CN206257987U - A kind of no-arbitrary pricing formula cooling tower - Google Patents
A kind of no-arbitrary pricing formula cooling tower Download PDFInfo
- Publication number
- CN206257987U CN206257987U CN201621103560.0U CN201621103560U CN206257987U CN 206257987 U CN206257987 U CN 206257987U CN 201621103560 U CN201621103560 U CN 201621103560U CN 206257987 U CN206257987 U CN 206257987U
- Authority
- CN
- China
- Prior art keywords
- water
- locator
- cooling tower
- delivery port
- distribution nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of no-arbitrary pricing formula cooling tower,Including panel,Air-inlet window,Water collecting bin,Air duct,Support frame in air duct,Electric fan is installed on support frame as described above,Electric fan lower section sets the first water-locator,First water-locator is connected with the water inlet in panel wall,First delivery port and the second delivery port are set on the ponding headwall,Described first delivery port connection water pump one end,The water collecting bin middle part is installed by screen pack,The screen pack top sets the second water-locator,First delivery port is above screen pack,The water pump other end is connected with the second water-locator,Water-distribution nozzle position correspondence direction opposition on water-distribution nozzle and the second water-locator on first water-locator,Atomising device is set on the water-distribution nozzle,The jet length of the distance between first water-locator and the second water-locator equal to water-distribution nozzle on the second water-locator.The utility model need not install filler, save the cost of cooling tower, simplify cooling tower cleaning process.
Description
Technical field
The utility model is related to a kind of cooling tower, in particular to a kind of no-arbitrary pricing formula cooling tower.
Background technology
Now, cooling tower is widely used in various fields, and, typically in cylinder or square shape, cold air is from tower bottom for cooling tower
It is inhaled into tower, heat exchange is formed with hot water in tower, is finally discharged by tower top.But filler is equipped with inside cooling tower mostly,
And filler need to often be replaced and cleaned when using, the cost of cooling tower is so substantially increased, while in the case of produced water, filler
It is easily contaminated, and difficult cleaning.
Utility model content
The utility model overcomes existing cooling inner-tower filling material cost greatly, changes clothes frequently problem.
In order to solve the above-mentioned technical problem, the utility model uses following technical scheme:
A kind of no-arbitrary pricing formula cooling tower, including panel, air-inlet window, water collecting bin, air duct, the support frame in air duct,
Electric fan is installed, electric fan lower section sets the first water-locator on support frame as described above, entering in the first water-locator and panel wall
The mouth of a river is connected, and the first delivery port and the second delivery port are set on the ponding headwall, and first delivery port connects water pump one end,
Screen pack is installed at the water collecting bin middle part, and the screen pack top sets the second water-locator, and first delivery port is in screen pack
Top, below filter screen, the water pump other end is connected the second delivery port with the second water-locator, the cloth on first water-locator
Water-distribution nozzle position correspondence direction opposition on sprinkler head and the second water-locator.Further, atomization is set on the water-distribution nozzle
Device.
Further, the distance between first water-locator and the second water-locator are equal to water-distribution nozzle on the second water-locator
Jet length.
Compared with prior art, the utility model has the advantages that:
Filler need not be installed in cooling tower, the cost of cooling tower is greatlyd save, while solve traditional cooling tower filling out
Material needs the problem being often replaced and cleaned, when having pollutant in processing hot water, simplify cooling tower cleaning process, prevents inside
Block, it is cost-effective.
Brief description of the drawings
Fig. 1 is a kind of structure chart of no-arbitrary pricing formula cooling tower of the present utility model.
In figure:1. panel, 2. air-inlet window, 3. water collecting bin, 4. air duct, 5. support frame, 6. the first delivery port, 7. electronic wind
Machine, 8. the first water-locator, 9. water inlet, 10. water pump, 11. second water-locators, 12. water-distribution nozzles, 13. atomising devices, 14. mistakes
Filter screen, 15. cooling towers, 16. second delivery ports.
Specific embodiment
1 pair of specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of no-arbitrary pricing formula cooling tower of the utility model, including panel 1, air-inlet window 2, water collecting bin 3, air duct
4, the support frame 5 in air duct 4 installs electric fan 7 on support frame as described above 5, the lower section of electric fan 7 sets the first water distribution
Device 8, the first water-locator 8 is connected with the water inlet 9 on the wall of panel 1, and the first delivery port 6, and second are set on the wall of the water collecting bin 3
Delivery port 16, the described connection water pump 10 of first delivery port 6 one end, screen pack 14, the screen pack are installed in the middle part of the water collecting bin 3
14 tops set the second water-locator 11, and, in the top of screen pack 14, the second delivery port 16 is under screen pack for first delivery port 6
Side, the other end of the water pump 10 is connected with the second water-locator 11, the water distribution of water-distribution nozzle 12 and second on first water-locator 8
The position correspondence direction opposition of water-distribution nozzle 12 on device 11.Atomising device 13, first cloth are set on the water-distribution nozzle 12
Jet length of the distance between the water-locator 11 of hydrophone 8 and second equal to water-distribution nozzle 12 on the second water-locator.
Embodiment 1:
When hot water contamination-free, the screen pack 14 in water collecting bin 3 can be removed, cooling tower 15 is operationally, first in ponding
Bucket 3 fills it up with cold water, and hot water enters the first water-locator 8 from water inlet 9, by the water-distribution nozzle 12 on the first water-locator 8 and atomization
Device 13, downwards spray into cooling tower 15 in, while electric fan 7 rotate, cold air from air-inlet window 2 enter cooling tower in spray
The hot water penetrated carries out heat exchange, then discharges cooling tower from air duct 4, and now the cold water in water collecting bin 3 is acted on through water pump 10, is taken out
Enter the second water-locator 11, by water-distribution nozzle 12 and atomising device 13 on the second water-locator 11, upwards in penetrating cooling tower 15,
Hot water contacts in cold water and tower, make latter of its cooling down fall into again in water collecting bin 3, and the water of cooling passes through the second water outlet
Mouth 16 enters circulating line.
Embodiment 2:
When there is pollutant in hot water, screen pack 14 is loaded onto at the middle part of water collecting bin 3, while removing the first water-locator and second
Atomising device 13 on water-locator, cooling tower 15 operationally, first fills it up with cold water in water collecting bin 3, and sewage enters the from water inlet 9
One water-locator 8, by the water-distribution nozzle 12 on the first water-locator 8, sprays into cooling tower 15 downwards, while electric fan 7 is turning
It is dynamic, cold air from air-inlet window 2 into cooling tower in carry out heat exchange with the sewage of injection, then discharge cooling tower from air duct 4, this
When water collecting bin 3 in cold water acted on through water pump 10, the second water-locator 11 is drawn into, by the water-distribution nozzle on the second water-locator 11
12, spray into upwards in cooling tower 15, the waste water in cold water and tower makes latter of its cooling down fall into water collecting bin 3 again
In, the clean water through cooling down enters circulating line by the second delivery port 16.
The utility model causes that in cooling tower filler need not be installed, and greatlys save the cost of cooling tower, while solving
Traditional cooling tower filler needs the problem being often replaced and cleaned, and when having pollutant in processing hot water, simplification cooling tower is clear
Journey is washed, internal blocking is prevented, it is cost-effective.
Finally it should be noted that:Above example is merely to illustrate the technical scheme of the application rather than to its protection domain
Limitation, although being described in detail to the application with reference to above-described embodiment, those of ordinary skill in the art should
Understand:Those skilled in the art read still can be to applying after the application specific embodiment carry out a variety of changes, modification or
Person's equivalent, but these changes, modification or equivalent, are applying within pending claims.
Claims (3)
1. a kind of no-arbitrary pricing formula cooling tower, including panel, air-inlet window, water collecting bin, air duct, the support frame in air duct, institute
State and electric fan is installed on support frame, electric fan lower section sets the first water-locator, the water inlet on the first water-locator and panel wall
Mouth is connected, it is characterised in that:First delivery port and the second delivery port, the first delivery port connection are set on the ponding headwall
Screen pack is installed at water pump one end, the water collecting bin middle part, and the screen pack top sets the second water-locator, first delivery port
Above screen pack, below filter screen, the water pump other end is connected the second delivery port with the second water-locator, first water distribution
Water-distribution nozzle position correspondence direction opposition on water-distribution nozzle and the second water-locator on device.
2. a kind of no-arbitrary pricing formula cooling tower according to claim 1, it is characterised in that:Atomization is set on the water-distribution nozzle
Device.
3. a kind of no-arbitrary pricing formula cooling tower according to claim 2, it is characterised in that:First water-locator and the second cloth
Jet length of the distance between the hydrophone equal to water-distribution nozzle on the second water-locator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621103560.0U CN206257987U (en) | 2016-10-08 | 2016-10-08 | A kind of no-arbitrary pricing formula cooling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621103560.0U CN206257987U (en) | 2016-10-08 | 2016-10-08 | A kind of no-arbitrary pricing formula cooling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206257987U true CN206257987U (en) | 2017-06-16 |
Family
ID=59023558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621103560.0U Expired - Fee Related CN206257987U (en) | 2016-10-08 | 2016-10-08 | A kind of no-arbitrary pricing formula cooling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206257987U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113776352A (en) * | 2021-09-23 | 2021-12-10 | 辉承传热技术(山东)有限公司 | Filler-free cross-flow type closed cooling tower |
-
2016
- 2016-10-08 CN CN201621103560.0U patent/CN206257987U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113776352A (en) * | 2021-09-23 | 2021-12-10 | 辉承传热技术(山东)有限公司 | Filler-free cross-flow type closed cooling tower |
CN113776352B (en) * | 2021-09-23 | 2023-12-29 | 辉承传热技术(山东)有限公司 | Cross flow type closed cooling tower without packing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206566678U (en) | A kind of spray column | |
CN203565403U (en) | COP cleaning groove | |
CN204685374U (en) | Novel two stage cascade spray booth | |
CN206257987U (en) | A kind of no-arbitrary pricing formula cooling tower | |
CN208482883U (en) | A kind of thermoplastic articles cleaning device | |
CN203245735U (en) | Polishing dust-removing equipment | |
CN107519719A (en) | A kind of construction site cleaner | |
CN208526128U (en) | A kind of water mist dust-removing system | |
CN207786192U (en) | A kind of dust-extraction unit | |
CN206857411U (en) | A kind of multifunction storage water pot | |
CN205925365U (en) | Spray column and filtration system | |
CN206701005U (en) | It is a kind of new from dedusting network cabinet | |
CN205673120U (en) | A kind of water curtain water rotation coating cloud trapping ring protection device | |
CN203598637U (en) | Dust removal cabinet | |
CN204486114U (en) | High-efficient atomizing catches paint spray booth | |
CN206934997U (en) | A kind of Horizental showering tower apparatus | |
CN103245212A (en) | Energy-saving cooling tower | |
CN206198911U (en) | A kind of wet dust separater | |
CN206153044U (en) | Spout room exhaust cavity | |
CN209490633U (en) | A kind of coal-fired flue gas desulfurization dedusting dehydrating demisting mechanism | |
CN205495202U (en) | Wash dust shaker | |
CN104889006A (en) | Water curtain spraying coagulation mechanism | |
CN206138883U (en) | Mist purification system equipment sprays paint | |
CN205495214U (en) | Dust shaker is washed in spraying | |
CN204816069U (en) | Fountain dust device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170616 Termination date: 20171008 |