CN206281515U - Emission monitoring equipment based on energy management and control - Google Patents

Emission monitoring equipment based on energy management and control Download PDF

Info

Publication number
CN206281515U
CN206281515U CN201621470987.4U CN201621470987U CN206281515U CN 206281515 U CN206281515 U CN 206281515U CN 201621470987 U CN201621470987 U CN 201621470987U CN 206281515 U CN206281515 U CN 206281515U
Authority
CN
China
Prior art keywords
receiver
energy management
monitoring equipment
emission monitoring
equipment based
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621470987.4U
Other languages
Chinese (zh)
Inventor
俞国青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Chaoyang Intelligent Polytron Technologies Inc
Original Assignee
Suzhou Chaoyang Intelligent Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Chaoyang Intelligent Polytron Technologies Inc filed Critical Suzhou Chaoyang Intelligent Polytron Technologies Inc
Priority to CN201621470987.4U priority Critical patent/CN206281515U/en
Application granted granted Critical
Publication of CN206281515U publication Critical patent/CN206281515U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model is related to a kind of emission monitoring equipment based on energy management and control, include equipment supporter, receiver is installed in equipment, receiver has lid by gemel connection, location-plate is provided with receiver, receiver top is provided with flashing board, data handling component is installed on location-plate, some data communication ports are provided with data handling component, it is connected in data communication port and uses electric energy consumption harvester, with gas energy consumption harvester, use water consumption harvester, data transmission device, alarm device, interaction control device is additionally provided with location-plate, interaction control device is connected with data communication port.Thus, by with electric energy consumption harvester, with gas energy consumption harvester, use water consumption harvester, the discharge capacity of waste water, waste gas can be estimated from energy consumption, even discharged using stealthy stealing, high precision can be monitored according to source energy consumption using being estimated.Without carrying out large-scale redevelopment to existing pipeline, operation, maintenance cost are low, convenient to carry out.

