China
Prior art keywords
fixture
steel pipe
lock catch
template
catch device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621357463.4U
Other languages
Chinese (zh)
Inventor
刘昕宇
杨勇
崔磊
孟繁禹
翟新鹏
周景昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621357463.4U priority Critical patent/CN206245743U/en
Application granted granted Critical
Publication of CN206245743U publication Critical patent/CN206245743U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model provides a kind of template lock catch device and reinforcement system, including top lock catch device, middle part lock catch device and bottom lock catch device, first steel pipe clamping part of top lock catch device is spacing between the first and second fixtures, and the second steel pipe clamping part is spacing between the third and fourth fixture;First support shuttering holder of middle part lock catch device is spacing between the 5th and the 6th fixture, and the second support shuttering holder is spacing between the 7th and the 8th fixture;And bottom lock catch device includes at least two locating supports, locating support is spaced to be set and with support shuttering bottom location division.Template lock catch device of the present utility model and reinforcement system can fix template system, and ensure that the accuracy and the stability of template of template internal orifice size and absolute altitude, and design ingenious, it is simple for structure, it is simple for production, it is easy to process, practical, it is suitable to large-scale promotion application.

Description

Template lock catch device and reinforcement system
Technical field
The utility model is related to technical field of building construction, the more particularly to positioning of guide wall form board and reinforcement technique field, Specifically refer to a kind of template lock catch device and reinforcement system.
Background technology
In construction, conventional guide wall form board system as shown in figure 1, including two pieces of support shutterings, each branch hold mode Plate includes template 4, flitch 5 and steel pipe 6, and flitch 5 is located between steel pipe 6 and template 4 and is fixed in template 4, two pieces of branch hold modes The spaced setting of plate, and two pieces of support shutterings are into being symmetrical arranged.
But, when above-mentioned guide wall form board system being installed using conventional lock catch device and reinforcement system, carrying out concrete When pouring, the external force when meeting of template 4 is because of self gravitation and casting concrete produces the skew of position, makes to lead the size of wall and mark It is high inaccurate.
Accordingly, it is desirable to provide a kind of template lock catch device and reinforcement system, it can fix template system, and can protect The accuracy and the stability of template of card template internal orifice size and absolute altitude.
Utility model content
In order to overcome above-mentioned shortcoming of the prior art, a purpose of the present utility model is to provide a kind of template fore shaft Device and reinforcement system, it can fix template system, and ensure that template internal orifice size and absolute altitude accuracy and The stability of template, is suitable to large-scale promotion application.
Another object of the present utility model is to provide a kind of template lock catch device and reinforcement system, and its design is ingenious, knot Structure is succinct, simple for production, easy to process, practical, is suitable to large-scale promotion application.
To achieve the above objectives, template lock catch device of the present utility model and reinforcement system, including top lock catch device, in Portion's lock catch device and bottom lock catch device, wherein:
The top lock catch device includes that the first steel pipe clamping part, the second steel pipe clamping part, top fixing rod, first are fixed Part, the second fixture, the 3rd fixture and the 4th fixture, the first steel pipe clamping part have the first steel pipe clamping portion, institute The second steel pipe clamping part is stated with the second steel pipe clamping portion, the first steel pipe clamping part and the equal edge of the second steel pipe clamping part The length direction of the top fixing rod is removably set on the top fixing rod, along the top on the top fixing rod The length direction of portion's fix bar is provided with multiple first fixed bits, multiple second fixed bits, multiple 3rd fixed bit and multiple the Four fixed bits, first fixture is located in one of on first fixed bit, and second fixture is located therein one On individual second fixed bit, the first steel pipe clamping part it is spacing first fixture and second fixture it Between, the 3rd fixture is located in one of on the 3rd fixed bit, and the 4th fixture is located in one of described On 4th fixed bit, the second steel pipe clamping part is spacing between the 3rd fixture and the 4th fixture;
The middle part lock catch device include the first support shuttering holder, the second support shuttering holder, middle part fix bar, 5th fixture, the 6th fixture, the 7th fixture and the 8th fixture, the first support shuttering holder have first Hold mode plate clamping part, the second support shuttering holder has the second support shuttering clamping part, the first support shuttering folder Gripping member and the second support shuttering holder are removably set on the middle part along the length direction of the middle part fix bar In fix bar, the length direction of the middle part fix bar is provided with multiple 5th fixed bits, multiple in the middle part fix bar 6th fixed bit, multiple 7th fixed bits and multiple 8th fixed bits, the 5th fixture are located in one of the described 5th On fixed bit, the 6th fixture is located in one of on the 6th fixed bit, the first support shuttering holder limit Between the 5th fixture and the 6th fixture, the 7th fixture is located in one of the 7th fixation for position On position, the 8th fixture is located in one of on the 8th fixed bit, the second support shuttering holder it is spacing Between 7th fixture and the 8th fixture;And
The bottom lock catch device includes at least two locating supports, and the locating support is spaced to be set and with branch Hold mode plate bottom location division.
It is preferred that the first steel pipe clamping portion and the second steel pipe clamping portion are steel pipe clamping holes.
It is preferred that the first steel pipe clamping part is relative against being formed by first component and second component, described first Part and the second component are removably set on the top fixing rod along the length direction of the top fixing rod, described First component and the second component are respectively positioned between first fixture and second fixture and bear against described First fixture and second fixture, the first steel pipe clamping portion be located at the first component and the second component it Between;The second steel pipe clamping part is relative against being formed by third member and the 4th part, the third member and the described 4th Part is removably set on the top fixing rod along the length direction of the top fixing rod, the third member and institute State the 4th part be respectively positioned between the 3rd fixture and the 4th fixture and bear against the 3rd fixture and 4th fixture, the second steel pipe clamping portion is located between the third member and the 4th part.
More preferably, the first component, the second component, the third member and the 4th part are mountain type Part.
It is preferred that the first support shuttering holder includes the first steel pipe supporter and the first template supporter, it is described First steel pipe supporter and the first template supporter are removably set on institute along the length direction of the middle part fix bar State in the fix bar of middle part, the first steel pipe supporter and the first template supporter are respectively positioned on the 5th fixture and institute State between the 6th fixture and bear against the 5th fixture and the 6th fixture, the first support shuttering clamping Portion is located between the 5th fixture and the 6th fixture;The second support shuttering holder is supported including the second steel pipe By part and the second template supporter, the second template supporter and the second steel pipe supporter are along the middle part fix bar Length direction be removably set in the middle part fix bar, the second template supporter and the second steel pipe supporter The 7th fixture and the described 8th is respectively positioned between the 7th fixture and the 8th fixture and bears against to consolidate Determine part, the second support shuttering retaining part is between the second steel pipe supporter and the second template supporter.
More preferably, the first steel pipe supporter and the second steel pipe supporter are mountain type part.
It is preferred that the cross section of the first support shuttering clamping part is 13 shapes for rotating 180 degree, second hold mode The cross section of plate clamping part is 13 shapes.
It is preferred that first fixture, second fixture, the 3rd fixture and the 4th fixture are equal It is removably set on the top fixing rod along the length direction of the top fixing rod;5th fixture, described Six fixtures, the 7th fixture and the 8th fixture are movably arranged along the length direction of the middle part fix bar In the middle part fix bar.
More preferably, the top fixing rod is top standing screw, first fixture, second fixture, institute State the 3rd fixture and the 4th fixture is threadably engaged on the top standing screw;During the middle part fix bar is Portion's standing screw, the 5th fixture, the 6th fixture, the 7th fixture and the equal screw thread of the 8th fixture It is engaged on the middle part standing screw.
It is preferred that support shuttering bottom location division is support shuttering bottom locating slot.
The beneficial effects of the utility model are essentially consisted in:
1st, template lock catch device of the present utility model and reinforcement system include top lock catch device, middle part lock catch device and bottom Portion's lock catch device, the first steel pipe clamping part of top lock catch device is spacing between the first and second fixtures, the second steel pipe folder Gripping member is spacing between the third and fourth fixture;First support shuttering holder of middle part lock catch device is spacing the 5th and Between six fixtures, the second support shuttering holder is spacing between the 7th and the 8th fixture;And bottom lock catch device bag Include at least two locating supports, the spaced setting of locating support and with support shuttering bottom location division, when using, by the One and second steel pipe clamping part clamp two pieces of steel pipes of support shuttering respectively, by the first and second support shuttering holders distinguish Two pieces of support shutterings of clamping, the bottom of support shuttering is positioned by support shuttering bottom location division, therefore, it is possible to by template System is fixed, and ensure that the accuracy and the stability of template of template internal orifice size and absolute altitude, is suitable to large-scale promotion Using.
2nd, template lock catch device of the present utility model and reinforcement system include top lock catch device, middle part lock catch device and bottom Portion's lock catch device, the first steel pipe clamping part of top lock catch device is spacing between the first and second fixtures, the second steel pipe folder Gripping member is spacing between the third and fourth fixture;First support shuttering holder of middle part lock catch device is spacing the 5th and Between six fixtures, the second support shuttering holder is spacing between the 7th and the 8th fixture;And bottom lock catch device bag At least two locating supports are included, locating support is spaced to be set and with support shuttering bottom location division, therefore, design is skilful It is wonderful, it is simple for structure, it is simple for production, it is easy to process, practical, it is suitable to large-scale promotion application.
These and other objects of the present utility model, feature and advantage, by following detailed descriptions, accompanying drawing and right will Try to achieve to fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in appended claims.
Brief description of the drawings
Fig. 1 is the schematic perspective view of conventional guide wall form board system.
Fig. 2 is the schematic perspective view of a specific embodiment of template lock catch device of the present utility model and reinforcement system.
Fig. 3 is the schematic perspective view that the guide wall form board system shown in Fig. 1 is fixed using the specific embodiment shown in Fig. 2.
(symbol description)
1 top lock catch device;11 first steel pipe clamping parts;12 second steel pipe clamping parts;13 top fixing rods;14 first consolidate Determine part;15 second fixtures;16 the 3rd fixtures;17 the 4th fixtures;18 first steel pipe clamping portions;19 first components;20 Two parts;2 middle part lock catch devices;21 first support shuttering holders;22 second support shuttering holders;23 middle part fix bars; 24 the 5th fixtures;25 the 6th fixtures;26 the 7th fixtures;27 the 8th fixtures;28 first support shuttering clamping parts;29 One steel pipe supporter;30 first template supporters;3 bottom lock catch devices;31 locating supports;32 support shuttering bottoms location division; 33 cross bars;34 montants;4 templates;41 second steel pipe supporters;42 second template supporters;43 second steel pipe clamping portions;44 second Support shuttering clamping part;45 third members;46 the 4th parts;5 lumps of wood;6 steel pipes;7 existing structures.
Specific embodiment
In order to be more clearly understood that technology contents of the present utility model, described in detail especially exemplified by following examples.
It is shown in Figure 2, in a specific embodiment of the present utility model, template lock catch device of the present utility model and Reinforcement system includes top lock catch device 1, middle part lock catch device 2 and bottom lock catch device 3, wherein:
The top lock catch device 1 include the first steel pipe clamping part 11, the second steel pipe clamping part 12, top fixing rod 13, First fixture 14, the second fixture 15, the 3rd fixture 16 and the 4th fixture 17, the first steel pipe clamping part 11 have First steel pipe clamping portion 18, the second steel pipe clamping part 12 has the second steel pipe clamping portion 43, the first steel pipe clamping part 11 and the second steel pipe clamping part 12 along the length direction of the top fixing rod 13 be removably set on the top consolidate In fixed pole 13, the length direction of the top fixing rod 13 is provided with multiple first fixed bits on the top fixing rod 13 (not shown), multiple second fixed bit (not shown)s, multiple 3rd fixed bit (not shown)s and the multiple 4th Fixed bit (not shown), first fixture 14 is located in one of on first fixed bit, and described second fixes Part 15 is located in one of on second fixed bit, and the first steel pipe clamping part 11 is spacing in the He of the first fixture 14 Between second fixture 15, the 3rd fixture 16 is located in one of on the 3rd fixed bit, and the described 4th consolidates Determine part 17 to be located in one of on the 4th fixed bit, the second steel pipe clamping part 12 is spacing in the 3rd fixture 16 And the 4th fixture 17 between;
The middle part lock catch device 2 includes that the first support shuttering holder 21, the second support shuttering holder 22, middle part are solid Fixed pole 23, the 5th fixture 24, the 6th fixture 25, the 7th fixture 26 and the 8th fixture 27, first support shuttering Holder 21 has the first support shuttering clamping part 28, and the second support shuttering holder 22 is clamped with the second support shuttering Portion 44, the first support shuttering holder 21 and the second support shuttering holder 22 are along the middle part fix bar 23 Length direction is removably set in the middle part fix bar 23, along the middle part fix bar 23 in the middle part fix bar 23 Length direction is provided with multiple 5th fixed bit (not shown)s, multiple 6th fixed bit (not shown)s, the multiple 7th Fixed bit (not shown) and multiple 8th fixed bit (not shown)s, the 5th fixture 24 are located in one of institute State on the 5th fixed bit, the 6th fixture 25 is located in one of on the 6th fixed bit, first support shuttering Holder 21 is spacing between the 5th fixture 24 and the 6th fixture 25, and the 7th fixture 26 is located therein On one the 7th fixed bit, the 8th fixture 27 is located in one of on the 8th fixed bit, described second Hold mode plate-holder 22 is spacing between the 7th fixture 26 and the 8th fixture 27;And
The bottom lock catch device 3 includes at least two locating supports 31, and the spaced setting of the locating support 31 is simultaneously With support shuttering bottom location division 32.
The first steel pipe clamping portion 18 and the second steel pipe clamping portion 43 can be any suitable steel pipe clamping portions, For clamping steel pipe 6, prevent it from moving, can be shown in Figure 2 with identical or different, it is specific real of the present utility model one Apply in example, the first steel pipe clamping portion 18 and the second steel pipe clamping portion 43 are identical, are steel pipe clamping holes.
The number in the first steel pipe clamping portion 18 and the second steel pipe clamping portion 43 can as needed determine, please join As shown in Figure 2, in a specific embodiment of the present utility model, the first steel pipe clamping part 11 has two first steel Tube clamping portion 18, the second steel pipe clamping part 12 has two the second steel pipe clamping portions 43.
Two the first steel pipe clamping portions 18 can be arranged on the side of the top fixing rod 13, it is also possible to be arranged on The both sides of the top fixing rod 13, two the second steel pipe clamping portions 43 can be arranged on the one of the top fixing rod 13 Side, it is also possible to be arranged on the both sides of the top fixing rod 13, it is shown in Figure 2, in of the present utility model one specific implementation In example, two the first steel pipe clamping portions 18 are arranged on the both sides of the top fixing rod 13 and relatively described top fixing rod 13 are symmetrical arranged, and two the second steel pipe clamping portions 43 are arranged on the both sides and relatively described top of the top fixing rod 13 Fix bar 13 is symmetrical arranged.
The first steel pipe clamping part 11 and the second steel pipe clamping part 12 can be suitably composed with any, please join As shown in Figure 2, in a specific embodiment of the present utility model, the first steel pipe clamping part 11 is by first component 19 and second Part 20 is relative against formation, and the first component 19 and the second component 20 are along the length side of the top fixing rod 13 To being removably set on the top fixing rod 13, the first component 19 and the second component 20 are respectively positioned on described first Between fixture 14 and second fixture 15 and bear against first fixture 14 and second fixture 15, institute The first steel pipe clamping portion 18 is stated to be located between the first component 19 and the second component 20;The second steel pipe clamping part 12 Relative against being formed by the part 46 of third member 45 and the 4th, the third member 45 and the 4th part 46 are along the top The length direction of portion's fix bar 13 is removably set on the top fixing rod 13, the third member 45 and described 4th Part 46 is respectively positioned between the 3rd fixture 16 and the 4th fixture 17 and bears against the He of the 3rd fixture 16 4th fixture 17, the second steel pipe clamping portion 43 is located between the third member 45 and the 4th part 46. Steel pipe 6 can be clamped by holding by the first component 19 and the make-up of the second component 20, by the He of the third member 45 Other steel pipe 6 can be clamped holding by the make-up of the 4th part 46.
The first component 19, the second component 20, the third member 45 and the 4th part 46 can be appointed What suitable part, can be shown in Figure 2 with identical or different, in a specific embodiment of the present utility model, described the One part 19, the second component 20, the third member 45 and the 4th part 46 are identical, are mountain type part.
It is any suitable that the first support shuttering holder 21 and the second support shuttering holder 22 can have Constitute, shown in Figure 2, in a specific embodiment of the present utility model, the first support shuttering holder 21 includes First steel pipe supporter 29 and the first template supporter 30, the first steel pipe supporter 29 and the first template supporter 30 Be removably set in the middle part fix bar 23 along the length direction of the middle part fix bar 23, first steel pipe against Part 29 and the first template supporter 30 are respectively positioned between the 5th fixture 24 and the 6th fixture 25 and difference Against the 5th fixture 24 and the 6th fixture 25, the first support shuttering clamping part 28 is located at the described 5th and consolidates Determine between part 24 and the 6th fixture 25;The second support shuttering holder 22 includes the second steel pipe supporter 41 and the Two template supporters 42, the second template supporter 42 and the second steel pipe supporter 41 are along the middle part fix bar 23 Length direction be removably set in the middle part fix bar 23, the second template supporter 42 and second steel pipe are supported The 7th fixture 26 is respectively positioned between the 7th fixture 26 and the 8th fixture 27 and born against by part 41 With the 8th fixture 27, the second support shuttering clamping part 44 is positioned at the second steel pipe supporter 41 and described second Between template supporter 42.
The first steel pipe supporter 29 and the second steel pipe supporter 41 can be any suitable steel pipe supporters, Can be shown in Figure 2 with identical or different, in a specific embodiment of the present utility model, the first steel pipe supporter 29 and the second steel pipe supporter 41 it is identical, be mountain type part.
The first template supporter 30 and the second template supporter 42 can be any suitable template supporters, Can be shown in Figure 2 with identical or different, in a specific embodiment of the present utility model, the first template supporter 30 and the second template supporter 42 it is identical, be circular cone stage body.
It is any suitable that the first support shuttering clamping part 28 and the second support shuttering clamping part 44 can have Shape, for clamp standoff template, prevents it from moving, shown in Figure 2, in a specific embodiment of the present utility model, The cross section of the first support shuttering clamping part 28 is 13 shapes for rotating 180 degree, the second support shuttering clamping part 44 Cross section is 13 shapes.
The number of the first support shuttering clamping part 28 and the second support shuttering clamping part 44 can be as needed It is determined that, shown in Figure 2, in a specific embodiment of the present utility model, the first support shuttering holder 21 has Two the first support shuttering clamping parts 28, the second support shuttering holder 22 has two second support shutterings Clamping part 44.
Two the first support shuttering clamping parts 28 can be arranged on the side of the middle part fix bar 23, it is also possible to set Put in the both sides of the middle part fix bar 23, two the second support shuttering clamping parts 44 can be arranged on the middle part and fix The side of bar 23, it is also possible to be arranged on the both sides of the middle part fix bar 23, it is shown in Figure 2, of the present utility model one In specific embodiment, two the first support shuttering clamping parts 28 are arranged on the both sides of the middle part fix bar 23 and relative institute State middle part fix bar 23 to be symmetrical arranged, two the second support shuttering clamping parts 44 are arranged on the two of the middle part fix bar 23 Side and relatively described middle part fix bar 23 is symmetrical arranged.
First fixture 14, second fixture 15, the 3rd fixture 16 and the 4th fixture 17 Any suitable attachment structure, the 5th fixture 24, the 6th fixture can be used with the top fixing rod 13 25th, the 7th fixture 26 and the 8th fixture 27 can use any suitable connection with the middle part fix bar 23 Structure, shown in Figure 2, in a specific embodiment of the present utility model, first fixture 14, described second are fixed Part 15, the 3rd fixture 16 and the 4th fixture 17 may move along the length direction of the top fixing rod 13 and set Put on the top fixing rod 13;5th fixture 24, the 6th fixture 25, the 7th fixture 26 and institute The 8th fixture 27 is stated to be removably set in the middle part fix bar 23 along the length direction of the middle part fix bar 23.
First fixture 14, second fixture 15, the 3rd fixture 16 and the 4th fixture 17 Being removably set on the top fixing rod 13 along the length direction of the top fixing rod 13 can be using any suitable Structure, the 5th fixture 24, the 6th fixture 25, the 7th fixture 26 and the 8th fixture 27 are equal Being removably set in the middle part fix bar 23 along the length direction of the middle part fix bar 23 can be using any suitable Structure, shown in Figure 2, in a specific embodiment of the present utility model, the top fixing rod 13 is the fixed spiral shell in top Bar, first fixture 14, second fixture 15, the 3rd fixture 16 and the equal screw thread of the 4th fixture 17 It is engaged on the top standing screw;The middle part fix bar 23 is middle part standing screw, the 5th fixture 24, described 6th fixture 25, the 7th fixture 26 and the 8th fixture 27 are threadably engaged in the middle part standing screw On.
For the ease of operation, the middle part standing screw is detachable screw rod, in a specific embodiment of the present utility model In, the middle part standing screw is the detachable screw rod of three-stage, and it is divided into three parts along its length, and these three parts are mutual It is detachably connected, can is these three parts by middle part standing screw dismounting thus when dismounting is needed.
First fixture 14, second fixture 15, the 3rd fixture 16, the 4th fixture 17, 5th fixture 24, the 6th fixture 25, the 7th fixture 26 and the 8th fixture 27 can be appointed What suitable fixture, can be shown in Figure 2 with identical or different, described in a specific embodiment of the present utility model First fixture 14, second fixture 15, the 3rd fixture 16, the 4th fixture 17, the described 5th fix Part 24, the 6th fixture 25, the 7th fixture 26 and the 8th fixture 27 are identical, are nut.
Support shuttering bottom location division 32 can be any suitable support shuttering bottom location division, for positioning branch Hold mode plate bottom, it is shown in Figure 2, in a specific embodiment of the present utility model, support shuttering bottom location division 32 is support shuttering bottom locating slot.
The number of the locating support 31 can determine as needed, shown in Figure 2, in of the present utility model one tool In body embodiment, the number of the locating support 31 is 2.It is described in order to reinforce guide wall form board system more firm More than 4, multiple locating supports 31 line up two rows to the number of locating support 31, and locating support 31 described in two rows is mutually flat OK, the spaced setting of locating support 31 in often arranging.
The locating support 31 can be suitably composed with any, shown in Figure 2, in of the present utility model one tool In body embodiment, the locating support 31 includes cross bar 33 and two montants 34, the spaced setting of two montants 34, institute State cross bar 33 to be connected with two montants 34 respectively and be not attached to the top of the montant 34, so as to described perpendicular at two Opening up support shuttering bottom locating slot is formed between bar 34 and the cross bar 33.
It is shown in Figure 3 when using, locating support 31 is welded on existing structure 7, while Control architecture internal orifice chi Very little and absolute altitude, the existing structure 7 includes having poured the bottom concrete of completion and the reinforcing bar of banded completion, will support The bottom of template is positioned in support shuttering bottom location division 32, and the 5th fixture 24, the first steel pipe supporter the 29, the 8th are consolidated Determine the steel pipe supporter 41 of part 27 and second to be unloaded from middle part fix bar 23, the two ends of middle part fix bar 23 wear two pieces of branch respectively The hold mode plate template 4 of support shuttering (specific be, for example), then load onto respectively the first steel pipe supporter 29 and the 5th fixture 24, And second steel pipe supporter 41 and the 8th fixture 27, support shuttering is pressed from both sides by the 5th fixture 24 and the 6th fixture 25 Hold and be fixed between the first steel pipe supporter 29 and the first template supporter 30, by the 7th fixture 26 and the 8th fixture 27 Another support shuttering is clamped between the second steel pipe supporter 41 and the second template supporter 42, is pressed from both sides by the first steel pipe The steel pipe clamping part 12 of gripping member 11 and second clamps two pieces of steel pipes of support shuttering 6 respectively, solid by the first fixture 14 and second Determine part 15 to fix therebetween the first steel pipe clamping part 11, by the 3rd fixture 16 and the 4th fixture 17 by the second steel Tube gripping element 12 is fixed therebetween.
Therefore, template lock catch device of the present utility model and reinforcement system are applied to the classes such as positioning and the reinforcing of guide wall form board Like engineer applied, the utility model is supported the use with guide wall form board system, and according to leading wall thickness and absolute altitude adjusting template fore shaft Device, it is ensured that the stability of the accuracy and template of template internal orifice size and absolute altitude.
To sum up, template lock catch device of the present utility model and reinforcement system can fix template system, and ensure that The stability of the accuracy and template of template internal orifice size and absolute altitude, and design ingenious, simple for structure, simple for production, processing It is convenient, practical, it is suitable to large-scale promotion application.
As can be seen here, the purpose of this utility model is achieved completely and effectively.Function of the present utility model and Structural principle is shown and is illustrated in embodiment, and under without departing substantially from the principle, implementation method can make any modification.Institute So that the utility model includes all variant embodiments based on claim spirit and right.

Claims (10)

1. a kind of template lock catch device and reinforcement system, it is characterised in that including top lock catch device, middle part lock catch device and bottom Portion's lock catch device, wherein:
The top lock catch device include the first steel pipe clamping part, the second steel pipe clamping part, top fixing rod, the first fixture, Second fixture, the 3rd fixture and the 4th fixture, the first steel pipe clamping part have the first steel pipe clamping portion, described the Two steel pipe clamping parts have the second steel pipe clamping portion, and the first steel pipe clamping part and the second steel pipe clamping part are along described The length direction of top fixing rod is removably set on the top fixing rod, solid along the top on the top fixing rod The length direction of fixed pole is provided with multiple first fixed bits, multiple second fixed bits, multiple 3rd fixed bits and the multiple 4th and consolidates Positioning, first fixture is located in one of on first fixed bit, and second fixture is located in one of institute State on the second fixed bit, the first steel pipe clamping part is spacing between first fixture and second fixture, institute State the 3rd fixture to be located in one of on the 3rd fixed bit, the 4th fixture is located in one of the described 4th and consolidates In positioning, the second steel pipe clamping part is spacing between the 3rd fixture and the 4th fixture;
The middle part lock catch device includes the first support shuttering holder, the second support shuttering holder, middle part fix bar, the 5th Fixture, the 6th fixture, the 7th fixture and the 8th fixture, the first support shuttering holder have first hold mode Plate clamping part, the second support shuttering holder has the second support shuttering clamping part, the first support shuttering holder The middle part is removably set on the second support shuttering holder along the length direction of the middle part fix bar to fix On bar, the length direction of the middle part fix bar is provided with multiple 5th fixed bits, the multiple 6th in the middle part fix bar Fixed bit, multiple 7th fixed bits and multiple 8th fixed bits, the 5th fixture are located in one of the 5th fixation On position, the 6th fixture is located in one of on the 6th fixed bit, the first support shuttering holder it is spacing Between 5th fixture and the 6th fixture, the 7th fixture is located in one of the 7th fixed bit On, the 8th fixture is located in one of on the 8th fixed bit, and the second support shuttering holder is spacing in institute State between the 7th fixture and the 8th fixture;And
The bottom lock catch device includes at least two locating supports, and the locating support is spaced to be set and with branch hold mode Plate bottom location division.
2. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that the first steel pipe clamping portion and The second steel pipe clamping portion is steel pipe clamping hole.
3. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that the first steel pipe clamping part by First component and second component are relative against formation, and the first component and the second component are along the top fixing rod Length direction is removably set on the top fixing rod, and the first component and the second component are respectively positioned on described first Between fixture and second fixture and bear against first fixture and second fixture, first steel Tube clamping portion is located between the first component and the second component;The second steel pipe clamping part is by third member and the 4th Part is relative to be may move against formation, the third member and the 4th part along the length direction of the top fixing rod It is arranged on the top fixing rod, the third member and the 4th part are respectively positioned on the 3rd fixture and described Between four fixtures and bear against the 3rd fixture and the 4th fixture, the second steel pipe clamping portion is located at institute State between third member and the 4th part.
4. template lock catch device as claimed in claim 3 and reinforcement system, it is characterised in that the first component, described Two parts, the third member and the 4th part are mountain type part.
5. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that the first support shuttering clamping Part includes the first steel pipe supporter and the first template supporter, and the first steel pipe supporter and the first template supporter are equal It is removably set in the middle part fix bar along the length direction of the middle part fix bar, the first steel pipe supporter and institute State the first template supporter and be respectively positioned between the 5th fixture and the 6th fixture and bear against the described 5th and consolidate Determine part and the 6th fixture, the first support shuttering retaining part is in the 5th fixture and the 6th fixture Between;The second support shuttering holder includes the second steel pipe supporter and the second template supporter, and second template is supported The middle part is removably set on by part and the second steel pipe supporter along the length direction of the middle part fix bar to fix On bar, the second template supporter and the second steel pipe supporter are respectively positioned on the 7th fixture and the 8th fixation Between part and the 7th fixture and the 8th fixture are born against, the second support shuttering retaining part is in described Between second steel pipe supporter and the second template supporter.
6. template lock catch device as claimed in claim 5 and reinforcement system, it is characterised in that the first steel pipe supporter and The second steel pipe supporter is mountain type part.
7. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that the first support shuttering clamping The cross section in portion is 13 shapes for rotating 180 degree, and the cross section of the second support shuttering clamping part is 13 shapes.
8. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that first fixture, described Second fixture, the 3rd fixture and the 4th fixture may move along the length direction of the top fixing rod and set Put on the top fixing rod;5th fixture, the 6th fixture, the 7th fixture and the described 8th consolidate Determine part to be removably set in the middle part fix bar along the length direction of the middle part fix bar.
9. template lock catch device as claimed in claim 8 and reinforcement system, it is characterised in that the top fixing rod is top Standing screw, first fixture, second fixture, the 3rd fixture and the equal screw thread of the 4th fixture are nibbled Close on the top standing screw;The middle part fix bar is middle part standing screw, and the 5th fixture, the described 6th consolidate Determine part, the 7th fixture and the 8th fixture to be threadably engaged on the middle part standing screw.
10. template lock catch device as claimed in claim 1 and reinforcement system, it is characterised in that determine the support shuttering bottom Position portion is support shuttering bottom locating slot.
CN201621357463.4U 2016-12-12 2016-12-12 Template lock catch device and reinforcement system Expired - Fee Related CN206245743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621357463.4U CN206245743U (en) 2016-12-12 2016-12-12 Template lock catch device and reinforcement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621357463.4U CN206245743U (en) 2016-12-12 2016-12-12 Template lock catch device and reinforcement system

Publications (1)

Publication Number Publication Date
CN206245743U true CN206245743U (en) 2017-06-13

Family

ID=59007068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621357463.4U Expired - Fee Related CN206245743U (en) 2016-12-12 2016-12-12 Template lock catch device and reinforcement system

Country Status (1)

Country Link
CN (1) CN206245743U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938828A (en) * 2017-12-13 2018-04-20 江阴中创网络信息有限公司 A kind of graphene EPS assembled architecture systems
CN117306855A (en) * 2023-11-28 2023-12-29 中国二十二冶集团有限公司 Multipurpose wall form supporting device and using method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938828A (en) * 2017-12-13 2018-04-20 江阴中创网络信息有限公司 A kind of graphene EPS assembled architecture systems
CN117306855A (en) * 2023-11-28 2023-12-29 中国二十二冶集团有限公司 Multipurpose wall form supporting device and using method
CN117306855B (en) * 2023-11-28 2024-02-23 中国二十二冶集团有限公司 Wall form supporting device and using method

Similar Documents

Publication Publication Date Title
CN206245743U (en) Template lock catch device and reinforcement system
CN107989364A (en) A kind of strip Quick Release support system for beam
CN205057564U (en) Unsteady anchor clamps of processing steel pipe
CN204152202U (en) Column template clamp frame
CN105945459B (en) Body section joining method
CN205916901U (en) Joist steel fixture
CN208437580U (en) A kind of device for molding reinforcement cage
CN206046956U (en) A kind of steel reinforcement cage spiral bar spacing controls instrument
CN207672995U (en) A kind of In Great Basement late poured band support template
CN206888514U (en) Slidingtype is to tensing solid beam forms Support bracket
CN206752852U (en) A kind of batter post bar reinforcement positioning device
CN204728317U (en) The omnipotent supporting rod of a kind of castinplace pile
CN206385794U (en) A kind of wall-connecting piece and its connection system
CN210412962U (en) Combined fixing clamp for reflow welding of multi-solid-support plate-level assembly
CN204186071U (en) A kind of by U-shaped card, triangle is buckled and grab forms mechanical type pintle hook lock
CN204139606U (en) Building form fastener
CN208668966U (en) Three-stage split bolt for building
CN206829651U (en) A kind of plug-in type is segmented marked rod
CN206937150U (en) A kind of screw detection fixing device
CN207228653U (en) Fixture off the net is chosen outside new floor edge
CN203129562U (en) External scaffolding wall-connecting component
CN207714745U (en) A kind of building structural post formwork clamp device
CN206090279U (en) Connecting plate drilling template for bridge
CN218522224U (en) Clamp type beam template reinforcing device
CN217111710U (en) Rock sample for testing shear strength of rock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613