CN206279998U - Building functional surveying instrument - Google Patents
Building functional surveying instrument Download PDFInfo
- Publication number
- CN206279998U CN206279998U CN201621388135.0U CN201621388135U CN206279998U CN 206279998 U CN206279998 U CN 206279998U CN 201621388135 U CN201621388135 U CN 201621388135U CN 206279998 U CN206279998 U CN 206279998U
- Authority
- CN
- China
- Prior art keywords
- electric machine
- mounting bracket
- drilling rod
- support frame
- axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 claims abstract description 20
- 230000007246 mechanism Effects 0.000 claims abstract description 9
- 230000008878 coupling Effects 0.000 claims abstract description 5
- 238000010168 coupling process Methods 0.000 claims abstract description 5
- 238000005859 coupling reaction Methods 0.000 claims abstract description 5
- 241001149930 Protura <class> Species 0.000 claims description 8
- 230000005611 electricity Effects 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 3
- 230000008569 process Effects 0.000 abstract description 3
- 238000005070 sampling Methods 0.000 abstract description 3
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 208000033999 Device damage Diseases 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
Building functional surveying instrument, belongs to building search equipment technical field.The utility model in order to solve existing civil engineering exploration process because in soil property hard thing cannot drill through cause personnel labor intensity greatly, ineffective problem.The utility model includes support frame, fixed mount is hinged with support frame lateral wall, support frame upper end is welded with mounting bracket, electric machine support can be slidably mounted on the track of upper mounting bracket by road wheel and guiding mechanism, the right-hand member of electric machine support is provided with longitudinal movable motor, gear is installed on the output shaft of longitudinal movable motor, gear is engaged with the longitudinal rack on upper mounting bracket, electric machine support upper end is provided with rotary electric machine, rotary electric machine bottom is provided with output revolving shaft, output revolving shaft is installed with thick drilling rod by shaft coupling and is connected, thick drilling rod passes through support frame, the bottom of thick drilling rod is provided with drill bit.The utility model reasonable in design, operation stability when equipment is drilled is high, sampling of being digged pit by hand without manpower, surveys in hgher efficiency.
Description
Technical field
The utility model is related to a kind of building functional surveying instrument, belongs to building search equipment technical field.
Background technology
Civil engineering is to build the required buildings such as all kinds of people's Working Lifes, it is necessary to first carry out geology before construction
Exploration, so determines to build the building of suitable type in this area, it is ensured that building and ginseng safety according to the different of geological conditions.
Humidity, acid-base value, constituent, density of soil etc. all can cause one to the life of the security of building and people
Fixed influence, the reconnaissance mode of prior art is all mostly that the exploration of geology is carried out by way of sampling of digging pit, and is being met
To hard thing when, it is difficult to proceed, it is therefore desirable to sampling of digging pit again, so to a certain extent to operating efficiency produce
Influence is given birth to, has caused operating efficiency to reduce, survey crew's labour intensity is big, operated constant problem.
The content of the invention
The purpose of this utility model be in order to solve existing civil engineering exploration process because in soil property hard thing cannot drill through lead
Cause personnel labor intensity big, ineffective problem, and then building functional surveying instrument is provided.
Building functional surveying instrument includes support frame, fixed mount, upper mounting bracket, electric machine support, rotary electric machine and longitudinal movable motor,
Fixed mount is hinged with described support frame lateral wall, described support frame upper end is welded with mounting bracket, in the middle of upper mounting bracket
Place is longitudinally provided with track, and described electric machine support can be slidably mounted on track by road wheel and guiding mechanism, motor branch
The right-hand member of frame is provided with longitudinal movable motor, is provided with gear on the output shaft of described longitudinal movable motor, gear with install
Longitudinal rack engagement on upper mounting bracket, described electric machine support upper end is provided with rotary electric machine, and rotary electric machine bottom is provided with
Output revolving shaft, output revolving shaft is installed with thick drilling rod by shaft coupling and is connected, and thick drilling rod passes through support frame, and the bottom of thick drilling rod is provided with
Drill bit, drill bit is provided with jig drill bar and portals, and the top both sides of the thick drilling rod are provided with pressing slideway, be provided with pressing slideway by
Depression bar, thick drilling rod inner chamber is provided with jig drill bar, and the jig drill bar is set up with pressing lever by connecting rod and is connected.
Preferably:The bottom of described fixed mount is provided with adjustment conehead, the side that described adjustment conehead is connected through a screw thread
Formula is sleeved on fixed mount.
Preferably:Described guiding mechanism includes that the first directive wheel, the second directive wheel, first axis of guide and second are oriented to
Axle, the first described axis of guide and second axis of guide are arranged on electric machine support by bolt, and first axis of guide and second is oriented to
The other end of axle is set up by bearing and the first directive wheel and the second directive wheel and installed, and the first directive wheel and the second directive wheel are clamped
On the both sides working face of track.
Preferably:The lateral wall of described pressing lever is provided with anti-skidding annular knurl texture.
