CN206232348U - Tower crane attached wall part in high pier construction - Google Patents

Tower crane attached wall part in high pier construction Download PDF

Info

Publication number
CN206232348U
CN206232348U CN201621314695.1U CN201621314695U CN206232348U CN 206232348 U CN206232348 U CN 206232348U CN 201621314695 U CN201621314695 U CN 201621314695U CN 206232348 U CN206232348 U CN 206232348U
Authority
CN
China
Prior art keywords
steel plate
tower crane
attaching rod
wall attaching
high pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621314695.1U
Other languages
Chinese (zh)
Inventor
张馨
王小丹
陈历珊
师秀峰
杨志国
张成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201621314695.1U priority Critical patent/CN206232348U/en
Application granted granted Critical
Publication of CN206232348U publication Critical patent/CN206232348U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Tower crane attached wall part in a kind of high pier construction, is made up of connection pedestal and wall attaching rod;The connection pedestal includes two blocks of steel plates and Duo Gen reinforcing bars, and every piece of multiple bolts of the uniform installation in steel plate middle part, many reinforcing bars are uniformly laid and are fixed on steel plate;The termination of the wall attaching rod is junction steel plate, and junction steel plate is bolted with the steel plate for being connected pedestal.The utility model is actual according to tower crane specification and scene, and the height and position pre-embedded steel slab specified in pier shaft set up junction steel plate as connection pedestal in wall attaching rod termination.During installation, wall attaching rod is connected by screw bolts with pre-embedded steel slab, safe and reliable, simple operation.

Description

Tower crane attached wall part in high pier construction
Technical field
The utility model belongs to the auxiliary equipment of tower crane installation in high pier construction, tower crane in more particularly to a kind of high pier construction Attached wall part.
Background technology
According to pertinent regulations, in high pier construction, must take attached wall of the tower crane height more than 30 meters connects measure to protect Card tower crane Stability Analysis of Structures.In attached wall system, one end of Anchored Bar is connected with adhesion frame by bearing pin, and the other end will be with fixation It is connected in the pre-buried pedestal of pier shaft.Because the attachment frame and wall attaching rod of tower crane are usually the genuine dispatching of tower crane manufacturer, directly press Book is installed as directed, therefore in work progress, it is important that to consider that wall attaching rod is reliably connected problem with the effective of pier shaft. At present, with the connection of pedestal generally using welding, due to belonging to work high above the ground, the operation of operating personnel's butt welding machine is inconvenient for wall attaching rod, So that the problems such as existing macroscopic curtailment of weld seam, short of width, slag inclusion sting meat, also inconvenient to carry out inside using equipment , there is larger potential safety hazard in flaw detection.
The content of the invention
The purpose of this utility model provides tower crane attached wall part in a kind of high pier construction, and the tower crane attached wall part can effectively be kept away Exempt from the welded bands various problems come and the safety coefficient for improving wall-attaching equipment.
As above conceive, the technical solution of the utility model is:Tower crane attached wall part in a kind of high pier construction, it is characterised in that: It is made up of connection pedestal and wall attaching rod;The connection pedestal includes two blocks of steel plates and Duo Gen reinforcing bars, every piece of uniform peace in steel plate middle part The multiple bolts of dress, many reinforcing bars are uniformly laid and are fixed on steel plate;The termination of the wall attaching rod be junction steel plate, junction steel plate with The steel plate for connecting pedestal is bolted.
The size of the steel plate of above-mentioned connection pedestal is:600 × 600mm, 10~20mm of thickness.
Above-mentioned reinforcing bar uses φ 28~φ 32mm screw-thread steels, its tail end to be formed with 90 ° of crotches of 100~150mm.
The utility model is actual according to tower crane specification and scene, and the height and position pre-embedded steel slab specified in pier shaft are used as even Pedestal is connect, junction steel plate is set up in wall attaching rod termination.During installation, wall attaching rod is connected by screw bolts with pre-embedded steel slab, safety It is reliable, simple operation.
Brief description of the drawings
Fig. 1 is the front view for connecting pedestal;
Fig. 2 is the side view for connecting pedestal;
Fig. 3 is the top view for connecting pedestal;
Fig. 4 is the schematic diagram of wall attaching rod front end junction steel plate;
Fig. 5 is wall attaching rod and connection pedestal connection diagram.
In figure:1- reinforcing bars;2- steel plates;3- bolts;4- bolts hole;5- junction steel plates;6- shaft of high pier (part);7- attached walls Bar.
Specific embodiment:
As shown in Figure 1,2,3, 4:Tower crane attached wall part in a kind of high pier construction, is made up of connection pedestal and wall attaching rod.It is described Connection pedestal includes two blocks of steel plates and Duo Gen reinforcing bars, and every piece of multiple bolts of the uniform installation in steel plate middle part, many reinforcing bars are uniformly laid It is fixed on steel plate.The termination of the wall attaching rod is junction steel plate, and junction steel plate is bolted with the steel plate for being connected pedestal.
1st, the making of steel plate.2 pieces of 600 × 600mm, the steel plate of 10~20mm of thickness are taken, as shown in Figure 1 position and quantity system Bore, aperture is φ 29mm, and drilling loads M27 bolts after finishing, and spot welding is fixed;Take φ 28~φ 32mm screw-thread steels, long by 600~ 700mm, tail end sets 90 ° of crotches of 100~150mm.
2nd, steel plate is embedded.After pier shaft reaches object height, the position coordinates that steel plate should be buried, Ran Houxian are calculated first Be arranged symmetrically for two blocks of steel plates by the particular location that field goes out according to setting-out, and fixation, it is ensured that is not moved during casting concrete It is dynamic.
3rd, attachment device installation requirement.The perpendicularity of tower body axis is checked with theodolite, its deviation cannot be greater than 4/1000, Wall attaching rod must be reliable with the connection of adhesion frame, adhesion frame and tower body internal overarm support, and three wall attaching rods of attaching frame are tried one's best and are in In same level.The location criteria of wall attaching rod can so be ensured, can accurately be docked with pier shaft pre-embedded steel slab.
4th, the connection of wall attaching rod and pre-embedded steel slab.Regulation wall attaching rod, make the bolt hole of its termination junction steel plate accurately with advance The bolt docking on steel plate is buried, timely top nut is simultaneously tightened.Double nut can be optionally set, as shown in Figure 5.

Claims (3)

1. tower crane attached wall part in a kind of high pier construction, it is characterised in that:It is made up of connection pedestal and wall attaching rod;The connection pedestal Including two blocks of steel plates and Duo Gen reinforcing bars, every piece of multiple bolts of the uniform installation in steel plate middle part, many reinforcing bars are uniformly laid and are fixed in steel On plate;The termination of the wall attaching rod is junction steel plate, and junction steel plate is bolted with the steel plate for being connected pedestal.
2. tower crane attached wall part in high pier construction according to claim 1, it is characterised in that:The steel plate of above-mentioned connection pedestal Size is:600 × 600mm, 10~20mm of thickness.
3. tower crane attached wall part in high pier construction according to claim 1, it is characterised in that:Above-mentioned reinforcing bar uses 28~φ of φ 32mm screw-thread steels, its tail end is formed with 90 ° of crotches of 100~150mm.
CN201621314695.1U 2016-12-02 2016-12-02 Tower crane attached wall part in high pier construction Expired - Fee Related CN206232348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621314695.1U CN206232348U (en) 2016-12-02 2016-12-02 Tower crane attached wall part in high pier construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621314695.1U CN206232348U (en) 2016-12-02 2016-12-02 Tower crane attached wall part in high pier construction

Publications (1)

Publication Number Publication Date
CN206232348U true CN206232348U (en) 2017-06-09

Family

ID=58977605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621314695.1U Expired - Fee Related CN206232348U (en) 2016-12-02 2016-12-02 Tower crane attached wall part in high pier construction

Country Status (1)

Country Link
CN (1) CN206232348U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653093A (en) * 2018-11-14 2019-04-19 中交公局桥隧工程有限公司 A kind of simple wall-attaching equipment of detachable lock button and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653093A (en) * 2018-11-14 2019-04-19 中交公局桥隧工程有限公司 A kind of simple wall-attaching equipment of detachable lock button and construction method

Similar Documents

Publication Publication Date Title
CN101967886B (en) Assembly and installation methods of steel containment vessel of nuclear power station
CN103669883B (en) A kind of installation adjusting method of combined isolation bearing
CN101275400A (en) Method for mounting large-sized rolling mills
CN203947771U (en) A kind of Bailey beam pendent form support system
CN109763835A (en) A kind of shield machine reception steel platform
CN103526954A (en) Support for overweight precision embedded part and construction method thereof
CN206232348U (en) Tower crane attached wall part in high pier construction
CN107386343A (en) A kind of single pile pullout tests system and its application process
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN101486090A (en) Method for dismounting and replacing ladle turret revolving bearing
CN102518300A (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN103953052A (en) Pile-beam-arch steel pipe column construction method
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN104358405B (en) The full hall pattern board supporting system of a kind of heavy duty
CN204940889U (en) Novel compositions adjustment means
CN205387824U (en) Pre -buried hoisting point structure
CN203487639U (en) Device for precisely pre-burying and fixing steelwork column anchor bolts
CN105421251B (en) Plate-girder jacking supporting mechanism, plate-girder jacking supporting tool
CN110905218A (en) Sectional hoisting process for super-large-span box-shaped steel beam
CN206034929U (en) Hoisting frame of dress behind concrete square column capital
CN103590839B (en) Subway station cast-in-place structural portal support construction technology
CN104499728A (en) Absorbing tower horizontal moving device and construction method thereof
Bošnjak et al. Bucket chain excavator: Failure analysis and redesign of the counterweight boom supporting truss columns
CN100366854C (en) Method for structuring sightseeing tower from H type steel and method for manufacturing H type steel structure
CN202809639U (en) Steel girder foundation of construction elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20191202