CN206279618U - A kind of basement wall infiltration crack plugging system - Google Patents

A kind of basement wall infiltration crack plugging system Download PDF

Info

Publication number
CN206279618U
CN206279618U CN201621418277.7U CN201621418277U CN206279618U CN 206279618 U CN206279618 U CN 206279618U CN 201621418277 U CN201621418277 U CN 201621418277U CN 206279618 U CN206279618 U CN 206279618U
Authority
CN
China
Prior art keywords
crack
groove
wall
infiltration
plugged zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621418277.7U
Other languages
Chinese (zh)
Inventor
王鹏
张淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201621418277.7U priority Critical patent/CN206279618U/en
Application granted granted Critical
Publication of CN206279618U publication Critical patent/CN206279618U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of basement wall infiltration crack plugging system, including wall, there is infiltration crack on the wall, on the back side of the wall, correspondence position in infiltration crack is provided with groove, being horizontally disposed with the groove has the derived aqueduct that seeped water in wall, one end of the aqueduct is against on internal infiltration crack, and by filling the fixation of the first floor crack plugged zone realization in bottom portion of groove and wall, it is opening when being provided with water guide on the part body outside the plugged zone of first floor crack, it is the valve of closed mode after the completion of water guide, in the groove, second layer crack plugged zone is set outside the plugged zone of first floor crack, aqueduct and valve after the completion of water guide is buried in inside grooves by second layer crack plugged zone, groove is filled and led up;The second layer crack plugged zone external application is provided with waterproof layer.The features such as the utility model has safety, is applicable, having promote well and practical value, and good economic benefit can be produced after extensive popularization and application.

