CN206257695U - Steam type airheater - Google Patents

Steam type airheater Download PDF

Info

Publication number
CN206257695U
CN206257695U CN201621322287.0U CN201621322287U CN206257695U CN 206257695 U CN206257695 U CN 206257695U CN 201621322287 U CN201621322287 U CN 201621322287U CN 206257695 U CN206257695 U CN 206257695U
Authority
CN
China
Prior art keywords
low
housing
steam
pressure
tube bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621322287.0U
Other languages
Chinese (zh)
Inventor
苏凯泉
陈利江
张勇
严宝来
唐晓锋
黄天国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI ZHICHENG BIOCHEMICAL ENGINEERING EQUIPMENT Co Ltd
Original Assignee
WUXI ZHICHENG BIOCHEMICAL ENGINEERING EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI ZHICHENG BIOCHEMICAL ENGINEERING EQUIPMENT Co Ltd filed Critical WUXI ZHICHENG BIOCHEMICAL ENGINEERING EQUIPMENT Co Ltd
Priority to CN201621322287.0U priority Critical patent/CN206257695U/en
Application granted granted Critical
Publication of CN206257695U publication Critical patent/CN206257695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

Steam type airheater, including housing, the tube bank of several low pressure has been arranged side by side in the housing, one end of the housing is provided with low-pressure steam inlet, the low-pressure steam inlet is located at the upside at the end, the other end is provided with low-pressure steam outlet, the low-pressure steam outlet is located at the downside at the end, the low-pressure steam inlet is connected with one layer of low pressure tube bank topmost, the low-pressure steam outlet is connected with bottom one layer of low pressure tube bank, the bottom of the housing is provided with air intlet, air outlet slit is provided with the top of the housing, exhaust outlet is additionally provided with the top of the housing, the bottom of the housing is additionally provided with drain port, the upper inwall of the low pressure tube bank is provided with several arc convex, gap is left between the arc convex of arbitrary neighborhood, length of the gap more than arc convex.The utility model, improves heat exchanger effectiveness, while the low pressure tube bank superficial dust cycle is long, is convenient to clean.

Description

Steam air heater
Technical field
The utility model is related to steam air heater, belongs to technical field of chemical.
Background technology
Air Leakage is always puzzlement biomass fermentation caused by biomass boiler steam air heater pipe dust stratification, corrosion What the problem of electric enterprise, dust stratification and corrosion were caused leaks out, and causing air-introduced machine to load increases, the air-supply needed for reducing boiler combustion Amount, reduces efficiency of combustion, and load band is not enough.Often there is steam leakage phenomenon in heater system, and passed through in fine and closely woven aluminium fin Often block, clear up extremely difficult, boiler combustion and generation load are directly affected when serious.
Utility model content
In order to solve above-mentioned problem, the utility model discloses steam air heater, its concrete technical scheme It is as follows:
Steam air heater, including housing, have been arranged side by side the tube bank of several low pressure, the housing in the housing One end be provided with low-pressure steam inlet, the low-pressure steam inlet is located at the upside at the end, and the other end is provided with low-pressure steam Outlet, the low-pressure steam outlet is located at the downside at the end, and the low-pressure steam inlet is connected with one layer of low pressure tube bank topmost, The low-pressure steam outlet is connected with bottom one layer of low pressure tube bank, and the bottom of the housing is provided with air intlet, the shell Air outlet slit is provided with the top of body, exhaust outlet is additionally provided with the top of the housing, the bottom of the housing is additionally provided with thin The mouth of a river, the upper inwall of the low pressure tube bank is provided with several arc convex, and gap is left between the arc convex of arbitrary neighborhood, Length of the gap more than arc convex.
There is row's arc convex in every low pressure tube bank, and arc convex is located at the top that low pressure restrains inwall.
Half of the height of the arc convex less than low pressure bundle diameters.
Neighbouring low pressure tube bank head and the tail two ends order insertion.
The two ends of the low pressure tube bank are respectively arranged with tube bank fixed plate, and the two ends of all low pressure tube banks both pass through corresponding end Tube bank fixed plate.
The low-pressure steam inlet towards housing top, the low-pressure steam outlet towards housing lower section.
Pressure gauge connection is additionally provided with the top of the housing.
The method for installing steam-air preheater, comprises the following steps:
(1)Choose support:A support is chosen, the length when width of support is more than housing horizontal positioned, support is stood After on the ground, the top horizontal of support;
(2)Steam-air preheater is installed:Steam-air preheater level is placed in the top of support, support energy It is enough to fix steam-air preheater so that the low-pressure steam inlet of steam-air preheater towards support it is vertical on Side, the low-pressure steam outlet of the steam-air preheater towards support vertical lower, now, steam-air preheater Air intake towards support vertical lower, the vertical direction of the air outlet slit of steam-air preheater towards support;
(3)Connect air access tube:Air access tube is installed in the air intlet of steam-air preheater, air is passed through Pipe is connected with the flue in workshop, for towards the flue gas that workshop is passed through in air access tube;
(4)Air outlet conduits are installed:Air outlet conduits, the air are installed in the air outlet slit of steam-air preheater Efferent duct is in flare form, and air outlet conduits are from itself and air outlet slit installation end towards the other end gradually enlarging;
(5)Insertion pressure gauge:Pressure gauge is inserted in the pressure gauge connection of steam-air preheater.
The step(4)In air outlet conduits be provided with thermometer boss, be inserted with thermometer in the thermometer boss.
The step(3)A transition conduit is also equipped between middle air access tube and air intlet, the transition conduit Open top is consistent with air intlet, and is docked with air intlet sealing, and the bottom opening of transition conduit is consistent with air access tube, And be passed through the seal of tube with air and dock.
The air outlet conduits and transition conduit are provided with manhole.
Operation principle of the present utility model is:
The utility model, the boiler smoke in biomass workshop is passed into steam-air preheater from air access tube, Heat exchange is carried out with low-pressure steam in steam-air preheater, is then sent out from air outlet conduits, low-pressure steam is from low Steam inlet is pressed to enter into low pressure tube bank, low-pressure steam is restrained by low pressure and discharged from low-pressure steam outlet, in steam and sky During gas heat exchange, some water vapours can be produced in housing, eventually be condensed into water, the water is discharged from drain port, led to Air pressure in excess pressure table monitoring housing, when air pressure is too high, can control the air pressure in housing by exhaust outlet.
The beneficial effects of the utility model are:
The utility model, low-pressure steam enters from steam air heater low pressure tube bank topmost, low-pressure steam according to It is secondary to be restrained by all of low pressure, enter eventually into bottom low pressure tube bank, from low-pressure steam outlet discharge, and air from A bottom low pressure tube bundle flow enters, and sequentially passes through all of low pressure tube bank, goes out from a uppermost low pressure tube bundle flow, air Sufficient heat exchange can be carried out with steam, heat exchanger effectiveness is improved, while the low pressure tube bank superficial dust cycle is long, is easy to clear Reason.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model,
Fig. 2 is the cross-sectional view of low pressure tube bank,
Fig. 3 is the A direction views of Fig. 1,
Fig. 4 is the B direction views of Fig. 1,
Fig. 5 is the view after the utility model is installed with support,
Reference numerals list:1-housing, the tube bank of 2-low pressure, 3-tube bank fixed plate, 4-air access tube, 5-support, 6-transition conduit, 7-air outlet conduits, 8-arc convex, N1-air intlet, N2-air outlet slit, N3-low-pressure steam enters Mouthful, N4-low-pressure steam outlet, N5-drain port, N6-exhaust outlet, M1-manhole, P1-pressure gauge connection.
