CN206272153U - Cable laying goes out well servicing unit - Google Patents
Cable laying goes out well servicing unit Download PDFInfo
- Publication number
- CN206272153U CN206272153U CN201621325742.2U CN201621325742U CN206272153U CN 206272153 U CN206272153 U CN 206272153U CN 201621325742 U CN201621325742 U CN 201621325742U CN 206272153 U CN206272153 U CN 206272153U
- Authority
- CN
- China
- Prior art keywords
- cable
- supporting plate
- servicing unit
- goes out
- well servicing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of cable laying and goes out well servicing unit, including:One cable shaft, the borehole wall of the cable shaft is provided with a protection board, and the first supporting plate and the second supporting plate are respectively equipped with the relative borehole wall, and first supporting plate and second supporting plate are fixed on the protection board by a fixing bolt respectively;One cat ladder is obliquely located between first supporting plate and second supporting plate, and the cat ladder is provided with one first cable support pulley and one second cable support pulley, and a cable is on the first cable support pulley and the second cable support pulley;The cat ladder is provided with multiple length adjusting screws.Cable laying of the present utility model go out well servicing unit by fixing bolt by first supporting plate and second supporting plate on the protection board by the cable laying gone out into well servicing unit fix; and multiple length adjusting screws are additionally provided with the cat ladder so that cat ladder adapts to the cable shaft of different in width.
Description
Technical field
The utility model is related to a kind of cable laying servicing unit, and espespecially a kind of cable laying goes out well servicing unit.
Background technology
In the construction of cable shaft cabling, needs are frequently encountered by the operation of the cable-pull well head in the cable shaft
Situation.At this moment just necessary by the cable-pull cable wellhead, by the cable-pull in the cable shaft, the cable shaft is inevitable
Must have two cambers in short distance, one is turn that cable produces protection pipe and the cable borehole wall, and another is cable
The turn of cable wellhead is produced, it is necessary to corner just must set quarter block in corner.But fix and turn
Curved pulley difficulty is big, and very time-consuming, causes the progress of construction slow, influences its economic benefit.
Therefore, it is necessary to designing a kind of new cable laying goes out well servicing unit, to overcome above mentioned problem.
Utility model content
The utility model provides a kind of easy fixation and is applicable wide cable laying and goes out well servicing unit.
The technical solution adopted in the utility model is:A kind of cable laying goes out well servicing unit, including:One cable shaft, institute
The borehole wall for stating cable shaft is provided with a protection board, and the first supporting plate and the second supporting plate are respectively equipped with the relative borehole wall, described
First supporting plate and second supporting plate are fixed on the protection board by a fixing bolt respectively;One cat ladder obliquely sets
Between first supporting plate and second supporting plate, the cat ladder is provided with one first cable support pulley and one second
Cable support pulley, a cable is on the first cable support pulley and the second cable support pulley;The cat ladder
It is provided with multiple length adjusting screws.
Further, first supporting plate is provided with multiple angle adjustable bolt holes.
Further, length of the length of first supporting plate more than second supporting plate.
Further, one end of the cat ladder is connected with the top of first supporting plate, the other end with described second
The bottom connection of fagging.
Further, the top of first supporting plate protrudes from the cable shaft, and the bottom of second supporting plate sets
In in the cable shaft and less than the top of first supporting plate.
Further, the first cable support pulley is located at cat ladder top, and is close to first supporting plate
Top.
Further, the second cable support pulley is located at cat ladder lower section, and is close to second supporting plate
Bottom.
Further, a protection pipe is equipped with the protection board, the cable is located in the protection pipe, described first
Supporting plate and second supporting plate are located at protection pipe top.
Further, the second cable support pulley is higher than the protection pipe bottom.
Compared to prior art, cable laying of the present utility model goes out well servicing unit by fixing bolt by described first
The cable laying can be gone out well servicing unit and fixed by supporting plate and second supporting plate on the protection board, Er Qiesuo
State and be additionally provided with cat ladder multiple length adjusting screws so that cat ladder adapts to the cable shaft of different in width.
Brief description of the drawings
Accompanying drawing is further understood to of the present utility model for providing, and constitutes a part for specification, and following
Specific embodiment is used to explain the utility model together, but should not constitute to limitation of the present utility model.In the accompanying drawings,
Fig. 1:The utility model cable laying goes out one of structural representation of well servicing unit;
Fig. 2:The utility model cable laying goes out the two of the structural representation of well servicing unit.
Each component names and its label
Cable shaft 1
Protection board 11
Protection pipe 2
Cable 3
Fixing bolt 4
First supporting plate 5
Angle adjustable bolt hole 51
Second supporting plate 6
Cat ladder 7
Length adjusting screws 71
First cable support pulley 8
Second cable support pulley 9
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein
Described specific embodiment is merely to illustrate and explains the utility model, is not limited to the utility model.
As depicted in figs. 1 and 2, cable laying of the present utility model goes out well servicing unit, including a cable shaft 1, the electricity
The borehole wall of cable well 1 is provided with a protection board 11, and the protection board 11 is provided with the first supporting plate 5 and the second supporting plate 6, a cat ladder
7 connection first supporting plate 5 and second supporting plates 6 a, protection pipe 2 is arranged in the protection on the borehole wall
Plate 11, in the protection pipe 2, the cable 3 is extended outside the cable shaft 1 cable 3 by the cat ladder 7.
First supporting plate 5 and second supporting plate 6 are fixed on the protection board 11 by a fixing bolt 4 respectively
On.More than the length of second supporting plate 6, the top of first supporting plate 5 protrudes from the length of first supporting plate 5
1 mouthful of the cable shaft.First supporting plate 5 is provided with multiple angle adjustable bolt holes 51 so that the cable laying goes out well
Servicing unit adapts to the cable shaft 1 of different depth.The one end of the cat ladder 7 connects the top of first supporting plate 5, and the other end connects
Connect the bottom of second supporting plate 6, the bottom of the top higher than second supporting plate 6 of first supporting plate 5, described the
The bottom of two supporting plates 6 is in the cable shaft 1 so that the cat ladder 7 is obliquely in the cable shaft 1.
The cat ladder 7 is provided with one first cable support pulley 8 and one second cable support pulley 9 and multiple length are adjusted
Section bolt 71 so that the cat ladder 7 adapts to the cable shaft 1 of different in width.The first cable support pulley 8 is climbed located at described
The top of ladder 7, near first supporting plate 5, the first cable support pulley 8 at least partly protrudes from 1 mouthful of the cable shaft
Outward.The second cable support pulley 9 is located at the lower section of the cat ladder 7, higher than the bottom of the protection pipe 2.In the present embodiment,
The length adjusting screws 71 are located between the first cable support pulley 8 and the second cable support pulley 9.
To sum up, cable laying of the present utility model goes out well servicing unit, and the cable 3 is extended to from the protection pipe 2
In the cable shaft 1, extend described by the first cable support pulley 8 again by the second cable support pulley 9
1 mouthful of cable shaft is outer.Adjust the length that the length adjusting screws 71 can adjust the cat ladder 7 so that the cat ladder 7 can be flexible
Use, be suitable for different cable shafts 1 and different height.The angle adjustable bolt hole 51 is adjusted, can adapt to the cat ladder 7
The cable shaft 1 of different depth.As long as cable laying of the present utility model goes out well servicing unit by first supporting plate 5 and
Two supporting plates 6 are fixed on the protection board 11 by fixing bolt 4 and can be used, and the cable laying goes out well servicing unit peace
The fixed facility of dress, applicable scope is wide.
Without departing from the thought that the utility model is created, any group is carried out to various different embodiments of the present utility model
Close, should be considered as the utility model disclosure;In range of the technology design of the present utility model, technical scheme is carried out
Any combination of the thought created without prejudice to the utility model that various simple modifications and different embodiments are carried out, all should be at this
Within the protection domain of utility model.
Claims (9)
1. a kind of cable laying goes out well servicing unit, it is characterised in that including:
One cable shaft, the borehole wall of the cable shaft is provided with a protection board, be respectively equipped with the relative borehole wall the first supporting plate and
Second supporting plate, first supporting plate and second supporting plate are fixed on the protection board by a fixing bolt respectively
On;One cat ladder is obliquely located between first supporting plate and second supporting plate, and the cat ladder is provided with one first electricity
Cable supports pulley and one second cable support pulley, a cable to be located at the first cable support pulley and the second cable branch
On support pulley;The cat ladder is provided with multiple length adjusting screws.
2. cable laying as claimed in claim 1 goes out well servicing unit, it is characterised in that:First supporting plate is provided with many
Individual angle adjustable bolt hole.
3. cable laying as claimed in claim 1 goes out well servicing unit, it is characterised in that:The length of first supporting plate is big
In the length of second supporting plate.
4. cable laying as claimed in claim 3 goes out well servicing unit, it is characterised in that:One end of the cat ladder and described
The top connection of one supporting plate, the other end is connected with the bottom of second supporting plate.
5. cable laying as claimed in claim 4 goes out well servicing unit, it is characterised in that:Dash forward on the top of first supporting plate
For the cable shaft, the bottom of second supporting plate is in the cable shaft and less than the top of first supporting plate
End.
6. cable laying as claimed in claim 5 goes out well servicing unit, it is characterised in that:The first cable support pulley sets
In cat ladder top, and near the top of first supporting plate.
7. cable laying as claimed in claim 6 goes out well servicing unit, it is characterised in that:The second cable support pulley sets
In cat ladder lower section, and near the bottom of second supporting plate.
8. cable laying as claimed in claim 7 goes out well servicing unit, it is characterised in that:A guarantor is equipped with the protection board
Pillar, in the protection pipe, first supporting plate and second supporting plate are located at the protection pipe to the cable
Top.
9. cable laying as claimed in claim 8 goes out well servicing unit, it is characterised in that:The second cable support pulley is high
In the protection pipe bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621325742.2U CN206272153U (en) | 2016-12-06 | 2016-12-06 | Cable laying goes out well servicing unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621325742.2U CN206272153U (en) | 2016-12-06 | 2016-12-06 | Cable laying goes out well servicing unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206272153U true CN206272153U (en) | 2017-06-20 |
Family
ID=59043458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621325742.2U Active CN206272153U (en) | 2016-12-06 | 2016-12-06 | Cable laying goes out well servicing unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206272153U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108616104A (en) * | 2018-07-13 | 2018-10-02 | 安徽华电工程咨询设计有限公司 | A kind of open caisson of staggered floor cable laying |
CN108711787A (en) * | 2018-06-02 | 2018-10-26 | 郑文豪 | A kind of cable multi-angle lay scaffold |
CN111585214A (en) * | 2020-04-03 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | Prefabricated assembled cable laying structure of cable trench facility |
-
2016
- 2016-12-06 CN CN201621325742.2U patent/CN206272153U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108711787A (en) * | 2018-06-02 | 2018-10-26 | 郑文豪 | A kind of cable multi-angle lay scaffold |
CN108711787B (en) * | 2018-06-02 | 2020-05-05 | 湘潭潭州电力建设有限公司 | Multi-angle laying scaffold for cables |
CN108616104A (en) * | 2018-07-13 | 2018-10-02 | 安徽华电工程咨询设计有限公司 | A kind of open caisson of staggered floor cable laying |
CN111585214A (en) * | 2020-04-03 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | Prefabricated assembled cable laying structure of cable trench facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206272153U (en) | Cable laying goes out well servicing unit | |
CN202307932U (en) | Ground pile type solar photovoltaic support | |
CN202349395U (en) | Adjustable plastic pipe fixing clamp | |
CN206195292U (en) | Spring bearing structure based on installation of generating line shaft | |
CN204643439U (en) | A kind of guiderail base | |
CN204835454U (en) | Adjustable cable wire rack | |
CN206246928U (en) | A kind of new electromechanical erecting device based on adjustable structure | |
CN205777624U (en) | A kind of hole of constructing, face " E " clevis of limit security protection | |
CN207144485U (en) | A kind of socket joint type slide tray installed for shear wall formwork | |
CN206072548U (en) | Efficient spring support hanging frame | |
CN209219406U (en) | A kind of back-to-back composite desk frame | |
CN209887810U (en) | Prefabricated component side form mechanism with adjustable position and angle | |
CN207553654U (en) | A kind of vertical supporting device of assembled architecture | |
CN207053118U (en) | A kind of high load-bearing aluminum cable tray | |
CN204889112U (en) | Lift table of adjustable length | |
CN206203725U (en) | Small-sized sustaining wall | |
CN206051234U (en) | A kind of Novel elevator car rail brackets | |
CN203867196U (en) | Portable hanging bar installation device | |
CN208252964U (en) | A kind of anti-loose hanger of electromechanical pipeline Fast Installation being directly connected to expansion bolt | |
CN204173710U (en) | A kind of car guide rail frame | |
CN204099430U (en) | The multi-joint bearing support of adjustable pitch | |
CN203845631U (en) | Lifting beam | |
CN204059898U (en) | A kind of convenient inner scaffold regulating height | |
CN203959583U (en) | The guide rail frame that a kind of installation effectiveness is high | |
CN203847958U (en) | Equipment mounting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |