CN206233230U CN201621303288.0U CN201621303288U CN206233230U CN 206233230 U CN206233230 U CN 206233230U CN 201621303288 U CN201621303288 U CN 201621303288U CN 206233230 U CN206233230 U CN 206233230U
Authority
CN
China
Prior art keywords
floating platform
steel
bridge pier
pile
disappear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621303288.0U
Other languages
Chinese (zh)
Inventor
段新鸽
潘寿东
潘建龙
刘斌
王勤荣
王凤喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201621303288.0U priority Critical patent/CN206233230U/en
Application granted granted Critical
Publication of CN206233230U publication Critical patent/CN206233230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to bridge construction field, and in particular to a kind of bridge pier pile tube pile foundation constructing device, including:Anchor ingot, floating platform, guiding disappear force mechanisms, percussive drill, cable machine, wirerope and steel pile casting, disappear force mechanisms, percussive drill and the cable machine of being oriented to is arranged on the floating platform, the anchor ingot is fixed on riverbed, it is connected by cable machine and wirerope between anchor ingot and floating platform, the steel pile casting is arranged on the guiding and disappears in force mechanisms;The floating platform includes, multiple buoyancy tanks and link, and the buoyancy tank is connected by link;The force mechanisms that disappear that are oriented to include that be oriented to derrick and the power steel pipe socket that disappears, the steel pile casting is set in described disappearing in power steel pipe socket.

Description

A kind of bridge pier pile tube pile foundation constructing device
Technical field
The utility model is related to bridge construction field, and in particular to a kind of bridge pier pile tube pile foundation constructing device.
Background technology
Bridge pier pile tube in traditional water, using queen post steel-pipe pile, steel-pipe pile pore-forming uses impact drill, impact drill to be arranged on On floating platform, after floating platform positioning, steel pile casting is installed, steel pile casting lower end is embedded in the zap pit of riverbed face temporarily, and upper end is such as Fruit is rigidly connected with floating platform, is influenceed by rig dynamic impact problem and water wave fluctuating during piling, floats platform Overall to drive steel pile casting to rise and fall, steel pile casting lower end is then active, and mud is largely quickly lost in pile foundation construction, it is impossible to complete Into drilling construction.
Utility model content
The purpose of this utility model, is in order in solving the problems, such as background technology, there is provided a kind of bridge pier pile tube pile foundation construction Device.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of bridge pier pile tube pile foundation constructing device, including:Anchor ingot, floating platform, guiding disappear force mechanisms, percussive drill, cable Machine, wirerope and steel pile casting, disappear force mechanisms, percussive drill and cable machine of the guiding are arranged on the floating platform, the anchor Ingot is fixed on riverbed, is connected by cable machine and wirerope between anchor ingot and floating platform, and the steel pile casting is arranged on the guiding Disappear in force mechanisms;
The floating platform includes, multiple buoyancy tanks and link, and the buoyancy tank is connected by link;
The force mechanisms that disappear that are oriented to include that be oriented to derrick and the power steel pipe socket that disappears, the steel pile casting is set in the power steel that disappears In pipe sleeve, the power of the disappearing steel pipe socket diameter 1~3cm bigger than steel pile casting external diameter.
Preferably, the floating platform is rectangle, the buoyancy tank quantity is 4, is arranged in two row two and arranged, between two row It is provided with space, the guiding force mechanisms that disappear are arranged on the space top.
Preferably, the floating platform is provided with 4 cable machines, 4 cable machines are separately fixed at the floating platform Four corner locations at, to the positioning of floating platform.
Preferably, the guiding derrick includes, and crossbearer and vertical frame, the crossbearer is two parallel girder steels, described vertical Frame is two parallel girder steels vertical with the crossbearer, and the power of the disappearing steel pipe is set on the closure that the crossbearer is surrounded with vertical frame In interval.
Bridge pier pile tube in traditional water, using queen post steel-pipe pile, steel-pipe pile pore-forming uses impact drill, impact drill to be arranged on On floating platform, after floating platform positioning, steel pile casting is installed, steel pile casting lower end is embedded in the zap pit of riverbed face temporarily, and upper end is such as Fruit is rigidly connected with floating platform, is influenceed by rig dynamic impact problem and water wave fluctuating during piling, floats platform Overall to drive steel pile casting to rise and fall, steel pile casting lower end is then active, and mud is largely quickly lost in pile foundation construction, it is impossible to complete Into drilling construction.
Using the present apparatus, when being influenceed by rig dynamic impact problem and water wave fluctuating during piling, be oriented to derrick and The power that disappears steel pipe socket can rise and fall with floating platform on the water surface, eliminate and dissolved waterpower fluctuating effect, and steel pile casting lower end is then In stationary state, steel pile casting is overall to be constrained within guide thimble again, and pile foundation construction can be smoothed out
Preferably, the external diameter of the power of the disappearing steel pipe socket is tangent with the crossbearer or vertical frame, the tangent welding.
Preferably, being provided with connection bracket on the crossbearer or vertical frame, the connection bracket is arranged on the power steel that disappears At the external diameter of pipe sleeve and the point of contact of the crossbearer or vertical frame.
Preferably, the power of the disappearing steel pipe socket inwall is provided with overcoat, it is used to prevent steel pile casting outer wall with the power of disappearing The excessive friction of steel pipe socket inwall, so as to serve protective effect.
Preferably, four corner location correspondence cable machines of the floating platform are respectively arranged with deadman.
A kind of bridge pier pile tube pile base construction method, comprises the following steps:
1 fixes anchor ingot, and be positioned at for floating platform and need at bore position, riverbed is impacted with impact drill by startup cable machine, with Form the build-in hole of a depth 30-50cm or so;
2 installation guiding disappear force mechanisms and steel pile casting, and steel pile casting lower end is embedded in the zap pit of riverbed face temporarily;
3 using percussive drill drilling, and after pile foundation pore-forming, using catheterized reperfusion underwater concrete, inserting piling steel-pipe pile is in mixed In solidifying soil;
4 pull out steel pile casting, enter row constraint to steel pile casting by the guiding force mechanisms that disappear before pulling out and during pulling out, and constraint is held Continue to concrete final set.
Steel-pipe pile, by function influences such as current, as do not constrained, is likely to result in crooked existing in not solidified concrete As the constraint using the above method by being oriented to the force mechanisms that disappear can prevent crooked situation from occurring.
In sum, the beneficial effects of the utility model:
1. a kind of bridge pier pile tube pile foundation constructing device described in the utility model, is oriented to and disappears force mechanisms in floating platform base After this positioning, can be by movement all around(In the range of 1m)It is accurately positioned, the power that disappears steel pipe socket intended diameter compares steel The big 2cm of casing, has 1cm spaces per side.
2. a kind of bridge pier pile tube pile foundation constructing device described in the utility model, can effectively dissolve and eliminate waterpower fluctuating, Guide effect is carried out to steel pile casting simultaneously.
3. a kind of bridge pier pile tube pile foundation constructing device described in the utility model, can play to steel tube concrete pile mixed The effect of the auxiliary stabilization before the final set of solidifying soil.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view that the force mechanisms that disappear are oriented in the utility model;
Fig. 3 is the front view that the force mechanisms that disappear are oriented in the utility model;
Fig. 4 is the left view that the force mechanisms that disappear are oriented in the utility model.
Specific embodiment
Specific examples below is only that, to explanation of the present utility model, it is not to limitation of the present utility model, sheet Art personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, But as long as all being protected by Patent Law in right of the present utility model.
The utility model is described in detail with embodiment below in conjunction with the accompanying drawings.
Embodiment 1:
In the present embodiment, depth of water 10m, riverbed is exposed bedrock, locally there is shallower cobble coating, and suspension bridge bridge pier is used Queen post steel-pipe pile, steel-pipe pile combination concrete anchor is fixed in 3.5m below bedrock surface.
According to Fig. 1~Fig. 4, a kind of bridge pier pile tube pile foundation constructing device, including:Anchor ingot 1, floating platform 2, guiding disappear Force mechanisms 3, percussive drill 4, cable machine 5, wirerope 6 and steel pile casting 7, are oriented to disappear force mechanisms 3, percussive drill 4 and cable machine 5 and are arranged on On floating platform 2, anchor ingot 1 is fixed on riverbed, is connected by cable machine 5 and wirerope 6 between anchor ingot 1 and floating platform 2, steel pile casting 7 disappear in force mechanisms 3 installed in guiding;Floating platform 2 includes, multiple buoyancy tanks 21 and link 22, and buoyancy tank 21 passes through link 22 It is connected;The guiding force mechanisms 3 that disappear include that be oriented to derrick 31 and the power steel pipe socket 32 that disappears, steel pile casting 7 is set in and disappears in power steel pipe socket 32, The diameter of the power that disappears steel pipe socket 32 than the big 2cm of external diameter of steel pile casting 7, the inwall of the power that disappears steel pipe socket 32 is provided with overcoat.
Steel-pipe pile pore-forming uses percussive drill 4, and being guided by 1.0m steel pile castings 7 carries out impact operation, after pore-forming, perfusion Underwater concrete, assigns 80cm bridge pier steel-pipe piles, and the single weight of anchor ingot is 8t, prefabricated by C25 concretes, and size is 147 × 147 × 147cm, matches somebody with somebody JKL-8 types percussive drill 4 on floating platform 2.
Floating platform 2 is rectangle, and the quantity of buoyancy tank 21 is 4, is arranged in two row two and arranged, space 211 is provided between two row, The guiding force mechanisms 3 that disappear are arranged on the top of space 211, and the size of single buoyancy tank is 900 × 270 × 165cm.
Floating platform 2 is provided with 4 cable machines, 5,4 cable machines 5 and is separately fixed at four corner locations of floating platform 2, To the positioning of floating platform 2,2 four corner location correspondence cable machines 5 of floating platform are respectively arranged with deadman 51.
Being oriented to derrick 31 includes, crossbearer 311 and vertical frame 312, and crossbearer 311 is two parallel girder steels, and it is two to indulge frame 312 The parallel girder steel vertical with crossbearer 311, the closure that the power that disappears steel pipe socket 32 is arranged on crossbearer 311 with vertical frame 312 is surrounded is interval interior.
The external diameter of the power that disappears steel pipe socket 32 is tangent with crossbearer 311 and vertical frame 312, the tangent welding, the company of being provided with crossbearer 311 Bracket 313 is connect, connection bracket 313 is arranged at the point of contact of the external diameter of the power steel pipe socket 32 that disappears and crossbearer 311.
A kind of bridge pier pile tube pile base construction method, comprises the following steps:
1 fixes anchor ingot 1, and be positioned at for floating platform 2 and need at bore position, riverbed is impacted with impact drill by startup cable machine 5, Cheated with the build-in for forming a depth 30-50cm or so;
2 installation guiding disappear force mechanisms 3 and steel pile casting 7, and the lower end of steel pile casting 7 is embedded in the zap pit of riverbed face temporarily;
3 are drilled using percussive drill 4, and after pile foundation pore-forming, using catheterized reperfusion underwater concrete, inserting piling steel-pipe pile is in mixed In solidifying soil;
4 pull out steel pile casting, enter row constraint to steel pile casting 7 by the guiding force mechanisms 3 that disappear before pulling out and during pulling out, and constrain Continue to concrete final set.
Steel-pipe pile, by function influences such as current, as do not constrained, is likely to result in crooked existing in not solidified concrete As the constraint using the above method by being oriented to the force mechanisms 3 that disappear can prevent crooked situation from occurring.

Claims (8)

1. a kind of bridge pier pile tube pile foundation constructing device, it is characterised in that including:Anchor ingot(1), floating platform(2), be oriented to and disappear power machine Structure(3), percussive drill(4), cable machine(5), wirerope(6)And steel pile casting(7), it is described to be oriented to the force mechanisms that disappear(3), percussive drill(4) And cable machine(5)It is arranged on the floating platform(2)On, anchor ingot(1)With floating platform(2)Between pass through cable machine(5)And wirerope (6)It is connected, the steel pile casting(7)The force mechanisms that disappear are oriented to installed in described(3)It is interior;
The floating platform(2)Including multiple buoyancy tanks(21)And link(22), the buoyancy tank(21)By link(22)Phase Even;
It is described to be oriented to the force mechanisms that disappear(3)Including being oriented to derrick(31)With the power steel pipe socket that disappears(32), the steel pile casting(7)It is set in The power of the disappearing steel pipe socket(32)It is interior.
2. a kind of bridge pier pile tube pile foundation constructing device according to claim 1, it is characterised in that the floating platform(2) It is rectangle, the buoyancy tank(21)Quantity is 4, is arranged in two row two and arranged, space is provided between two row(211), the guiding Disappear force mechanisms(3)It is arranged on the space(211)Top.
3. a kind of bridge pier pile tube pile foundation constructing device according to claim 2, it is characterised in that the floating platform(2) It is provided with 4 cable machines(5), 4 cable machines(5)It is separately fixed at the floating platform(2)Four corner locations at.
4. a kind of bridge pier pile tube pile foundation constructing device according to claim 3, it is characterised in that the guiding derrick(31) Including crossbearer(311)With vertical frame(312), the crossbearer(311)It is two parallel girder steels, the vertical frame(312)For two with The crossbearer(311)Vertical parallel girder steel, the power of the disappearing steel pipe socket(32)It is arranged on the crossbearer(311)With vertical frame(312) The closure for surrounding is interval interior.
5. a kind of bridge pier pile tube pile foundation constructing device according to claim 4, it is characterised in that the power of the disappearing steel pipe socket (32)External diameter and the crossbearer(311)Or vertical frame(312)It is tangent.
6. a kind of bridge pier pile tube pile foundation constructing device according to claim 5, it is characterised in that the crossbearer(311)Or Vertical frame(312)On be provided with connection bracket(313), the connection bracket(313)It is arranged on the power steel pipe socket that disappears(32)It is outer Footpath and the crossbearer(311)Or vertical frame(312)Point of contact at.
7. a kind of bridge pier pile tube pile foundation constructing device according to claim 6, it is characterised in that the power of the disappearing steel pipe socket (32)Inwall is provided with overcoat.
8. a kind of bridge pier pile tube pile foundation constructing device according to claim 7, it is characterised in that the floating platform(2) Four corner location correspondence cable machines(5)It is respectively arranged with deadman(51).
CN201621303288.0U 2016-11-30 2016-11-30 A kind of bridge pier pile tube pile foundation constructing device Expired - Fee Related CN206233230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621303288.0U CN206233230U (en) 2016-11-30 2016-11-30 A kind of bridge pier pile tube pile foundation constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621303288.0U CN206233230U (en) 2016-11-30 2016-11-30 A kind of bridge pier pile tube pile foundation constructing device

Publications (1)

Publication Number Publication Date
CN206233230U true CN206233230U (en) 2017-06-09

Family

ID=58980345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621303288.0U Expired - Fee Related CN206233230U (en) 2016-11-30 2016-11-30 A kind of bridge pier pile tube pile foundation constructing device

Country Status (1)

Country Link
CN (1) CN206233230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522211A (en) * 2016-11-30 2017-03-22 中铁十六局集团第三工程有限公司 Pile foundation construction device and pile foundation construction method for bridge pier tubular pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522211A (en) * 2016-11-30 2017-03-22 中铁十六局集团第三工程有限公司 Pile foundation construction device and pile foundation construction method for bridge pier tubular pile

Similar Documents

Publication Publication Date Title
CN106522211B (en) A kind of bridge pier tubular pole pile foundation constructing device and its construction method
CN108571621B (en) Pipeline immersed tube construction method by using floating box type water floating gantry crane method
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN206646497U (en) A kind of clad steel casing structure
CN103924585B (en) The construction method of wind-powered electricity generation socketed pile
US2475933A (en) Marine drilling rig
CN102312442A (en) Construction method of trestle steel pipe pile foundation
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN207314329U (en) A kind of steel reinforcement cage positioner of underwater cast-in-place pile
CN104563119A (en) Rotating type floating pile driving guide frame
CN106320333A (en) Row type water cast-in-place pile device and construction method
CN106381881A (en) Gravity-type single-pile foundation
CN100374656C (en) Construction method for large-diameter tilted socketed pile
CN110206071B (en) Method and device for reinforcing joints of underground continuous wall
CN107740404A (en) A kind of construction method of underground continuous wall
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
CN206233230U (en) A kind of bridge pier pile tube pile foundation constructing device
CN103556972A (en) Self-installed ocean floor drilling template and installation method thereof
CN104002936B (en) A kind of shoal, strand drilling platform
CN206143760U (en) Ally oneself with formula of arranging bored concrete pile device on water
CN204510221U (en) Rotary marine piling saddle
CN116513384A (en) Water floating platform device and installation method thereof
CN212715000U (en) Steel cofferdam positioning system in deep water
CN114348199A (en) Offshore wind power foundation platform capable of resisting wind wave influence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609