Description

A kind of basement wall infiltration crack plugging system
Technical field
The utility model is related to civil engineering technical field, more particularly to a kind of basement wall infiltration crack closure system System.
Background technology
With the development of society, the progress of technology, Large Underground parking lot, market and civil air defense constructions and installations are more and more.It is right In the basement of large area, the length of wall is often more long, and rear metope of having constructed occurs crack unavoidably, and crack easily causes oozes Water problems.Traditional handicraft typically uses " completion method ", with pneumatic pick, drill rod or at a high speed the cutting disc of rotation by crack growth, shape Forming V-shape or dovetail groove, be layered after cleaning up pressure smear epoxy resin mortar or cement mortar, pitch ointment, high molecule sealing materials or The material dead-end fractures such as various finished product sealing agents.But when water percolating capacity is larger, infiltration can influence loss circulation material plugging effect, seepage Treatment effect is not fine.
Utility model content
The purpose of this utility model is to provide a kind of basement wall infiltration crack plugging system, to solve water percolating capacity larger When, infiltration can influence loss circulation material plugging effect, and seepage treatment effect is not good technical problem.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of basement wall infiltration crack plugging system, including wall, there is infiltration crack on the wall, its feature exists In:On the back side of the wall, the correspondence position in infiltration crack is provided with groove, and being horizontally disposed with the groove has wall Aqueduct derived from interior infiltration, one end of the aqueduct is against on internal infiltration crack, and by filling in bottom portion of groove First floor crack plugged zone realizes the fixation with wall, is to open when being provided with water guide on the part body outside the plugged zone of first floor crack It is the valve of closed mode to open after the completion of state, water guide, and second layer Crack Sealing is set in the groove, outside the plugged zone of first floor crack Aqueduct and valve after the completion of water guide is buried in inside grooves by blocking layer, second layer crack plugged zone, and groove is filled and led up; The second layer crack plugged zone external application is provided with waterproof layer.
It is further preferred that the depth of groove is not more than the 1/2 of thickness of wall body.
Further, first floor crack plugged zone and second layer crack plugged zone are by epoxy resin mortar, cement mortar, pitch Ointment or high molecule sealing materials layering pressure are smeared and formed.
Further, the waterproof layer is formed by cement group water-proofing material brushing or pasted by waterproof roll and forms.
Additionally, the groove is V-shaped groove or dovetail groove.
It is further preferred that the aqueduct is along the spaced row aqueduct of groove bearing of trend.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model first drains wall upstream face water when being blocked to infiltration crack, on the one hand reduces water pair The pressure of wall upstream face, on the other hand can eliminate the influence seeped water in leak stopping processing procedure to waterproof material performance, significantly Improve impervious treatment effect;The utility model improves to traditional infiltration crack method for blocking, with minimum manpower and thing The input of power, produces greatly with beneficial effect, with safety, be applicable the features such as, having promote well and practical value, widely Good economic benefit can be produced after popularization and application.
Brief description of the drawings
Fig. 1 is the knot that the wall that a kind of basement wall infiltration crack plugging system of the utility model is related to is not provided with groove Structure schematic diagram;
Fig. 2 is that the wall that a kind of basement wall infiltration crack plugging system of the utility model is related to sets the knot after groove Structure schematic diagram;
Fig. 3 is that the inside grooves that the utility model is related to set the structural representation after aqueduct;
Fig. 4 is the structural representation that the inside grooves that the utility model is related to set first floor crack plugged zone;
Fig. 5 is the structural representation after the aqueduct that the utility model is related to is truncated;
A kind of structural representation of basement wall infiltration crack plugging system of Fig. 6 the utility model.
Reference:1- walls;2- infiltrations crack;3- grooves;4- aqueducts;5- valves;6- first floors crack plugged zone;7- Second layer crack plugged zone;8- waterproof layers.
Specific embodiment
For technological means, character of innovation, reached purpose and effect for realizing the utility model are easy to understand, below The utility model is further illustrated with reference to accompanying drawing.
The embodiment recorded herein is specific specific embodiment of the present utility model, of the present utility model for illustrating Design, is explanatory and exemplary, should not be construed as the limit to the utility model implementation method and the utility model scope System.Except the implementation exception recorded herein, those skilled in the art can also be public based on the application claims and specification institute The content opened includes doing using the embodiment to recording herein using obvious other technical schemes, these technical schemes Go out the technical scheme of any obvious substitutions and modifications.
A kind of basement wall infiltration crack plugging system, as shown in fig. 6, including wall 1, as shown in figure 1, on wall 1 There is infiltration crack 2, as shown in Fig. 2 on the back side of wall 1, the correspondence position in infiltration crack 2 is provided with groove 3, groove 3 is deep Degree is not more than the 1/2 of the thickness of wall 1, and groove 3 is V-shaped groove or dovetail groove, as shown in figure 3, be horizontally disposed with groove 3 having wall Aqueduct 4 derived from interior infiltration, aqueduct 4 is along the spaced row aqueduct of the bearing of trend of groove 3, as shown in figure 4, leading One end of water pipe 4 is against on internal infiltration crack 2, and is realized and wall by the first floor crack plugged zone 6 filled in the bottom of groove 3 The fixation of body, when being provided with water guide on the part body outside first floor crack plugged zone 6 for after the completion of opening, water guide to close The valve 5 of closed state, groove 3 is interior, the peripheral hardware second layer crack plugged zone 7 of first floor crack plugged zone 6, second layer crack plugged zone 7 are buried in inside groove 3 aqueduct 4 and valve 5 after the completion of water guide, and groove 3 is filled and led up;Outside second layer crack plugged zone 7 Waterproof layer 8 is laid with, waterproof layer 8 is formed by cement group water-proofing material brushing or pasted by waterproof roll and forms, first floor Crack Sealing Blocking layer 6 and second layer crack plugged zone 7 are smeared by epoxy resin mortar, cement mortar, pitch ointment or high molecule sealing materials layering pressure Form.
A kind of construction method of basement wall infiltration crack plugging system, it is characterised in that comprise the following steps:
Step one, prepares before construction:The position for determining infiltration crack 2 is checked, and carries out mark;
Step 2, sets groove 3:Drilling treatment is carried out to the infiltration crack 2 of the back side of wall 1 using impact drill, is impacted It is 45 ° to bore bore angle, forms V-arrangement or trapezoidal groove 3, and rinse groove 3 with clear water;
Step 3, the infiltration water guide of crack 2 treatment:Bottom is installed inside groove 3 to be connected and with valve with infiltration crack 2 5 aqueduct 4, valve 5 be located at the position of 4 body of aqueduct 1/2 at, and the bottom of groove 3 layering pressure smear epoxy resin mortar, cement Mortar, pitch ointment or high molecule sealing materials form first floor crack plugged zone 6, will be fixed on wall 1 inside aqueduct 4, Valve 5 is outside first floor crack plugged zone 6;
Step 4, the infiltration water guide of crack 2 treatment:Open 5 pairs of infiltration cracks 2 of valve and guide infiltration;
Step 5, truncates aqueduct 4:After water is drained, valve 5 is closed, truncate aqueduct 4 to the mouth of pipe without departing from groove 3 Mouthful;
Step 6, secondary repairing:In first floor crack, layering pressure in the outside of plugged zone 6 smears epoxy resin mortar, cement mortar, coal tar Cream or high molecule sealing materials, form second layer crack plugged zone 7, and second layer crack plugged zone 7 is by the water guide after truncation Valve 5 after pipe 4 and closing is buried in inside groove 3, and groove 3 is filled and led up;
Step 7, lays waterproof layer 8:In second layer crack, waterproof layer 8, so far, basement wall are laid in the outside of plugged zone 7 Closure system construction in infiltration crack is completed.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, it is all in this practicality Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (6)

1. a kind of basement wall infiltration crack plugging system, including wall(1), the wall(1)On have infiltration crack(2), It is characterized in that:The wall(1)Back side on, infiltration crack(2)Correspondence position be provided with groove(3), the groove (3)Interior being horizontally disposed with has the derived aqueduct that will be seeped water in wall(4), the aqueduct(4)One end be against internal infiltration and split Seam(2)On, and by filling in groove(3)The first floor crack plugged zone of bottom(6)The fixation with wall is realized, in first floor crack Plugged zone(6)Outside part body be when being provided with water guide be the valve of closed mode after the completion of opening, water guide(5), The groove(3)Interior, first floor crack plugged zone(6)Peripheral hardware second layer crack plugged zone(7), second layer crack plugged zone (7)By the aqueduct after the completion of water guide(4)And valve(5)It is buried in groove(3)Inside, by groove(3)Fill and lead up;The second layer Crack plugged zone(7)It is laid with waterproof layer outward(8).
2. a kind of basement wall infiltration crack plugging system as claimed in claim 1, it is characterised in that:The groove(3) Depth is not more than wall(1)The 1/2 of thickness.
3. a kind of basement wall infiltration crack plugging system as claimed in claim 1, it is characterised in that:The first floor crack Plugged zone(6)With second layer crack plugged zone(7)By epoxy resin mortar, cement mortar, pitch ointment or high molecule sealing materials point Lamination is smeared and formed.
4. a kind of basement wall infiltration crack plugging system as claimed in claim 1, it is characterised in that:The waterproof layer (8)Formed by cement group water-proofing material brushing or pasted by waterproof roll and form.
5. a kind of basement wall infiltration crack plugging system as claimed in claim 1, it is characterised in that:The groove(3) It is V-shaped groove or dovetail groove.
6. as described in claim 1 ~ 5 any one a kind of basement wall infiltration crack plugging system, it is characterised in that:Institute State aqueduct(4)It is along groove(3)The spaced row aqueduct of bearing of trend.
CN201621418277.7U 2016-12-22 2016-12-22 A kind of basement wall infiltration crack plugging system Expired - Fee Related CN206279618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621418277.7U CN206279618U (en) 2016-12-22 2016-12-22 A kind of basement wall infiltration crack plugging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621418277.7U CN206279618U (en) 2016-12-22 2016-12-22 A kind of basement wall infiltration crack plugging system

Publications (1)

Publication Number Publication Date
CN206279618U true CN206279618U (en) 2017-06-27

Family

ID=59072699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621418277.7U Expired - Fee Related CN206279618U (en) 2016-12-22 2016-12-22 A kind of basement wall infiltration crack plugging system

Country Status (1)

Country Link
CN (1) CN206279618U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759842A (en) * 2016-12-22 2017-05-31 中国建筑第二工程局有限公司 A kind of basement wall infiltration crack plugging system and its construction method
CN108385998A (en) * 2018-02-06 2018-08-10 厦门防水博士建筑工程有限公司 A kind of water leakage through exterior wall repairerment technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759842A (en) * 2016-12-22 2017-05-31 中国建筑第二工程局有限公司 A kind of basement wall infiltration crack plugging system and its construction method
CN108385998A (en) * 2018-02-06 2018-08-10 厦门防水博士建筑工程有限公司 A kind of water leakage through exterior wall repairerment technique

Similar Documents

Publication Publication Date Title
CN106381840B (en) Fracture plugging grouting method under a kind of high pressure moving water state
CN102733371B (en) Closed direct-sucking sectional vacuum preloading foundation treatment method
CN101943006B (en) Treatment method of water leakage of construction joints of tunnel
CN107326868A (en) A kind of large reservoir concrete dam body fracture plugging method
CN108166517B (en) Well sealing method and well sealing device for super high-rise high-water pressure deep well dewatering well
CN206279618U (en) A kind of basement wall infiltration crack plugging system
CN104389314A (en) Grouting reinforcement device and method for shallow clay
CN205314107U (en) Sectional type slip casting pipe device that foundation stabilization used
CN202450559U (en) Waterproof structure of basement
CN107448008A (en) A kind of construction technology that Durable Water Repellant is reproduced using minimally invasive method
CN205422815U (en) Big flood underground mine tunnel waterwall
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN207376637U (en) A kind of open caisson seepage-proof structure
CN109707057A (en) The plugging structure and its construction method of Basement Main Wall Crack infiltration
CN106049418A (en) Combined grouting reinforcement method for tunnel surface in shallow buried traversing faultage
CN203939060U (en) The slight leakage plugging structure of a kind of diaphragm wall
CN205636825U (en) Waterproof structure of basement
CN207974113U (en) A kind of orientation given layer grouting sleeve valve pipe
CN105178364B (en) Underground building light precipitation well point post-cast strip anti-seepage construction method
CN106638606B (en) A kind of quick grouting method of deep covering layer
CN107514150A (en) A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant
CN105714739B (en) Preventing secondary cracking process of repairing in fluting method seepage treatment
CN106759842A (en) A kind of basement wall infiltration crack plugging system and its construction method
CN106939619A (en) A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits
CN105544547A (en) Covering type soil filled and soft soil stratum segmented reinforcing device and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

CF01 Termination of patent right due to non-payment of annual fee