CN206229880U - The Process Unit of U-tube group - Google Patents

The Process Unit of U-tube group Download PDF

Info

Publication number
CN206229880U
CN206229880U CN201621348905.9U CN201621348905U CN206229880U CN 206229880 U CN206229880 U CN 206229880U CN 201621348905 U CN201621348905 U CN 201621348905U CN 206229880 U CN206229880 U CN 206229880U
Authority
CN
China
Prior art keywords
tube group
wheel
bent pipe
arc
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621348905.9U
Other languages
Chinese (zh)
Inventor
尚云霞
杨文明
王文山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Feng Xi Chemical Equipment Co Ltd
Original Assignee
Shanxi Feng Xi Chemical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Feng Xi Chemical Equipment Co Ltd filed Critical Shanxi Feng Xi Chemical Equipment Co Ltd
Priority to CN201621348905.9U priority Critical patent/CN206229880U/en
Application granted granted Critical
Publication of CN206229880U publication Critical patent/CN206229880U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The utility model is related to U-tube group, the Process Unit of U-shaped heat exchanger tube, the specially Process Unit of U-tube group.Solve the problems, such as the overall Process Unit of shortage U-tube group.The frock is made up of workbench, the briquetting for pipe fitting end positioning, bent pipe tooling I, bent pipe tooling II;Workbench face is provided with dowel hole in the circle centre position of U-tube group bending circular arc, on the side of each dowel hole or side-lower is provided with briquetting pilot hole;Bent pipe tooling I includes support frame, a shaping wheel and two rollers, and the structure of bent pipe tooling II is identical with bent pipe tooling I.The utility model has the advantages that low manufacture cost, simple structure, repeatable utilization, quality are good, easy to operate;Can fully ensure that the quality index such as circularity, deviation and the wall thickness reduction of U-bend allow deviation range in and U-tube group reliability of operation.

Description

The Process Unit of U-tube group
Technical field
The utility model is related to bent pipe tooling, more particularly to U-tube group, the specially Process Unit of U-shaped heat exchanger tube, U-shaped The Process Unit of pipe group.
Background technology
The bending forming of pipe occupies more important position in the processing and fabricating of whole chemical industry equipment, in particular by U The pipe group of shape pipe group arrangement, using very universal under the heating of Chemical Manufacture and cooling occasion.
When U-tube group is arranged on device interior, it is desirable to which the bending radius of pipe uses the minimum bending radius of pipe, so as to In space arrangement pipe as much as possible as small as possible.To ensure U-tube group reliability of operation, do not allow to adopt at U-bend Use punched bend.To ensure the quality index such as circularity, deviation and wall thickness reduction in allowed limits, U-bend does not allow heat It is curved.Due to the overall Process Unit of shortage U-tube group, U-tube group is by pipe fitting weldings of the multiple with U-bend to prior art Into, cause welding point excessive, influence the quality of U-tube group.
The content of the invention
The utility model solves the problems, such as to lack the overall Process Unit of U-tube group, there is provided a kind of U-tube group bends work Dress.
The utility model adopts the following technical scheme that realization:The Process Unit of U-tube group, by workbench, is used for The briquetting of pipe fitting end positioning, bent pipe tooling I, bent pipe tooling II are constituted;Workbench face bends the center of circle of circular arc in U-tube group Place is provided with dowel hole, on the side of each dowel hole or side-lower is provided with briquetting pilot hole;The briquetting by bottom pad The pressing plate on plate and top is constituted, and backing plate side upper surface is provided with tube seat, pressing plate side lower surface be provided with the tube seat on backing plate The tube seat of lower cooperation, is also provided with briquetting pin shaft hole on pressing plate, using briquetting bolt by pressing plate and its under backing plate be pressed on On the briquetting pilot hole in workbench face, between pipe fitting end is pressed on the tube seat for coordinating up and down;Bent pipe tooling I include support frame, One shaping wheel and two rollers, support frame by train wheel bridge, lower plate, be fixed on upper lower plate side and positioned at upper lower plate Between connecting tube constitute, shaping wheel is positioned between upper and lower clamping plate by bolt, and make the arc wheel face of shaping wheel with Pressing plate is corresponding with the tube seat front and back position on backing plate, makes the dowel hole that bolt is positioned on workbench face simultaneously in Bent pipe tooling I is positioned at workbench face, and two rollers are positioned between upper and lower clamping plate by bearing pin respectively, and make two rollers Arc wheel face and shaping wheel arc wheel face can hold tightly simultaneously in pipe fitting;The structure of bent pipe tooling II is identical with bent pipe tooling I.
The utility model has the advantages that low manufacture cost, simple structure, repeatable utilization, quality are good, easy to operate;Energy The quality index such as circularity, deviation and the wall thickness reduction of U-bend are fully ensured that in the deviation range for allowing and U-tube group is run Reliability.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is the structural representation of upper lower plate;
Fig. 4 is the pressure plate structure schematic diagram of briquetting;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the backing structure schematic diagram of briquetting;
Fig. 7 is the top view of Fig. 6;
Fig. 8 is the structural representation of shaping wheel;
Fig. 9 is that the arch of shaping wheel lacks placement location schematic diagram;
Figure 10 rotates the schematic diagram after 90 degree when being shaping wheel demolition;
Figure 11 is the structural representation of support frame;
Figure 12 is roller structure schematic diagram.
In figure:1- workbenches, 2- briquettings, 2-1- backing plates, 2-2- pressing plates, 3- bent pipe toolings I, 4- bend pipe work Dress II, 5- dowel holes, 6- briquetting pilot holes, 7- tube seats, 8- briquetting pin shaft holes, 9- briquetting bolts, 10- shapings Wheel, 11- rollers, 12- train wheel bridges, 13- lower plates, 14- connecting tubes, 15- bolts, 16- bearing pins, 17- arch Lack.
Specific embodiment
The Process Unit of U-tube group, by workbench 1, the briquetting 2, bent pipe tooling I3, the bend pipe that are positioned for pipe fitting end Frock II4 is constituted;The face of workbench 1 is provided with dowel hole 5 in the circle centre position of U-tube group bending circular arc, each dowel hole Side on or side-lower be provided with briquetting pilot hole 6;The briquetting 2 is made up of the backing plate 2-1 of bottom and the pressing plate 2-2 on top, Backing plate 2-1 sides upper surface is provided with tube seat 7, and pressing plate 2-2 sides lower surface is provided with the pipe coordinated up and down with the tube seat on backing plate Groove 7, is also provided with briquetting pin shaft hole 8 on pressing plate, using briquetting bolt 9 by pressing plate and its under backing plate be pressed on workbench On the briquetting pilot hole 6 in face, between pipe fitting end is pressed on the tube seat for coordinating up and down;Bent pipe tooling I includes support frame, a shaping Wheel 10 and two rollers 11, support frame by train wheel bridge 12, lower plate 13, be fixed on upper lower plate side and positioned at upper lower plate it Between connecting tube 14 constitute, shaping wheel 10 is positioned between upper and lower clamping plate by bolt 15, and makes the arc wheel of shaping wheel Face is corresponding with the tube seat front and back position on pressing plate and backing plate, the dowel hole that bolt 15 is positioned on workbench face simultaneously Bent pipe tooling I is set to be positioned at workbench face in 5, two rollers 11 are positioned between upper and lower clamping plate by bearing pin 16 respectively, And enable the arc wheel face of the arc wheel face of two rollers and shaping wheel while holding tightly in pipe fitting;The structure and bend pipe of bent pipe tooling II Frock I is identical.
Application method is as follows(As shown in Figure 1):
1st, the two ends of whole straight tube are processed into welding groove, and removes greasy dirt, iron rust, to facilitate the continued access of straight tube.
2nd, the connecting tube 14 of bent pipe tooling I is pulled, support frame and two rollers thereon are rotated around alignment pin, make connection Straight tube vertically downward, is penetrated the shaping wheel of swan neck system I and the arc wheel face of two rollers by pipe, and tube head is clamped, connected by briquetting Sleeve pipe is put on pipe, arm strength is lengthened, connecting tube is pulled upwards by hand, support frame drives roller around curved needed for shaping wheel rotation one Bent angle, completes bending for first U-bend.
3rd, after the completion of first U-bend, should not be moved on curved position eventually, swan neck system is assembled at second U-bend II, when second U-bend shapes substantially, the connecting tube of swan neck system I is return into beginning curved position, continue to pull swan neck system II It is fully formed second U-bend.
4th, pull down swan neck system I and be assemblied in the 3rd U-bend position, carry out bending for the 3rd U-bend, until whole U Shape pipe group is completed.
In order to the roundness deviation and trommel rate that ensure U-bend are controlled in tolerance, the arc wheel of shaping wheel 10 It is a circular arc that face uses straight transitions, the i.e. center section of arc wheel face between bicircular arcs structure, circular arc, and its two ends is identical Another circular arc, straight transitions between circular arc;During specific implementation, the arc radius of center section are 10.5mm, the circular arc at two ends Radius is 12.6mm, and the center of circle of two circular arcs is at a distance of 3.5mm.It is convenient disassembly, springback capacity is considered during shaping wheel design, and in processing Remove 1/4 arch after shaping and lack 17;As shown in Fig. 9,10, after pipe bends shaping, after shaping is taken turns into rotated ninety degrees, due to The scarce presence of arch, can smoothly dismantle shaping wheel.

Claims (4)

1. a kind of Process Unit of U-tube group, it is characterised in that by workbench(1), for pipe fitting end positioning briquetting (2), bent pipe tooling I(3), bent pipe tooling II(4)Constitute;Workbench(1)Face is provided with the circle centre position of U-tube group bending circular arc Dowel hole(5), on the side of each dowel hole or side-lower is provided with briquetting pilot hole(6);The briquetting(2)By bottom Backing plate(2-1)With the pressing plate on top(2-2)Constitute, backing plate(2-1)Side upper surface is provided with tube seat(7), pressing plate(2-2)One Side lower surface is provided with the tube seat coordinated up and down with the tube seat on backing plate(7), briquetting pin shaft hole is also provided with pressing plate(8), using pressure Block bolt(9)By pressing plate and its under backing plate be pressed on the briquetting pilot hole in workbench face(6)On, pipe fitting end is compressed Between the tube seat for coordinating up and down;Bent pipe tooling I includes support frame, a shaping wheel(10)With two rollers(11), support frame by Train wheel bridge(12), lower plate(13), be fixed on lower plate side and the connecting tube between upper lower plate(14)Constitute, into Shape wheel(10)By bolt(15)It is positioned between upper and lower clamping plate, and makes the arc wheel face of shaping wheel and pressing plate and backing plate On tube seat front and back position correspondence, bolt(15)The dowel hole being positioned on workbench face simultaneously(5)It is interior and make curved Plumber's dress I is positioned at workbench face, two rollers(11)Pass through bearing pin respectively(16)It is positioned between upper and lower clamping plate, and makes The arc wheel face of two rollers and the arc wheel face of shaping wheel can be held tightly in pipe fitting simultaneously;The structure and bent pipe tooling of bent pipe tooling II I is identical.
2. the Process Unit of U-tube group according to claim 1, it is characterised in that shaping wheel removes 1/ after shaping 4 arch lack(17).
3. the Process Unit of U-tube group according to claim 1 and 2, it is characterised in that shaping wheel(10)Arc wheel face Using bicircular arcs structure, straight transitions, the i.e. center section of arc wheel face are a circular arc between circular arc, and its two ends is that identical is another One circular arc, straight transitions between circular arc.
4. the Process Unit of U-tube group according to claim 3, it is characterised in that the arc radius of center section are 10.5mm, the arc radius at two ends are 12.6mm, and the center of circle of two circular arcs is at a distance of 3.5mm.
CN201621348905.9U 2016-12-09 2016-12-09 The Process Unit of U-tube group Expired - Fee Related CN206229880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621348905.9U CN206229880U (en) 2016-12-09 2016-12-09 The Process Unit of U-tube group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621348905.9U CN206229880U (en) 2016-12-09 2016-12-09 The Process Unit of U-tube group

Publications (1)

Publication Number Publication Date
CN206229880U true CN206229880U (en) 2017-06-09

Family

ID=58978235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621348905.9U Expired - Fee Related CN206229880U (en) 2016-12-09 2016-12-09 The Process Unit of U-tube group

Country Status (1)

Country Link
CN (1) CN206229880U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108213217A (en) * 2018-03-20 2018-06-29 安庆三维电器有限公司 Pipe shaping mould and tooling
CN108856402A (en) * 2018-06-28 2018-11-23 湖州织里宝丰铝业有限公司 Aluminum Alloy U pipe forming machine structure
CN112742933A (en) * 2020-12-16 2021-05-04 中国空气动力研究与发展中心高速空气动力研究所 Bending forming method of resistance belt
CN112756445A (en) * 2020-12-16 2021-05-07 中国空气动力研究与发展中心高速空气动力研究所 Special forming tool for resistance belt
CN113199740A (en) * 2021-04-27 2021-08-03 天长市星河防腐仪表有限公司 Elbow pipe device for fluorine-spraying diaphragm pipe of instrument

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108213217A (en) * 2018-03-20 2018-06-29 安庆三维电器有限公司 Pipe shaping mould and tooling
CN108856402A (en) * 2018-06-28 2018-11-23 湖州织里宝丰铝业有限公司 Aluminum Alloy U pipe forming machine structure
CN112742933A (en) * 2020-12-16 2021-05-04 中国空气动力研究与发展中心高速空气动力研究所 Bending forming method of resistance belt
CN112756445A (en) * 2020-12-16 2021-05-07 中国空气动力研究与发展中心高速空气动力研究所 Special forming tool for resistance belt
CN113199740A (en) * 2021-04-27 2021-08-03 天长市星河防腐仪表有限公司 Elbow pipe device for fluorine-spraying diaphragm pipe of instrument

Similar Documents

Publication Publication Date Title
CN206229880U (en) The Process Unit of U-tube group
CN102266876B (en) Forming process and mould of seamless fork-shaped pipe
CN201516449U (en) High-strength straight seam butt welding three-way die
CN207872792U (en) A kind of cold pressing swan neck system
CN207394200U (en) A kind of air-conditioning tube assembly
CN104438509B (en) A kind of ultra-thin stainless steel bending tube forming method
CN111054830A (en) Method and device for connecting pipe and plate by using plastic deformation of pipe
CN110369549B (en) Integral rolling method for transition step pipe with smaller pipe diameter ratio and conical surface
CN111014367A (en) Long and thin arc shell and press forming method of long and thin polygonal double-arc shell
CN104815881A (en) Bending method for three-roller plate bending machine
CN202239125U (en) Pipe bending device of spiral water-cooling pipe for bending and casting
CN205289358U (en) Copper pipe bender
CN205519259U (en) Pipe strap mold processing
CN110976672B (en) Method and device for realizing connection of plate and pipe by utilizing plastic deformation of plate
CN212760508U (en) Make-up machine of tee bend is processed into to T venturi tube
CN205096294U (en) Roll formula bending machine
CN108380783B (en) The positive and negative compound progressive molding grommet integral (type) flange device of one kind and technique
CN103341559B (en) For the diel that metal pipe mouth is shaping
CN206253517U (en) The reverse single processing mold of steel tower corner iron with heating function
CN105013858A (en) Steel-plate tube coiling machine
CN201621389U (en) Metal corrugated pipe
CN201249239Y (en) Drilling rod pressure straightening die
CN109514201A (en) A kind of cold punching technology of heavy off-road vehicle vehicle frame stiffening plate
CN105215113B (en) A kind of continuous recurvation Aluminum Alloy Tube pushes away o ing device and method
CN205289356U (en) Automatic rotatory copper pipe bender

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

CF01 Termination of patent right due to non-payment of annual fee