Description

Emission monitoring equipment based on energy management and control
Technical field
The utility model is related to a kind of emission monitoring equipment, more particularly to a kind of emission monitoring based on energy management and control to set It is standby.
Background technology
For existing energy management and control, its major way is by energy resource system Centralized Monitoring, increasing substantially enterprise Industry energy resource system labor productivity.In energy resource system exception and accident, EMS is made timely, quick and accurate by Centralized Monitoring True disposal, controls the influence caused by energy resource system failure in bottom line, it is ensured that energy resource system stable operation.
But, existing energy managing and control system or device do not play supervision effect to the discharge of enterprise.Meanwhile, very Difficulty is applied directly in the discharge supervision such as enterprise, the industrial wastewater of plant area, waste gas.Meanwhile, current exhausting control mainly stresses In the terminal of discharge, enterprise, plant area are easy to be discharged steathily by illegal technological means, and terminal now cannot be detected Arrive, there is certain supervision leak and risk.
In view of above-mentioned defect, the design people is actively subject to research and innovation, a kind of based on energy management and control to found Emission monitoring equipment, makes it have more the value in industry.
Utility model content
In order to solve the above technical problems, the purpose of this utility model is to provide a kind of emission monitoring based on energy management and control setting It is standby.
Emission monitoring equipment based on energy management and control of the present utility model, includes equipment supporter, is installed in the equipment There is receiver, the receiver has lid by gemel connection, wherein:Location-plate, the storage are provided with the receiver Box top is provided with flashing board, data handling component is provided with the location-plate, if being provided with the data handling component Dry data communication port, be connected in the data communication port with electric energy consumption harvester, with gas energy consumption harvester, With water consumption harvester, data transmission device, alarm device, interaction control device is additionally provided with the location-plate, it is described Interaction control device is connected with data communication port.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the use electric energy consumption harvester bag Basic ammeter body is included, electricity consumption detection tabs have been provided with the basic ammeter body, set in the electricity consumption detection tabs There is grounding assembly.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the use gas energy consumption harvester By-passing valve is included, electronics throughput valve is installed on the by-passing valve.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, it is described to use water consumption harvester Run-in index return valve is included, flowmeter is connected with the run-in index return valve.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the data transmission device is RJ45 communication interfaces and/or be wireless communication assembly, antenna is provided with the wireless communication assembly.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the alarm device is buzzer And/or it is warning lamp to be, honeycomb hole is provided with the receiver, the buzzer is arranged on after honeycomb hole, the storage Lamp socket is provided with box, the warning lamp is connected with lamp socket.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the interaction control device includes There are operation button and display screen, the operation button includes substrate, button assembly is distributed with the substrate, on the substrate Jerk control knob is provided with, the display screen is light-emitting diode display.
Further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the equipment supporter bottom is set There is carrying component, the carrying component is universal wheel, and position brake component is provided with the universal wheel.
Yet further, the above-mentioned emission monitoring equipment based on energy management and control, wherein, the both sides of the equipment supporter set Hitch assembly is equipped with, the hitch assembly includes joining piece, and location hole is provided with the joining piece, is set in the location hole It is equipped with wall nail.
By such scheme, the utility model at least has advantages below:
1st, receiver possesses rain-proof construction, even installs and can also place out of doors rainwater intrusion.
2nd, by with electric energy consumption harvester, with gas energy consumption harvester, use water consumption harvester, can be from energy consumption The discharge capacity of waste water, waste gas is estimated, is even discharged using stealthy stealing, can supervised according to source energy consumption using being estimated Control high precision.
3rd, without carrying out large-scale redevelopment to existing pipeline, operation, maintenance cost are low, convenient to carry out.
4th, possess independent interaction control device, be easy to field adjustable, extension wall can also be carried out and fixed, reduce space and account for With.
5th, using data transmission device, the need for meeting high in the clouds data communication, also allow for data upload and collect.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model Art means, and being practiced according to the content of specification, with preferred embodiment of the present utility model and coordinate accompanying drawing detailed below Describe in detail bright as after.
Brief description of the drawings
Fig. 1 is the structural representation of the emission monitoring equipment based on energy management and control.
The implication of each reference is as follows in figure.
The receiver of 1 equipment supporter 2
The flashing board of 3 lid 4
The data communication port of 5 data handling component 6
7 use the gas energy consumption harvester of electric energy consumption harvester 8
9 use the basic ammeter body of water consumption harvester 10
The grounding assembly of 11 electricity consumption detection tabs 12
The electronics throughput valve of 13 by-passing valve 14
The flowmeter of 15 run-in index return valve 16
The wireless communication assembly of 17RJ45 communication interfaces 18
The substrate of 19 antenna 20
The jerk control knob of 21 button assembly 22
The universal wheel of 23 display screen 24
The wall of 25 joining piece 26 is followed closely
The warning lamp of 27 buzzer 28
29 location-plates
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
Such as the emission monitoring equipment based on energy management and control of Fig. 1, equipment supporter 1 is included, receiver is installed in equipment 2, receiver 2 has lid 3 by gemel connection, and its unusual part is:In order to meet the integrated layout in space in case, Location-plate 29 is provided with receiver 2.Meanwhile, in order to meet the use needs of some outdoor environments, it is to avoid cause rainwater to invade Enter, the top of receiver 2 is provided with flashing board 4.Specifically, it is contemplated that the data summarization treatment facility of energy management and control, fixed Data handling component 5 is installed on the plate 29 of position, some data communication ports 6, data communication end are provided with data handling component 5 It is connected on mouthfuls 6 with electric energy consumption harvester 7, with gas energy consumption harvester 8, with water consumption harvester 9, data transfer Device, alarm device.Thus, the collection statistics needs of multi-class data are met.Also, the regulation in view of Field Force is controlled just Profit, can carry out live allotment according to the production emissions status of different operating mode enterprises, more accurate numerical value be obtained, in location-plate Interaction control device is additionally provided with 29, interaction control device is connected with data communication port 6.
From the point of view of with reference to the preferably implementation method of the utility model one, in order to realize that the use of high-power electric appliance part can be supervised Control, be easy to implement follow-up discharge statistics, and use includes basic ammeter body 10, basic ammeter with electric energy consumption harvester 7 Electricity consumption detection tabs 11 are provided with body 10, grounding assembly 12 is provided with electricity consumption detection tabs 11.In such manner, it is possible to meet factory Register one's residence into the access of electric terminals or large-scale electric equipment supply port in area.Meanwhile, the presence of grounding assembly 12 can be relied on, carry Rise safety in utilization.Even if there is electric charge exception, will not also puncture data handling component 5.
From the point of view of further, in order to coordinate common combustion gas or steam pipework layout, the time is preferably counted with gas, used Include by-passing valve 13 with gas energy consumption harvester 8, electronics throughput valve 14 is installed on by-passing valve 13.So, not only The all air inflows during plant area's normal work can be obtained, Pipeline transport is not interfered with also, reduce calculation error.Meanwhile, can Realize real-time data acquisition.Equally, what the utility model was used includes run-in index return valve 15 with water consumption harvester 9, Flowmeter 16 is connected with run-in index return valve 15.Thus, the construction of run-in index return valve 15 is relied on, using less backflow Coordinate flowmeter 16 that plant area is counted with water.And it is possible to larger plant area's water supply port of caliber is arranged on, without Large-scale redevelopment is carried out, application cost is low.
From the point of view of further, it is contemplated that the data is activation of subsequent treatment, reception facility, the high in the clouds data that satisfaction becomes increasingly popular Transmission communication needs, and can be adapted with common network, and data transmission device is RJ45 communication interfaces 17.Simultaneously, it is contemplated that Field wiring there may be certain limitation, in order to realize preferably data transfer, coordinate wireless data delivery, also may be used To use wireless communication assembly 18.Also, antenna 19 is installed on wireless communication assembly 18, is easy to lift communication effect.
From the point of view of with reference to actual implementation, in order to when there is abnormality, realize local onsite alarming, the announcement of use Alarm device be buzzer 27 and/or be warning lamp 28.In such manner, it is possible to meet preferable performance of the acousto-optic with alarm.It is specific next Say, in order to occur without audio occlusion, honeycomb hole is provided with receiver 2, buzzer 27 is arranged on after honeycomb hole.Meanwhile, Lamp socket is provided with receiver 2, warning lamp 28 is connected with lamp socket.So, even if warning lamp when can also see exception a long way off 28 light.
Simultaneously, it is contemplated that the man-machine interaction facility during implementation, the interaction control device that the utility model is used is included Operation button and display screen 23.In order to meet relatively reasonable key arrangement, meet the adjustment of Common Parameters and set, use Operation button includes substrate 20, and button assembly 21 is distributed with substrate 20, and jerk control knob 22 is provided with substrate 20.This Sample, even if unit exception occur can also be turned off in time.Also, display screen 23 is light-emitting diode display, is occupied little space, show Show that effect is good.
Also, the need in view of site layout project, it is easy to carry, the bottom of equipment supporter 1 of use is provided with carrying component. Specifically, it is universal wheel 24 to carry component, and position brake component is provided with universal wheel 24.Meanwhile, in order to reduce on-site Computer room takes up room, and realizes that liftoff extension wall is installed, and the both sides of equipment supporter 1 are provided with hitch assembly.The hitch assembly includes There is joining piece 25, location hole is provided with joining piece 25, wall nail 26 is provided with location hole.In this manner it is ensured that receiver 2 with Metope is combined and consolidated, and long-term placement is not in displacement.
Operation principle of the present utility model is as follows:Rely on electric energy consumption harvester, with gas energy consumption harvester 8, use water The mutual cooperation of energy consumption harvester 9, can be estimated according to the actual energy consumption of plant area, obtain its actual discharge waste water, Waste gas and carbon situation is used, the data of acquisition are compared more targeted in discharge terminal collection.
Be can be seen that by above-mentioned character express and with reference to accompanying drawing using after the utility model, gather around and have the following advantages:
1st, receiver possesses rain-proof construction, even installs and can also place out of doors rainwater intrusion.
2nd, by with electric energy consumption harvester, with gas energy consumption harvester, use water consumption harvester, can be from energy consumption The discharge capacity of waste water, waste gas is estimated, is even discharged using stealthy stealing, can supervised according to source energy consumption using being estimated Control high precision.
3rd, without carrying out large-scale redevelopment to existing pipeline, operation, maintenance cost are low, convenient to carry out.
4th, possess independent interaction control device, be easy to field adjustable, extension wall can also be carried out and fixed, reduce space and account for With.
5th, using data transmission device, the need for meeting high in the clouds data communication, also allow for data upload and collect.
The above is only preferred embodiment of the present utility model, is not limited to the utility model, it is noted that For those skilled in the art, on the premise of the utility model know-why is not departed from, can also do Go out some improvement and modification, these are improved and modification also should be regarded as protection domain of the present utility model.

Claims (9)

1. the emission monitoring equipment based on energy management and control, includes equipment supporter (1), and receiver (2) is provided with the equipment, The receiver (2) has lid (3) by gemel connection, it is characterised in that:Location-plate is provided with the receiver (2) (29), receiver (2) top is provided with flashing board (4), and data handling component (5) is provided with the location-plate (29), Some data communication ports (6) are provided with the data handling component (5), are connected respectively on the data communication port (6) Useful electric energy consumes harvester (7), with gas energy consumption harvester (8), with water consumption harvester (9), data transmission device, announcement Alarm device, is additionally provided with interaction control device, the interaction control device and data communication port (6) on the location-plate (29) It is connected.
2. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The electric energy consumption is adopted Acquisition means (7) include basic ammeter body (10), and electricity consumption detection tabs (11) are provided with the basic ammeter body (10), Grounding assembly (12) is provided with the electricity consumption detection tabs (11).
3. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The gas energy consumption is adopted Acquisition means (8) include by-passing valve (13), and electronics throughput valve (14) is provided with the by-passing valve (13).
4. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The water consumption is adopted Acquisition means (9) include run-in index return valve (15), and flowmeter (16) is connected with the run-in index return valve (15).
5. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The data transfer dress It is set to RJ45 communication interfaces (17) and/or is wireless communication assembly (18), antenna is installed on the wireless communication assembly (18) (19)。
6. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The alarm device is Buzzer (27) and/or be warning lamp (28), be provided with honeycomb hole on the receiver (2), the buzzer (27) is installed After honeycomb hole, lamp socket is provided with the receiver (2), the warning lamp (28) is connected with lamp socket.
7. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The interactive controlling dress Put and include operation button and display screen (23), the operation button includes substrate (20), is distributed with the substrate (20) Button assembly (21), is provided with jerk control knob (22) on the substrate (20), the display screen (23) is light-emitting diode display.
8. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The equipment supporter (1) bottom is provided with carrying component, and the carrying component is universal wheel (24), and position brake is provided with the universal wheel (24) Component.
9. the emission monitoring equipment based on energy management and control according to claim 1, it is characterised in that:The equipment supporter (1) both sides are provided with hitch assembly, and the hitch assembly includes joining piece (25), and it is fixed to be provided with the joining piece (25) Position hole, is provided with wall nail (26) in the location hole.
CN201621470987.4U 2016-12-29 2016-12-29 Emission monitoring equipment based on energy management and control Expired - Fee Related CN206281515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621470987.4U CN206281515U (en) 2016-12-29 2016-12-29 Emission monitoring equipment based on energy management and control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621470987.4U CN206281515U (en) 2016-12-29 2016-12-29 Emission monitoring equipment based on energy management and control

Publications (1)

Publication Number Publication Date
CN206281515U true CN206281515U (en) 2017-06-27

Family

ID=59071533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621470987.4U Expired - Fee Related CN206281515U (en) 2016-12-29 2016-12-29 Emission monitoring equipment based on energy management and control

Country Status (1)

Country Link
CN (1) CN206281515U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115173336A (en) * 2022-05-30 2022-10-11 哈尔滨普华电力设计有限公司 Intelligent energy service management and control station based on double carbon targets and working method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115173336A (en) * 2022-05-30 2022-10-11 哈尔滨普华电力设计有限公司 Intelligent energy service management and control station based on double carbon targets and working method thereof

Similar Documents

Publication Publication Date Title
CN208459810U (en) A kind of wired home leak immersion protective device based on ARM
CN203287753U (en) Energy unattended managing and monitoring system
CN205068034U (en) Building energy management system based on thing networking
CN203748358U (en) Accurate irrigation device based on internet of things
CN106097155B (en) A kind of car plumbing intelligent monitoring and management system based on mobile Internet
CN101339430A (en) Indoor electric appliance energy-saving intelligent monitoring system
CN202870579U (en) Computer monitoring system for controlling building energy consumption
CN203704978U (en) Data machine room microenvironment monitoring system device
CN206281515U (en) Emission monitoring equipment based on energy management and control
CN202563307U (en) Energy-saving environmental protection control system of intelligent hotel
CN205121203U (en) Novel smart home systems
CN204178174U (en) A kind of intelligent remote detection and control terminal
CN205210540U (en) Wisdom house management platform
CN205608449U (en) Fire damp monitored control system of double layer reticulated twine
CN204480032U (en) Based on the unattended station intelligent management system that remote terminal controls
CN207637029U (en) A kind of roofing spraying cooling control system based on rainwater recycle
CN217926241U (en) Real-time online cloud detection system for air compressor
CN203178783U (en) Temperature and humidity environment monitoring system for live working instrument storehouse
CN205158120U (en) Unattended substation gis room ventilation control system
CN210924243U (en) Wisdom garden safety inspection and early warning system
CN208060984U (en) A kind of smart water quality monitoring and control equipment
CN208984141U (en) Cable duct monitor control system
CN203518122U (en) Water leakage alarm system of air conditioner special for machine room
CN106247571A (en) A kind of air-conditioner centralized control system
CN205644327U (en) Management and control system with ability equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

Termination date: 20201229

CF01 Termination of patent right due to non-payment of annual fee