Specific embodiment
With reference to the accompanying drawings and detailed description, the utility model is further elucidated.It should be understood that following specific embodiment parties Formula is merely to illustrate the utility model rather than limits scope of the present utility model.
Arrow in Fig. 1 represents the flow direction of air, this steam air heater visible with reference to accompanying drawing, including housing 1, several low pressure tube bank 2 has been arranged side by side in the housing 1, one end of the housing 1 is provided with low-pressure steam inlet N3, institute Upsides of the low-pressure steam inlet N3 positioned at the end is stated, the other end is provided with low-pressure steam outlet N4, the low-pressure steam outlet N4 Positioned at the downside at the end, the bottom of the housing 1 is provided with air intlet N1, and the top of the housing 1 is provided with air outlet slit N2, the top of the housing 1 is additionally provided with exhaust outlet N6, and the bottom of the housing 1 is additionally provided with drain port N5.This practicality is new Type, housing 1 is used for the heat exchange space that the utility model is installed and forms internal closing, and low-pressure steam is from of the present utility model Top enters, and from bottom discharge, low-pressure steam have passed through all of low pressure tube bank 2, and the flow direction of air is then from this practicality New bottom enters, and from bottom discharge, air and low-pressure steam reverse flow being capable of sufficient heat exchanges.
Fig. 2 is the cross-sectional view of low pressure tube bank, visible with reference to accompanying drawing, if the upper inwall of low pressure tube bank is provided with Dry arc convex 8, leaves gap, length of the gap more than arc convex between the arc convex 8 of arbitrary neighborhood.Every There is row's arc convex 8 in low pressure tube bank, and arc convex 8 is located at the top that low pressure restrains inwall.The arc convex 8 Highly less than the half of low pressure bundle diameters.Arc convex 8 does not influence low pressure to restrain the flowing of interior condensed water, while can be to low Pressure steam plays unhurried current effect, allows low-pressure steam to flow slack-off, increases heat exchanger time.
The neighbouring low pressure restrains 2 head and the tail two ends order insertions.Ensure that low-pressure steam has a unobstructed flowing Channel.
The two ends of the tube bank are respectively arranged with tube bank fixed plate 3, and the two ends of all tube banks both pass through the tube bank of corresponding end Fixed plate 3.Tube bank fixed plate 3 can maintain static all of tube bank, it is ensured that use safety.
Towards the top of housing 1, the low-pressure steam outlet N4 is towards the lower section of housing 1 for the low-pressure steam inlet N3.Low pressure Steam can be smoothly flowed therein in low pressure tube bank 2.
The top of the housing 1 is additionally provided with pressure gauge connection P1.Pressure gauge is inserted in pressure gauge connection P1, shell is monitored Pressure condition in body 1, it is ensured that use safety.
The method for installing steam-air preheater, comprises the following steps:
(1)Choose support 5:Choose a support 5, the length when width of support 5 is more than 1 horizontal positioned of housing, support 5 After standing on the ground, the top horizontal of support 5;
(2)Steam-air preheater is installed:Steam-air preheater level is placed in the top of support 5, support 5 Steam-air preheater can be fixed so that the low-pressure steam inlet N3 of steam-air preheater is towards support 5 Vertical direction, the low-pressure steam outlet N4 of the steam-air preheater towards support 5 vertical lower, now, steam- , towards the vertical lower of support 5, the air outlet slit N2 of steam-air preheater is towards support 5 for the air intake of air preheater Vertical direction;
(3)Connect air access tube 4:Air access tube 4, air are installed in the air intlet N1 of steam-air preheater Access tube 4 is connected with the flue in workshop, for towards the flue gas that workshop is passed through in air access tube 4;
(4)Air outlet conduits 7 are installed:Air outlet conduits 7 are installed in the air outlet slit N2 of steam-air preheater, it is described Air outlet conduits 7 are in flare form, and air outlet conduits 7 are from itself and air outlet slit N2 installation ends towards the other end gradually enlarging;
(5)Insertion pressure gauge:Pressure gauge is inserted in the pressure gauge connection P1 of steam-air preheater.
This installation method so that steam-air preheater can be used safely, the flue gas with workshop fully carries out hot friendship Change, and reduce dust stratification, improve the cycle of maintenance.
The step(4)In air outlet conduits 7 be provided with thermometer boss, be inserted with temperature in the thermometer boss Meter.Temperature by the air discharged after steam-air preheater heat exchange is monitored by thermometer.
The step(3)A transition conduit 6, the transition are also equipped between middle air access tube 4 and air intlet N1 The open top of pipe 6 is consistent with air intlet N1, and is docked with air intlet N1 sealings, the bottom opening and air of transition conduit 6 Access tube 4 is consistent, and is docked with the sealing of air access tube 4.By transition conduit 6, the velocity variations situation of flow of flue gas is buffered, made Obtaining the utility model has the use environment of stabilization.
The air outlet conduits 7 and transition conduit 6 are provided with manhole M1.Manhole M1 is used to observe steam-sky for operator The dust stratification situation of air preheater, and other situations in steam-air preheater.
Technological means disclosed in the utility model scheme is not limited only to the technological means disclosed in above-mentioned technological means, also Including being combined constituted technical scheme by above technical characteristic.
With above-mentioned according to desirable embodiment of the present utility model as enlightenment, by above-mentioned description, related work people Member can carry out various changes and amendments in the range of without departing from this utility model technological thought completely.This reality The content on specification is not limited to new technical scope, it is necessary to its technology is determined according to right Property scope.

Claims (7)

1. steam air heater, it is characterized in that including housing, the tube bank of several low pressure, institute have been arranged side by side in the housing The one end for stating housing is provided with low-pressure steam inlet, and the low-pressure steam inlet is located at the upside at the end, and the other end is provided with low Pressure steam (vapor) outlet, the low-pressure steam outlet is located at the downside at the end, the low-pressure steam inlet and one layer of low-voltage tube topmost Beam is connected, and the low-pressure steam outlet is connected with bottom one layer of low pressure tube bank, and the bottom of the housing is provided with air intlet, Air outlet slit is provided with the top of the housing, exhaust outlet is additionally provided with the top of the housing, the bottom of the housing also sets Drain port is equipped with, the upper inwall of the low pressure tube bank is provided with several arc convex, is stayed between the arc convex of arbitrary neighborhood There are gap, length of the gap more than arc convex.
2. steam air heater according to claim 1, it is characterized in that having row's arc convex in every low pressure tube bank Rise, and arc convex is located at the top that low pressure restrains inwall.
3. steam air heater according to claim 2, it is characterized in that the height of the arc convex is less than low-voltage tube The half of beam diameter.
4. steam air heater according to claim 3, it is characterized in that neighbouring low pressure tube bank head and the tail two End order insertion.
5. steam air heater according to claim 1, it is characterized in that the two ends of low pressure tube bank are respectively arranged with Tube bank fixed plate, the two ends of all low pressure tube banks both pass through the tube bank fixed plate of corresponding end.
6. steam air heater according to claim 1, it is characterized in that the low-pressure steam inlet is towards on housing Side, the low-pressure steam outlet towards housing lower section.
7. steam air heater according to claim 1, it is characterized in that being additionally provided with pressure gauge at the top of the housing Interface.
CN201621322287.0U 2016-12-05 2016-12-05 Steam type airheater Expired - Fee Related CN206257695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621322287.0U CN206257695U (en) 2016-12-05 2016-12-05 Steam type airheater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621322287.0U CN206257695U (en) 2016-12-05 2016-12-05 Steam type airheater

Publications (1)

Publication Number Publication Date
CN206257695U true CN206257695U (en) 2017-06-16

Family

ID=59027362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621322287.0U Expired - Fee Related CN206257695U (en) 2016-12-05 2016-12-05 Steam type airheater

Country Status (1)

Country Link
CN (1) CN206257695U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108050536A (en) * 2017-11-30 2018-05-18 江苏中科重工股份有限公司 Low-temperature air preheater
CN109469909A (en) * 2018-09-27 2019-03-15 上海双木散热器制造有限公司 Control the steam air heater of dioxin concentration

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108050536A (en) * 2017-11-30 2018-05-18 江苏中科重工股份有限公司 Low-temperature air preheater
CN108050536B (en) * 2017-11-30 2019-10-29 江苏中科重工股份有限公司 Low-temperature air preheater
CN109469909A (en) * 2018-09-27 2019-03-15 上海双木散热器制造有限公司 Control the steam air heater of dioxin concentration

Similar Documents

Publication Publication Date Title
CN206257695U (en) Steam type airheater
CN110230810B (en) Energy-saving deaerator without steam discharge
CN204513362U (en) A kind of power economized boiler with waste heat recovery
CN203837010U (en) Graphite pipe type low-temperature air preheater
CN207262700U (en) A kind of flue gas waste heat recovery water jacket furnace
CN206330143U (en) Low-pressure steam air preheater
CN104406185A (en) Boiler smoke gas cascade afterheat recovery energy-saving device
CN205424990U (en) Durable air heater
CN202253724U (en) Wind sealing equipment for rotary type air preheater
CN204213956U (en) A kind of boiler smoke step waste heat recovery economizer
CN203869016U (en) Heat exchange device of spirally corrugated tube at tail of industrial boiler
CN203571706U (en) Tube panel type water pipe heat exchanger integrated with electrostatic precipitator
CN201909308U (en) Flue gas waste heat device
CN206739251U (en) Industrial Boiler afterheat generating system
CN201973735U (en) Single-cycle dredging type air leakage control system for Ljungstrom air preheaters
CN207162509U (en) Improve SCR temperature of reactor system and devices
CN206274230U (en) A kind of superconduction fluidised form heat exchanger
CN203384999U (en) Inlet air heater of air preheater of generator set boiler
CN204177248U (en) A kind of forming machine high-temperature flue gas heat-energy recovering apparatus
CN204593869U (en) A kind of device for utilizing waste of boiler
CN220229100U (en) Vertical gas boiler with external steam-water separator
CN203454819U (en) Waste heat recovery system of smelting furnace for aluminum ingot production
CN204478509U (en) A kind of heat-absorbing structure of inner bag biomass boiler
CN210485661U (en) Heat recovery device for vertical combustion furnace
CN202835317U (en) Vertical type boiler with towering pipe

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170616

Termination date: 20171205