproof homework of whole roof boarding at the lead to the hole site, compared to prior art
Middle needs open up multiple through holes corresponding with each breather pipe on roof boarding, while needing to implement at each lead to the hole site
Gas in each breather pipe is concentrated defeated by water-proofing treatment, roofing ventilation waterproof construction provided by the utility model using discharge
Building external is delivered to, the through hole of discharge need to be only opened up, overall waterproofing work amount is built and is greatly decreased, and build overall knot
The good water-proof effect of structure.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is embodiment of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, also
Other accompanying drawings can be obtained according to the accompanying drawing for providing.
Fig. 1 is a kind of overall structure diagram of specific embodiment provided by the utility model.
Wherein, in Fig. 1:
Roof boarding -1, compoboard -101, breather pipe -2, discharge -3, air storage chamber -4, sealing plate -5, exhaust
Hole -6.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1 is refer to, Fig. 1 is a kind of overall structure diagram of specific embodiment provided by the utility model.
In a kind of specific embodiment provided by the utility model, roofing ventilation waterproof construction mainly includes roofing
Plate 1, breather pipe 2 and discharge 3.
Wherein, roof boarding 1 is the top structure of building, may generally be plate or pitched roof type.
Breather pipe 2 is arranged on building interior, each pipeline communication in its one end and building, mainly for delivery of pipeline
Gas.Discharge 3 is connected with each breather pipe 2, is mainly used in the gas collection of conveying in each breather pipe 2, and will collect
Gas concentrate and be transported to outside roof boarding 1, namely discharge 3 is by after the gas collection in each breather pipe 2 and concentration is transported to and builds
Build outside.
Specifically, in actual application, be delivered to for the gas in the corresponding pipeline being connected by each breather pipe 2
In discharge, gas that discharge 3 will collect is concentrated and is delivered to building external, in this way, need to only be opened up on roof boarding 1 one with
The corresponding through hole of discharge 3, then implementation water-proofing treatment can complete the waterproof work of whole roof boarding 1 at the lead to the hole site
Industry, compared to needing to open up multiple through holes corresponding with each breather pipe 2 on roof boarding 1 in the prior art, while needing
Implement water-proofing treatment at each lead to the hole site, roofing ventilation waterproof construction provided by the utility model will using discharge 3
Gas in each breather pipe 2 is concentrated and is delivered to building external, need to only open up the through hole of discharge 3, and the waterproofing work amount of building is big
Width is reduced, and builds integrally-built good water-proof effect.
Because discharge 3 needs to open up through hole on roof boarding 1, it is contemplated that the larger situation of architecture noumenon length, now
The possible through hole for needing to open up multiple discharges 3 on roof boarding 1, or many discharges 3 are collected, it has not been convenient to discharge 3
In architectural installation, even more so that the overall aesthetics of building is poor.
Based on this consideration, roofing ventilation waterproof construction provided by the utility model also includes an air storage chamber 4, the gas storage
Room 4 can collect the gas in each discharge 3, and most these gases are transported to building external at last.
In a kind of preferred embodiment on air storage chamber 4, can be by setting up sealing plate 5, the sealing plate 5 and discharge
3 outer wall is connected, and the marginal portion of the sealing plate 5 is connected with the inwall of roof boarding 1, now, the sealing plate 5 itself and roofing
Air storage chamber 4 is formed between plate 1, through hole is opened up in the marginal position of sealing plate 5, to enable that each discharge 3 will be communicated therewith
Each breather pipe 2 in gas collection to inside the air storage chamber 4, in this way, one or more only need to be opened up in roof boarding 1 leading to
Gas in air storage chamber 4 can be transported to the portion of building by hole, the through hole, in actual construction, preferably be designed sealing plate 5
It is concrete slab.Certainly, it is not limited in said structure by way of sealing plate 5 and roof boarding 1 form air storage chamber 4, remaining
Such as the modes such as plugging material can be filled between the inwall of sealing plate 5 and roof boarding 1 can also use.
Can be steam vent by via design in a kind of preferred embodiment of the through hole opened up on roof boarding 1
6, the steam vent 6 can utilize air conducting principle so that the gas inside air storage chamber 4 is effectively emitted into building external.
In order to strengthen the waterproof effect of roofing ventilation waterproof construction, first can be provided with the side wall of steam vent 6
Sealing ring, first sealing ring can form liquid-tight envelope to air storage chamber 4 so that the waterproof effect that the top of the building has had.
It is, of course, also possible to be provided with stop-leak compound on the side wall of steam vent 6, the stop-leak compound can equally strengthen waterproof effect.
Based on it is also contemplated that, the second sealing can also be provided with the position that the outer wall of discharge 3 is connected with sealing plate 5
Circle, second sealing ring ensure that the sealing of air storage chamber 4, improve the overall degassing function of building, while, it may have it is higher
Waterproof effect.It is, of course, also possible to rubber washer is provided with the position that is connected with sealing plate 5 of outer wall of discharge 3, the rubber
Rubber gasket can also improve the sealing of air storage chamber 4.
In actual construction, sloping roof structure is typically designed at the top of building, if that is, roof boarding 1 specifically may include
Dry block compoboard 101, and each compoboard 101 is obliquely installed, has a predetermined inclination angle with horizontal plane, and splice it is integral after
Form sloping roof structure.The predetermined inclination angle is usually 15 °, 30 °, it is also possible to carried out selecting other numerical value according to actual conditions
Angle of inclination.
When the top of building is sloping roof structure, each discharge 3 can be set along the inwall of compoboard 101.Specifically
, appropriate location increases the air storage chamber 4 of horizontal direction sealing plate 5, the sealing plate 5 and ridge-shaped triangularity under ridge.Respectively
Breather pipe 2 passed when 101 inwall of compoboard is passed to, no longer roof boarding 1 formed through hole, but be fixed on the inwall of roof boarding 1
On discharge 3 be connected, discharge 3 directly leads to the air storage chamber 4 into triangle.The need for according to facade effect, in the suitable of ridge
When position sets the steam vent 6 with definite shape structure, and the air storage chamber 4 of triangle is connected with steam vent 6, by each breather pipe
Interior gas is delivered to building external.Certainly, set location of the discharge 3 in building is random.
The utility model also provides a kind of building, including wall and the roofing ventilation waterproof knot being arranged on the wall
Structure, wherein, roofing ventilation waterproof construction is identical with the above, and here is omitted.
In sum, roofing provided by the utility model ventilation waterproof construction mainly include roof boarding 1, breather pipe 2 with
And discharge 3.Wherein, breather pipe 2 is arranged on building interior, and each pipeline communication in its one end and building is mainly used in
The gas of conveyance conduit.Discharge 3 is connected with each breather pipe 2, is mainly used in the gas collection of conveying in each breather pipe 2, and
And the gas that will collect is concentrated and is transported to outside roof boarding 1, namely discharge 3 after the gas collection in each breather pipe 2 and will be concentrated
It is transported to building external.In actual application, be delivered to for the gas in the corresponding pipeline being connected by each breather pipe 2
In discharge, gas that discharge 3 will collect is concentrated and is delivered to building external, in this way, need to only be opened up on roof boarding 1 one with
The corresponding through hole of discharge 3, then implementation water-proofing treatment can complete the waterproof work of whole roof boarding 1 at the lead to the hole site
Industry, compared to needing to open up multiple through holes corresponding with each breather pipe 2 on roof boarding 1 in the prior art, while needing
Implement water-proofing treatment at each lead to the hole site, roofing ventilation waterproof construction provided by the utility model will using discharge 3
Gas in each breather pipe 2 is concentrated and is delivered to building external, need to only open up the through hole of discharge 3, and the waterproofing work amount of building is big
Width is reduced, and builds integrally-built good water-proof effect.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or new using this practicality
Type.Various modifications to these embodiments will be apparent for those skilled in the art, determine herein
The General Principle of justice can in other embodiments be realized in the case where spirit or scope of the present utility model are not departed from.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The most wide scope consistent with features of novelty.
Claims (8)
1. a kind of roofing ventilation waterproof construction of building, including roof boarding (1), it is characterised in that also including some respectively with
Correspond to the breather pipe (2) of pipeline communication within doors, and connect with each breather pipe (2), for each breather pipe (2) is interior
Gas concentrate be transported to the roof boarding (1) discharge (3) outward.
2. roofing according to claim 1 ventilation waterproof construction, it is characterised in that also including with the discharge (3)
Outer wall is connected, the sealing plate (5) for forming air storage chamber (4) between the roof boarding (1) at itself.
3. roofing according to claim 2 ventilation waterproof construction, it is characterised in that the row of being provided with the roof boarding (1)
Stomata (6), and the steam vent (6) connects with the air storage chamber (4).
4. roofing according to claim 3 ventilation waterproof construction, it is characterised in that set on the side wall of the steam vent (6)
It is equipped with the first sealing ring for forming liquid-tight envelope to the air storage chamber (4).
5. roofing according to claim 4 ventilation waterproof construction, it is characterised in that the outer wall of the discharge (3) and institute
State the second sealing ring being provided with the connected position of sealing plate (5) for forming hermetic seal to the air storage chamber (4).
6. the roofing ventilation waterproof construction according to claim any one of 1-5, it is characterised in that the roof boarding (1) bag
The compoboard (101) for some pieces being included horizontal by predetermined inclination angle and being spliced mutually.
7. roofing according to claim 6 ventilation waterproof construction, it is characterised in that each discharge (3) is respectively along right
The inwall of the compoboard (101) answered is set.
8. a kind of building, including wall and the roofing ventilation waterproof construction being arranged on the wall, it is characterised in that the room
Face ventilation waterproof construction is the roofing ventilation waterproof construction described in claim 1-7 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621432365.2U CN206289840U (en) | 2016-12-23 | 2016-12-23 | One kind building and its roofing ventilation waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621432365.2U CN206289840U (en) | 2016-12-23 | 2016-12-23 | One kind building and its roofing ventilation waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206289840U true CN206289840U (en) | 2017-06-30 |
Family
ID=59154606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621432365.2U Expired - Fee Related CN206289840U (en) | 2016-12-23 | 2016-12-23 | One kind building and its roofing ventilation waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206289840U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590048A (en) * | 2018-04-27 | 2018-09-28 | 南安市创培电子科技有限公司 | It is a kind of building and its roofing ventilate waterproof cleaning structure |
-
2016
- 2016-12-23 CN CN201621432365.2U patent/CN206289840U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590048A (en) * | 2018-04-27 | 2018-09-28 | 南安市创培电子科技有限公司 | It is a kind of building and its roofing ventilate waterproof cleaning structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017118195A1 (en) | Pds zero-slope protection siphonic drainage and collection method and construction process | |
CN209586176U (en) | A kind of multifunctional door and window discharge structure | |
CN206289840U (en) | One kind building and its roofing ventilation waterproof construction | |
CN206053156U (en) | A kind of architectural design roof cornice waterproof structure | |
CN208072564U (en) | A kind of building rain sewage diversion casing | |
CN106522448A (en) | Building and roof ventilation waterproof structure thereof | |
CN209686732U (en) | A kind of architectural design roof cornice waterproof structure | |
CN204960160U (en) | Domatic roofing eaves mouth structure | |
CN105040957B (en) | A kind of natural lighting of underground structure, daily ventilation, fire control smoke exhausting device | |
CN204475700U (en) | Roof top hung rectangular skylight | |
CN207322058U (en) | A kind of wall body vertical afforests rainwater utilization structure | |
CN203547039U (en) | Combined exhaust device for roof | |
CN106703226A (en) | Waterproof ventilating plate | |
CN207582770U (en) | Lighting roof closing in waterproof construction | |
CN208168191U (en) | A kind of outdoor outlet is from guarded drainage air-line system | |
CN206784434U (en) | A kind of basement waterproofing drainage structure | |
CN206769942U (en) | A kind of tunnel construction sprinkling dust-removing device | |
CN220620763U (en) | Novel rainwater riser in curtain wall | |
CN213143649U (en) | Go out roofing pipeline waterproof construction | |
CN211080795U (en) | Waterproof and breathable tile for building roof | |
CN106836665A (en) | A kind of construction of the air-out type air-conditioning under concrete roof installation | |
CN217150934U (en) | Roof waterproof structure | |
CN207410158U (en) | The water guide structure of layer box body on a kind of container | |
CN209891581U (en) | Roof waterproof coating structure | |
CN208844809U (en) | A kind of buffering band structure for planted roof and parapet junction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170630 |