CN206289646U - Construction site ponding recycles processing system - Google Patents

Construction site ponding recycles processing system Download PDF

Info

Publication number
CN206289646U
CN206289646U CN201620905110.7U CN201620905110U CN206289646U CN 206289646 U CN206289646 U CN 206289646U CN 201620905110 U CN201620905110 U CN 201620905110U CN 206289646 U CN206289646 U CN 206289646U
Authority
CN
China
Prior art keywords
water
construction site
processing system
level sensor
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620905110.7U
Other languages
Chinese (zh)
Inventor
杨明升
丁斯顿
周万雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201620905110.7U priority Critical patent/CN206289646U/en
Application granted granted Critical
Publication of CN206289646U publication Critical patent/CN206289646U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Non-Electrical Variables (AREA)
  • Sewage (AREA)

Abstract

Processing system is recycled the utility model discloses a kind of construction site ponding, belongs to ponding processing technology field.The system includes construction water system and automatic drain system, and both are combined to realize construction site product water reuse and automatic-discharging.Comprising water pump, the supply channel and discharge pipe line being connected with the water pump, the supply channel is used to deliver water into construction water point;The discharge pipe line is used to discharge in water.Basement ponding is recycled, construction water, saving water resource is used as;When ponding is excessive, Auto-drainage saves manpower.

Description

Construction site ponding recycles processing system
Technical field
The utility model is related to the basement ponding in a kind of accumulated water treating system, particularly building engineering construction to recycle Processing system.
Background technology
With the development of social economy, to the need for the utilization and people's air defense of the underground space, in architectural engineering, basement is everywhere It can be seen that, inevitably there are many ponding in basement foundation ditch, before not backfilling particularly in the region of rich groundwater.Locate at present The mode for managing basement ponding is substantially to set catch pit at foundation ditch bottom to collect ponding, then will enter draining outside ponding extraction foundation ditch Ditch.
There is many deficiencies in this processing mode, one is the waste for causing water resource;Two is that special messenger need to be arranged to draw water, and is increased Plus cost of labor.
Therefore known basement ponding processing mode there are problems that above-mentioned a variety of inconvenience and.
Utility model content
The technical problems to be solved in the utility model is that construction site ponding is recycled.
In order to solve the above-mentioned technical problem, the utility model provides a kind of construction site ponding and recycles processing system, Comprising water pump, the supply channel and discharge pipe line being connected with the water pump, the supply channel is used to deliver water into construction use Water spot;The discharge pipe line is used to discharge in water.
Further, the supply channel is connected on the water pump with discharge pipe line by threeway, wherein the drainpipe Road is provided with valve, and the valve is placed between threeway and drain outlet.
Further, also including level sensor, the level sensor is connected to controller;The valve is magnetic valve, The magnetic valve is connected to the controller.
Further, also including pressure sensor, the pressure sensor is placed in the water supply line.
Further, also including check valve, the check valve is placed between threeway and water pump.
Further, the water pump includes water supply pump and draining water pump, and the supply channel is connected to the water supply pump; The discharge pipe line is connected to the draining water pump.
Further, also including controller, the controller is connected to the water supply pump and the draining water pump, wherein institute State controller and be also associated with level sensor, the level sensor is placed in ponding.
Further, the level sensor includes water level sensor and discharge level sensor, the water level Sensor sets lower limit water level, and the discharge level sensor sets upper limit water level and lower limit water level, the water level sensing Lower limit water level of the lower limit water level of device less than the discharge level sensor.
Further, also including pressure sensor, the pressure sensor is placed on water supply line and is connected to the control Device.
Further, also including check valve, the check valve is placed on the supply channel.
Using the beneficial effects of the utility model:
1st, simple structure, with low cost, involved equipment application is universal, ripe, it is easy to assembling and safeguard;
2nd, basement ponding is recycled, is used as construction water, saving water resource;
3rd, Automated condtrol, system automatic start-stop is realized supplying water or draining, saves manpower.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the structural representation of embodiment two.
In figure:1st, catch pit 2, changeable water supply controller 3, pressure sensor 4, water level sensor 5, water supply water Pump 6, feed pipe 7, check valve 8, water discharge controller 9, discharge level sensor 10, draining water pump 11, draining Pipe 12, catch pit 13, water pump 14, level sensor 15, controller 16, pressure sensor 17, magnetic valve 18th, feed pipe 19, check valve 20, drainpipe.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art The utility model may be better understood and can be practiced, but illustrated embodiment is not as to restriction of the present utility model.
Embodiment one:
Referring to the drawings 1, a kind of construction site ponding recycles processing system, comprising water supply pump 5 and draining water pump 10, puts In catch pit 1, feed pipe 6 connects water supply pump 5 to construction water point, the connection draining of drainpipe 11 water pump 10 to outdoor drainage Ditch.
Feed pipe 6 is provided with check valve 7, and during construction water, the hydraulic pressure of feed pipe 6 changes, and pressure sensor 3 is by signal Feed back to changeable water supply controller 2, the control start and stop of water supply pump 5 of changeable water supply controller 2, in addition, changeable water supply controller 2 is also associated with water supply water Level sensor 4, water level sensor 4 is provided with lower limit water level, and the water level of catch pit 1 is restricted water supply under being less than water level sensor 4 During position, water supply pump 5 stops supplying water.
Water discharge controller 8 controls the start and stop of draining water pump 10 by discharge level sensor 9, and discharge level sensor 9 is set There are upper limit water level and lower limit water level, the water level of catch pit 1 goes up during more than 9 upper limit water level of discharge level sensor, draining water pump 10 Start draining, when the water level of catch pit 1 is less than 9 lower limit water level of discharge level sensor, draining water pump 10 stops draining.
In addition, the lower limit water level of water level sensor 4 is less than the lower limit water level of discharge level sensor 9.
When drainage arrangement works, water supply installation can be while operation, unaffected.
This construction site ponding recycles processing system by water lev el control below the lower limit water level of discharge level sensor 9, For construction water.
Embodiment two:
Referring to the drawings 2, a kind of construction site ponding recycles processing system, comprising water pump 13, the confession being connected with water pump 13 Water pipe 18, for delivering water into construction water point, also comprising drainpipe 20, is connected by threeway with feed pipe 18, for inciting somebody to action Water is discharged.
Magnetic valve 17 is provided with drainpipe 20, magnetic valve 17 is connected to controller 15;Pressure is provided with feed pipe 18 Sensor 16 and check valve 19, pressure sensor 16 are connected to controller 15;Controller 15 is also associated with level sensor 14, water Level sensor 14 is placed in catch pit 12, is provided with the first water level, the second water level, the 3rd water level, and water level is raised successively.
Magnetic valve 17 is normally off, and the monitoring hydraulic pressure of feed pipe 18 of pressure sensor 16 transmits signals to controller 15, Controller 15 controls the start and stop of water pump 13, realizes construction water system.
When the water level of catch pit 12 is less than 14 first water level of level sensor, the control water pump 13 of controller 15 stops;Construction is used Water is less or water accumulation level rise is too fast, and when the water level of catch pit 12 is higher than three water level of level sensor 14, controller 15 is controlled Magnetic valve processed 17 is opened, and controls water pump 13 to start, and forms drainage system;The water level decreasing of catch pit 12 is less than level sensor 14 During the second water level, the control magnetic valve 17 of controller 15 is closed, and stops draining.
This construction site ponding recycles processing system to control in the water level of level sensor first and second water accumulation level Between water level, for construction water.
Embodiment described above is only the preferred embodiment lifted to absolutely prove the utility model, the utility model Protection domain not limited to this.Equivalent substitute or change that those skilled in the art are made on the basis of the utility model Change, within protection domain of the present utility model.Protection domain of the present utility model is defined by claims.

Claims (10)

1. a kind of construction site ponding recycles processing system, it is characterised in that:Comprising water pump, the water supply being connected with the water pump Pipeline and discharge pipe line, and control the controller and the level sensor that is connected with the controller of the water pump start and stop;Institute Supply channel is stated for delivering water into construction water point;The discharge pipe line is used to discharge in water.
2. construction site ponding according to claim 1 recycles processing system, it is characterised in that:The supply channel with Discharge pipe line is connected on the water pump by threeway, wherein the discharge pipe line is provided with valve, the valve is placed in threeway Between drain outlet.
3. construction site ponding according to claim 2 recycles processing system, it is characterised in that the valve is electromagnetism Valve, the magnetic valve is connected to the controller.
4. construction site ponding according to claim 2 recycles processing system, it is characterised in that:Also include pressure sensing Device, the pressure sensor is placed on the supply channel.
5. construction site ponding according to claim 2 recycles processing system, it is characterised in that:Also include check valve, The check valve is placed between the threeway and water pump.
6. construction site ponding according to claim 1 recycles processing system, it is characterised in that:The water pump includes supplying Water water pump and draining water pump, the supply channel are connected to the water supply pump;The discharge pipe line is connected to the water drain Pump.
7. construction site ponding according to claim 6 recycles processing system, it is characterised in that:The controller connection To the water supply pump and the draining water pump, the level sensor is placed in ponding.
8. construction site ponding according to claim 7 recycles processing system, it is characterised in that:The level sensor Including water level sensor and discharge level sensor, the water level sensor sets lower limit water level, the water drain Level sensor sets upper limit water level and lower limit water level, and the lower limit water level of the water level sensor is passed less than the discharge level The lower limit water level of sensor.
9. construction site ponding according to claim 7 recycles processing system, it is characterised in that:Also include pressure sensing Device, the pressure sensor is placed on water supply line and is connected to the controller.
10. construction site ponding according to claim 6 recycles processing system, it is characterised in that:Also include check valve, The check valve is placed on the supply channel.
CN201620905110.7U 2016-08-19 2016-08-19 Construction site ponding recycles processing system Active CN206289646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620905110.7U CN206289646U (en) 2016-08-19 2016-08-19 Construction site ponding recycles processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620905110.7U CN206289646U (en) 2016-08-19 2016-08-19 Construction site ponding recycles processing system

Publications (1)

Publication Number Publication Date
CN206289646U true CN206289646U (en) 2017-06-30

Family

ID=59094758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620905110.7U Active CN206289646U (en) 2016-08-19 2016-08-19 Construction site ponding recycles processing system

Country Status (1)

Country Link
CN (1) CN206289646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168032A (en) * 2016-08-19 2016-11-30 五冶集团上海有限公司 Construction site hydrops recycling processing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168032A (en) * 2016-08-19 2016-11-30 五冶集团上海有限公司 Construction site hydrops recycling processing system

Similar Documents

Publication Publication Date Title
CN211621642U (en) Automatic device for elevator well pit dewatering
CN206289646U (en) Construction site ponding recycles processing system
CN208152233U (en) A kind of horizontal underground sewage disposal system Boosting pumping station
CN208749398U (en) A kind of tapping equipment of coal mine overlying rock water
CN204401640U (en) Dewatering installation at the bottom of Foundation Pit
CN208293627U (en) A kind of basement bottom board waterproof/drainage structure
CN214656351U (en) Foundation pit construction water level reduces structure
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device
CN202000379U (en) Blocking device for reserved port on bottom plate of basement
CN205348357U (en) Waste water drainage system in ordinary basement in people's air defense basement upper portion
CN106168032A (en) Construction site hydrops recycling processing system
CN204510147U (en) Upper storage reservoir storehouse basin leakage preventing structure
CN207063096U (en) Underground sump converges discharge structure
CN206581978U (en) A kind of tunnel water handling integrated system
CN104452891B (en) Method for construction water level control water supply system
CN204212169U (en) Sump automatic water pumping device for water
CN201713858U (en) Rainwater collecting, processing and lifting device
CN202181554U (en) Local deepened area underground water treatment device in building foundation construction
CN206987280U (en) A kind of floor structure
CN206110310U (en) Bury intelligent sewage lifting pump station of formula integration
CN221236071U (en) Device for solving leakage prevention of elevator shaft from concrete structure construction
CN204059378U (en) The priming device of deep-foundation side wall
CN204252150U (en) A kind of water drainage of deep foundation pit pump antipriming
CN220013971U (en) Di-row drainage two-purpose two-way water pump station behind dyke
CN207512825U (en) The interim water supply pump system of project is built in a kind of room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant