CN206240655U - Cyclone dust collectors inlet attack - Google Patents

Cyclone dust collectors inlet attack Download PDF

Info

Publication number
CN206240655U
CN206240655U CN201621304236.5U CN201621304236U CN206240655U CN 206240655 U CN206240655 U CN 206240655U CN 201621304236 U CN201621304236 U CN 201621304236U CN 206240655 U CN206240655 U CN 206240655U
Authority
CN
China
Prior art keywords
heat
insulation layer
sets
cyclone dust
dust collectors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621304236.5U
Other languages
Chinese (zh)
Inventor
俞雪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI LAIDA THERMAL ENGINEERING Co Ltd
Original Assignee
WUXI LAIDA THERMAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI LAIDA THERMAL ENGINEERING Co Ltd filed Critical WUXI LAIDA THERMAL ENGINEERING Co Ltd
Priority to CN201621304236.5U priority Critical patent/CN206240655U/en
Application granted granted Critical
Publication of CN206240655U publication Critical patent/CN206240655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model belongs to technical field of environment protection equipment, is related to a kind of cyclone dust collectors inlet attack, including inlet tube, the entrance tube side part to set laterally adapter, and laterally adapter end face method to set up is blue, and orchid connects methods described with cyclone dust collectors body;The entrance inside pipe wall laminating sets the 3rd heat-insulation layer, horizontal nozzle inner wall laminating sets the second heat-insulation layer, the fastening of inlet tube bottom surface sets head plate, the opening bottom surface of head plate is fixedly connected steel sleeve, the fastening of steel sleeve bottom face sets sleeve pipe shrouding, first heat-insulation layer is set in the steel sleeve, and the laminating of head plate upper surface sets the 4th heat-insulation layer.The utility model product structure is simple, it is reasonable to be skillfully constructed, and internal surface of sleeve pipe laminating sets heat-insulation layer, has both realized warming effect, also ensures that sealed reliable;Head plate bottom steel sleeve convex under setting so that inlet attack can bear larger difference variation, adapt to effect of preferably expanding with heat and contract with cold.

Description

Cyclone dust collectors inlet attack
Technical field
The utility model belongs to technical field of environment protection equipment, is related to a kind of cyclone dust collectors inlet attack.
Background technology
Cyclone dust collectors are a classes of dust arrester.Dust removal mechanism is dust-contained airflow is rotated, by means of centrifugation Grit is separated from air-flow and is trapped in wall by power, then grit is fallen into ash bucket by Action of Gravity Field.Cyclone dust collectors it is each Individual part all has the dimensions ratio, the variation of each proportionate relationship, can influence the efficiency and pressure of cyclone dust collectors Loss, wherein deduster diameter, air inlet port dimensions, air slit diameter are major influence factors.Exceed it should be noted that working as when in use During a certain boundary, favorable factor can also be converted into unfavorable factor.In addition, some factors are favourable for improving efficiency of dust collection, but Can increase the pressure loss, thus adjustment to each factor must take into account.The interface arrangement of existing cyclone dust collectors is unreasonable, causes Easily there is a problem of leakage.
The content of the invention
The utility model is regarding to the issue above, there is provided a kind of cyclone dust collectors inlet attack, the inlet attack reliable operation, Will not leak.
According to the technical solution of the utility model:A kind of cyclone dust collectors inlet attack, it is characterised in that:Including entrance Pipe, the entrance tube side part sets laterally adapter, and laterally adapter end face method to set up is blue, and methods described is blue and cyclone dust collectors sheet Body is connected;The entrance inside pipe wall laminating sets the 3rd heat-insulation layer, and horizontal nozzle inner wall laminating sets the second heat-insulation layer, inlet tube Bottom surface fastening sets head plate, and the opening bottom surface of head plate is fixedly connected steel sleeve, and the fastening of steel sleeve bottom face sets sleeve pipe envelope Plate, sets the first heat-insulation layer in the steel sleeve, and the laminating of head plate upper surface sets the 4th heat-insulation layer, the 3rd heat-insulation layer with The junction of the second heat-insulation layer forms expansion mouth, the expansion mouth be connected with the second heat-insulation layer one end internal diameter less than expansion mouth Near the internal diameter of inlet tube central axis one end.
Used as further improvement of the utility model, the laterally adapter includes two pieces of side seal boards be arrangeding in parallel and difference It is connected to the capping plate of the side seal board upper/lower terminal.
Used as further improvement of the utility model, the steel sleeve bottom sets bottom flange, bottom flange and sleeve pipe shrouding Between be fastenedly connected by bolt, packing ring and nut.
As further improvement of the utility model, between second heat-insulation layer and horizontal nozzle inner wall, the 3rd insulation It is fastenedly connected by anchor studs respectively between layer and entrance inside pipe wall and between head plate and the 4th heat-insulation layer.
Used as further improvement of the utility model, methods described is blue to set sealing gasket and cyclone dust collectors body between.
It is of the present utility model to have technical effect that:The utility model product structure is simple, it is reasonable to be skillfully constructed, internal surface of sleeve pipe Laminating sets heat-insulation layer, has both realized warming effect, also ensures that sealed reliable;Head plate bottom steel sleeve convex under setting, makes Obtaining inlet attack can bear larger difference variation, adapt to effect of preferably expanding with heat and contract with cold.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the top view of Fig. 1.
Specific embodiment
Specific embodiment of the present utility model is further described below in conjunction with the accompanying drawings.
In Fig. 1,2, including upper flange 1, inlet tube 2, anchor studs 3, head plate 4, bolt 5, packing ring 6, nut 7, steel sleeve 8th, the first heat-insulation layer 9, bottom flange 10, sleeve pipe shrouding 11, side seal board 12, capping plate 13, square flange 14, the 3rd heat-insulation layer 15, close Packing 16, laterally adapter 17, the second heat-insulation layer 18, the 4th heat-insulation layer 19, the 3rd heat-insulation layer 20, expansion mouth 21 etc..
As shown in Figure 1, 2, the utility model is a kind of cyclone dust collectors inlet attack, including inlet tube 2, the inlet tube 2 sidepieces set laterally adapter 17, laterally the end face method to set up orchid 14 of adapter 17, and methods described blue 14 connects with cyclone dust collectors body It is logical;The laminating of the inwall of the inlet tube 2 sets the 3rd heat-insulation layer 20, and the laterally inwall of adapter 17 laminating sets the second heat-insulation layer 18, enters The fastening of mouth pipe 2 bottom surface sets head plate 4, and the opening bottom surface of head plate 4 is fixedly connected steel sleeve 8, and the fastening of the bottom face of steel sleeve 8 sets Put and the first heat-insulation layer 9 be set in sleeve pipe shrouding 11, the steel sleeve 8, the laminating of the upper surface of head plate 4 sets the 4th heat-insulation layer 19, The junction of the 3rd heat-insulation layer 20 and the second heat-insulation layer 18 forms expansion mouth 21, the heat-insulation layer 18 of the expansion mouth 21 and second Be connected one end internal diameter less than expansion mouth 21 near the central axis one end of inlet tube 2 internal diameter.
Laterally adapter 17 includes two pieces of side seal boards 12 be arrangeding in parallel and is connected to the upper/lower terminal of the side seal board 12 Capping plate 13.
The bottom of steel sleeve 8 sets bottom flange 10, and bolt 5, packing ring 6 and nut are passed through between bottom flange 10 and sleeve pipe shrouding 11 7 are fastenedly connected.
Between second heat-insulation layer 18 and laterally adapter 17 inwall, between the 3rd heat-insulation layer 20 and the inwall of inlet tube 2 and end socket It is fastenedly connected by anchor studs 3 respectively between the heat-insulation layer 19 of plate 4 and the 4th.
Sealing gasket 16 is set between square flange 14 and cyclone dust collectors body.
The course of work of the present utility model is as follows:Operationally, air-flow is flowed into inlet attack from upper flange 1, due to Inlet attack inwall sets the 4th heat-insulation layer 19 that the 3rd heat-insulation layer 20, the second heat-insulation layer 18 and bottom are set, and air-flow is in motion During can effectively be incubated, it is to avoid energy loss, meanwhile, the steel sleeve 8 connected on head plate 4 can avoid expanding with heat and contract with cold and pair set Standby infringement.The particular design of expansion mouth 21 has preferable guide functions to air-flow, guides gas flow.

