CN206273959U - The ruggedized construction of purlin - Google Patents
The ruggedized construction of purlin Download PDFInfo
- Publication number
- CN206273959U CN206273959U CN201621176935.6U CN201621176935U CN206273959U CN 206273959 U CN206273959 U CN 206273959U CN 201621176935 U CN201621176935 U CN 201621176935U CN 206273959 U CN206273959 U CN 206273959U
- Authority
- CN
- China
- Prior art keywords
- purlins
- pin
- purlin
- ruggedized construction
- brace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of ruggedized construction of purlin, including multiple up and down to drawing tie rod, centre Pin reinforcement assemblies and side Pin reinforcement assemblies, each described two ends up and down to drawing tie rod is connected on the web of adjacent purlin, and each is described up and down to drawing the bottom wing listrium of another purlin in adjacent purlin of top flange plate and the other end of a purlin of the one end in adjacent purlin of tie rod;The middle Pin reinforcement assemblies are connected with the bottom wing listrium of the multiple middle Pin purlins respectively and the two ends of the middle Pin reinforcement assemblies are oppositely arranged in the orientation of multiple purlins;Side Pin reinforcement assemblies web respectively with the outside Pin purlins, the bottom wing listrium of the inner edge Pin purlins and the middle Pin reinforcement assemblies are connected, and the two ends of the side Pin reinforcement assemblies are staggered setting along the length direction of the purlin.Ruggedized construction according to purlin of the present utility model has the advantages that good stability, high capacity, simple, effect is significant of constructing.
Description
Technical field
The utility model is related to construction engineering technical field, more particularly, to a kind of ruggedized construction of purlin.
Background technology
The lateral easy unstability of light-steel roofing purlin, is solved in Practical Project by setting tie rod between each Pin purlins
The certainly stable problem of purlin.Lateral support point of the tie rod as purlin is assumed in traditional design, while assuming to consider each
Interaction between Pin purlins, individually takes a Pin purlins and is calculated.However, when the setting of tie rod is unsatisfactory for two above vacation
When determining design conditions, traditional computational methods can produce larger error.In correlation technique, by the section for increasing list Pin purlins
Area improves the bearing capacity of purlin, and construct cumbersome and effect is limited.
Utility model content
The utility model is intended at least solve one of technical problem present in prior art.Therefore, the utility model is carried
Go out a kind of ruggedized construction of purlin, there is the ruggedized construction of the purlin good stability, high capacity, simple, effect of constructing to show
The advantage of work.
The ruggedized construction of the purlin according to the utility model embodiment, the purlin for it is multiple and in the horizontal direction it is parallel simultaneously
Interval setting, is outside Pin purlins positioned at outermost two purlins, respectively with two in the orientation of multiple purlins
Two adjacent purlins of the individual outside Pin purlins are inner edge Pin purlins, the multiple purlins between two inner edge Pin purlins
Bar is centre Pin purlins, and each described purlin includes top flange plate, bottom wing listrium and is connected to the top flange plate and institute respectively
State the web between bottom wing listrium, the top flange plate of each purlin away from the web one end and bottom wing listrium it is remote
Crimping is respectively equipped with from one end of the web, the ruggedized construction includes:Multiple is up and down to drawing tie rod, and each is described right up and down
The two ends of tie rod are drawn to be connected on the web of adjacent purlin, each is described up and down to drawing one end of tie rod adjacent to adjacent purlin
The bottom wing listrium of another purlin of the top flange plate and the other end of a purlin in bar in adjacent purlin;Middle Pin adds
Gu component, the middle Pin reinforcement assemblies are connected with the bottom wing listrium of the multiple middle Pin purlins respectively and the middle Pin adds
Gu the two ends of component are oppositely arranged in the orientation of multiple purlins;Side Pin reinforcement assemblies, the side Pin reinforcement assemblies
Web respectively with the outside Pin purlins, the bottom wing listrium of the inner edge Pin purlins and the middle Pin reinforcement assemblies are connected,
Stagger setting along the length direction of the purlin at the two ends of the side Pin reinforcement assemblies.
The ruggedized construction of the purlin according to the utility model embodiment, using middle Pin reinforcement assemblies and side Pin reinforcement assemblies
Multiple purlins is formed an overall structure for stabilization, improve the bearing capacity of component, and it is simple to construct, effect is significant.
In addition, the ruggedized construction of the purlin according to the utility model embodiment also has following additional technical characteristic:
According to some embodiments of the present utility model, the middle Pin purlins are multiple, the middle Pin reinforcement assemblies bag
The bottom brace tensioning apparatus of multiple bottom braces and the adjacent bottom brace of connection is included, multiple bottom braces are connected to multiple
On the bottom wing listrium of the middle Pin purlins.
Alternatively, relative one end of the adjacent bottom brace is configured with reverse external screw thread, the bottom brace respectively
The two ends of tight device are configured with the reverse internal thread coordinated with the reverse external screw thread respectively.
In some embodiments of the present utility model, the bottom brace is by the first connector and the middle Pin purlins
Bottom wing listrium is connected.
Further, first connector includes the first base plate and is connected to the opposite sides of first base plate
Two first side plates on edge, by being weldingly connected between the bottom brace and first base plate, first base plate with it is described
Between the bottom wing listrium of middle Pin purlins, between first side plate and the web of the middle Pin purlins and another
It is connected by self-tapping screw respectively between the crimping of the bottom wing listrium of first side plate and the middle Pin purlins.
According to some embodiments of the present utility model, the side Pin reinforcement assemblies include the first batter brace, the second batter brace
And the batter brace tensioning apparatus of one end of one end and second batter brace of connection first batter brace, described second is oblique
The other end of tie rod be connected with the web of the outside Pin purlins and second batter brace two ends along the purlin length
Direction is staggered setting, the other end of first batter brace respectively with the middle Pin reinforcement assemblies and the inner edge Pin purlins
Bottom wing listrium is connected and the two ends of first batter brace are staggered setting along the length direction of the purlin.
Alternatively, described one end of described one end of first batter brace and second batter brace constructs reversely respectively
External screw thread, the two ends of the batter brace tensioning apparatus are configured with the reverse interior spiral shell coordinated with the reverse external screw thread respectively
Line.
Advantageously, first batter brace is divided into first level portion and the first rake, described first along its length
Horizontal part is connected and the first level portion with the bottom wing listrium of the middle Pin reinforcement assemblies and the inner edge Pin purlins respectively
Two ends be oppositely arranged in the orientation of multiple purlins, first rake and the batter brace tensioning apparatus phase
Even, first rake be obliquely installed relative to horizontal direction and first rake two ends along the purlin length
Direction is staggered setting.
Alternatively, second batter brace is straight-bar and is obliquely installed relative to horizontal direction.
In some specific embodiments of the present utility model, the other end of first batter brace is by the second connection
Part is connected with the bottom wing listrium of the inner edge Pin purlins.
Further, second connector includes the second base plate and is connected to the opposite sides of second base plate
Two second side plates on edge, by being weldingly connected between the other end of first batter brace and second base plate, institute
State between the bottom wing listrium of the second base plate and the inner edge Pin purlins, the abdomen of second side plate and the inner edge Pin purlins
Between plate and another described second side plate and the inner edge Pin purlins bottom wing listrium crimping between respectively pass through self tapping
Screw is connected.
In some embodiments of the present utility model, the other end of second batter brace by the 3rd connector with
The web of the outside Pin purlins is connected.
Further, the 3rd connector includes the first connecting plate and the second connecting plate that are connected with each other, described second
By being weldingly connected between the other end of batter brace and first connecting plate, second connecting plate and the outside Pin
Between the web of purlin by threaded fastener be connected, in the horizontal plane, the other end of second batter brace with it is described
The edge of the first connecting plate is parallel.
In alternative embodiment of the present utility model, the other end of first batter brace passes through transition tensioning apparatus
It is connected with the middle Pin reinforcement assemblies.
In some specific embodiments of the present utility model, the side Pin reinforcement assemblies also include support frame, the support
The two ends of frame be oppositely arranged in the orientation of multiple purlins and respectively with the web of the outside Pin purlins and described
The web of inner edge Pin purlins is connected.
Further, support frame as described above include upper assistant support, lower assistant support and be connected to the upper assistant support and it is described under
The web of the main support between assistant support, the web of the outside Pin purlins and the inner edge Pin purlins is respectively by the 4th connection
Part is connected with the main support of support frame as described above.
Alternatively, the 4th connector includes vertically disposed first side plate and the second side plate, the master of support frame as described above
By being weldingly connected between first side plate of support and the 4th connector, the web and the inner edge of the outside Pin purlins
The web of Pin purlins is connected by self-tapping screw with the second side plate of the 4th connector respectively.
According to some embodiments of the present utility model, between the ruggedized construction is the multiple and length direction along the purlin
Every setting, in the horizontal plane, orientation along the multiple purlins of the adjacent ruggedized construction on multiple purlins
The central axis of orientation is symmetrical arranged.
Advantageously, each described ruggedized construction also includes the level for balancing the pulling force for eliminating the side Pin reinforcement assemblies
The side Pin self-balancing pull bars of component, it is described while Pin self-balancings pull bar with it is described while Pin reinforcement assemblies be connected and adjacent described reinforce knot
The side Pin self-balancings pull bar of structure is connected, and the length direction of the side Pin self-balancing pull bars is parallel with the length direction of the purlin.
Further, the side Pin self-balancings pull bar of the adjacent ruggedized construction is connected by pull bar tensioning apparatus.
Alternatively, it is described while Pin self-balancings pull bar by the 5th connector with it is described while Pin reinforcement assemblies be connected.
Further, the 5th connector includes support plate, and the support plate is provided with perforation, the perforation be closed loop hole or
Open loop hole, the side Pin reinforcement assemblies pass through the perforation, by welding between the side Pin self-balancings pull bar and the support plate
It is connected.
Advantageously, the 5th connector also includes two clamp nuts, and two clamp nut difference screw threads coordinate
The support plate is clamped on the side Pin reinforcement assemblies and from the both sides of the support plate.
Alternatively, the Pin reinforcement assemblies when Pin self-balancing pull bars clamp described by ends bent with the side Pin
Reinforcement assembly is connected.
Additional aspect of the present utility model and advantage will be set forth in part in the description, partly by from following description
In become obvious, or by it is of the present utility model practice recognize.
Brief description of the drawings
Fig. 1 is the partial structural diagram of the ruggedized construction of the purlin according to the utility model embodiment;
Fig. 2 is schematic cross-sectional views of the Fig. 1 along line A-A;
Fig. 3 is the partial structural diagram of the ruggedized construction of the purlin according to the utility model embodiment;
Fig. 4 is schematic cross-sectional views of the Fig. 3 along line B-B;
Fig. 5 is schematic cross-sectional views of the Fig. 3 along line C-C;
Fig. 6 is schematic cross-sectional views of the Fig. 5 along line D-D;
Fig. 7 is the knot of first connector (the second connector) of the ruggedized construction of the purlin according to the utility model embodiment
Structure schematic diagram;
Fig. 8 is the knot of first connector (the second connector) of the ruggedized construction of the purlin according to the utility model embodiment
Structure schematic diagram;
Fig. 9 is the structural representation of the 3rd connector of the ruggedized construction of the purlin according to the utility model embodiment;
Figure 10 is the structural representation of the 3rd connector of the ruggedized construction of the purlin according to the utility model embodiment;
Figure 11 is the structural representation of the 4th connector of the ruggedized construction of the purlin according to the utility model embodiment;
Figure 12 is the structural representation of the 4th connector of the ruggedized construction of the purlin according to the utility model embodiment;
Figure 13 is the structural representation of the 5th connector of the ruggedized construction of the purlin according to the utility model embodiment;
Figure 14 is the knot of the 5th connector of the ruggedized construction of the purlin according to an alternative embodiment of the present utility model
Structure schematic diagram;
Figure 15 is that the side Pin self-balancings of the ruggedized construction of the purlin according to another alternative embodiment of the present utility model are drawn
The structural representation of bar.
Reference:
The ruggedized construction 1000 of purlin,
Up and down to drawing tie rod 1100,
Middle Pin reinforcement assemblies 1200, bottom brace 1210, bottom brace tensioning apparatus 1220,
Side Pin reinforcement assembly 1300,
First batter brace 1310, first level portion 1311, the first rake 1313,
Second batter brace 1320,
Batter brace tensioning apparatus 1330,
Support frame 1340, upper assistant support 1341, lower assistant support 1342, main support 1343,
First connector 1400, self-tapping screw 1401, the first base plate 1410, the first side plate 1420,
Second connector 1500, the second base plate 1510, the second side plate 1520,
3rd connector 1600, threaded fastener 1601, the first connecting plate 1610, the second connecting plate 1620,
Side Pin self-balancings pull bar 1700,
4th connector 1800, the first side plate 1810, the second side plate 1820,
5th connector 1900, support plate 1910, perforation 1911,
Purlin 2000, outside Pin purlin 2001, inner edge Pin purlins 2002, middle Pin purlins 2003, top flange plate 2100, under
Flange plate 2200, web 2300,
Pull bar tensioning apparatus 3000.
Specific embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein ad initio
Same or similar element or element with same or like function are represented to same or similar label eventually.Below by ginseng
The embodiment for examining Description of Drawings is exemplary, is only used for explaining the utility model, and it is not intended that to of the present utility model
Limitation.
In description of the present utility model, it is to be understood that term " " center ", " length ", " on ", D score, " preceding ",
" afterwards ", the orientation of the instruction such as "left", "right", " vertical ", " level ", " interior ", " outward ", " clockwise ", " counterclockwise " or position are closed
System is, based on orientation shown in the drawings or position relationship, to be for only for ease of description the utility model and simplify description, rather than
Indicate or imply signified device or element and must have specific orientation, with specific azimuth configuration and operation, therefore can not
It is interpreted as to limitation of the present utility model.Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that referring to
Show or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " are defined
Feature can express or implicitly include one or more this feature.In description of the present utility model, unless separately
It is described, " multiple " is meant that two or more.
The application is based on what inventor made to the discovery of following facts and problem and understanding:
The lateral easy unstability of light-steel roofing purlin, is solved in Practical Project by setting tie rod between each Pin purlins
The certainly stable problem of purlin.Lateral support point of the tie rod as purlin is assumed in traditional design, while assuming to consider each
Interaction between Pin purlins, individually takes a Pin purlins and is calculated.However, when the setting of tie rod is unsatisfactory for two above vacation
When determining design conditions, traditional computational methods can produce larger error.
For example, in Practical Project set individual layer up and down to draw tie rod (that is, tie rod one end connect a Pin purlins web and
The top flange plate of the neighbouring purlin, the other end of tie rod connects the web of adjacent purlin and the lower flange of the neighbouring adjacent purlin
Plate) be then unsatisfactory for two above assume design conditions, now should not code requirement formula purlin is checked.Meanwhile, it is limited
When meta analysis shows to set tie rod to drawing up and down, easily there is too early unstability in purlin, and the bearing capacity of purlin is far below proper calculation
Value.
Accordingly, it would be desirable to be reinforced to purlin, to improve the stability and bearing capacity of purlin, and traditional ruggedized construction is equal
It is the reinforcing based on purlin component level, typically by the bearing capacity for increasing the area of section of list Pin purlins to improve purlin, applies
Work is cumbersome and effect is limited.
Therefore, the utility model proposes a kind of good stability, high capacity, construction it is simple, the purlin of effect is significant plus
Fixing structure 1000.
The ruggedized construction 1000 of the purlin according to the utility model embodiment is described below with reference to Fig. 1-Figure 15.
As shown in Fig. 1-Figure 15, the ruggedized construction 1000 of the purlin according to the utility model embodiment, including up and down to drawing
Tie rod 1100, centre Pin reinforcement assembly 1200 and side Pin reinforcement assembly 1300.
Specifically, purlin 2000 is multiple, and multiple purlins 2000 be arranged in parallel in the horizontal direction, and multiple purlins 2000
It is spaced apart from each other in the horizontal direction.Wherein, in the orientation of multiple purlins 2000, positioned at outermost two purlins
2000 is outside Pin purlin 2001, is respectively inner edge Pin purlins with two two adjacent purlins 2000 of outside Pin purlins 2001
2002, multiple purlins 2000 between two inner edge Pin purlins 2002 are centre Pin purlin 2003,2000 points of each purlin
Bao Kuo not top flange plate 2100, bottom wing listrium 2200 and the web that is connected between top flange plate 2100 and bottom wing listrium 2200
2300, top flange plate 2100 sets away from one end of web 2300 and one end away from web 2300 of bottom wing listrium 2200 respectively
There is crimping.For example, the length direction of each purlin 2000 is oriented in left-right direction, multiple purlins 2000 are arranged along the longitudinal direction,
It is outside Pin purlin 2001 positioned at the most purlin 2000 of front side and positioned at the purlin 2000 of most rear side.
It should be noted that the cross section that purlin 2000 is illustrate only in accompanying drawing is the situation of " C " shape, i.e. purlin 2000
Top flange plate 2100 and bottom wing listrium 2200 respectively by web 2300 two ends towards identical direction extend, the utility model
The ruggedized construction 1000 of purlin to be equally applicable to the cross section of purlin 2000 be the situation of Z-shaped, for example, purlin 2000 is upper
Flange plate 2100 and bottom wing listrium 2200 are extended in the opposite direction by the two ends of web 2300 respectively.
It is up and down multiple to drawing tie rod 1100, each two ends up and down to drawing tie rod 1100 is connected to adjacent purlin
On 2000 web 2300, and each is up and down to drawing a purlin 2000 of the one end of tie rod 1100 in adjacent purlin 2000
Top flange plate 2100, each is up and down to drawing another purlin 2000 in adjacent purlin 2000 of the other end of tie rod 1100
Bottom wing listrium 2200.For example, each up and down to draw the front end of tie rod 1100 in adjacent purlin 2000 positioned at front side
The top flange plate 2100 of purlin 2000, the bottom wing listrium of purlin 2000 positioned at rear side of the rear end in adjacent purlin 2000
2200, i.e. each front end up and down to drawing tie rod 1100 is located at rear end top.
Bottom wing listrium 2200 of the middle Pin reinforcement assemblies 1200 respectively with Pin purlins 2003 in the middle of multiple is connected, and centre Pin
The two ends of reinforcement assembly 1200 are oppositely arranged in the orientation of multiple purlins 2000, for example, centre Pin reinforcement assembly 1200
Projection in the horizontal plane overlaps with the projection up and down to drawing tie rod 1100 in the horizontal plane.Here, middle Pin reinforcement assemblies
1200 two ends are oppositely arranged the two ends company for referring to middle Pin reinforcement assemblies 1200 in the orientation of multiple purlins 2000
The orientation for being oriented parallel to multiple purlins 2000 of line, for example, the front end of centre Pin reinforcement assembly 1200 with rear end preceding
It is relative in rear direction.
Web 2300, the lower flange of inner edge Pin purlins 2002 respectively with outside Pin purlin 2001 of side Pin reinforcement assembly 1300
Plate 2200 is connected with centre Pin reinforcement assembly 1200, and the two ends of side Pin reinforcement assembly 1300 are staggered along the length direction of purlin 2000
Set.In this way, the pulling force of middle Pin reinforcement assemblies 1200 to be transferred to side Pin reinforcement assembly 1300 branch of outside Pin purlin 2001
Seat, so as to improve the stability of purlin 2000.Here, the two ends of side Pin reinforcement assemblies 1300 are wrong along the length direction of purlin 2000
The direction for opening up the line for putting the two ends for referring to side Pin reinforcement assembly 1300 is not parallel with the length direction of purlin 2000, example
Such as, the front end of side Pin reinforcement assemblies 1300 is staggered in the lateral direction with rear end.
The ruggedized construction 1000 of the purlin according to the utility model embodiment, using middle Pin reinforcement assemblies 1200 and side Pin
Reinforcement assembly 1300 makes multiple purlins 2000 form an overall structure for stabilization, improves the bearing capacity of component, and reinforce
Process need not remove existing structure component, not have any destruction to roofing, and construction is simple, effect is significant.
According to some embodiments of the present utility model, as depicted in figs. 1 and 2, middle Pin purlins 2003 are multiple, middle Pin
Reinforcement assembly 1200 includes the bottom brace tensioning apparatus 1220 of multiple bottom braces 1210 and the adjacent bottom brace 1210 of connection, under multiple
Tie rod 1210 is connected in the middle of multiple on the bottom wing listrium 2200 of Pin purlins 2003, so that beneficial to the carrying for improving component
Power.
Alternatively, bottom brace tensioning apparatus 1220 can be screw rod connector;Or, as depicted in figs. 1 and 2, bottom brace
Tensioning apparatus 1220 can also be flower basket bolt, wherein, the length of the threaded portion for being screwed into flower basket bolt of bottom brace 1210 is not
Tensile bearing capacity less than 40mm, and flower basket bolt is not less than 25kN.
Specifically, relative one end of adjacent bottom brace 1210 is configured with reverse external screw thread, bottom brace tensioning dress respectively
The two ends for putting 1220 are configured with the reverse internal thread coordinated with reverse external screw thread respectively.For example, in adjacent bottom brace 1210
The front-end structure of a bottom brace 1210 positioned at rear side have clockwise external screw thread, the position in adjacent bottom brace 1210
Anticlockwise external screw thread, the rear end of bottom brace tensioning apparatus 1220 are configured with the rear end of a bottom brace 1210 of front side
It is configured with clockwise internal thread and front-end structure has anticlockwise internal thread.Thus, by turning bottom brace
Tight device 1220 can adjust the length of bottom brace 1210, so as to realize the tensioning of bottom brace 1210.
In some embodiments of the present utility model, as depicted in figs. 1 and 2, bottom brace 1210 passes through the first connector
1400 are connected with the bottom wing listrium 2200 of centre Pin purlin 2003.Further, as shown in Figure 7 and Figure 8, the first connector 1400
Including the first base plate 1410 and two the first side plates 1420, two the first side plates 1420 are connected to the phase of the first base plate 1410
To both sides edge, by being weldingly connected between the base plate 1410 of bottom brace 1210 and first, the first base plate 1410 and centre Pin purlins
Between 2003 bottom wing listrium 2200, it is between first side plate 1420 and the web 2300 of centre Pin purlin 2003 and another
Pass through the phase of self-tapping screw 1401 respectively between individual first side plate 1420 and the crimping of the bottom wing listrium 2200 of centre Pin purlin 2003
Even.
For example, the front side edge of the first base plate 1410 and rear side edge are connected to the first side plate 1420, the first base plate 1410
Rear side be connected by self-tapping screw 1401 with the web 2300 of centre Pin purlin 2003 along the first upper side plate 1420, the first bottom
The front side of plate 1410 is along the crimping of upper first side plate 1420 and the bottom wing listrium 2200 of centre Pin purlin 2003 by self tapping spiral shell
Silk 1401 is connected.Thus, the welding between the base plate 1410 of bottom brace 1210 and first can be completed before construction, for example, drop-down
Welding between the base plate 1410 of bar 1210 and first can be carried out in factory or ground, so, self tapping need to only be carried out during construction
The connection of screw 1401, such that it is able to realize construction overall process cold-working industry, it is not necessary to any Site Welding, it is adaptable to multiple material
The reinforcing of roofing, and it is easy to the maintenance and replacing in later stage, recycling after facilitating component to remove.
Preferably, the first connector 1400 can be channel-section steel, and the web of bottom brace 1210 and the channel-section steel is by welding phase
Even, between the bottom wing listrium 2200 of the web of the channel-section steel and centre Pin purlin 2003, the edge of a wing of the channel-section steel and centre Pin purlins
Between the web 2300 of bar 2003 and the channel-section steel the edge of a wing and the bottom wing listrium 2200 of centre Pin purlin 2003 crimping it
Between respectively by self-tapping screw 1401 be connected.
According to some embodiments of the present utility model, as shown in Figure 3 and Figure 4, side Pin reinforcement assemblies 1300 are oblique including first
Tie rod 1310, the second batter brace 1320 and batter brace tensioning apparatus 1330.One end of first batter brace 1310 and the second oblique pull
One end of bar 1320 is connected with batter brace tensioning apparatus 1330 respectively, the other end and the outside Pin purlins of the second batter brace 1320
2001 web 2300 is connected, and the two ends of the second batter brace 1320 are staggered setting along the length direction of purlin 2000, and first is oblique
Bottom wing listrium 2200 of the other end of tie rod 1310 respectively with middle Pin reinforcement assemblies 1200 and inner edge Pin purlins 2002 is connected, and
Stagger setting along the length direction of purlin 2000 at the two ends of the first batter brace 1310.For example, the front end of the second batter brace 1320 with
Rear end is staggered in the lateral direction, and the front end of the first batter brace 1310 is staggered in the lateral direction with rear end.
Alternatively, batter brace tensioning apparatus 1330 can be screw rod connector;Or, as shown in Figure 3 and Figure 4, batter brace
Tensioning apparatus 1330 can also be flower basket bolt, wherein, the first batter brace 1310 and the second batter brace 1320 are screwed into gaily decorated basket spiral shell
The length of the threaded portion of bolt is not less than 40mm respectively, and the tensile bearing capacity of flower basket bolt is not less than 25kN.
Specifically, described one end of described one end of the first batter brace 1310 and the second batter brace 1320 constructs reversely respectively
External screw thread, the two ends of batter brace tensioning apparatus 1330 are configured with the reverse internal thread coordinated with reverse external screw thread respectively.
As a example by positioned at the side Pin reinforcement assembly 1300 of rear side, the rear end of the first batter brace 1310 is configured with anticlockwise outer spiral shell
Line, the front-end structure of the second batter brace 1320 has clockwise external screw thread, the rear end construction of batter brace tensioning apparatus 1330
There is clockwise internal thread and front-end structure has anticlockwise internal thread.Thus, it is tensioned dress by turning batter brace
The length of 1330 length that can adjust the first batter brace 1310 and the second batter brace 1320 is put, so as to realize the first batter brace
1310 and second batter brace 1320 tensioning.
In alternative embodiment of the present utility model, as shown in Figure 3 and Figure 4, the first batter brace 1310 is along its length
Be divided into the rake 1313 of first level portion 1311 and first, first level portion 1311 respectively with middle Pin reinforcement assemblies 1200 and interior
The bottom wing listrium 2200 of side Pin purlin 2002 is connected, and first level portion 1311 two ends multiple purlins 2000 orientation
On be oppositely arranged, the first rake 1313 is connected with batter brace tensioning apparatus 1330, and the first rake 1313 is relative to level side
To being obliquely installed, and the two ends of the first rake 1313 are staggered setting along the length direction of purlin 2000.For example, the first batter brace
1310 are divided into the rake 1313 of first level portion 1311 and first being sequentially connected along the longitudinal direction, before first level portion 1311
End extends along the longitudinal direction with the line of rear end, the one end being connected with batter brace tensioning apparatus 1330 position of the first rake 1313
Stagger in the lateral direction with rear end in other end top, and the front end of the first rake 1313.
In some embodiments of the present utility model, as shown in Figure 3 and Figure 4, the second batter brace 1320 is straight-bar, i.e. the
Two batter braces 1320 do not bend, and the second batter brace 1320 is obliquely installed relative to horizontal direction.For example, the second batter brace
1320 one end being connected with the web 2300 of outside Pin purlin 2001 is located at other end top, and before the second batter brace 1320
Stagger in the lateral direction with rear end at end.Thus, the machine-shaping and connection of the second batter brace 1320 are facilitated.
In the specific embodiment shown in Fig. 3 and Fig. 4, the other end of the first batter brace 1310 passes through the second connector
1500 are connected with the bottom wing listrium 2200 of inner edge Pin purlins 2002.Further, as shown in Figure 7 and Figure 8, the second connector 1500
Including the second base plate 1510 and two the second side plates 1520, two the second side plates 1520 are connected to the phase of the second base plate 1510
To both sides edge, by being weldingly connected between the other end of the first batter brace 1310 and the second base plate 1510, the second base plate
Between the bottom wing listrium 2200 of 1510 and inner edge Pin purlins 2002, the web of second side plate 1520 and inner edge Pin purlins 2002
Between 2300 and another second side plate 1520 and inner edge Pin purlins 2002 bottom wing listrium 2200 crimping between lead to respectively
Self-tapping screw 1401 is crossed to be connected.
For example, the front side edge of the second base plate 1510 and rear side edge are connected to the second side plate 1520, the second base plate 1510
Rear side be connected by self-tapping screw 1401 with the web 2300 of inner edge Pin purlins 2002 along the second upper side plate 1520, the second bottom
The front side of plate 1510 passes through self tapping spiral shell along the second upper side plate 1520 and the crimping of the bottom wing listrium 2200 of inner edge Pin purlins 2002
Silk 1401 is connected.Thus, the welding between the first batter brace 1310 and the second base plate 1510 can be completed before construction, for example,
Welding between first batter brace 1310 and the second base plate 1510 can be carried out in factory or ground, so, only be needed during construction
The connection of self-tapping screw 1401 is carried out, such that it is able to realize construction overall process cold-working industry, it is not necessary to any Site Welding, it is adaptable to
The reinforcing of multiple material roofing, and it is easy to the maintenance and replacing in later stage, recycling after facilitating component to remove.
Preferably, the second connector 1500 can be channel-section steel, and the first batter brace 1310 passes through weldering with the web of the channel-section steel
Connect connected, between the web of the channel-section steel and the bottom wing listrium 2200 of inner edge Pin purlins 2002, the edge of a wing of the channel-section steel and inner edge
Between the web 2300 of Pin purlins 2002 and the channel-section steel the edge of a wing and inner edge Pin purlins 2002 bottom wing listrium 2200 volume
It is connected by self-tapping screw 1401 respectively between side.
In some embodiments of the present utility model, as shown in Figure 3 and Figure 4, the other end of the second batter brace 1320
It is connected with the web 2300 of outside Pin purlin 2001 by the 3rd connector 1600.Further, as shown in Figure 9 and Figure 10,
Three connectors 1600 include the first connecting plates 1610 and the second connecting plate 1620 that are connected with each other, the second batter brace 1320 it is described
By being weldingly connected between the other end and the first connecting plate 1610, the web of the second connecting plate 1620 and outside Pin purlin 2001
It is connected by threaded fastener 1601 between 2300.So, it is possible to achieve construction overall process cold-working industry, it is not necessary to any site welding
Connect, it is adaptable to the reinforcing of multiple material roofing, and be easy to the maintenance and replacing in later stage, recycling after facilitating component to remove.
Wherein, in the horizontal plane, the other end of the second batter brace 1320 is parallel with the edge of the first connecting plate 1610.
For example, as shown in Fig. 3, Fig. 4 and Figure 10, in the horizontal plane, the other end of the second batter brace 1320 is relative to left and right directions
Inclined angle is with the first connecting plate 1610 relative to the inclined angled complimentary of the second connecting plate 1620.It is appreciated that first connects
Angle between the connecting plate 1620 of fishplate bar 1610 and second can carry out reasonable selection according to site operation size.
Preferably, the 3rd connector 1600 can be angle steel, lead between the second batter brace 1320 and the side of the angle steel
Cross and be weldingly connected, be connected by bolt between the opposite side of the angle steel and the web 2300 of outside Pin purlin 2001.
In alternative embodiment of the present utility model, the other end of the first batter brace 1310 passes through transition tensioning apparatus
(not shown) is connected with centre Pin reinforcement assembly 1200.Similarly, transition tensioning apparatus can be screw rod connector or flower
Basket bolt.For example, the first batter brace 1310 and the relative one end of centre Pin reinforcement assemblies 1200 construct reverse external screw thread respectively,
The two ends of transition tensioning apparatus are configured with the reverse internal thread coordinated with reverse external screw thread respectively.Thus, by turning
Crossing tensioning apparatus can realize the tensioning of the first batter brace 1310 and centre Pin reinforcement assembly 1200.
In the alternative embodiment shown in Fig. 3, Fig. 5 and Fig. 6, side Pin reinforcement assembly 1300 can also include support frame
1340, the two ends of support frame 1340 are oppositely arranged in the orientation of multiple purlins 2000, and the two ends of support frame 1340 are divided
It is not connected with the web 2300 of outside Pin purlin 2001 and the web 2300 of inner edge Pin purlins 2002.Thus, multiple purlins 2000
Resistance to overturning is stronger, bearing capacity is higher.For example, the longitudinal center axis of support frame 1340 is oriented along the longitudinal direction, favorably
Ground, the two ends of support frame 1340 are located at 1/3rd length of purlin 2000 respectively.
Specifically, as shown in Figure 5 and Figure 6, support frame 1340 includes upper assistant support 1341, lower assistant support 1342 and is connected to
Main support 1343 between upper assistant support 1341 and lower assistant support 1342, the web 2300 and inner edge Pin purlins of outside Pin purlin 2001
Articles 2002 web 2300 is connected by the 4th connector 1800 with the main support 1343 of support frame 1340 respectively, such that it is able to reality
Existing construction overall process cold-working industry.Preferably, support frame 1340 can be C-type steel, so that structural strength is high, and convenient formation.
Alternatively, as shown in Fig. 3, Fig. 6, Figure 11 and Figure 12, the 4th connector 1800 includes vertically disposed first side plate
1810 and second side plate 1820, i.e. the first side plate 1810 and the second side plate 1820 are respectively perpendicular to horizontal plane, and the first side plate
1810 and second side plate 1820 it is perpendicular to one another.First side plate of the connector 1800 of main support 1343 and the 4th of support frame 1340
By being weldingly connected between 1810, the web 2300 of outside Pin purlin 2001 and the web 2300 of inner edge Pin purlins 2002 lead to respectively
Self-tapping screw 1401 is crossed to be connected with the second side plate 1820 of the 4th connector 1800.In this way, construction overall process cold-working industry is realized, no
Need any Site Welding, it is adaptable to the reinforcing of multiple material roofing, and be easy to the maintenance and replacing in later stage, facilitate component to remove
Recycling afterwards.
According to some embodiments of the present utility model, ruggedized construction 1000 can be multiple, the edge of multiple ruggedized constructions 1000
The length direction interval setting of purlin 2000, in the horizontal plane, adjacent strengthening structure 1000 is on multiple purlins 2000 along many
The central axis of the orientation orientation of individual purlin 2000 is symmetrical arranged, and so as to further enhance the stability of purlin 2000, enters
One step improves the bearing capacity of purlin 2000.For example, multiple ruggedized constructions 1000 are spaced apart in left-right direction, shown in Fig. 1 and Fig. 3
Horizontal plane in, the central axis that along the longitudinal direction orients of the adjacent strengthening structure 1000 on multiple purlins 2000 is symmetrical.
Advantageously, as shown in figure 3, each ruggedized construction 1000 can also include side Pin self-balancings pull bar 1700, side Pin from
Balancing pull rod 1700 is connected with side Pin reinforcement assembly 1300, and adjacent strengthening structure 1000 the phase of side Pin self-balancings pull bar 1700
Even, the length direction of side Pin self-balancings pull bar 1700 is parallel with the length direction of purlin 2000, and side Pin is eliminated such that it is able to balance
The horizontal component of the pulling force of reinforcement assembly 1300, the overall structure of multiple purlins 2000 is more stablized.
Further, as shown in figure 3, the side Pin self-balancings pull bar 1700 of adjacent strengthening structure 1000 is by pull bar tensioning dress
3000 are put to be connected.For example, the relative one end of the side Pin self-balancings pull bar 1700 of adjacent strengthening structure 1000 construct respectively it is reverse
External screw thread, the two ends of pull bar tensioning apparatus 3000 are configured with the reverse internal thread coordinated with reverse external screw thread respectively.Thus,
The tensioning of side Pin self-balancings pull bar 1700 can be realized by turning pull bar tensioning apparatus 3000.
Alternatively, as shown in Figure 3 and Figure 4, while Pin self-balancings pull bar 1700 by the 5th connector 1900 with while Pin reinforce
Component 1300 is connected.Further, as shown in Fig. 3, Fig. 4, Figure 13 and Figure 14, the 5th connector 1900 includes support plate 1910, branch
Plate 1910 is provided with perforation 1911, and perforation 1911 can be the closed loop hole shown in Figure 13 or the open loop hole shown in Figure 14, and side Pin adds
Gu component 1300 is through perforation 1911, by being weldingly connected between side Pin self-balancings pull bar 1700 and support plate 1910.In this way, can be with
Realize construction overall process cold-working industry, it is not necessary to any Site Welding, it is adaptable to the reinforcing of multiple material roofing, and be easy to the later stage
Safeguard and change, recycling after facilitating component to remove.
Advantageously, the 5th connector 1900 can also include two clamp nut (not shown)s, two clamp nuts
Screw thread coordinates on side Pin reinforcement assembly 1300 respectively, and two clamp nuts clamp support plate 1910 from the both sides of support plate 1910,
So as to structure is more consolidated.
Alternatively, as shown in figure 15, side Pin self-balancings pull bar 1700 passes through ends bent gripper edge Pin reinforcement assemblies 1300,
So as to realize being connected with side Pin reinforcement assembly 1300, simpler convenience of constructing.
Below with reference to the accompanying drawings the ruggedized construction of the purlin according to a specific embodiment of the present utility model is described in detail
1000, it is worth understanding, simply exemplary illustration described below, and it is not intended that to limitation of the present utility model.
As shown in Fig. 1-Figure 13, the ruggedized construction 1000 of the purlin according to the utility model embodiment, including up and down to drawing
Tie rod 1100, centre Pin reinforcement assembly 1200, while Pin reinforcement assemblies 1300 and while Pin self-balancings pull bar 1700.
Specifically, purlin 2000 is multiple, and multiple purlins 2000 are arranged along the longitudinal direction, the length of each purlin 2000
Direction orients in left-right direction.It is up and down multiple to drawing tie rod 1100, each two ends up and down to drawing tie rod 1100 connects respectively
On the web 2300 of adjacent purlin 2000, and each up and down to draw tie rod 1100 front end in adjacent purlin 2000
Positioned at the top flange plate 2100 of the purlin 2000 of front side, purlin 2000 positioned at rear side of the rear end in adjacent purlin 2000
Bottom wing listrium 2200.
Middle Pin purlins 2003 are multiple, under middle Pin reinforcement assemblies 1200 include that multiple bottom braces 1210 and connection are adjacent
The bottom brace tensioning apparatus 1220 of tie rod 1210.Bottom brace 1210 is by under the first connector 1400 and centre Pin purlin 2003
Flange plate 2200 is connected, and specifically, the first connector 1400 includes the first base plate 1410 and two the first side plates 1420, two the
Side plate 1420 is connected to the front side edge and rear side edge of the first base plate 1410, between the base plate 1410 of bottom brace 1210 and first
By being weldingly connected, the phase of self-tapping screw 1401 is passed through between the first base plate 1410 and the bottom wing listrium 2200 of centre Pin purlin 2003
Even, the rear side of the first base plate 1410 along the web 2300 of the first upper side plate 1420 and centre Pin purlin 2003 by self-tapping screw
1401 are connected, and the front side of the first base plate 1410 is along the first upper side plate 1420 and the bottom wing listrium 2200 of centre Pin purlin 2003
Crimping is connected by self-tapping screw 1401.
The front-end structure of the bottom brace 1210 positioned at rear side in adjacent bottom brace 1210 has clockwise outer
Screw thread, the rear end of the bottom brace 1210 positioned at front side in adjacent bottom brace 1210 is configured with anticlockwise outer spiral shell
Line, the rear end of bottom brace tensioning apparatus 1220 is configured with clockwise internal thread and front-end structure to be had in anticlockwise
Screw thread.
Side Pin reinforcement assembly 1300 includes the first batter brace 1310, the second batter brace 1320, batter brace tensioning apparatus 1330
With support frame 1340.First batter brace 1310 is divided into the rake 1313 of first level portion 1311 and first, first along the longitudinal direction
The front-end and back-end of horizontal part 1311 are relative in the longitudinal direction, the first rake 1313 by batter brace tensioning apparatus 1330 with
Second batter brace 1320 is connected, and one end being connected with batter brace tensioning apparatus 1330 of the first rake 1313 is located on the other end
Side, and the front end of the first rake 1313 staggers in the lateral direction with rear end.Second batter brace 1320 is straight-bar, the second oblique pull
One end being connected with the web 2300 of outside Pin purlin 2001 of bar 1320 is located at other end top, and the second batter brace 1320
Stagger in the lateral direction with rear end front end.
As a example by positioned at the side Pin reinforcement assembly 1300 of rear side, the rear end of the first rake 1313 is configured with counterclockwise
External screw thread, the front-end structure of the second batter brace 1320 has clockwise external screw thread, after batter brace tensioning apparatus 1330
End is configured with clockwise internal thread and front-end structure has anticlockwise internal thread.
First level portion 1311 is connected by the second connector 1500 with the bottom wing listrium 2200 of inner edge Pin purlins 2002, tool
Body ground, the second connector 1500 includes the second base plate 1510 and two the second side plates 1520, and two the second side plates 1520 connect respectively
The front side edge and rear side edge of the second base plate 1510 are connected on, by welding phase between first level portion 1311 and the second base plate 1510
Even, it is connected by self-tapping screw 1401 between the second base plate 1510 and the bottom wing listrium 2200 of inner edge Pin purlins 2002, the second bottom
The rear side of plate 1510 is connected with the web 2300 of inner edge Pin purlins 2002 along the second upper side plate 1520 by self-tapping screw 1401,
The front side of the second base plate 1510 passes through along the second upper side plate 1520 and the crimping of the bottom wing listrium 2200 of inner edge Pin purlins 2002
Self-tapping screw 1401 is connected.First level portion 1311 and the relative one end of bottom brace 1210 construct reverse external screw thread, mistake respectively
The two ends for crossing tensioning apparatus are configured with the reverse internal thread coordinated with reverse external screw thread respectively.
3rd connector 1600 includes being connected with each other and in the first connecting plate 1610 of predetermined angle and the second connecting plate
1620, the predetermined angle and the second batter brace 1320 are relative to the inclined angled complimentary of left and right directions, and the second horizontal part 1321
By being weldingly connected between the first connecting plate 1610, between the web 2300 of the second connecting plate 1620 and outside Pin purlin 2001
It is connected by threaded fastener 1601.
Support frame 1340 is set perpendicular to the web 2300 of purlin 2000, support frame 1340 include upper assistant support 1341, under
Assistant support 1342 and the main support 1343 being connected between assistant support 1341 and lower assistant support 1342.Outside Pin purlin 2001
The web 2300 of web 2300 and inner edge Pin purlins 2002 is connected by the 4th connector 1800 with main support 1343 respectively, and the 4th
Connector 1800 includes the side plate 1820 of vertically disposed first side plate 1810 and second, i.e. the first side plate 1810 and the second side plate
1820 are respectively perpendicular to horizontal plane, and the first side plate 1810 and the second side plate 1820 are perpendicular to one another.The main support of support frame 1340
1343 and the 4th connector 1800 the first side plate 1810 between by being weldingly connected, the He of web 2300 of outside Pin purlin 2001
The web 2300 of inner edge Pin purlins 2002 passes through the phase of the second side plate 1820 of self-tapping screw 1401 and the 4th connector 1800 respectively
Even.
The length direction of side Pin self-balancings pull bar 1700 is parallel with the length direction of purlin 2000, and the 5th connector 1900 is wrapped
Support plate 1910 is included, support plate 1910 is provided with perforation 1911, and perforation 1911 is closed loop hole, and first level portion 1311 passes through perforation
1911, by being weldingly connected between side Pin self-balancings pull bar 1700 and support plate 1910.
Ruggedized construction 1000 is multiple, and multiple ruggedized constructions 1000 are spaced apart in left-right direction, shown in Fig. 7 and Fig. 9
In horizontal plane, the central axis that along the longitudinal direction orients of the adjacent strengthening structure 1000 on multiple purlins 2000 is symmetrical, adjacent
One end that the side Pin self-balancings pull bar 1700 of ruggedized construction 1000 is relative constructs reverse external screw thread, pull bar tensioning apparatus respectively
3000 two ends are configured with the reverse internal thread coordinated with reverse external screw thread respectively.Wherein, bottom brace tensioning apparatus 1220,
Batter brace tensioning apparatus 1330, transition tensioning apparatus and pull bar tensioning apparatus 3000 are flower basket bolt.
The ruggedized construction 1000 of the purlin according to the utility model embodiment, using middle Pin reinforcement assemblies 1200, side Pin
Reinforcement assembly 1300 and side Pin self-balancings pull bar 1700 make multiple purlins 2000 form an overall structure for stabilization, improve structure
The bearing capacity of part, and reinforcing process need not remove existing structure component, not have any destruction to roofing, and construction is simple, effect
Fruit is significantly.
Additionally, the ruggedized construction 1000 of the purlin according to the utility model embodiment, middle Pin reinforcement assemblies 1200, side Pin
Reinforcement assembly 1300 and side Pin self-balancings pull bar 1700 are using threaded connection, it is possible to achieve construction overall process cold-working industry, no
Need any Site Welding, it is adaptable to the reinforcing of multiple material roofing, and be easy to the maintenance and replacing in later stage, facilitate component to remove
Recycling afterwards.
, it is necessary to illustrate in description of the present utility model, unless otherwise clearly defined and limited, term " phase
Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can
Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi
Two connections of element internal.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in utility model.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " specific embodiment ", " can
Select embodiment ", the description of " example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example are described
Structure, material or feature are contained at least one embodiment of the present utility model or example.In this manual, to above-mentioned art
The schematic representation of language is not necessarily referring to identical embodiment or example.And, the specific features of description, structure, material or
Person's feature can in an appropriate manner be combined in one or more any embodiments or example.
While there has been shown and described that embodiment of the present utility model, it will be understood by those skilled in the art that:
In the case where principle of the present utility model and objective is not departed from various changes, modification, replacement can be carried out to these embodiments
And modification, scope of the present utility model limits by claim and its equivalent.
Claims (24)
1. a kind of ruggedized construction of purlin, the purlin is multiple and parallel, spaced-apart is set in the horizontal direction, described in multiple
It is outside Pin purlins, respectively outside Pin purlin phases described with two positioned at outermost two purlins in the orientation of purlin
Two adjacent purlins are inner edge Pin purlins, and the multiple purlins between two inner edge Pin purlins are centre Pin purlins, often
The individual purlin includes top flange plate, bottom wing listrium and the abdomen being connected between the top flange plate and the bottom wing listrium respectively
Plate, one end and one end away from the web point of bottom wing listrium away from the web of the top flange plate of each purlin
Crimping is not provided with it, it is characterised in that the ruggedized construction includes:
It is multiple that up and down to drawing tie rod, each described two ends up and down to drawing tie rod is connected on the web of adjacent purlin,
Each is described up and down to drawing the top flange plate and the other end of a purlin of the one end of tie rod in adjacent purlin adjacent to adjacent
The bottom wing listrium of another purlin in purlin;
Middle Pin reinforcement assemblies, the middle Pin reinforcement assemblies be connected with the bottom wing listrium of the multiple middle Pin purlins respectively and
The two ends of the middle Pin reinforcement assemblies are oppositely arranged in the orientation of multiple purlins;
Side Pin reinforcement assemblies, side Pin reinforcement assemblies webs respectively with the outside Pin purlins, the inner edge Pin purlins
Bottom wing listrium is connected with the middle Pin reinforcement assemblies, and the two ends of the side Pin reinforcement assemblies are wrong along the length direction of the purlin
Open up and put.
2. the ruggedized construction of purlin according to claim 1, it is characterised in that the middle Pin purlins are multiple, described
Middle Pin reinforcement assemblies include the bottom brace tensioning apparatus of multiple bottom braces and the adjacent bottom brace of connection, multiple described drop-down
Bar is connected on the bottom wing listrium of multiple middle Pin purlins.
3. the ruggedized construction of purlin according to claim 2, it is characterised in that relative one end of the adjacent bottom brace
Reverse external screw thread is configured with respectively, and the two ends of the bottom brace tensioning apparatus are configured with respectively matches somebody with somebody with the reverse external screw thread
The reverse internal thread for closing.
4. the ruggedized construction of purlin according to claim 2, it is characterised in that the bottom brace by the first connector with
The bottom wing listrium of the middle Pin purlins is connected.
5. the ruggedized construction of purlin according to claim 4, it is characterised in that first connector includes the first base plate
With two first side plates on the opposite sides edge for being connected to first base plate, the bottom brace and first base plate it
Between by being weldingly connected, between the bottom wing listrium of first base plate and the middle Pin purlins, first side plate with
Between the web of the middle Pin purlins and another described first side plate and the middle Pin purlins bottom wing listrium volume
It is connected by self-tapping screw respectively between side.
6. the ruggedized construction of purlin according to claim 1, it is characterised in that the side Pin reinforcement assemblies include that first is oblique
The batter brace tensioning of one end of tie rod, one end of the second batter brace and connection first batter brace and second batter brace
Device, the other end of second batter brace be connected with the web of the outside Pin purlins and second batter brace two ends edge
The length direction of the purlin staggers setting, the other end of first batter brace respectively with the middle Pin reinforcement assemblies and institute
The bottom wing listrium for stating inner edge Pin purlins is connected and the two ends of first batter brace are staggered setting along the length direction of the purlin.
7. the ruggedized construction of purlin according to claim 6, it is characterised in that described one end of first batter brace and
Described one end of second batter brace constructs reverse external screw thread respectively, and the two ends of the batter brace tensioning apparatus construct respectively
There is the reverse internal thread coordinated with the reverse external screw thread.
8. the ruggedized construction of purlin according to claim 6, it is characterised in that first batter brace is along its length
Be divided into first level portion and the first rake, the first level portion respectively with the middle Pin reinforcement assemblies and the inner edge Pin
The bottom wing listrium of purlin is connected and the two ends in the first level portion are oppositely arranged in the orientation of multiple purlins, institute
State the first rake to be connected with the batter brace tensioning apparatus, first rake is obliquely installed and institute relative to horizontal direction
The two ends of the first rake are stated to stagger setting along the length direction of the purlin.
9. the ruggedized construction of purlin according to claim 6, it is characterised in that second batter brace is straight-bar and relative
It is obliquely installed in horizontal direction.
10. the ruggedized construction of purlin according to claim 6, it is characterised in that first batter brace it is described another
End is connected by the second connector with the bottom wing listrium of the inner edge Pin purlins.
The ruggedized construction of 11. purlins according to claim 10, it is characterised in that second connector includes the second bottom
Plate and be connected to second base plate opposite sides edge two the second side plates, first batter brace it is described another
By being weldingly connected between end and second base plate, between the bottom wing listrium of second base plate and the inner edge Pin purlins,
Between one second side plate and the web of the inner edge Pin purlins and another described second side plate and the inner edge Pin
It is connected by self-tapping screw respectively between the crimping of the bottom wing listrium of purlin.
The ruggedized construction of 12. purlins according to claim 6, it is characterised in that second batter brace it is described another
End is connected by the 3rd connector with the web of the outside Pin purlins.
The ruggedized construction of 13. purlins according to claim 12, it is characterised in that the 3rd connector includes mutually interconnecting
The first connecting plate and the second connecting plate for connecing, pass through between the other end of second batter brace and first connecting plate
It is weldingly connected, is connected by threaded fastener between second connecting plate and the web of the outside Pin purlins, in horizontal plane
Interior, the other end of second batter brace is parallel with the edge of first connecting plate.
The ruggedized construction of 14. purlins according to claim 6, it is characterised in that first batter brace it is described another
End is connected by transition tensioning apparatus and the middle Pin reinforcement assemblies.
The ruggedized construction of 15. purlins according to claim 6, it is characterised in that the side Pin reinforcement assemblies also include branch
Support, the two ends of support frame as described above be oppositely arranged in the orientation of multiple purlins and respectively with the outside Pin purlins
Web be connected with the web of the inner edge Pin purlins.
The ruggedized construction of 16. purlins according to claim 15, it is characterised in that support frame as described above include upper assistant support,
Lower assistant support and the main support being connected between the upper assistant support and the lower assistant support, the web of the outside Pin purlins and
The web of the inner edge Pin purlins is connected by the 4th connector with the main support of support frame as described above respectively.
The ruggedized construction of 17. purlins according to claim 16, it is characterised in that the 4th connector includes vertically setting
By weldering between first side plate of the first side plate and the second side plate put, the main support of support frame as described above and the 4th connector
Connect connected, the web of the web of the outside Pin purlins and the inner edge Pin purlins is connected by self-tapping screw with the described 4th respectively
Second side plate of fitting is connected.
The ruggedized construction of 18. purlin according to any one of claim 1-17, it is characterised in that the ruggedized construction is
Multiple and along the length direction interval setting of the purlin, in the horizontal plane, the adjacent ruggedized construction is on multiple purlins
The central axis that the orientation along multiple purlins of bar is oriented is symmetrical arranged.
The ruggedized construction of 19. purlins according to claim 18, it is characterised in that each described ruggedized construction also includes using
The while Pin self-balancing pull bars of the horizontal component of the pulling force in Pin reinforcement assemblies, the side Pin self-balancing pull bars are eliminated in balance
With it is described while Pin reinforcement assemblies be connected and the adjacent ruggedized construction while Pin self-balancings pull bar be connected, the side Pin self-balancings are drawn
The length direction of bar is parallel with the length direction of the purlin.
The ruggedized construction of 20. purlins according to claim 19, it is characterised in that the side Pin of the adjacent ruggedized construction is certainly
Balancing pull rod is connected by pull bar tensioning apparatus.
The ruggedized construction of 21. purlins according to claim 19, it is characterised in that the side Pin self-balancings pull bar is by the
Five connectors are connected with the side Pin reinforcement assemblies.
The ruggedized construction of 22. purlins according to claim 21, it is characterised in that the 5th connector includes support plate,
The support plate is provided with perforation, and the perforation is closed loop hole or open loop hole, and the side Pin reinforcement assemblies pass through the perforation, described
By being weldingly connected between side Pin self-balancings pull bar and the support plate.
The ruggedized construction of 23. purlins according to claim 22, it is characterised in that the 5th connector also includes two
Clamp nut, two clamp nut difference screw threads coordinate on the side Pin reinforcement assemblies and are pressed from both sides from the both sides of the support plate
The tight support plate.
The ruggedized construction of 24. purlins according to claim 19, it is characterised in that the side Pin self-balancings pull bar is by end
End bending clamp it is described while Pin reinforcement assemblies with it is described while Pin reinforcement assemblies be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621176935.6U CN206273959U (en) | 2016-11-02 | 2016-11-02 | The ruggedized construction of purlin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621176935.6U CN206273959U (en) | 2016-11-02 | 2016-11-02 | The ruggedized construction of purlin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206273959U true CN206273959U (en) | 2017-06-23 |
Family
ID=59062922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621176935.6U Withdrawn - After Issue CN206273959U (en) | 2016-11-02 | 2016-11-02 | The ruggedized construction of purlin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206273959U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639348A (en) * | 2016-11-02 | 2017-05-10 | 北京清华同衡规划设计研究院有限公司 | Purline reinforcing structure |
-
2016
- 2016-11-02 CN CN201621176935.6U patent/CN206273959U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639348A (en) * | 2016-11-02 | 2017-05-10 | 北京清华同衡规划设计研究院有限公司 | Purline reinforcing structure |
CN106639348B (en) * | 2016-11-02 | 2022-08-16 | 北京清华同衡规划设计研究院有限公司 | Reinforced structure of purlin |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639348A (en) | Purline reinforcing structure | |
CN103964090B (en) | The production method of container bottom board unit, chassis and container and chassis | |
CN205917856U (en) | Pin -connected panel container prefabricated house | |
CN206273959U (en) | The ruggedized construction of purlin | |
CN209130471U (en) | A kind of antidetonation suspension and support | |
CN107366439A (en) | A kind of rod member for grid bracing means and its application method | |
CN104343184B (en) | Large-span two-way beam string structure and multi-fulcrum pipe truss mixed connection structure | |
CN203008136U (en) | Concrete-filled steel tubular column and reinforced concrete beam middle joint connection structure | |
CN208701704U (en) | Bayonet type soil nailing connecting node | |
CN207110064U (en) | A kind of attachment structure of cant beam and rear wall | |
CN209620264U (en) | A kind of novel anti-pulling connector | |
CN207392236U (en) | A kind of composite beam and sandwich wall connecting node | |
CN203008137U (en) | Concrete-filled steel tubular column and reinforced concrete beam top joint connection structure | |
CN108005372A (en) | A kind of setting assembling type suspension scaffold | |
CN205153212U (en) | Steel pipe concrete shear force wall and building | |
CN203684535U (en) | Weldable regulating type steel bar connection device | |
CN205777099U (en) | A kind of huge combined steel and concrete column of built-in lattice reinforcing bar | |
CN208152310U (en) | A kind of horizontal tension rib connecting node of wall | |
CN104234189B (en) | A kind of four tubular truss structures of prefabricated house | |
CN208594471U (en) | A kind of bondbeam that bolt weldering is mixed | |
CN209538393U (en) | A kind of clamping plate type support of aluminium alloy hub type joint net frame | |
CN207314524U (en) | A kind of high performance concrete chain type combining structure | |
CN208501886U (en) | A kind of connection structure of new steel structure square steel tube column | |
CN207296179U (en) | A kind of c-type support column of steel building | |
CN207177332U (en) | A kind of new sliceable building reinforced column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170623 Effective date of abandoning: 20220816 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20170623 Effective date of abandoning: 20220816 |