CN206246834U - A kind of support of pipelines for being applied to bridge - Google Patents
A kind of support of pipelines for being applied to bridge Download PDFInfo
- Publication number
- CN206246834U CN206246834U CN201621353364.9U CN201621353364U CN206246834U CN 206246834 U CN206246834 U CN 206246834U CN 201621353364 U CN201621353364 U CN 201621353364U CN 206246834 U CN206246834 U CN 206246834U
- Authority
- CN
- China
- Prior art keywords
- support plate
- arc
- support
- bridge
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of support of pipelines for being applied to bridge, belong to bridge strengthening field, it is intended to influence of the vibrations to pipeline can be slowed down.Its drip irrigation device is to include bridge and pipeline, the bridge lower section is provided with some evenly distributed vertical support plates, the vertical support plate is provided with horizontal support plate, the horizontal support plate is provided with the arc placed for pipeline, the horizontal support plate is located at below arc to be provided with and is embedded in groove one, the groove one bolster being provided with to arc support for arc.
Description
Technical field
The utility model is related to bridge strengthening field, more particularly to a kind of support of pipelines for being applied to bridge.
Background technology
For the regular electric wire placed on bridge, all pipeline can be set come electric wire of arranging, pipeline one in the lower section of bridge
As be arranged on support and fixed by support, in the reinforcing to bridge, maintenance and reinforcing to pipeline and support are necessary
One step, because bridge top can frequently cross car, causes bridge that some can occur and shakes, and is arranged on the pipeline below bridge
Also can shake, and then can occur frequently to rub with support, cause pipe wear serious, getting off can influence pipeline for a long time
Quality, and if changing pipeline can produce larger financial burden during reinforcing.
Utility model content
The purpose of this utility model is to provide a kind of support of pipelines for being applied to bridge, and it can slow down vibrations to pipeline
Influence.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of bridge of being applied to
Support of pipelines, including bridge and pipeline, the bridge lower section are provided with some evenly distributed vertical support plates, on the vertical support plate
Horizontal support plate is provided with, the horizontal support plate is provided with the arc placed for pipeline, and the horizontal support plate is located under arc
Side is provided with and is embedded in groove one, the groove one bolster being provided with to arc support for arc.
By such scheme, vertical support plate is used to support horizontal support plate, and cross-brace is used for support pipeline, and arc is embedded
Placed for pipeline in groove one, the bolster in groove one is used to slow down the influence of the vibrations to pipeline of bridge, when bridge is opened
When beginning to shake, vertical support plate can be caused to shake first, vibrations are passed to horizontal support plate by vertical support plate, horizontal support plate passes vibrations
Bolster is passed, bolster is then passed to arc, is located at using the vibration that the buffering effect of itself eliminates the overwhelming majority
The vibrations that conduit acceptor above arc is arrived are minimum, so that pipeline is relatively stable on support, slow down vibrations to pipe
The influence in road.
Further, the bolster includes the support chip and spring one coordinated with arc, the one end of the spring one
Bottom land with groove one is fixedly connected, and the other end is fixedly connected with support chip.
By such scheme, spring one is used to eliminate most of vibrations, and support chip is used for support arc, support chip is set
That puts coordinates with arc, and arc can be made relatively stable positioned at bolster top.
Further, the two ends of the arc are provided with banking stop, and the both sides of the horizontal support plate upper end are provided with to spacing
The spacing limiting plate of piece.
By such scheme, banking stop is connected to the two ends of arc, while be located between two pieces of limiting plates, it is so spacing
Piece can just draw arc, make arc relatively stable on horizontal support.
Further, it is provided with pressing plate above the limiting plate.
By such scheme, pressing plate is provided with above limiting plate, banking stop can be prevented due to the effect of spring one
Banking stop is departed from the limitation of limiting plate, make banking stop relatively stable between limiting plate.
Further, the horizontal support plate is located to be opened up below banking stop in fluted two, the groove two and is provided with bullet
Spring two, one end of the spring two is fixedly connected with the bottom land of groove two, and the other end is fixedly connected with support member, the support member with
Banking stop is contradicted.
By such scheme, spring two and support member cooperate and enter row buffering to the vibrations on horizontal support, and then
Slow down the vibrations of the banking stop above support member, so as to coordinate bolster to slow down the vibrations of pipeline, pipeline is relatively stablized
On horizontal support.
Further, the two ends of the arc have upwardly extended stay along its circumferencial direction, two stays it
Between leave gap.
By such scheme, stay be used for the pipeline that is pointed in arc carry out it is spacing, because stay is by arc
The two ends of plate extend along its circumferencial direction and form, so that stay is relatively stable on arc, when needing that pipeline is put
Put when on arc, two stays are pulled in the direction away from each other, gap is become big, pipeline is then placed into arc
On shape plate, stay is unclamped, stay is returned to initial position, make gap less than the diameter of pipeline, so as to limit pipeline
Position.
Further, the horizontal support plate is provided with locking steel wire, described locking steel wire one end away from one end of vertical support plate
It is fixedly connected with horizontal support plate, the other end is provided with tight locking button and is detachably connected with vertical support plate.
By such scheme, locking steel wire enables horizontal support plate to bear larger gravity to draw horizontal support plate, if
There is tight locking button to be detachably connected with vertical support plate, facilitate pipe laying, when pipe laying, first locking steel wire by locking
Button departs from vertical support plate, after installing, then tight locking button is fastened on vertical support plate.
Further, the locking steel wire includes steel wire one, steel wire two and lock sleeve, described lock sleeve one end and steel wire
One rotates connection, and the other end is threadedly coupled with steel wire two.
By such scheme, being covered by rotation lock can just adjust the tightness of locking steel wire, when needs remove lock
When linking closely, rotation lock set makes steel wire two away from steel wire one, increases the total length of locking steel wire, is fastened to when tight locking button
When on vertical support plate, rotation lock set makes the total length of locking steel wire shorten, so that locking steel wire is in tight state, energy
Enough preferably traction athwartship legs.
In sum, the utility model has the advantages that:
1st, by the setting of bolster and arc, the influence of the pipeline that vibrations are pointed on arc can be slowed down, from
And pipeline need not be changed when to bridge strengthening;
2nd, by the setting of spring two and support member, influence of the vibrations to banking stop can be slowed down;
3rd, by the setting of locking steel wire, horizontal pipeline is enable to bear larger gravity.
Brief description of the drawings
Fig. 1 is the structural representation that the present embodiment is used to embody vertical support plate and horizontal support plate;
Fig. 2 is the structural representation that the present embodiment is used to embody groove two;
Fig. 3 is the enlarged drawing of A in Fig. 2;
Fig. 4 is the enlarged drawing of B in Fig. 2.
In figure, 1, bridge;2nd, vertical support plate;21st, horizontal support plate;3rd, arc;31st, stay;311st, gap;4th, support
Piece;41st, spring one;42nd, groove one;5th, banking stop;51st, limiting plate;52nd, pressing plate;6th, groove two;61st, spring two;62nd, support
Part;7th, locking steel wire;71st, steel wire one;72nd, steel wire two;73rd, lock sleeve;74th, tight locking button.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
It is a kind of to be applied to the support of pipelines of bridge, as shown in figure 1, including bridge 1, it is provided with vertically in the lower section of bridge 1
Support plate 2, vertical support plate 2 is evenly arranged in the lower section of bridge 1, horizontal support plate 21 is provided with vertical support plate 2, for support pipeline.
As shown in Fig. 2 the arc 3 placed for pipeline is provided with horizontal support plate 21, while being set on horizontal support plate 21
There is the groove 1 placed for arc 3, bolster is provided with the bottom land of groove 1, for buffering the shake on horizontal support plate 21
It is dynamic, so that pipeline is relatively stable on horizontal support plate 21.
As shown in Figures 2 and 3, stay 31 is equipped with the two ends of arc 3, stay 31 is made up of elastomeric material, for example
It is made up of flexure strip, but is not limited to flexure strip, stay 31 is upwardly extended along its circumferencial direction by arc 3 and formed, and two
Left between stay 31 for the gap 311 in pipeline insertion arc 3, it is first when needing to be placed into pipeline in arc 3
Stay 31 is first pulled, gap 311 is become big, then pipeline is embedded in arc 3, unclamp stay 31, stay 31
Automatically reset using the elasticity of itself, clamping pipeline makes pipeline relatively stable on arc 3.
As shown in Figures 2 and 3, bolster includes support chip 4 and spring 1, one end and the groove 1 of spring 1
Bottom land is fixedly connected, and the other end is fixedly connected with support chip 4, and support chip 4 coordinates with arc 3, for support arc 3, when
Pipeline is located at when on arc 3, and the gravity of pipeline is applied on arc 3, and support chip 4 is contradicted by the support of spring 1
On arc 3.
As shown in figure 3, banking stop 5 is provided with the two ends of arc 3, for arc 3 relatively being stablized in horizontal branch
On plate 21, the both sides for being located at banking stop 5 in horizontal support plate 21 are provided with limiting plate 51, for spacing to banking stop 5, make banking stop 5
It is not easily disconnected from horizontal support plate 21.
As shown in figure 3, open up in fluted 26, groove 26 being provided with bullet in the lower section that horizontal support plate 21 is located at banking stop 5
Spring 2 61, one end of spring 2 61 is fixedly connected with the bottom land of groove, and the other end is fixedly connected with support member 62, and support member 62 is
Work shape a, part for support member 62 is located in groove 26, and another part is located at outside groove 26, and in the effect of spring 2 61
Under, support member 62 is contradicted with banking stop 5, make banking stop 5 not with the directly contact of horizontal support plate 21, when having vibrations on horizontal support plate 21
When, vibrations will not be directly passed to banking stop 5, but pass to limit again by passing to support member 62 after the buffering of spring 2 61
Bit slice 5, makes the influence of the vibrations that banking stop 5 is subject to smaller.
As shown in Figures 2 and 3, the pressing plate 52 spacing to banking stop 5 is provided with two tops of limiting plate 51, it is spacing for preventing
Piece 5 departs between two limiting plates 51 from the top of horizontal support plate 21, and the arc 3 that draws for making banking stop 5 relatively stable is located at horizontal stroke
To on support plate 21.
As shown in Figures 2 and 4, locking steel wire 7 is provided with horizontal support plate 21 and vertical support plate 2, locking steel wire 7 includes steel
Silk one 71, steel wire 2 72 and lock sleeve 73, one end of steel wire 1 are fixed away from one end of vertical support plate 2 with horizontal support plate 21 and are connected
Connect, the other end is connected with the threaded one end of lock sleeve 73, the one end of steel wire 2 72 rotates with the other end of lock sleeve 73 and is connected, and the other end sets
There is tight locking button 74 and vertical support plate 2 to be detachably connected near one end of bridge 1, such locking steel wire 7 just with horizontal support plate 21 and
The rock-steady structure of triangle is constituted between vertical support plate 2.
Specific implementation is described as follows:When needing pipe laying, rotation lock first covers 73, makes steel wire 1 away from steel wire two
72, increase the total length of locking steel wire 7, then tight locking button 74 is removed from vertical support plate 2, stay 31 is at this moment pulled open,
Pipeline is embedded on arc 3 by the gap 311 between two stays 31, then unclamp stay 31, stay 31 due to
Itself initial position is resiliently returned to, it is spacing to pipeline, make pipeline relatively stable on arc 3, at this moment the weight of pipeline
Power is applied on arc 3, while spring 1 contradicts the support arc 3 of support chip 4, make arc 3 not directly with transverse direction
Support plate 21 is contradicted, and when having vibrations on horizontal support plate 21, vibrations can first pass to spring 1, and spring 1 utilizes itself
Cushioning effect, buffering falls more vibrations, is then passed to support chip 4, then passes to the arc 3 contradicted with support chip 4, finally
Pipeline is passed to, the vibrations that at this moment conduit acceptor is arrived are minimum, pipeline is in relatively stable state, pole affected by vibrations
It is small, additionally, due to limiting plate 51 and pressing plate 52 to the spacing of banking stop 5, make arc 3 relatively stable on horizontal support plate 21,
Spring 2 61 buffers fall most vibrations first, then passes to banking stop 5 by support member 62, makes what banking stop 5 was subject to
Vibration influence is minimum, so as to slow down influence of the vibrations on banking stop 5 to the vibrations of arc 3, makes the place that pipeline is more stable
In on horizontal support, without there is larger friction between support, when being reinforced to bridge 1, without frequently replacing
Pipeline.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected by Patent Law in right of the present utility model.
Claims (8)
1. a kind of support of pipelines for being applied to bridge, including bridge(1), it is characterized in that:The bridge(1)Lower section is provided with some equal
The vertical support plate of even arrangement(2), the vertical support plate(2)It is provided with horizontal support plate(21), the horizontal support plate(21)It is provided with
For the arc that pipeline is placed(3), the horizontal support plate(21)Positioned at arc(3)Lower section be provided with and supply arc(3)It is embedded
Groove one(42), the groove one(42)Inside it is provided with to arc(3)The bolster of support.
2. a kind of support of pipelines for being applied to bridge according to claim 1, it is characterized in that:The bolster include with
Arc(3)The support chip of cooperation(4)With spring one(41), the spring one(41)One end and groove one(42)Bottom land consolidate
Fixed connection, the other end and support chip(4)It is fixedly connected.
3. a kind of support of pipelines for being applied to bridge according to claim 2, it is characterized in that:The arc(3)Two
End is provided with banking stop(5), the horizontal support plate(21)The both sides of upper end are provided with to banking stop(5)Spacing limiting plate(51).
4. a kind of support of pipelines for being applied to bridge according to claim 3, it is characterized in that:The limiting plate(51)It is upper
Side is provided with pressing plate(52).
5. a kind of support of pipelines for being applied to bridge according to claim 3, it is characterized in that:The horizontal support plate(21)Position
In banking stop(5)Lower section open up fluted two(6), the groove two(6)Inside it is provided with spring two(61), the spring two(61)
One end and groove two(6)Bottom land be fixedly connected, the other end is fixedly connected with support member(62), the support member(62)With it is spacing
Piece(5)Contradict.
6. a kind of support of pipelines for being applied to bridge according to claim 1, it is characterized in that:The arc(3)Two
End has upwardly extended stay along its circumferencial direction(31), two stays(31)Between leave gap(311).
7. a kind of support of pipelines for being applied to bridge according to claim 1, it is characterized in that:The horizontal support plate(21)Far
One end from vertical support plate is provided with locking steel wire(7), the locking steel wire(7)One end and horizontal support plate(21)It is fixedly connected, separately
One end is provided with tight locking button(74)With vertical support plate(2)It is detachably connected.
8. a kind of support of pipelines for being applied to bridge according to claim 7, it is characterized in that:The locking steel wire(7)Bag
Steel wire one is included(71), steel wire two(72)And lock sleeve(73), the lock sleeve(73)One end and steel wire one(71)Rotate connection,
The other end and steel wire two(72)Threaded connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621353364.9U CN206246834U (en) | 2016-12-09 | 2016-12-09 | A kind of support of pipelines for being applied to bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621353364.9U CN206246834U (en) | 2016-12-09 | 2016-12-09 | A kind of support of pipelines for being applied to bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206246834U true CN206246834U (en) | 2017-06-13 |
Family
ID=59007212
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621353364.9U Expired - Fee Related CN206246834U (en) | 2016-12-09 | 2016-12-09 | A kind of support of pipelines for being applied to bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206246834U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110615390A (en) * | 2019-09-04 | 2019-12-27 | 湖州东吴建设有限公司 | Safe and environment-friendly automatic lifting device for scaffold steel pipe |
-
2016
- 2016-12-09 CN CN201621353364.9U patent/CN206246834U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110615390A (en) * | 2019-09-04 | 2019-12-27 | 湖州东吴建设有限公司 | Safe and environment-friendly automatic lifting device for scaffold steel pipe |
CN110615390B (en) * | 2019-09-04 | 2024-02-13 | 湖州东吴建设有限公司 | Automatic lifting device for safe and environment-friendly scaffold steel pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205829036U (en) | A kind of communication cable sets up uses fixed clamp device | |
CN201360119Y (en) | Guiding support for laying cables | |
CN104444390B (en) | A kind of adjustable material collecting device of double copper rod | |
CN206246834U (en) | A kind of support of pipelines for being applied to bridge | |
CN206624498U (en) | A kind of textile machinery all-direction rotation is oriented to roll structure | |
CN205420649U (en) | Spinning shallow | |
CN209054181U (en) | A kind of suspension and support of variable torque | |
CN203401895U (en) | Small rail trolley used for transporting fiber roller shutter cloth | |
CN206820438U (en) | It is a kind of to be easy to fixed quantum communications electric wire | |
CN204210509U (en) | A kind of manual access type hanging wire car | |
CN205417689U (en) | Liftable handcart | |
CN204079797U (en) | A kind of branch means of steel fiber production | |
CN207339159U (en) | Marine GRP cable tray | |
CN204137966U (en) | Plate unwinding device | |
CN206465069U (en) | A kind of wire spool storing unit | |
CN206229949U (en) | Grid steel frame processing mold | |
CN105862289A (en) | Automatic yarn cleaning device | |
CN207242828U (en) | A kind of magnetic force rectifys inclined structure | |
CN206824196U (en) | A kind of single-power divides coal device | |
CN206376104U (en) | A kind of adjustable weaving yarn device | |
CN202968903U (en) | Special support for mounting weft accumulator | |
CN204223246U (en) | The simple and easy compress of woven fabric | |
CN202849656U (en) | Creel hanging rod | |
CN206705608U (en) | Axle car on a kind of novel hydraulic | |
CN207339152U (en) | Glass fibre reinforced plastic cable bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170613 Termination date: 20171209 |