Claims (4)

1. a kind of cyclone dust collectors inlet attack, it is characterised in that:Including inlet tube(2), the inlet tube(2)Sidepiece sets horizontal To adapter(17), laterally adapter(17)End face method to set up is blue(14), methods described orchid(14)Connected with cyclone dust collectors body; The inlet tube(2)Inwall laminating sets the 3rd heat-insulation layer(20), laterally adapter(17)Inwall laminating sets the second heat-insulation layer (18), inlet tube(2)Bottom surface fastening sets head plate(4), head plate(4)Opening bottom surface be fixedly connected steel sleeve(8), steel bushing Pipe(8)Bottom face fastening sets sleeve pipe shrouding(11), the steel sleeve(8)The first heat-insulation layer of interior setting(9), head plate(4)On Surface laminating sets the 4th heat-insulation layer(19), the 3rd heat-insulation layer(20)With the second heat-insulation layer(18)Junction formed enlarging Portion(21), the expansion mouth(21)With the second heat-insulation layer(18)Be connected one end internal diameter be less than expansion mouth(21)Near inlet tube (2)The internal diameter of central axis one end.
2. cyclone dust collectors inlet attack as claimed in claim 1, it is characterised in that:The laterally adapter(17)Including two pieces The side seal board be arrangeding in parallel(12)And it is connected to the side seal board(12)The capping plate of upper/lower terminal(13).
3. cyclone dust collectors inlet attack as claimed in claim 1, it is characterised in that:The steel sleeve(8)Bottom sets bottom Flange(10), bottom flange(10)With sleeve pipe shrouding(11)Between pass through bolt(5), packing ring(6)And nut(7)It is fastenedly connected.
4. cyclone dust collectors inlet attack as claimed in claim 1, it is characterised in that:Second heat-insulation layer(18)With transverse direction Adapter(17)Between inwall, the 3rd heat-insulation layer(20)With inlet tube(2)Between inwall and head plate(4)With the 4th heat-insulation layer(19) Between respectively pass through anchor studs(3)It is fastenedly connected.
CN201621304236.5U 2016-11-30 2016-11-30 Cyclone dust collectors inlet attack Expired - Fee Related CN206240655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621304236.5U CN206240655U (en) 2016-11-30 2016-11-30 Cyclone dust collectors inlet attack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621304236.5U CN206240655U (en) 2016-11-30 2016-11-30 Cyclone dust collectors inlet attack

Publications (1)

Publication Number Publication Date
CN206240655U true CN206240655U (en) 2017-06-13

Family

ID=59004532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621304236.5U Expired - Fee Related CN206240655U (en) 2016-11-30 2016-11-30 Cyclone dust collectors inlet attack

Country Status (1)

Country Link
CN (1) CN206240655U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106694250A (en) * 2016-11-30 2017-05-24 无锡市莱达热工工程有限公司 Inlet connector of cyclone dust collector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106694250A (en) * 2016-11-30 2017-05-24 无锡市莱达热工工程有限公司 Inlet connector of cyclone dust collector

Similar Documents

Publication Publication Date Title
CN202325631U (en) Gas-slag separating and coalbed gas recycling device for downhole drilling of coal mine
CN207315602U (en) A kind of air intake structure of new air compressor
CN105737639B (en) UTILIZATION OF VESIDUAL HEAT IN cyclone separator
CN206410196U (en) A kind of integrated environment-friendly stove fume exhaust device for being easy to repair
CN206240655U (en) Cyclone dust collectors inlet attack
CN102828769A (en) Complete oil receiving, pumping and conveying device for pumping and extracting mine gas
CN204212720U (en) A kind of drilling dust-removing apparatus
WO2017016097A1 (en) Dust collection apparatus for loader
CN204126853U (en) Residual heat of air compressor reclaims unit waterway structure
CN106694250A (en) Inlet connector of cyclone dust collector
CN209465192U (en) A kind of new type cyclone dust collector
CN206969382U (en) A kind of energy-efficient coal ash conveying device
CN207295835U (en) A kind of city tap-water water supply installation for having the function of that dust and moisture is wet
CN206469720U (en) A kind of smelting furnace waste heat recovery dust pelletizing system
CN206518976U (en) A kind of novel gas-liquid knockout tower
CN204469730U (en) A kind of anti-spilled centrifuge tube
CN208535439U (en) Duct closing type device
CN203130144U (en) Gas collector for mining
CN206240653U (en) Cyclone dust collectors
CN207567185U (en) A kind of device for extracting coal tar
CN106870094A (en) A kind of heat sink of Cylinder of motorcycle
CN205628845U (en) Dust collecting device for solar panel
CN219399046U (en) Geothermal water degassing device based on geothermal water supply
CN202851053U (en) Whole set connecting and pumping conveying device for mine gas pumping
CN202715603U (en) Novel exhaust system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20171130

CF01 Termination of patent right due to non-payment of annual fee