CN206244558U - A kind of carbon black water treatment system of natural gas pyrolysis acetylene - Google Patents

A kind of carbon black water treatment system of natural gas pyrolysis acetylene Download PDF

Info

Publication number
CN206244558U
CN206244558U CN201621372583.1U CN201621372583U CN206244558U CN 206244558 U CN206244558 U CN 206244558U CN 201621372583 U CN201621372583 U CN 201621372583U CN 206244558 U CN206244558 U CN 206244558U
Authority
CN
China
Prior art keywords
carbon black
concentrator
rake
natural gas
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621372583.1U
Other languages
Chinese (zh)
Inventor
张红东
任文章
段荣全
李存福
马忠英
赵生斌
杨健
赵悦年
路万里
吴泽培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Salt Lake Industry Co Ltd
Original Assignee
Qinghai Salt Lake Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Salt Lake Industry Co Ltd filed Critical Qinghai Salt Lake Industry Co Ltd
Priority to CN201621372583.1U priority Critical patent/CN206244558U/en
Application granted granted Critical
Publication of CN206244558U publication Critical patent/CN206244558U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a kind of carbon black water treatment system of natural gas pyrolysis acetylene, including:Flocculant pond, blender, centrifugal dehydrator, collecting-tank and concentrator, the outlet in flocculant pond is connected with the entrance of blender by pipeline, the outlet of blender is connected with the entrance of concentrator, the first outlet connection gutter of concentrator, the second outlet of concentrator is connected with the entrance of centrifugal dehydrator, the outlet of centrifugal dehydrator is connected with collecting-tank, and the outlet of collecting-tank is connected with blender;The carbon black water treatment system of the utility model natural gas pyrolysis acetylene, efficient purified treatment can be realized to sooty water, it is ensured that the wastewater to reach standard of discharge, environment will not be polluted, can also prevent carbon black from obstruction is caused to equipment and pipeline simultaneously, improve equipment service efficiency.

Description

A kind of carbon black water treatment system of natural gas pyrolysis acetylene
Technical field
The utility model is related to natural gas acetylene equipment technical field, more particularly to a kind of natural gas pyrolysis acetylene Carbon black water treatment system.
Background technology
In natural gas pyrolysis acetylene technique, the byproduct carbon black of generation possesses superfine granularity and the not spy of free settling Point, if be expelled directly out with waste water, is not acted upon to bring environment greatly pollution.Simultaneously in order to prevent carbon black in system Interior accumulation causes system jams, needs constantly continuously to discharge the carbon black waste water that partial oxidation is produced in process of production, prevents Content of carbon black is too high in locking system.Sooty water in normal production is discharged from system, is fed directly to acetylene carbon black water process System, qualified waste water (turbidity≤30mg/L) is discharged after the operation such as carbon black separation, sedimentation, filtering, dehydration is carried out to sooty water, Qualified sooty water is most processed at last enters waste water system.
In current whole carbon black waste water handling process, high-efficiency sedimentation device is nucleus equipment, in carbon black waste water processing procedure Carbon black sedimentation, carbon black mud discharge high-efficiency sedimentation device complete, but in actual moving process discovery, frequently occur stifled Plug situation, causes high-efficiency sedimentation device to sprain pressure, it is impossible to normal operation, in order to prevent pressure protection high-efficiency sedimentation device of spraining, artificially opens The drain emitted on bottom equipment is considered in high-efficiency sedimentation device side, and a large amount of carbon black waste waters are directly entered entirely from high-efficiency sedimentation device side Factory's waste water system, pollution is caused to company's waste water system.
Utility model content
Therefore, the utility model provides a kind of carbon black water treatment system of natural gas pyrolysis acetylene, for solving charcoal It is black to cause equipment and conveyance conduit to block, after carbon black Water warfare the problems such as unqualified pollution environment.
To reach above-mentioned purpose, what the technical solution of the utility model was realized in:
A kind of carbon black water treatment system of natural gas pyrolysis acetylene, including:Flocculant pond 1, blender 2, centrifugal dehydration Machine 3, collecting-tank 4 and concentrator 5,
The outlet in flocculant pond 1 is connected with the entrance of blender 2 by pipeline, the outlet of blender 2 and entering for concentrator 5 Mouth is connected, and the first outlet connection gutter of concentrator 5, the second outlet of concentrator 5 connects with the entrance of centrifugal dehydrator 3 Connect, the outlet of centrifugal dehydrator 3 is connected with collecting-tank 4, the outlet of collecting-tank 4 is connected with blender 2.
The bottom of concentrator 5 is funnel type structure.
Concentrator 5 includes:One end of tumbler 51, rotating shaft 52, rake 53 long and short rake 54, tumbler 51 and rotating shaft 52 It is fixedly connected, the other end of rotating shaft 52 is fixedly connected with rake 53 long and short rake 54, and rotating shaft 52 is hung down with the bottom centre of concentrator 5 It is straight to set.
Scraper plate 5a is additionally provided with rake 53 long and short rake 54, rake 53 long and short rake 54 are symmetricly set on the both sides of rotating shaft 52.
Scraper plate 5a that scraper plate 5a is respectively separated in settings, and rake 53 long on rake 53 long and short rake 54 and be spaced room with it is short Interval room and scraper plate 5a on rake 54 are mutually matched correspondence.
Swash plate 55 is additionally provided with inside concentrator 5, swash plate 55 is fixedly connected along the upper port annular of concentrator 5.
Advantage of the present utility model and beneficial effect:The sooty water processing system of the utility model natural gas pyrolysis acetylene System, can realize efficient purified treatment, it is ensured that the wastewater to reach standard of discharge to sooty water, and environment will not be polluted, while Can also prevent carbon black to equipment and pipeline cause obstruction, improve equipment service efficiency and.
Brief description of the drawings
Fig. 1 is the utility model specific embodiment carbon black water treatment system structural representation,
Fig. 2 is the structural representation of the utility model specific embodiment concentrator.
Reference:
1- flocculants pond, 2- blenders,
3- centrifugal dehydrators, 4- collecting-tanks,
5- concentrators, 51- tumblers,
52- rotating shafts, 53- rakes long,
The short rakes of 54-, 55- swash plates,
5a- scraper plates.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage are clearer, below in conjunction with the accompanying drawings and specific implementation Example is described in detail to the utility model.
Embodiment one
A kind of carbon black water treatment system of natural gas pyrolysis acetylene, including:Flocculant pond 1, blender 2, centrifugal dehydration Machine 3, collecting-tank 4 and concentrator 5,
The outlet in flocculant pond 1 is connected with the entrance of blender 2 by pipeline, it may also be necessary in flocculant pond 1 Outlet increases water pump, and flocculant is supplied in blender 2, and the outlet of blender 2 is connected with the entrance C of concentrator 5, dense The first outlet D connections gutter of machine 5, water up to standard is entered in the middle of gutter;The second outlet A of concentrator 5 is de- with centrifugation The entrance connection of water dispenser 3, the carbon black mud obtained after being settled through concentrator 5 is transported in centrifugal dehydrator 3 by second outlet A, Centrifugal dehydration is carried out, the carbon black after dehydration is sent to the operation for using carbon black, such as power plant etc. and is used as fuel;Centrifugation is de- The outlet of water dispenser 3 is connected with collecting-tank 4, and for conveying the water of the discharge of centrifugal dehydrator 3 to collecting-tank 4, last collecting-tank 4 goes out Mouth is connected with blender 2 and the water conveying meeting collecting-tank 4 containing flocculant and a small amount of carbon black mud is reused, and realizes to natural gas Cracking prepares the efficient process of the sooty water produced by acetylene, it is to avoid while disabling facility and pipeline, it is ensured that discharge waste water reaches Mark does not pollute the environment.
After the concentrator 5 that comes into operation, add the sooty water of flocculant to be sent directly into concentrator 5 by blender and settled Treatment, in the case where flocculant addition is constant, the carbon black waste water delivery turbidity≤30mg/L through processing meets design and refers to Mark.
In operation increase concentrator 5 before system sludge discharging period be 4h, after transformation the system can with 24 hours continuous spoil disposals, Lift the operating efficiency of carbon black water treatment system.High-efficiency sedimentation device, sludge-tank and standby sludge have been disabled after increasing concentrator 5 Pond, reduces equipment investment cost, and system is changed to continuous operation, greatly reduces the labour intensity of employee, also protects by gap operating The qualified discharge of carbon black waste water is demonstrate,proved, while solving the problems, such as the preventing freeze in winter of carbon black water system well.Before increasing concentrator 5 The spoil disposal situation table of comparisons as shown in table 1, meets standard, it is to avoid environment is caused by the waste water discharged after the treatment of concentrator 5 afterwards Pollution.
Table 1
And the bottom of concentrator 5 is funnel type structure, due to Action of Gravity Field, facilitate the carbon black automatic sedimentation in sooty water To the bottom second outlet A of concentrator 5, the efficiency of carbon black sedimentation and discharge is improved.
Embodiment two
The present embodiment technical scheme is based on embodiment one, and concentrator 5 includes:Tumbler 51, rotating shaft 52, rake 53 long and short Rake 54, tumbler 51 is fixedly connected with one end of rotating shaft 52, and the other end of rotating shaft 52 is fixedly connected with rake 53 long and short rake 54, And rotating shaft 52 is vertically arranged with the bottom centre of concentrator 5, the carbon black material for being most deposited on the bottom of concentrator 5 plays stirring, scrapes The effect for going out, prevents disabling facility.Scraper plate 5a is additionally provided with rake 53 long and short rake 54, rake 53 long and short rake 54 are symmetricly set on The both sides of rotating shaft 52, scraper plate 5a is respectively separated setting on rake 53 long and short rake 54, and the scraper plate 5a harrowed on 53 long and interval are empty Position with it is short rake 54 on interval room and scraper plate 5a be mutually matched it is corresponding, ensure that the whole bottom all sites of concentrator all by Scraper plate 5a strikes off, while also to make scraper plate 5a keep certain distance with bottom, prevents scraper plate 5a from occurring to scratch or colliding with bottom, Avoid there is a problem of not striking off causing pipeline or equipment to be blocked.
If carbon black quality changes, after especially oxygen-containing ratio is reduced, carbon black can float, therefore inside concentrator 5 Also need to set swash plate 55, swash plate 55 is fixedly connected along the upper port annular of concentrator 5, can effectively prevent the bottom of concentrator 5 The carbon black material in portion is floated up, and lifts the purification efficiency and effect of sooty water;Additionally, be also devised with backwash in concentrator 5 entering Mouthful B, when concentrator 5 is using a period of time or when blocking, can be injected by backwash inlet B to pressurization in concentrator 5 Water is cleaned, and prevents the fortuitous events such as disabling facility or pipeline from occurring.
The carbon black water system that natural gas understanding prepares acetylene increases the concentrator transformation many beneficial effects of acquirement:1st, new enrichment Close function efficiently solves the exceeded problem of carbon black in sooty water, the sooty water after treatment is met discharge standard (delivery turbidity ≤ 30ppm), solve the problems, such as that discharge water is polluted to environment.2nd, 1 ton is arranged per 24h before carbon black mud amount is by transforming to improve to 6 tons Left and right, improve production efficiency.3rd, the operation of carbon black system is simplified, the labour intensity of employee is reduced.4th, by carbon black waste water The system that reason system is transform as continuous operation by gap operation, solves the antifreeze problem of system, reduces cost of equipment maintenance.
It should be noted that above-described embodiment is illustrated rather than to the utility model limiting the utility model System, and those skilled in the art can design alternative embodiment without departing from the scope of the appended claims. In claim, any reference symbol being located between bracket should not be configured to limitations on claims.Word " including " Element or step not listed in the claims is not excluded the presence of.Word "a" or "an" before element is not excluded for depositing The element as multiple.The use of word first, second, and third does not indicate that any order.Can be by these word solutions It is interpreted as title.

Claims (6)

1. a kind of carbon black water treatment system of natural gas pyrolysis acetylene, it is characterised in that the natural gas pyrolysis acetylene Carbon black water treatment system includes:Flocculant pond (1), blender (2), centrifugal dehydrator (3), collecting-tank (4) and concentrator (5),
The outlet of the flocculant pond (1) is connected with the entrance of the blender (2) by pipeline, and blender (2) go out Mouth is connected with the entrance of the concentrator (5), the first outlet connection gutter of the concentrator (5), the concentrator (5) Second outlet be connected with the entrance of the centrifugal dehydrator (3), the outlet of the centrifugal dehydrator (3) and the collecting-tank (4) connect, the outlet of the collecting-tank (4) is connected with the blender (2).
2. natural gas pyrolysis according to claim 1 prepares the carbon black water treatment system of acetylene, it is characterised in that described dense The bottom of close machine (5) is funnel type structure.
3. natural gas pyrolysis according to claim 2 prepares the carbon black water treatment system of acetylene, it is characterised in that described dense Close machine (5) includes:Tumbler (51), rotating shaft (52), long rake (53) and short rake (54), the tumbler (51) with described turn One end of axle (52) is fixedly connected, and the other end of the rotating shaft (52) and the rake (53) long and the short rake (54) are fixed and connected Connect, and the other end of the rotating shaft (52) is vertically set on the bottom centre of the concentrator (5).
4. natural gas pyrolysis according to claim 3 prepares the carbon black water treatment system of acetylene, it is characterised in that the length Scraper plate (5a) is additionally provided with rake (53) and the short rake (54), the rake (53) long and the short rake (54) are symmetricly set on institute State the both sides of rotating shaft (52).
5. natural gas pyrolysis according to claim 4 prepares the carbon black water treatment system of acetylene, it is characterised in that described to scrape Plate (5a) is respectively separated settings on the rake (53) long and the short rake (54), and the scraper plate (5a) harrowed on (53) of the length and Interval room is mutually matched corresponding with the interval room on the short rake (54) and scraper plate (5a).
6. natural gas pyrolysis according to claim 5 prepares the carbon black water treatment system of acetylene, it is characterised in that described dense Swash plate (55) is additionally provided with inside close machine (5), the swash plate (55) is fixed along the upper port annular of the concentrator (5) and connected Connect.
CN201621372583.1U 2016-12-14 2016-12-14 A kind of carbon black water treatment system of natural gas pyrolysis acetylene Active CN206244558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621372583.1U CN206244558U (en) 2016-12-14 2016-12-14 A kind of carbon black water treatment system of natural gas pyrolysis acetylene

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621372583.1U CN206244558U (en) 2016-12-14 2016-12-14 A kind of carbon black water treatment system of natural gas pyrolysis acetylene

Publications (1)

Publication Number Publication Date
CN206244558U true CN206244558U (en) 2017-06-13

Family

ID=59007344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621372583.1U Active CN206244558U (en) 2016-12-14 2016-12-14 A kind of carbon black water treatment system of natural gas pyrolysis acetylene

Country Status (1)

Country Link
CN (1) CN206244558U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116573824A (en) * 2023-05-30 2023-08-11 山东广晟环保科技有限公司 Sewage concentration tank for sewage treatment plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116573824A (en) * 2023-05-30 2023-08-11 山东广晟环保科技有限公司 Sewage concentration tank for sewage treatment plant
CN116573824B (en) * 2023-05-30 2023-11-07 山东广晟环保科技有限公司 Sewage concentration tank for sewage treatment plant

Similar Documents

Publication Publication Date Title
CN104843955A (en) Oil and gas field drilling mud waste while-drilling processing system and processing method thereof
CN103332803A (en) Downhole treatment and reuse device and method for mine water
CN104829070A (en) Oil and gas field drilling fluid waste treatment-while-drilling system
WO2018032805A1 (en) Multi-stage purification treatment system for residual water from treatment of contaminated bottom sludge from river or lake
CN106116023A (en) A kind of method of work of Waste Water Treatment
CN206244558U (en) A kind of carbon black water treatment system of natural gas pyrolysis acetylene
CN108726703A (en) A kind of coal-contained wastewater treatment process and equipment
CN205382030U (en) Mine effluent disposal system
CN209442766U (en) Defeated coal coal-contained wastewater processing transformation device
CN204644081U (en) A kind of oilfield drilling mud waste is with brill treatment system
CN201825802U (en) Movable type sewage treatment device
CN203540146U (en) Novel efficient physical-chemical water processing and precipitating device
CN207891178U (en) A kind of novel production wastewater treatment device
KR101517285B1 (en) A Sludge turnkey treatment system for a basin
CN206359396U (en) A kind of MBR Treated sewage reusings processing unit
CN216918721U (en) Handle dense medium coupling sedimentation system that contains coal waste water
CN210012712U (en) Wastewater desalination treatment system
CN102659273A (en) Novel glass edging wastewater collection and reuse system
CN209809621U (en) Continuous upward-flow integrated water purifying equipment
CN209797634U (en) High-efficient water purification system
CN208087423U (en) Painting wastewater processing equipment
CN107285563B (en) Garden water self-purification circulating system
CN206735895U (en) The precipitation return-flow structure of activated sludge in a kind of sewage disposal system
CN206232544U (en) A kind of integrated purifying device
CN210133962U (en) Garlic processing effluent treatment plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Qinghai Salt Lake yuanpin Chemical Co.,Ltd.

Assignor: QINGHAI SALT LAKE INDUSTRY Co.,Ltd.

Contract record no.: X2023990000998

Denomination of utility model: A Carbon Black Water Treatment System for Natural Gas Cracking to Acetylene Production

Granted publication date: 20170613

License type: Exclusive License

Record date: 20240102

EE01 Entry into force of recordation of patent licensing contract