CN206232661U - Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation - Google Patents

Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation Download PDF

Info

Publication number
CN206232661U
CN206232661U CN201621170778.8U CN201621170778U CN206232661U CN 206232661 U CN206232661 U CN 206232661U CN 201621170778 U CN201621170778 U CN 201621170778U CN 206232661 U CN206232661 U CN 206232661U
Authority
CN
China
Prior art keywords
cold
dry quenching
quenching furnace
coke dry
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621170778.8U
Other languages
Chinese (zh)
Inventor
焦玉雪
王玖文
杨逢庭
李恩文
谷永胜
张坤
刘�东
李峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAIWU TAISHAN COKING CO Ltd
Original Assignee
LAIWU TAISHAN COKING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAIWU TAISHAN COKING CO Ltd filed Critical LAIWU TAISHAN COKING CO Ltd
Priority to CN201621170778.8U priority Critical patent/CN206232661U/en
Application granted granted Critical
Publication of CN206232661U publication Critical patent/CN206232661U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)

Abstract

Automatically continuously uniformly load the integrated equipment of cold Jiao, including coke dry quenching furnace body, manhole and central blast cap before being gone into operation the utility model discloses a kind of coke dry quenching furnace, it is characterised in that:Stretched into the manhole can move forward and backward, the cold burnt conveyer belt of loading of feeding end height adjustable, steadily of centre of gravity;The mobile device for loading cold burnt conveyer belt is fixed on hull;Load the input termination chute of cold burnt conveyer belt, chute upper port connects spiral extraction pipe upper port.The coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation; due to cold burnt material continuance lifting, continuous loading; and can be uniformly distributed and be scattered; so big to cold burnt amount is loaded in coke dry quenching furnace; can not only be effectively protected central blast cap, and efficiency can be greatly improved, it is the labour intensity that reduces workman, high degree of automation, flexible and convenient to use;Because feeding process does not fly upward, so avoiding dust from flying, work situation is optimized;And on-stream time is substantially reduced, ensure the progress that goes into operation.

Description

Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation
Technical field
The utility model is related to a kind of coke dry quenching furnace to load the improvement that cold Jiao covers blast cap mode, specifically one kind not only Can raise labour efficiency, reduce the labour intensity of workman, and high degree of automation, coke dry quenching furnace flexible and convenient to use go into operation The preceding integrated equipment for automatically continuously uniformly loading cold Jiao.
Background technology
The coke dry quenching furnace of Coking Company's dry quenching system is the visual plant in package unit, its structure include coke dry quenching furnace body, Manhole, central blast cap, manhole are located on the waist side wall of coke dry quenching furnace body, red Jiao in rotary coke tank is put out from dry by elevators Furnace roof portion fire door loads in coke dry quenching furnace, and the cold recyclegas blasted by circulating fan is cooled down, then continuously will be cold But the coke after drains into belt and transports raw material plant to.And during the shut-down of coke dry quenching furnace annual overhaul, it is necessary to coke in stove is drained into cooling section very low Material position, when coke dry quenching furnace maintenance is finished, it is necessary to open coke dry quenching furnace manhole by it is artificial with spade load it is a large amount of it is cold it is burnt it is uniform, Smooth covers central blast cap, it is to avoid the damage during coke is loaded from fire door to central blast cap.It is this manually to load cold Burnt deficiency is:One is, because charge weight is big, generally to load 110-120 tons, also manually to carry out it is smooth, so time-consuming It is more long, it usually needs just to install within 48 hours, influence manufacturing schedule and productivity effect;Two is very big labor strength, work Efficiency is low, improves production cost.
By retrieval, in order to overcome above the deficiencies in the prior art, Chinese patent 201510712928.7 is disclosed A kind of " construction method for loading cold Jiao after coke dry quenching furnace annual overhaul ", the method is by conical protection device by boom hoisting Central blast cap upside is placed in, then conical protection device is fixed with the oblique bell bottom of furnace roof mouthful with steel wire rope, from oblique bell Interior to load cold Jiao, cold Jiao falls along coke dry quenching furnace inwall, is stopped by conical protection device, you can avoid the cold burnt damage for loading Central blast cap.But this improvement, because equipment integrated can not be acted, charging is discontinuous, so automaticity is poor, operation is not It is enough convenient, flexible, efficiency still can not be greatly improved.
The content of the invention
The purpose of this utility model is to provide one kind to be effectively protected central blast cap, and can be significantly The labour intensity raised labour efficiency, reduce workman, high degree of automation, coke dry quenching furnace flexible and convenient to use it is automatic before going into operation Continuous uniform loads cold burnt integrated equipment.
In order to reach object above, the technical scheme that the utility model is used is:The coke dry quenching furnace is automatic continuous before going into operation Uniformly load the integrated equipment of cold Jiao, including coke dry quenching furnace body, manhole and central blast cap, manhole is provided with 2, and symmetrical is located at dry putting out On the waist side wall of body of heater, the bottom of manhole is along position 10-40cm higher than the top of central blast cap, it is characterised in that:Described its In a manhole in stretch into the cold burnt conveyer belt of loading, the rear end for loading cold burnt conveyer belt passes through the through hole of mobile vertical panel, and Fixed with mobile vertical panel by rotary shaft, being fixed with cold burnt loading in the frame rear end side wall for loading cold burnt conveyer belt drives Motor, the cold burnt rotating shaft for loading motor is fixed with the drive roll for loading cold burnt conveyer belt and connected;Described mobile vertical panel On slide rail, corresponding manhole is pointed in the direction of slide rail to base fixing card;Loading is provided with the middle part of the cold burnt conveyer belt of loading The output arrangement for adjusting height of cold burnt conveyer belt;Described slide rail is fixed on hull, and wheel is provided with the frame of hull;Institute The load of the upside of the mobile vertical panel stated puts the lower end that load on roller puts chute, and the upper end of chute is by swinging axle and vertical support frame Upper end is connected, and lower end and the hull of vertical support frame are fixed;The rear end of the hull is provided with spiral extraction pipe, by spiral extraction pipe The cold burnt upper port for expecting continuance lifting to chute, cold burnt material are automatically flowed on the cold burnt conveyer belt of loading along chute.
The utility model is also implemented by following measure:The frame front end of the described cold burnt conveyer belt of loading fixedly mount to Preceding protrusion loads the inverted " v " plate of cold burnt conveyer belt output end.
Described output arrangement for adjusting height, by swivel nut clockwise, swivel nut counterclockwise and the screw rod clockwise for matching Constituted with screw rod counterclockwise, screw rod clockwise is screwed in swivel nut clockwise, screw rod counterclockwise is screwed in swivel nut counterclockwise, clockwise Screw rod and screw rod counterclockwise are connected as one by rotating hand handle, and make the axis of screw rod clockwise and screw rod counterclockwise at one On straight line.
The top and bottom of described spiral extraction pipe are equipped with bearing holder (housing, cover), the bearing holder (housing, cover) of upper end and the upper end of vertical support frame Fixed, the bearing holder (housing, cover) of lower end is fixed with the after-frame of hull;Be provided with bevel gear in the middle and lower part of spiral extraction pipe, bevel gear with carry material The shaft end bevel gear engagement of motor.
The structure of described spiral extraction pipe is known technology, therefore is seldom stated.
The beneficial effects of the utility model are:The coke dry quenching furnace automatically continuously uniformly loads cold the integrated of Jiao and sets before going into operation It is standby, due to cold burnt material continuance lifting, continuously load, and can be uniformly distributed and be scattered, thus it is big to cold burnt amount is loaded in coke dry quenching furnace, no Can only be effectively protected central blast cap, and efficiency can be greatly improved, the labour intensity of workman, automatic is reduced Change degree is high, flexible and convenient to use;Because feeding process does not fly upward, so avoiding dust from flying, work situation is optimized;And And on-stream time is substantially reduced, ensure the progress that goes into operation.Test proves that:Using the utility model, charge time 6 is small When can load 110 tons, 42 hours in advance more burnt than traditional people's frock, 437680 yuan of economic benefit can be saved;Put out due to dry Generator load is 21000kw during burnt normal production, therefore often saves the on-stream time of 1 hour, it is possible to save 41000kwh, Economize on electricity is obvious.
Brief description of the drawings
Fig. 1 cuts open schematic diagram for structure side of the present utility model depending on office.
Fig. 2 is the output end forward sight enlarged diagram that structure of the present utility model loads cold burnt conveyer belt.
Fig. 3 is structure output arrangement for adjusting height of the present utility model axial direction section view enlarged diagram.
Specific embodiment
Reference picture 1, Fig. 2, Fig. 3 makes the utility model.The coke dry quenching furnace automatically continuously uniformly loads the collection of cold Jiao before going into operation Forming apparatus, including coke dry quenching furnace body 1, manhole 2 and central blast cap 3, manhole 2 are provided with 2, the symmetrical waist for being located at coke dry quenching furnace body 1 On the wall of side, the bottom of manhole 2 is along position 10-40cm higher than the top of central blast cap 3, it is characterised in that:One of those described The cold burnt conveyer belt 4 of loading is stretched into manhole 2, the rear end for loading cold burnt conveyer belt 4 passes through the through hole of mobile vertical panel 5, and passes through Rotary shaft 6 is fixed with mobile vertical panel 5, and being fixed with cold burnt loading in the frame rear end side wall for loading cold burnt conveyer belt 4 drives Motor 7, the cold burnt rotating shaft for loading motor 7 is fixedly connected with the drive roll for loading cold burnt conveyer belt 4, is driven by cold burnt charging Dynamic motor 7 rotates the cold burnt conveyer belt 4 of loading, realizes in the cold burnt loading coke dry quenching furnace body 1 on cold burnt conveyer belt 4 is loaded, Because the cold burnt motor 7 that loads is arranged on the back-end location for loading cold burnt conveyer belt 4, it is possible to playing gravitational equilibrium work With making the center of gravity of the cold burnt conveyer belt 4 of loading in the position of rotary shaft 6;The base fixing card of described mobile vertical panel 5 is in cunning On rail 8, corresponding manhole 2 is pointed in the direction of slide rail 8, is moved along slide rail 8 by the mobile base of vertical panel 5, realizes loading cold Jiao The output end of conveyer belt 4 stretches into the position in coke dry quenching furnace body 1, so that cold Jiao for loading is smooth;It is described to load cold burnt conveyer belt 4 Middle part be provided with the output arrangement for adjusting height 9 for loading cold burnt conveyer belt 4, by export arrangement for adjusting height 9 adjust load it is cold The cold burnt input height of burnt conveyer belt 4;Described slide rail 8 is fixed on hull 10, and wheel 11 is provided with the frame of hull 10, Realize that whole machine is moved by hull 10 and its wheel 11;The load of the upside of described mobile vertical panel 5 is put load on roller 12 and puts chute 13 lower end, the upper end of chute 13 is connected by swinging axle 14 with the upper end of vertical support frame 15, the lower end of vertical support frame 15 and car Disk 10 is fixed;The rear end of the hull 10 is provided with spiral extraction pipe 16, and cold Jiao is expected into continuance lifting extremely by spiral extraction pipe 16 The upper port of chute 13, cold burnt material along being automatically flowed into chute 13 on the cold burnt conveyer belt 4 of loading, so as to realize cold burnt material it is continuous, In the continual dry coke oven body 1 of feeding, untill thickness requirement is reached.
As improvement of the present utility model:The frame front end fixed installation of the described cold burnt conveyer belt 4 of loading is forwardly convex Load the inverted " v " plate 17 of the cold output end of burnt conveyer belt 4, by inverted " v " plate 17 make on the cold burnt conveyer belt 4 of loading send out it is cold Jiao expects existing components of flow forward, also the components of flow of oriented both sides, makes cold burnt material distribution more uniform, smooth.
Described output arrangement for adjusting height 9, by swivel nut clockwise 91, swivel nut counterclockwise 92 and match it is clockwise Screw rod 93 and screw rod counterclockwise 94 are constituted, and screw rod clockwise 93 is screwed in swivel nut clockwise 91, and screw rod counterclockwise 94 screws in the inverse time In pin swivel nut 92, screw rod clockwise 93 and screw rod counterclockwise 94 are connected as one by rotating hand 95, and make screw rod clockwise 93 and screw rod counterclockwise 94 axis point-blank, when screw rod clockwise 93 and screw rod counterclockwise 94 are rotated clockwise, Swivel nut 91 clockwise and swivel nut counterclockwise 92 are moved towards, and raise the output end of the cold burnt conveyer belt 4 of loading, otherwise then reduce.
The top and bottom of described spiral extraction pipe 16 are equipped with bearing holder (housing, cover) 18, the bearing holder (housing, cover) 18 and vertical support frame of upper end 15 upper end is fixed, and bearing holder (housing, cover) 18 and the after-frame of hull 10 of lower end are fixed;Umbrella tooth is provided with the middle and lower part of spiral extraction pipe 16 Wheel 19, bevel gear 19 is engaged with the shaft end bevel gear for carrying material motor 20, when the lower mouth of spiral extraction pipe 16 is inserted in cold burnt stockpile Afterwards, start and carry material motor 20, you can drive spiral extraction pipe 16 to rotate, cold burnt material is continuously just promoted to the upper of chute 13 Mouthful.
The structure of described spiral extraction pipe 16 is known technology, therefore is seldom stated.
Using the utility model, after a coke dry quenching furnace is installed, can be promoted with whole machine, be transferred to other coke dry quenching furnaces, it is right Other coke dry quenching furnaces fill cold Jiao, are therefore particularly suitable for large-scale Coking Company.

Claims (4)

1. the integrated equipment of cold Jiao, including coke dry quenching furnace body are automatically continuously uniformly loaded before coke dry quenching furnace goes into operation(1), manhole(2)With in Centre blast cap(3), manhole(2)2 are provided with, symmetrical is located at coke dry quenching furnace body(1)Waist side wall on, manhole(2)Bottom along position Than central blast cap(3)Top 10-40cm high, it is characterised in that:Described one of manhole(2)Inside stretch into loading cold Burnt conveyer belt(4), load cold burnt conveyer belt(4)Rear end pass through mobile vertical panel(5)Through hole, and by rotary shaft(6)With Mobile vertical panel(5)It is fixed, loading cold burnt conveyer belt(4)Frame rear end side wall be fixed with and cold burnt load motor (7), cold burnt loading motor(7)Rotating shaft with load cold burnt conveyer belt(4)Drive roll fix connect;Described movement is vertical Plate(5)Base fixing card in slide rail(8)On, slide rail(8)Direction point to corresponding manhole(2);It is described to load cold burnt transmission Band(4)Middle part be provided with the cold burnt conveyer belt of loading(4)Output arrangement for adjusting height(9);Described slide rail(8)It is fixed on hull (10)On, in hull(10)Frame be provided with wheel(11);Described mobile vertical panel(5)The load of upside put roller(12)On Load puts chute(13)Lower end, chute(13)Upper end pass through swinging axle(14)With vertical support frame(15)Upper end connection, vertically Support(15)Lower end and hull(10)It is fixed;The hull(10)Rear end be provided with spiral extraction pipe(16).
2. the integrated equipment of cold Jiao is automatically continuously uniformly loaded before coke dry quenching furnace according to claim 1 goes into operation, and its feature exists In:The cold burnt conveyer belt of described loading(4)The fixed installation of frame front end forwardly convex load cold burnt conveyer belt(4)Output end Inverted " v " plate(17).
3. the integrated equipment of cold Jiao is automatically continuously uniformly loaded before coke dry quenching furnace according to claim 1 goes into operation, and its feature exists In:Described output arrangement for adjusting height(9), by swivel nut clockwise(91), swivel nut counterclockwise(92)And the up time for matching Pin screw rod(93)With screw rod counterclockwise(94)Constitute, screw rod clockwise(93)Screw in swivel nut clockwise(91)It is interior, screw rod counterclockwise (94)Screw in swivel nut counterclockwise(92)It is interior, screw rod clockwise(93)With screw rod counterclockwise(94)By rotating hand handle(95)It is connected as Integrally, and screw rod clockwise is made(93)With screw rod counterclockwise(94)Axis point-blank.
4. the integrated equipment of cold Jiao is automatically continuously uniformly loaded before coke dry quenching furnace according to claim 1 goes into operation, and its feature exists In:Described spiral extraction pipe(16)Top and bottom be equipped with bearing holder (housing, cover)(18), the bearing holder (housing, cover) of upper end(18)With vertical branch Frame(15)Upper end fix, the bearing holder (housing, cover) of lower end(18)With hull(10)After-frame fix;In spiral extraction pipe(16)In under Portion is provided with bevel gear(19), bevel gear(19)With carry material motor(20)The engagement of shaft end bevel gear.
CN201621170778.8U 2016-10-26 2016-10-26 Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation Active CN206232661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621170778.8U CN206232661U (en) 2016-10-26 2016-10-26 Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621170778.8U CN206232661U (en) 2016-10-26 2016-10-26 Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation

Publications (1)

Publication Number Publication Date
CN206232661U true CN206232661U (en) 2017-06-09

Family

ID=58982892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621170778.8U Active CN206232661U (en) 2016-10-26 2016-10-26 Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation

Country Status (1)

Country Link
CN (1) CN206232661U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257084A (en) * 2019-06-27 2019-09-20 宝钢湛江钢铁有限公司 A kind of coke dry quenching furnace fills cold burnt conveying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257084A (en) * 2019-06-27 2019-09-20 宝钢湛江钢铁有限公司 A kind of coke dry quenching furnace fills cold burnt conveying device

Similar Documents

Publication Publication Date Title
CN206998560U (en) A kind of sheet metal surface sanding apparatus
CN206188054U (en) Automatic feeding device
CN103283829A (en) Drying equipment and drying process thereof
CN206232661U (en) Coke dry quenching furnace automatically continuously uniformly loads the integrated equipment of cold Jiao before going into operation
CN207087029U (en) A kind of pipe cutting machine of automatic charging
CN204430973U (en) A kind of timber wiredrawing machinery modelled after an antique
CN203845336U (en) Automatic feeder for aluminum silicate smelting circular furnace
CN202485450U (en) Annular box type material distributor
CN204509439U (en) Mobile model rotary blowing formula furnace refining getter
CN204874662U (en) Bearing ring's heat treatment line
CN204162734U (en) A kind of novel blast-furnace uniform distribution system
CN211005475U (en) Oxygen lance fixing device in steel smelting process
CN210689179U (en) Oblique blanking buffer gear of mesh belt furnace
CN210560239U (en) Put out stove futilely and adorn cold burnt conveyor
CN207525369U (en) A kind of plating copper ball addition transveyer
CN213778462U (en) Drying-machine of wear-resisting steel ball processing
CN206078520U (en) Automatic feeding apparatus
CN203083309U (en) Alloy baking device
CN204261751U (en) Ball mill marble feeding device
CN216785593U (en) Place stable building engineering construction with promoting support
CN104401697B (en) Vertical lifting and automatic sorting machine for metal parts
CN220280638U (en) Feeding system of sponge metal briquetting machine
CN216192445U (en) Uniform material distribution system of blast furnace
CN202594938U (en) Furnace burden automatic feed system
CN211420221U (en) Electric stove automatic material conveying device for foundry goods processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant