CN206279008U - A kind of beans waste water primary treatment system - Google Patents

A kind of beans waste water primary treatment system Download PDF

Info

Publication number
CN206279008U
CN206279008U CN201621032366.8U CN201621032366U CN206279008U CN 206279008 U CN206279008 U CN 206279008U CN 201621032366 U CN201621032366 U CN 201621032366U CN 206279008 U CN206279008 U CN 206279008U
Authority
CN
China
Prior art keywords
treating column
mud
sewage
treatment system
waste water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621032366.8U
Other languages
Chinese (zh)
Inventor
金建平
王柳雄
王树国
冯大敏
蔡锦良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIAXING JIAJIALE FOODS CO Ltd
Original Assignee
JIAXING JIAJIALE FOODS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING JIAJIALE FOODS CO Ltd filed Critical JIAXING JIAJIALE FOODS CO Ltd
Priority to CN201621032366.8U priority Critical patent/CN206279008U/en
Application granted granted Critical
Publication of CN206279008U publication Critical patent/CN206279008U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a kind of beans waste water primary treatment system, its drip irrigation device is that source of sewage pond one end is parallel with treating column, solvent cell is connected on treating column, the clear water reserviors of sewage after being processed for storage are further connected with outside treating column, described clear water reserviors one end is connected with regulating reservoir, the treatment tower bottom is connected to the first mud sump, the pressure mud tank being connected with the first mud sump is provided with by first mud sump, plate and frame filter press is provided with by the pressure mud tank, is connected by water pipe between the plate and frame filter press and pressure mud tank.The utility model purpose is a kind of good sewage processing effect of offer and processes convenient and utilization rate beans waste water primary treatment system high.

Description

A kind of beans waste water primary treatment system
Technical field
The utility model is related to a kind of food technology field, more specifically, it relates to a kind of beans waste water primary treatment System.
Background technology
When carrying out processed soybean food and being processed, beans waste water, beans waste water is easily produced to be directly discharged into korneforos, appearance Easily river is polluted, natural, ecological is destroyed, also there is the sewage disposal system of correlation in traditional factory, but traditional to beans The processing system of waste water processed is relatively complicated, it is necessary to carry out Anaerobic Treatment by anaerobic tower, then coordinates tank for sewage gas and anaerobism mud Pond is processed, and water treatment effect is more poor, and easily produces secondary pollution, and its utilization rate is low, and is being used When, it is necessary to wholly off work is repaired when occurring damaging, it is not stopped, just it is not easy to maintenance.
Utility model content
In view of the shortcomings of the prior art, the purpose of this utility model is to provide a kind of good sewage processing effect and place Manage convenient and utilization rate beans Waste Water Treatment high.
To achieve the above object, the utility model provides following technical scheme:A kind of beans waste water primary treatment system, Including source of sewage pond and regulating reservoir, source of sewage pond one end is parallel with treating column, solvent cell is connected on treating column, outside treating column The clear water reserviors of sewage after being processed for storage are further connected with, described clear water reserviors one end is connected with regulating reservoir, and the treatment tower bottom connects There is the first mud sump, the pressure mud tank being connected with the first mud sump is provided with by the first mud sump, sheet frame pressure is provided with by the pressure mud tank Filter, is connected between the plate and frame filter press and pressure mud tank by water pipe.
By using above-mentioned technical proposal, it is directly entered in treating column by by the sewage in source of sewage pond, by solvent Solvent ferrous sulfate and quick lime in pond are put into well mixed, and acid neutralization, ferrous sulfate can be carried out by quick lime Flocculant the most widest, can cause that internal sewage fast hierarchical, the sewage after being divided into, upper strata clear water are put into clear water reserviors It is interior, the first mud sump is connected to by processing tower bottom, the pressure mud tank being connected with the first mud sump is provided with by the first mud sump, it is described Plate and frame filter press is provided with by pressure mud tank, is connected by water pipe between the plate and frame filter press and pressure mud tank, it is ensured that be deposited in treatment The mud of tower bottom, can be fully used, and be extruded by pressing mud tank pressure to enter plate and frame filter press, and the mud after squeezing directly arrives heat Power plant's burning electricity generation, the clear water in the mud of extrusion is processed into sewerage network, carries out secondary utilization, sufficiently ensures resource Secondary utilization and the completeness for utilizing.
The utility model is further arranged to:The solvent cell number is two, and one of them is filled with iron sulfite, separately Outer filling lime.
By using above-mentioned technical proposal, solvent cell number is two, can be filled with iron sulfite with one of them, in addition One filling lime, is easy to place.
The utility model is further arranged to:Between the source of sewage pond and treating column and treating column and the first mud sump it Between be equipped with the first water pump, the first water pump loong shunt has the second water pump.
By using above-mentioned technical proposal, by between source of sewage pond and treating column and treating column and the first mud sump between The first water pump is equipped with, the first water pump loong shunt has the second water pump, it is emergent to open when the second water pump can carry out emergent Open, and when maintenance, it is interim to open.
The utility model is further arranged to:Described treating column number at least one.
By using above-mentioned technical proposal, by using above-mentioned technical proposal, treating column number at least one, by treatment The increase of the quantity of tower, it is ensured that the amount in source of sewage pond, and when operation, treating column it is emergent, it is to avoid single treating column is damaged Bad influence overall work.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Reference in figure:1st, source of sewage pond;11st, the first mud sump;12nd, mud tank is pressed;13rd, plate and frame filter press;101st, One water pump;102nd, the second water pump;2nd, treating column;21st, steam power plant;22nd, sewerage network;3rd, solvent cell;4th, clear water reserviors, 5, regulating reservoir.
Specific embodiment
Reference picture 1 is described further to the utility model embodiment.
A kind of beans waste water primary treatment system, including source of sewage pond 1 and regulating reservoir 5, described one end of source of sewage pond 1 are in parallel There is treating column 2, the clear water reserviors 4 being further connected with for sewage after storage treatment, institute are connected to outside solvent cell 3, treating column 2 on treating column 2 State the one end of clear water reserviors 4 and be connected with regulating reservoir 5, the bottom of the treating column 2 is connected to the first mud sump 11, is provided with by the first mud sump 11 The pressure mud tank 12 being connected with the first mud sump 11, plate and frame filter press 13, the plate and frame filter press 13 are provided with by the pressure mud tank 12 Connected by water pipe and pressure mud tank 12 between.
By using above-mentioned technical proposal, it is directly entered in treating column 2 by by the sewage in source of sewage pond 1, by molten Solvent ferrous sulfate and quick lime in agent pond 3 are put into well mixed, and acid neutralization can be carried out by quick lime, and sulfuric acid is sub- Iron flocculant the most widest, can cause that internal sewage fast hierarchical, the sewage after being divided into, upper strata clear water are put into clear water In pond 4, the first mud sump 11 is connected to by the bottom for the treatment of column 2, is provided with what is be connected with the first mud sump 11 by the first mud sump 11 Pressure mud tank 12, is provided with plate and frame filter press 13 by the pressure mud tank 12, water is passed through between the plate and frame filter press 13 and pressure mud tank 12 Pipe is connected, it is ensured that is deposited in the mud of the bottom for the treatment of column 2, can be fully used, plate and frame filter press is pressed into by pressing mud tank 12 13 are extruded, and the mud after squeezing directly arrives the burning electricity generation of steam power plant 21, and the clear water in the mud of extrusion is at sewerage network 22 Reason, carries out secondary utilization, the completeness for sufficiently ensureing the secondary utilization of resource and utilizing.
The utility model is further arranged to:The number of the solvent cell 3 is two, and one of them is filled with iron sulfite, Another filling lime.
By using above-mentioned technical proposal, the number of solvent cell 3 is two, can be filled with iron sulfite with one of them, separately Outer filling lime, is easy to place.
The utility model is further arranged to:With the heavy mud for the treatment of column 2 and first between the source of sewage pond 1 and treating column 2 The first water pump 101 is equipped between pond 11, first water pump 101 loong shunt has the second water pump 102.
By using above-mentioned technical proposal, by between source of sewage pond 1 and treating column 2 and the mud sump for the treatment of column 2 and first The first water pump 101 is equipped between 11, first water pump 101 loong shunt has the second water pump 102, and the second water pump 102 can enter When row is emergent, emergency opening, and when maintenance, it is interim to open.
The utility model is further arranged to:The number at least one of the treating column 2.
By using above-mentioned technical proposal, by using above-mentioned technical proposal, number at least one for the treatment of column 2, by treatment The increase of the quantity of tower 2, it is ensured that the amount in source of sewage pond 1, and when operation, treating column 2 it is emergent, it is to avoid single treating column 2 damage influence overall work.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, the skill of this area Art personnel carry out common variations and alternatives in the range of technical solutions of the utility model and should be included in guarantor of the present utility model In the range of shield.

Claims (4)

1. a kind of beans waste water primary treatment system, including source of sewage pond and regulating reservoir, it is characterized in that:Source of sewage pond one end Treating column is parallel with, solvent cell is connected on treating column, the clear water reserviors of sewage after being processed for storage are further connected with outside treating column, it is described Clear water reserviors one end is connected with regulating reservoir, and the treatment tower bottom is connected to the first mud sump, is provided with heavy with first by the first mud sump The pressure mud tank of mud sump connection, is provided with plate and frame filter press by the pressure mud tank, water is passed through between the plate and frame filter press and pressure mud tank Pipe is connected.
2. a kind of beans waste water primary treatment system according to claim 1, it is characterized in that:The solvent cell number is two Individual, one of them is filled with iron sulfite, another filling lime.
3. a kind of beans waste water primary treatment system according to claim 2, it is characterized in that:The source of sewage pond and treatment The first water pump is equipped between tower and treating column and the first mud sump between, the first water pump loong shunt has the second water pump.
4. a kind of beans waste water primary treatment system according to claim 3, it is characterized in that:The treating column number is at least 1.
CN201621032366.8U 2016-08-31 2016-08-31 A kind of beans waste water primary treatment system Expired - Fee Related CN206279008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621032366.8U CN206279008U (en) 2016-08-31 2016-08-31 A kind of beans waste water primary treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621032366.8U CN206279008U (en) 2016-08-31 2016-08-31 A kind of beans waste water primary treatment system

Publications (1)

Publication Number Publication Date
CN206279008U true CN206279008U (en) 2017-06-27

Family

ID=59085606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621032366.8U Expired - Fee Related CN206279008U (en) 2016-08-31 2016-08-31 A kind of beans waste water primary treatment system

Country Status (1)

Country Link
CN (1) CN206279008U (en)

Similar Documents

Publication Publication Date Title
CN204779155U (en) Profile steel producing sewage treatment system
CN206256023U (en) A kind of domestic garbage treating system based on microwave cracking
CN207483395U (en) Environment-friendly type burning vaporising device gas well returns drain distillation processing system
CN206279008U (en) A kind of beans waste water primary treatment system
CN105951661A (en) Plain river water quality promoting system and method
CN204529426U (en) A kind of sewage water yield water temperature regulation device based on solar heating and thermo-electric generation
CN204342638U (en) A kind of sludge concentration desiccation press filteration system
CN206279044U (en) A kind of beans Waste Water Treatment
CN206198927U (en) Wet scrubber
CN203200136U (en) Remote-controlled solar sewage treatment device
CN204342639U (en) A kind of autoclave diaphragm formula plate-and-frame filter press
CN206219460U (en) Agricultural crop straw system fertilizer machine fermented waste fluid recycling mechanism
CN204193580U (en) A kind of heat supply sewage circular treatment equipment
CN207845183U (en) A kind of trade effluent centralized processor
CN205241270U (en) Sewage heating device
CN203346371U (en) Sludge resource utilization device
CN202786436U (en) Waste liquor recovery device
CN203790602U (en) Alcohol atmospheric distillation and waste-liquid concentration thermal coupling system of molasses materials
CN208933230U (en) A kind of sludge electromagnetism heat dehydration hydrolysis organic fertilizer equipment processed
CN101974410A (en) Five-stage anaerobic methane reactor
CN206392566U (en) Garbage disposal center
CN206940663U (en) Garbage, waste-water processing equipment
CN201282716Y (en) Canned orange in syrup production chain with secondary utilization of water resource
CN215143267U (en) Quasi-aerobic remediation system for refuse landfill
CN206008238U (en) A kind of wastewater recycling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

Termination date: 20190831

CF01 Termination of patent right due to non-payment of annual fee