The utility model has the advantages that:Building functional surveying instrument of the present utility model can effectively by rotary drilling ground
Mode treatment of digging pit carried out to the soil for needing exploration, solve the motionless phenomenon of hard thing brill, the utility model building functional surveying instrument sets
Meter is scientific and reasonable, simple to operate, after determining survey location, can be fixed by fixed mount stabilization, it is ensured that equipment is bored
Operation stability during hole, without manpower hand dipping, surveys in hgher efficiency.
Brief description of the drawings
Fig. 1 is a kind of topology view of civil engineering material-stirring device;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is guiding mechanism mounting structure view;
1- support frames in figure, 2- fixed mounts, the upper mounting brackets of 3-, 4- electric machine supports, 5- rotary electric machines, the 6- lengthwise rows leakages of electricity
Machine, 7- tracks, 8- guiding mechanisms, 9- output revolving shafts, 10- shaft couplings, the thick drilling rods of 11-, 12- drill bits, 13- jig drill bars portal, 14-
Gear, 15- longitudinal racks, 16- pressing slideways, 17- pressing levers, 18- jig drill bars, 19- connecting rods, 20- adjustment coneheads, 21- the
One directive wheel, the directive wheels of 22- second, the axis of guides of 23- first, the axis of guides of 24- second, 25- road wheels.
Specific embodiment
Specific embodiment one:Present embodiment is illustrated with reference to Fig. 1-3, the building functional surveying instrument of present embodiment includes support
Frame 1, fixed mount 2, upper mounting bracket 3, electric machine support 4, rotary electric machine 5 and longitudinal movable motor 6, the described lateral wall of support frame 1
On be hinged with fixed mount 2, the described upper end of support frame 2 is welded with mounting bracket 3, and upper mounting bracket middle is longitudinally provided with track
7, described electric machine support 4 can be slidably mounted on track 7 by road wheel 25 and guiding mechanism 8, the right-hand member peace of electric machine support 4
Equipped with longitudinal movable motor 6, gear 14 is installed on the output shaft of described longitudinal movable motor 6, gear 14 with installed in upper
Longitudinal rack 15 on mounting bracket 3 is engaged, and the described upper end of electric machine support 4 is provided with rotary electric machine 5, and the bottom of rotary electric machine 5 sets
There is output revolving shaft 9, output revolving shaft 9 is installed with thick drilling rod 11 by shaft coupling 10 and is connected, thick drilling rod 11 passes through support frame 1, thick to bore
The bottom of bar 11 is provided with drill bit 12, and drill bit 12 is provided with jig drill bar and portals 13, and the top both sides of the thick drilling rod 11 are provided with pressing
Slideway 16, is provided with pressing lever 17 in pressing slideway 16, the inner chamber of thick drilling rod 11 is provided with jig drill bar 18, and the jig drill bar 18 is by connecting
Extension bar 19 is set up with pressing lever 17 and is connected.It is arranged such, during work, by adjusting fixed mount 2, building functional surveying instrument stabilization is installed
On required exploration soil ground, the control band of rotary electric machine 5 is used force the boring work that drilling rod 11 is realized to soil, while being arranged on motor
Longitudinal movable motor 6 on support 4 is by under gear 14 and the engagement of tooth bar 15 being arranged on upper mounting bracket 3 so that electricity
Machine support 4 is overall to be realized vertically moving, and when getting into hard thing and being difficult to, pressing lever 17 is pressed down on, and jig drill bar 18 is passed through
Jig drill bar on drill bit 12 portals and 13 stretches out, and can effectively carry out crushing hard thing, solves to bore motionless phenomenon, after work, will
Equipment recovers initial position, and now drilling occurs in exploration ground, and survey crew can be entered by soil collecting instrument to the soil of depths
Row collection and exploration work.
Specific embodiment two:With reference to Fig. 1 and Fig. 2 explanation present embodiments, described in the building functional surveying instrument of present embodiment
The bottom of fixed mount 2 be provided with adjustment conehead 20, the mode that described adjustment conehead 20 is connected through a screw thread is sleeved on fixed mount 2
On.It is arranged such, by rotating adjustment conehead 20 so that fixed mount is consolidated in exploration soil needed for boring, it is ensured that building functional surveying instrument
Steady operation, be prevented effectively from device damage
Specific embodiment three:Present embodiment, the guiding described in the building functional surveying instrument of present embodiment are illustrated with reference to Fig. 3
Mechanism 8 includes the first directive wheel 21, the second directive wheel 22, first axis of guide 23 and second axis of guide 24, the first described guiding
The axis of guide 24 of axle 23 and second is arranged on electric machine support 4 by bolt, first axis of guide 23 and second axis of guide 24 it is another
End is set up by bearing and the first directive wheel 21 and the second directive wheel 22 and installed, and the first directive wheel 21 and the second directive wheel 22 are clamped
On the both sides working face of track 7.It is arranged such, first directive wheel 21 and the second directive wheel 22 of the both sides of track 7 can
Play guide effect, it is to avoid the road wheel 25 on electric machine support 4 de-orbits and 7 causes equipment operation failure in the process of running.
Specific embodiment four:With reference to Fig. 1 and Fig. 2 explanation present embodiments, described in the building functional surveying instrument of present embodiment
The lateral wall of pressing lever 17 be provided with anti-skidding annular knurl texture.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, this is not limited to
Utility model, although being described in detail to the utility model with reference to the foregoing embodiments, for those skilled in the art
For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic
Carry out equivalent.It is all it is of the present utility model spirit and principle within, any modification, equivalent substitution and improvements made etc.,
Should be included within protection domain of the present utility model.
Claims (4)
1. building functional surveying instrument, including support frame(1), fixed mount(2), upper mounting bracket(3), electric machine support(4), rotary electric machine(5)
With longitudinal movable motor(6), it is characterised in that:Described support frame(1)Fixed mount is hinged with lateral wall(2), described branch
Support(1)Upper end is welded with mounting bracket(3), upper mounting bracket middle is longitudinally provided with track(7), described electric machine support
(4)By road wheel(25)And guiding mechanism(8)Can be slidably mounted at track(7)On, electric machine support(4)Right-hand member be provided with it is vertical
To movable motor(6), described longitudinal movable motor(6)Output shaft on gear is installed(14), gear(14)Be arranged on
Upper mounting bracket(3)On longitudinal rack(15)Engagement, described electric machine support(4)Upper end is provided with rotary electric machine(5), rotate electricity
Machine(5)Bottom is provided with output revolving shaft(9), output revolving shaft(9)By shaft coupling(10)With thick drilling rod(11)Connection, thick drilling rod are installed
(11)Through support frame(1), thick drilling rod(11)Bottom be provided with drill bit(12), drill bit(12)Jig drill bar is provided with to portal(13),
The thick drilling rod(11)Top both sides be provided with pressing slideway(16), press slideway(16)Pressing lever is inside installed(17), it is thick to bore
Bar(11)Inner chamber is provided with jig drill bar(18), the jig drill bar(18)By connecting rod(19)With pressing lever(17)Set up connection.
2. building functional surveying instrument according to claim 1, it is characterised in that:Described fixed mount(2)Bottom be provided with adjustment
Conehead(20), described adjustment conehead(20)The mode being connected through a screw thread is sleeved on fixed mount(2)On.
3. building functional surveying instrument according to claim 1, it is characterised in that:Described guiding mechanism(8)It is oriented to including first
Wheel(21), the second directive wheel(22), first axis of guide(23)With second axis of guide(24), described first axis of guide(23)With
Two axis of guides(24)Electric machine support is arranged on by bolt(4)On, first axis of guide(23)With second axis of guide(24)It is another
End passes through bearing and the first directive wheel(21)With the second directive wheel(22)Set up and install, the first directive wheel(21)With the second directive wheel
(22)It is clamped and installed in track(7)Both sides working face on.
4. building functional surveying instrument according to claim 1, it is characterised in that:Described pressing lever(17)Lateral wall be provided with
Anti-skidding annular knurl texture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621388135.0U CN206279998U (en) | 2016-12-17 | 2016-12-17 | Building functional surveying instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621388135.0U CN206279998U (en) | 2016-12-17 | 2016-12-17 | Building functional surveying instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206279998U true CN206279998U (en) | 2017-06-27 |
Family
ID=59073855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621388135.0U Expired - Fee Related CN206279998U (en) | 2016-12-17 | 2016-12-17 | Building functional surveying instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206279998U (en) |
-
2016
- 2016-12-17 CN CN201621388135.0U patent/CN206279998U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106837185A (en) | Machine jumbolter independent rack | |
CN205349223U (en) | Drilling equipment for building | |
CN212642580U (en) | Boring machine for geological survey | |
CN106437510A (en) | Drilling machine formed through transformation of excavator | |
CN105201407B (en) | A kind of novel hydraulic Action of Superhigh Frequency Vibration unit head | |
CN113123726B (en) | Coal mine water permeation detection protection device for coal mine safety | |
CN212693306U (en) | Drilling device for prospecting | |
CN206279998U (en) | Building functional surveying instrument | |
CN210051571U (en) | Data acquisition device for geophysical exploration | |
CN113848086B (en) | Novel sampling and cutting device for geological survey | |
CN204754762U (en) | Drilling equipment for building | |
CN111648721A (en) | Drilling equipment with drill bit correction function | |
CN216247283U (en) | Drilling equipment convenient to petroleum geology sample detection | |
CN206035382U (en) | Rig that excavator was reformed transform | |
CN211205828U (en) | Geological detection sampling device | |
CN211342758U (en) | Drilling machine for geological drilling with stable work | |
CN205823182U (en) | A kind of novel automatic drilling machine | |
CN213812940U (en) | Ecological environment geological survey sampling device | |
CN112112562A (en) | Geological survey device for underground unfavorable engineering | |
CN207300628U (en) | A kind of petroleum geology detection sampler | |
CN207245614U (en) | A kind of frame column type emulsion boring machine | |
CN206693909U (en) | Movable indoor small-sized drill | |
CN219299228U (en) | Investigation drilling machine | |
CN217380531U (en) | Novel geological survey probing device | |
CN216076974U (en) | Improved generation geological survey probing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170627 |