CN206274343U - It is three phase combined idle to follow load box - Google Patents

It is three phase combined idle to follow load box Download PDF

Info

Publication number
CN206274343U
CN206274343U CN201621302233.8U CN201621302233U CN206274343U CN 206274343 U CN206274343 U CN 206274343U CN 201621302233 U CN201621302233 U CN 201621302233U CN 206274343 U CN206274343 U CN 206274343U
Authority
CN
China
Prior art keywords
load
idle
phase
follow
branch road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621302233.8U
Other languages
Chinese (zh)
Inventor
阮云鹏
洪志腾
陈勇刚
吴彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Fullde Electronics Co Ltd
Original Assignee
Guangdong Fullde Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Fullde Electronics Co Ltd filed Critical Guangdong Fullde Electronics Co Ltd
Priority to CN201621302233.8U priority Critical patent/CN206274343U/en
Application granted granted Critical
Publication of CN206274343U publication Critical patent/CN206274343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Electrical Variables (AREA)

Abstract

The utility model is related to marine generator technical field of measurement and test, it is particularly a kind of three phase combined idle to follow load box, including the idle follower being made up of control unit, relay, contactor, the active load of multiple difference gears and reactive load, control unit reactive load in real time according to needed for the load condition of default generator parameter and active load is calculated, controls the reactive load of respective notch to load according to required reactive load by relay and contactor;Also include forming Y-connection structure or triangular connection structure with three phase lines of generator output with the three-phase combining structure for being provided with controlling switch and three resistive modules, three resistive module suspension control switch controls.This is idle to follow load box without using high-power transformer to reach the test voltage of 690V, and cost is relatively low, at the same using idle follower before and after transformation adjust automatically reactive load, it is to avoid because of attachment structure change, power factor produces variation.

Description

It is three phase combined idle to follow load box
Technical field
The utility model is related to marine generator technical field of measurement and test, particularly a kind of three phase combined idle to follow load Case.
Background technology
Generating set is the power source of ship, and the only normal operation of generating set just can ensure that the safety boat of ship OK, and marine generator group often because fuel oil burn insufficient, piston, nozzle deposit carbon, cylinder body abrasion aggravation, overall efficiency The problems such as reduction, the underload failure of generating set is caused, and often just find that the performance of generating set occurs after failure generation Problem, so demand load case periodically carries out to generator band and carrying and testing.Because the generating voltage of generating set is generally required Test 390V and 690V, therefore traditional load box needs to dispose high-power transformer in load box input, so as to by 390V Generating voltage be lifted to 690V and tested, but high-power transformer is costly, is unfavorable for popularization and application.
The content of the invention
The purpose of this utility model is to solve weak point of the prior art, there is provided a kind of simple structure, low cost Three phase combined idle follow load box.
The purpose of this utility model is achieved through the following technical solutions:
There is provided it is a kind of it is three phase combined it is idle follow load box, be included in automatic power adjustment factor when accessing generator Idle follower, this is idle follower is by control unit, relay, contactor, the active load of multiple difference gears and idle Load is constituted, idle negative needed for control unit load condition calculating in real time according to default generator parameter and active load Carry, according to the shut-off that required reactive load passes through Control contactor, by the idle negative of contactor control respective notch It is loaded into going loading;Also include the three-phase combining structure electrically connected with generator output end, the three-phase combining structure is provided with control and opens Close and three resistive modules, three one end of resistive module power takings, three resistance from three phase lines of generator output respectively The equal suspension control switch control of the other end of module, so that three resistive modules form star with three phase lines of generator output Attachment structure or triangular connection structure.
Wherein, the controlling switch is provided with copper bar, and controlling switch is by copper bar three resistive modules away from three phase lines One end carry out short circuit, to form Y-connection structure.
Wherein, UPS electric supply installations are additionally provided with, the UPS electric supply installations include conventional power supply branch road, stand-by power supply branch road and Change-over switch, the idle follower from conventional power supply branch road or stand-by power supply branch road power taking, when conventional power supply branch road is powered off Change-over switch switches to stand-by power supply branch road and powers.
Wherein, change-over switch transmission electric signal notifies control unit to recalculate and load idle negative in handoff procedure Carry.
Wherein, the also blower fan including being lowered the temperature to idle follower.
Wherein, blower fan from it is conventional power supply branch road or stand-by power supply branch road power taking.
Wherein, also including communication module, control unit carries out communication and is connected by communication module and long-range host computer.
Wherein, control unit is PLC.
Wherein, also including load monitoring unit, control unit passes through load monitoring unit real-time monitoring active load and nothing The load condition of work(load.
The utility model controls three resistive modules to form star with three phase lines that generator is exported by controlling switch Attachment structure or triangular connection structure, the output crest voltage of generator isWhen connection is that triangle connects During binding structure, the phase voltage in three phase lines of generator output is equal to line voltage, and line current is equal toPhase current again, because This test voltage is 390V;When connection is star-like attachment structure, three-phase electricity is confluxed by intermediate contact, and the three of generator output Line voltage in root phase line is equal toPhase voltage, line current is equal to phase current, and the test voltage for now obtaining isCompared with prior art, it is originally idle to follow load box without using high-power transformer to reach 690V's Test voltage, simple structure and cost is relatively low.Reactive load is automatically adjusted before and after transformation using idle follower simultaneously to load, Avoid the power factor generation variation because of attachment structure change (output resistance of three-phase combining structure changes).
Brief description of the drawings
Utility model is described further using accompanying drawing, but embodiment in accompanying drawing is not constituted to of the present utility model What is limited, for one of ordinary skill in the art, on the premise of not paying creative work, can also be according to the following drawings Obtain other accompanying drawings.
Fig. 1 is the three phase combined idle system block diagram for following load box.
Fig. 2 is the three phase combined idle circuit diagram for following load box.
Fig. 3 is the schematic diagram of the three phase combined idle Y-connection structure for following load box.
Fig. 4 is the schematic diagram of the three phase combined idle triangular connection structure for following load box.
Specific embodiment
It is as shown in Figure 1 it is three phase combined idle follow load box, including by control unit 11, relay, contactor, many The idle follower that the active load 12 and reactive load 13 of individual different gears are constituted, wherein control unit 11 is made up of PLC, Reactive loads 13 of the PLC according to needed for the load condition of the parameter of default generator 3 and active load 12 is calculated, according to required The shut-off that reactive load 13 passes through Control contactor, is added by the reactive load 13 of contactor control respective notch Carry.Specifically, the parameter (including rated frequency, power factor etc.) of generator 3, operationally, PLC are pre-set on PLC Required reactive load 13 is calculated according to the load condition of active load 12 and the power factor for setting in real time, then by after The shut-off of electrical equipment control contactor, by the contactor matching loading correspondence gear of reactive load 13.It should be noted that this it is idle with Active load 12 and reactive load 13 are arranged to different gears with load box, are set with by active load 12 and reactive load 13 Technical scheme into equal gear is compared, and numerical value range of choice is bigger in the case of identical load quantity, and adjacent values are more flat It is sliding, so that idle follow load box application more flexible.With reference to Fig. 2, this is idle to follow load box also including defeated with generator 3 Go out the three-phase combining structure 7 of end electrical connection, the three-phase combining structure 7 is provided with controlling switch and three resistive modules, three resistance The power taking, the equal suspension control switch of the other end of three resistive modules from three phase lines of the output of generator 3 respectively of one end of module Control, so that three phase lines that three resistive modules are exported with generator 3 form Y-connection structure or triangle is connected knot Structure.Further, the controlling switch is provided with the copper bar 71 of 690V connection/390V disconnections, and controlling switch passes through the copper bar 71 Three resistive modules carry out short circuit away from three one end of phase line, to form Y-connection structure.The utility model passes through star three Dexterously be interchangeable for 390V and 690V voltages by angle conversion, needs not move through transformer.With reference to Fig. 3 and Fig. 4, specifically, when The copper bar 72 that 390V connection/690V disconnect is closed, and R55 these three resistive modules are end to end, and three-phase electricity passes through these three Contact is operated.It is at this time the circuit of triangular form connection, is equivalent to phase voltage equal to line voltage, line current is equal to Phase current again.Now the test voltage of generator 3 is 390V, and the voltage for entering into the inside of copper bar 72 is also 390V.Work as 690V The copper bar 71 that connection/390V disconnects is closed, and the tail end of R55 these three resistive modules all connects, and three-phase electricity is connect by this Point is confluxed.It is at this time the circuit of wye connection, is equivalent to line voltage and is equal toPhase voltage again, line current is equal to Phase current.Now the test voltage of generator 3 is 390V, and the voltage for entering into the inside of copper bar 71 will be raised to 690V.With it is existing Technology is compared, and this is idle to follow load box without using high-power transformer to reach 690 test voltage, simple structure and into This is relatively low.Simultaneously because the connection of three-phase combining structure 7 changes before and after transformation, its external output resistance also becomes It is dynamic, now idle follower again according to the parameter of default generator 3, the load condition of active load 12 and attachment structure not With recalculating required reactive load 13 and controlling the reactive load 13 of different gears to be loaded, so that before and after transformation Power factor keeps constant.
Further, originally idle to follow load box to be additionally provided with UPS electric supply installations, the UPS electric supply installations include conventional confession Electric branch road 21, stand-by power supply branch road 22 and change-over switch 23, the idle follower from it is conventional power supply branch road 21 or stand-by power supply The power taking of branch road 22, after conventional power supply branch road 21 (bank electricity) is de-energized suddenly, change-over switch 23 is transformed into stand-by power supply branch road 22 (ship electricity) is powered, it is to avoid the unexpected dead electricity of load box causes the damage that generator 3 occurs.Preferably, changed in handoff procedure Switch 23 sends electric signal and notifies that PLC is recalculated and loaded reactive load 13, because the induction reactance in each supply line is different, control Unit processed 11 recalculated in feeder circuit handoff procedure and control multiple difference gears reactive load 13 load condition, It is real to realize taking over seamlessly so as to ensure that power factor is unaffected in handoff procedure.
Further, this it is idle follow load box to be additionally provided with communication module 51, PLC by communication module 51 with it is long-range on Position machine 52 carries out communication connection.PLC, by automatically switching to distance control mode, makes work people when being communicated with long-range host computer 52 The test that member can also realize to generator 3 on the coast, realize by the spot or the long-range software of host computer 52 using reactive power from It is dynamic to follow function.
Further, it is originally idle to follow load box also including the blower fan 4 lowered the temperature to idle follower, so as to avoid nothing Work(follows load box operationally to overheat and damage.Preferably, blower fan 4 takes from conventional power supply branch road 21 or stand-by power supply branch road 22 Electricity, so as to ensure the lasting sex work of blower fan 4.
Further, originally idle to follow load box also including load monitoring unit 6, control unit 11 passes through load monitoring list Unit 6 monitors the load condition of active load 12 and reactive load 13, and PLC compares the wattful power read from load monitoring unit 6 Rate, reactive power, power factor, and calculated according to comparative result feedback adjustment reactive power, it is small until drawing actual deviation degree Power factor.Citing:It is 0.8 to set the power factor of generator 3, and after loading 100KW active loads 12, PLC will add automatically Carry the reactive load 13 of 75KVar.Then the measurement data of load monitoring unit 6 is read, whether compares the power factor after loading It is 0.8.If there is deviation, PLC can accordingly be added and subtracted according to deviation to the gear of reactive load 13, go directly measurement power because Son reaches 0.8.
Finally it should be noted that above example is only used to illustrate the technical solution of the utility model, rather than to this reality With the limitation of novel protected scope, although being explained to the utility model with reference to preferred embodiment, this area it is general It is logical it will be appreciated by the skilled person that can be modified to the technical solution of the utility model or equivalent, without deviating from this The spirit and scope of utility model technical scheme.

Claims (9)

1. it is three phase combined it is idle follow load box, be included in access generator when the idle of the automatic power adjustment factor follow Device, it is characterised in that:The idle follower by control unit, relay, contactor, the active load of multiple difference gears and Reactive load is constituted, and control unit load condition in real time according to default generator parameter and active load calculates required nothing Work(is loaded, and according to the shut-off that required reactive load passes through Control contactor, the nothing of respective notch is controlled by contactor Work(load is loaded;
Also include the three-phase combining structure electrically connected with generator output end, the three-phase combining structure is provided with controlling switch and three Resistive module, the power takings from three phase lines of generator output respectively of three one end of resistive module, three resistive modules it is another The equal suspension control switch control in one end, so that three resistive modules form Y-connection structure with three phase lines of generator output Or triangular connection structure.
It is 2. as claimed in claim 1 three phase combined idle to follow load box, it is characterised in that:The controlling switch is provided with copper Row, three resistive modules are carried out short circuit by controlling switch by copper bar away from three one end of phase line, to form Y-connection knot Structure.
It is 3. as claimed in claim 1 three phase combined idle to follow load box, it is characterised in that:UPS is additionally provided with to power dress Put, the UPS electric supply installations include conventional power supply branch road, stand-by power supply branch road and change-over switch, the idle follower is from conventional Power supply branch road or stand-by power supply branch road power taking, when conventional power supply branch road is powered off, change-over switch switches to stand-by power supply branch road and supplies Electricity.
It is 4. as claimed in claim 3 three phase combined idle to follow load box, it is characterised in that:Changed in handoff procedure and opened Close transmission electric signal and notify that control unit is recalculated and loads reactive load.
It is 5. as claimed in claim 4 three phase combined idle to follow load box, it is characterised in that:Also include to idle follower The blower fan lowered the temperature.
It is 6. as claimed in claim 5 three phase combined idle to follow load box, it is characterised in that:Blower fan is from conventional power supply branch road Or stand-by power supply branch road power taking.
It is 7. as claimed in claim 1 three phase combined idle to follow load box, it is characterised in that:Also include communication module, control Unit processed carries out communication and is connected by communication module and long-range host computer.
It is 8. as claimed in claim 1 three phase combined idle to follow load box, it is characterised in that:Control unit is PLC.
9. three phase combined idle as described in claim 1 or 3 follows load box, it is characterised in that:Also include load monitoring Unit, control unit is by load monitoring unit real-time monitoring active load and the load condition of reactive load.
CN201621302233.8U 2016-11-30 2016-11-30 It is three phase combined idle to follow load box Active CN206274343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621302233.8U CN206274343U (en) 2016-11-30 2016-11-30 It is three phase combined idle to follow load box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621302233.8U CN206274343U (en) 2016-11-30 2016-11-30 It is three phase combined idle to follow load box

Publications (1)

Publication Number Publication Date
CN206274343U true CN206274343U (en) 2017-06-23

Family

ID=59062622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621302233.8U Active CN206274343U (en) 2016-11-30 2016-11-30 It is three phase combined idle to follow load box

Country Status (1)

Country Link
CN (1) CN206274343U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329085A (en) * 2017-08-10 2017-11-07 中国船舶电站设备有限公司 Load box major loop star is connected switching control system and computational methods with triangle
CN109324289A (en) * 2018-10-31 2019-02-12 湖南福德电气有限公司 For testing the high-voltage load box of alternating current-direct current output object
CN111812539A (en) * 2020-07-20 2020-10-23 中国船舶电站设备有限公司 Ship power supply remote test system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107329085A (en) * 2017-08-10 2017-11-07 中国船舶电站设备有限公司 Load box major loop star is connected switching control system and computational methods with triangle
CN109324289A (en) * 2018-10-31 2019-02-12 湖南福德电气有限公司 For testing the high-voltage load box of alternating current-direct current output object
CN111812539A (en) * 2020-07-20 2020-10-23 中国船舶电站设备有限公司 Ship power supply remote test system and method

Similar Documents

Publication Publication Date Title
CN104659805B (en) Method for operating a wind farm
CN206274343U (en) It is three phase combined idle to follow load box
CN105406580B (en) A kind of electric power system and method
CN105720595A (en) Three-phase load unbalance adjustment apparatus
CN204205598U (en) System saving electricity optimizes the automatic regulation voltage pressure stabilizing device of electric energy and equipment group thereof
CN107732894A (en) A kind of control method of three end DC transmission system and its current conversion station
CN112005460A (en) Power supply equipment
CN103078397A (en) Shore-ship power supply method
CN114530814B (en) Direct-current deicing system for overhead contact system of electrified railway and control method thereof
CN111525606A (en) Double closed loop control-based ship shore-based power supply system seamless grid-connection control method
CN107370144A (en) A kind of loaded self-adaptive submarine observation network constant-current supply system
CN110535139A (en) A kind of wide cut regulator
CN204886200U (en) Distribution transformer unbalanced three phase current detection compensation arrangement
CN206274342U (en) Transformation load box with power factor compensation
CN110635472B (en) Method for increasing carrying capacity of three-phase energy storage inversion system and three-phase energy storage inversion system applying same
CN205811547U (en) A kind of automatic voltage bascule
CN202817886U (en) Uninterruptible power source
WO2023115835A1 (en) Power distribution unit
CN107394801B (en) Station transformer unbalance current treatment device based on three-phase four-wire system three-level SVG
CN109888787A (en) Distribution network load switches decreasing loss system
CN113644686B (en) Energy feedback system and control method
CN212586509U (en) Energy feedback type load testing system
CN206274341U (en) Carry the idle of UPS and follow load box
CN106662073B (en) For coordinating the method and system of the control to wind power plant during disconnecting with utility network
CN105207238B (en) A kind of automatic Load method of adjustment for three-phrase burden balance

Legal Events

Date Code Title Description
GR01 Patent grant