CN206267002U - A kind of pre-buried slip casting structure for preventing bumping at bridge-head - Google Patents

A kind of pre-buried slip casting structure for preventing bumping at bridge-head Download PDF

Info

Publication number
CN206267002U
CN206267002U CN201621377826.0U CN201621377826U CN206267002U CN 206267002 U CN206267002 U CN 206267002U CN 201621377826 U CN201621377826 U CN 201621377826U CN 206267002 U CN206267002 U CN 206267002U
Authority
CN
China
Prior art keywords
gate spool
slip casting
bridge
abutment
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621377826.0U
Other languages
Chinese (zh)
Inventor
鲁庆华
高旭明
卢庆宝
王晓伟
黄卫青
张晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Port Engineering Group Co Ltd
Original Assignee
China State Construction Port Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Port Engineering Group Co Ltd filed Critical China State Construction Port Engineering Group Co Ltd
Priority to CN201621377826.0U priority Critical patent/CN206267002U/en
Application granted granted Critical
Publication of CN206267002U publication Critical patent/CN206267002U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is related to a kind of pre-buried slip casting structure for preventing bumping at bridge-head, it includes pre-buried the first gate spool and the second gate spool being arranged in abutment changeover portion, first gate spool is arranged on the bottom of base course, horizontally disposed to have multiple, the second gate spool rectangular array is arranged in base course;Be arranged on base course bottom the first gate spool can road surface gene basis bearing capacity not enough and when settling to carrying out slip casting in roadbed, improve foundation bearing capacity, second gate spool can be when road surface settles because back filling behind abutment compactness is inadequate to slip casting in roadbed, improve the compaction of back filling behind abutment, because the first gate spool and the second gate spool are embedded in abutment changeover portion, generation problem is can directly inside slip casting, it is not necessary to which suspends traffic the maintenance of doing over again that be capable of achieving.

Description

A kind of pre-buried slip casting structure for preventing bumping at bridge-head
Technical field
The utility model is related to a kind of pre-buried slip casting structure for preventing bumping at bridge-head.
Background technology
Problem of bumping at bridge-head is always one of problem of puzzlement municipal administration engineers and technicians, it has also become high-grade highway Common quality defect.Bridge and roadbed, the composition material on road surface, rigidity, intensity, swell-shrink characteristic etc. have differences, and end of the bridge junction Easily concentrated stress is formed during stress.Under vehicular load, dead load, effect of natural environment, it is heavy that bridge occurs simultaneously with road Drop, but both settling amount has very big difference, the settling amount of road much larger than bridge settling amount (sedimentation difference is generally 10~ 30cm, the even more than 60cm having), faulting of slab ends is formed, cause that bumping at bridge-head occurs during driving.Road settlement is main by back filling behind abutment Compactness is inadequate, the sedimentation of roadbed foundation is caused.The harm of bumping at bridge-head is mainly shown as:Influence traffic safety, reduction row The disease of vehicle speed, influence car operation expense and acceleration bridge and road surface, the influence on system operation to road and bridge is very big.It is traditional anti- Attacking reinforcing maintenance will be carried out in the case where suspending traffic, and the normal of influence road is used.
Utility model content
Technical problem to be solved in the utility model is to provide one kind and can effectively prevent bumping at bridge-head with uninterrupted traffic Pre-buried slip casting structure.
The technical solution adopted in the utility model is:
The utility model includes pre-buried the first gate spool and the second gate spool being arranged in abutment changeover portion, described the One gate spool is arranged on the bottom of base course, horizontally disposed to have multiple, and the second gate spool rectangular array is set In base course.
The distance between adjacent described first gate spool of the utility model two is 1.5m-2m, and nearest apart from abutment The distance between the first gate spool and abutment be 0.8m-1.2m.
Horizontal range between adjacent second gate spool of the utility model two is 1.0m-2.0m, two adjacent institutes It is 1.0m-2.0m to state the vertical range between the second gate spool.
The distance between the utility model second gate spool nearest apart from abutment and abutment are 0.2m-1.0m, positioned at top Second gate spool at end is 0.8m-1.0m with the vertical range of road surface structare layer, positioned at second gate spool and original ground of bottom The distance between be 0.8m-1.0m.
The utility model is provided with the 3rd gate spool in side slope portion, and the distance between the 3rd gate spool and abutment are The distance between 1.5m-2.0m, two described 3rd gate spools are 1.5m-2.0m.
First gate spool described in the utility model includes outer tube and being nested with the inner tube in outer tube, in the outer tube and Plug hole is provided with the side wall of inner tube, two in axial direction adjacent plug holes are in 90 ° of settings.
Be provided with the second plug hole on the side wall of the second gate spool described in the utility model, in axial direction two it is adjacent The plug hole is in 90 ° of settings.
One end of 3rd gate spool described in the utility model is tapered, and is provided with the side wall of the 3rd gate spool Three plug holes, in axial direction two adjacent plug holes are in 90 ° of settings.
Good effect of the present utility model is:The first gate spool for being arranged on base course bottom can hold in road surface gene basis Carry when power is not enough settled to slip casting is carried out in roadbed, improve foundation bearing capacity, the second gate spool can be on road surface because of platform To slip casting in roadbed when back of the body degree of being backfilling and compacted not enough is settled, the compaction of back filling behind abutment is improved, due to first Gate spool and the second gate spool are embedded in abutment changeover portion, and generation problem is can directly inside slip casting, it is not necessary to suspends traffic It is capable of achieving maintenance of doing over again.Spacing between first gate spool and the spacing between abutment can be effectively ensured in slip casting Slip casting is uniform, it is ensured that grouting quality.Spacing between the second gate spool and spacing between abutment is same can effectively protect Card slip casting is uniform, and quality is good.The 3rd gate spool being arranged at side slope can be when there is horizontal sliding in roadbed substrate to roadbed Interior slip casting, prevents it from the phenomenon of horizontal sliding occur.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the gate spool positional structure schematic diagram of the utility model the 3rd;
Fig. 3 is the utility model the first gate spool structural representation;
Fig. 4 is the utility model the second gate spool structural representation;
Fig. 5 is the gate spool structural representation of the utility model the 3rd.
In the accompanying drawings, 1- abutments, 2- original grounds, 3- road surface structare layers, 4- base courses, the gate spools of 5- first, 501- outer tubes, 502- inner tubes, the plug holes of 503- first, the gate spools of 6- second, the plug holes of 601- second, the gate spools of 7- the 3rd, 701- the 3rd are poured into a mould Hole, 8- side slopes portion, 9- side slopes portion.
Specific embodiment
As shown in accompanying drawing 1,2, the utility model includes pre-buried the first gate spool 5 being arranged in abutment changeover portion and the Two gate spools 6, first gate spool 5 is arranged on the bottom of base course 4, horizontally disposed to have multiple, and single first pours The laying direction of note pipe 5 is identical with the width of road, and the rectangular array of the second gate spool 6 is arranged in base course 4, The laying direction of single second gate spool 6 is identical with the width of road;Between two adjacent first gate spools 5 away from The distance between the first gate spool 5 from being 1.5m-2m and nearest apart from abutment 1 and abutment 1 are 0.8m-1.2m;Two phases Horizontal range between adjacent second gate spool 6 is 1.0m-2.0m, vertical between two adjacent second gate spools 6 Distance is 1.0m-2.0m;The distance between the second gate spool 6 nearest apart from abutment 1 and abutment 1 are 0.2m-1.0m, positioned at top Second gate spool 6 at end and the vertical range of road surface structare layer 3 are 0.8m-1.0m, positioned at the second gate spool 6 of bottom and original place The distance between face 2 is 0.8m-1.0m;The 3rd gate spool 7, the 3rd gate spool 7 and abutment 1 are provided with side slope portion 8 The distance between be 1.5m-2.0m, the distance between two described 3rd gate spools 7 are 1.5m-2.0m, the 3rd gate spool 7 with Ground direction is vertical.
As shown in Figure 3, the first gate spool 5 described in the utility model includes outer tube 501 and is nested with outer tube 501 Inner tube 502, is provided with the first plug hole 503 on the side wall of the outer tube 501 and inner tube 502, in axial direction adjacent Two the first plug holes 503 in 90 ° of settings.
As shown in Figure 4, the second plug hole 601 is provided with the side wall of the second gate spool 6 described in the utility model, along axle To the adjacent plug hole 601 in two, direction in 90 ° of settings, the second gate spool 6 can pour the slurries with expansion character, phase When in prestressing force is applied to roadbed, sedimentation is offset in degree of correspondence.
As shown in Figure 5, one end of the 3rd gate spool 7 described in the utility model is tapered, is easy to construction, the described 3rd The 3rd plug hole 701 is provided with the side wall of gate spool 7, in axial direction two adjacent plug holes 701 set in 90 ° Put;Wrapped in the outside of the first gate spool 5 and the second gate spool 6 and be equipped with geotextiles.First gate spool 5, the second gate spool 6 and On the side wall of 3rd gate spool 7 interleaved set plug hole can with effective guarantee slip casting when uniformity.
The utility model, can be right in the case where traffic and use is not influenceed when road is when settling operation stage Abutment transition region carries out subgrade strengthening, greatly improves operating efficiency and construction safety performance.When settling the construction stage, It was found that slip casting can be immediately begun to after differential settlement, equipment, the input of personnel are reduced compared with doing over again, reduce construction cost With bad social influence.And the utility model material therefor is simple and easy to get, mud jacking construction technology is ripe.
Above example is only used to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing reality Example is applied to be described in detail the utility model, it will be understood by those within the art that:It still can be to preceding State the technical scheme described in embodiment to modify, or equivalent is carried out to which part technical characteristic;And these are repaiied Change or replace, do not make the spirit and scope of essence disengaging the utility model embodiment technical scheme of appropriate technical solution.

Claims (8)

1. a kind of pre-buried slip casting structure for preventing bumping at bridge-head, it is characterised in that it includes pre-buried being arranged in abutment changeover portion First gate spool (5) and the second gate spool (6), first gate spool (5) is arranged on the bottom of base course (4), along level Direction is provided with multiple, and the second gate spool (6) rectangular array is arranged in base course (4).
2. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 1, it is characterised in that two adjacent institutes The distance between first gate spool (5) is stated for 1.5m-2m, and first gate spool (5) and abutment nearest apart from abutment (1) The distance between (1) it is 0.8m-1.2m.
3. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 1, it is characterised in that two adjacent institutes The horizontal range between the second gate spool (6) is stated for 1.0m-2.0m, it is vertical between two adjacent second gate spools (6) Distance is 1.0m-2.0m.
4. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 3, it is characterised in that apart from abutment (1) The distance between nearest the second gate spool (6) and abutment (1) are 0.2m-1.0m, positioned at second gate spool (6) on top and road The vertical range of face structure sheaf (3) is 0.8m-1.0m, positioned at the distance between the second gate spool (6) and the original ground (2) of bottom It is 0.8m-1.0m.
5. a kind of according to claim any one of 1-4 prevents the pre-buried slip casting structure of bumping at bridge-head, it is characterised in that The 3rd gate spool (7) is provided with side slope portion (8), the distance between the 3rd gate spool (7) and abutment (1) are 1.5m- The distance between 2.0m, two described 3rd gate spools (7) are 1.5m-2.0m.
6. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 1, it is characterised in that described first pours Note pipe (5) includes outer tube (501) and the inner tube (502) being nested with outer tube (501), in the outer tube (501) and inner tube (502) the first plug hole (503) is provided with side wall, two in axial direction adjacent the first plug holes (503) are in 90 ° Set.
7. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 1, it is characterised in that described second pours The second plug hole (601) is provided with the side wall of note pipe (6), in axial direction two adjacent plug holes (601) are in 90 ° Set.
8. a kind of pre-buried slip casting structure for preventing bumping at bridge-head according to claim 5, it is characterised in that the described 3rd pours One end of note pipe (7) is tapered, and the 3rd plug hole (701) is provided with the side wall of the 3rd gate spool (7), vertically side To two adjacent plug holes (701) in 90 ° of settings.
CN201621377826.0U 2016-12-15 2016-12-15 A kind of pre-buried slip casting structure for preventing bumping at bridge-head Expired - Fee Related CN206267002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621377826.0U CN206267002U (en) 2016-12-15 2016-12-15 A kind of pre-buried slip casting structure for preventing bumping at bridge-head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621377826.0U CN206267002U (en) 2016-12-15 2016-12-15 A kind of pre-buried slip casting structure for preventing bumping at bridge-head

Publications (1)

Publication Number Publication Date
CN206267002U true CN206267002U (en) 2017-06-20

Family

ID=59045714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621377826.0U Expired - Fee Related CN206267002U (en) 2016-12-15 2016-12-15 A kind of pre-buried slip casting structure for preventing bumping at bridge-head

Country Status (1)

Country Link
CN (1) CN206267002U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221647A (en) * 2018-02-09 2018-06-29 聂重军 A kind of bridge abutment structure and its construction method
CN108930207A (en) * 2018-08-29 2018-12-04 武钦培 The construction method of expressway widening roadbed
CN109056778A (en) * 2018-08-31 2018-12-21 北京高能时代环境技术股份有限公司 Self-balancing sedimentation for landfill yard building can compensate for basis and system
CN110485316A (en) * 2019-08-27 2019-11-22 山东交通学院 A kind of method of multiple slip casting to administer bumping at bridge-head
CN110804931A (en) * 2019-11-15 2020-02-18 上海公路桥梁(集团)有限公司 Treatment method for lifting road surface
CN113235340A (en) * 2021-04-09 2021-08-10 浙江工业大学 Method for treating bump at bridge head by expanding and jacking transverse lead hole
CN113737624A (en) * 2021-09-13 2021-12-03 天津大学 Bridge head bump bag type grouting repair construction method
CN114508015A (en) * 2022-03-08 2022-05-17 河南城建学院 Method for reinforcing and repairing bridge-head bump road surface
CN114875732A (en) * 2021-12-17 2022-08-09 长沙理工大学 Embankment settlement prevention structure and method for expressway reconstruction and extension project
CN115162084A (en) * 2022-06-22 2022-10-11 浙江工业大学 Method for preventing vehicle bump at bridge head by means of differential settlement self-compensation of transition section of newly-built road bridge
CN117266023A (en) * 2023-11-21 2023-12-22 北京城建信捷轨道交通工程咨询有限公司 Paving structure and paving method of rail steel bridge deck

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221647A (en) * 2018-02-09 2018-06-29 聂重军 A kind of bridge abutment structure and its construction method
CN108930207A (en) * 2018-08-29 2018-12-04 武钦培 The construction method of expressway widening roadbed
CN108930207B (en) * 2018-08-29 2019-08-20 武钦培 The construction method of expressway widening roadbed
CN109056778A (en) * 2018-08-31 2018-12-21 北京高能时代环境技术股份有限公司 Self-balancing sedimentation for landfill yard building can compensate for basis and system
CN110485316A (en) * 2019-08-27 2019-11-22 山东交通学院 A kind of method of multiple slip casting to administer bumping at bridge-head
CN110804931A (en) * 2019-11-15 2020-02-18 上海公路桥梁(集团)有限公司 Treatment method for lifting road surface
CN113235340A (en) * 2021-04-09 2021-08-10 浙江工业大学 Method for treating bump at bridge head by expanding and jacking transverse lead hole
CN113235340B (en) * 2021-04-09 2022-06-17 浙江工业大学 Method for treating bump at bridge head by expanding and jacking transverse lead hole
CN113737624A (en) * 2021-09-13 2021-12-03 天津大学 Bridge head bump bag type grouting repair construction method
CN114875732A (en) * 2021-12-17 2022-08-09 长沙理工大学 Embankment settlement prevention structure and method for expressway reconstruction and extension project
CN114508015A (en) * 2022-03-08 2022-05-17 河南城建学院 Method for reinforcing and repairing bridge-head bump road surface
CN115162084A (en) * 2022-06-22 2022-10-11 浙江工业大学 Method for preventing vehicle bump at bridge head by means of differential settlement self-compensation of transition section of newly-built road bridge
CN115162084B (en) * 2022-06-22 2024-04-09 浙江工业大学 Method for preventing bridge head from jumping by differential settlement self-compensation of transition section of newly-built highway bridge
CN117266023A (en) * 2023-11-21 2023-12-22 北京城建信捷轨道交通工程咨询有限公司 Paving structure and paving method of rail steel bridge deck
CN117266023B (en) * 2023-11-21 2024-02-06 北京城建信捷轨道交通工程咨询有限公司 Paving structure and paving method of rail steel bridge deck

Similar Documents

Publication Publication Date Title
CN206267002U (en) A kind of pre-buried slip casting structure for preventing bumping at bridge-head
CN103321118B (en) Bridge road transition section roadbed structure of deep layer yielding ground regions
CN103266622A (en) L-shaped retaining wall structure with cross-over type special-shaped counterfort
WO2016138776A1 (en) Lowly disposed line structure used in medium-low speed magnetic levitation traffic engineering fill section
CN108611985A (en) Framed underpass bridge construction method that special geology is overweight
CN107587420B (en) A kind of abutment approach pavement structure and its construction method
CN102383353A (en) Combined structure for abrupt slope road bed of rapid transit railway
CN111021172A (en) Road construction process
CN108360369A (en) The road and bridge end of the bridge engaging portion structure of pre- anti-jump vehicle phenomenon
CN218621610U (en) Highway bridgehead roadbed structure
CN202000221U (en) Ballastless track structure for steep slope subgrade
CN206752241U (en) Kerbstone pedestal and the vertical disconnected structure of enlarging highway Intermediate Gray
CN101974871A (en) Short roadbed transition section structure between culverts of high speed railway
CN213358185U (en) Foam light soil highway embankment
CN210194456U (en) Steel corrugated pipe culvert soil filling structure
CN211113188U (en) Structure of back of a platform construction of backfilling
CN211079792U (en) Ling river adds muscle roadbed structure
CN209114501U (en) A kind of gear protection structure and component and highway
CN111622035A (en) Existing road widening and transformation method for reservoir area based on symmetrical integral type overhanging structure
CN109629592A (en) A kind of production method of ground logistics transportation pipeline
CN105672131B (en) It is a kind of first to push up the steel box-girder jacking technique and steel box girder cut afterwards
CN208009280U (en) A kind of anti-settling platform
CN212335687U (en) Roadbed structure for road
CN219731498U (en) Anti-sedimentation roadbed reinforcing structure
CN103821058B (en) The constructional device of Study on Reinforced Embankments Using and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20211215