Prior art keywords
bubble generator
flotation column
gas
cylinder
gas circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621321417.9U
Other languages
Chinese (zh)
Inventor
李耀基
宋慧林
刘丽芬
张朝旺
李若兰
彭千山
戴川
王灿霞
字佳林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Phosphate Chemical Group Corp Ltd
Original Assignee
Yunnan Phosphate Chemical Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Phosphate Chemical Group Corp Ltd filed Critical Yunnan Phosphate Chemical Group Corp Ltd
Priority to CN201621321417.9U priority Critical patent/CN206224229U/en
Application granted granted Critical
Publication of CN206224229U publication Critical patent/CN206224229U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Paper (AREA)

Abstract

The utility model is related to a kind of flotation column bubble control device, specially a kind of flotation column bubble generator automaton, the sub-cylinder of bubble generator is installed including some groups of connections, it is communicated to per component cylinder gas circuit on supply supervisor, supply is responsible for and is provided with gas flowmeter, pneumatic control valve and pressure transmitter onto the gas circuit of sub-cylinder, and the gas flowmeter, pneumatic control valve and pressure transmitter are connected to control system.This control device can not only every group of hair bubble generator of precise control throughput it is identical, ensure that the ore pulp that the bubble layer of uniform rising declines with adverse current is fully contacted collision, can also every group of bubble generator of monitor in real time aerated flow value and pressure value, possesses periodical blowdown function, reduce the infringement that the dirt in gas circuit is caused to bubble generator, ensure that foam maker effectively runs, the comprehensive management to flotation column supply and monitoring are improve on the whole, there is provided accurate, the efficient job security of right floatation process.

Description

A kind of flotation column bubble generator automaton
Technical field
The utility model is related to a kind of flotation column bubble control device, belongs to metallurgy equipment of mining field, specially a kind of flotation Post bubble generator automaton.
Background technology
With the high speed development of Phosphate Fertilizer Industry, the exploitation of phosphorus ore and consumption also steeply rise, phosphorus ore totality grade increasingly under Drop, impurity component becomes more and more complicated in causing phosphoric acid, and exploitation mid low grade phosphate rock stone is low in into the task of top priority Grade calcium collophanite, major impurity is carbonate impurities, and single reverse flotation flowsheet is mainly used at present, and removing carbonate is miscellaneous Matter, is enriched with and uses ore deposit, relatively easy in collophane is sorted.The flotation device that traditional preparation equipment is used, flotation device presence is accounted for Ground area is big, the problems such as high energy consumption;Therefore, be a kind of trend using novel flotation column, the application it is targeted it is improved be low energy Consumption without circulating pump Washdown type flotation column.
It is mainly by bubble generator to flotation column bottom injecting compressed air without circulating pump Washdown type flotation column, is formed Micro-bubble, the bubble layer of the rising of stabilization is collided with the uniform ore pulp adverse current for declining, and gangue mineral is brought up by bubble, and Useful Phosphate minerals flow out to flotation column bottom, so as to realize that useful Phosphate minerals are separated with gangue mineral.In flotation column running In, due to the factor such as mineral deposition and crystal precipitation, especially during Collophanite flotation, there is substantial amounts of calcium, magnesium ion, It is easy to separate out crystallization, sticks to bubble generator, cause bubble generator to block failure, flotation column is not normally functioning, In Collophanite flotation, flotation column is only capable of normal operation 7 days or so after clearing up or changing bubble generator, will gassing The phenomenon that generator is blocked, causes flotation column hydraulic performance decline, until lose sorting function.
Flotation bubble generator quantity is more, the bubble generator of general flotation column at 10~80, when find flotation column After flotation capacity declines, bubble generator can only be split out cleaning or replacing by branch, the time-consuming cycle is long, and manpower consumption is more, needs Want substantial amounts of manpower to be safeguarded, just can ensure that flotation column normally runs.
Utility model content
Overhaul what is changed for investigation is difficult to after the bubble generator generation problem existed in above-mentioned industry in the prior art Problem, the utility model provides a kind of flotation column bubble generator automaton, can effectively solve above-mentioned some Problem, is specifically realized in:Bubble is installed in a kind of flotation column bubble generator automaton, including some groups of connections The sub-cylinder (4) of generator, is communicated on supply supervisor (6) per component cylinder (4) gas circuit, supply supervisor (6) to sub-cylinder (4) gas flowmeter, pneumatic control valve (1) and pressure transmitter (2) be installed in gas circuit, it is the gas flowmeter, pneumatic Regulating valve (1) and pressure transmitter (2) are connected to control system (7).
Further, pneumatic control valve (1) is installed, pneumatic control valve (1) is even on the tail end of sub-cylinder (4) gas circuit Sub-cylinder (4) is passed to, pneumatic control valve (1) is connected to control system (7).
Further, the control system (7) adjusts control module (9), gas circuit automatic pollution discharge including flotation column aeration quantity Module (10), bubble generator state monitoring module (11), bubble generator reseting module (12).
Further, a host computer (8) is also included, host computer (8) is connected to control system (7), host computer (8) bag Display control module is included.
Further, the gas flow is calculated as vortex-shedding meter (3).
Operation principle introduction of the present utility model:A kind of flotation column bubble generator automaton, including some groups The sub-cylinder (4) of bubble generator is installed in connection, is communicated to per component cylinder (4) gas circuit on supply supervisor (6), supply supervisor (6) to being provided with gas flowmeter, pneumatic control valve (1) and pressure transmitter (2), the gas in the gas circuit of sub-cylinder (4) Flowmeter, pneumatic control valve (1) and pressure transmitter (2) are connected to control system (7).Flotation column bubble generator is divided into Multigroup control, gas flowmeter, pneumatic control valve (1) and pressure transmitter (2) are uniformly controlled using control system (7), are obtained Integrated level is high, be easily managed manipulation, and supply supervisor (6) is delivered the gas in each group gas circuit, by control system (7) from gas After every group of gas circuit gas flow that flowmeter gets, and by the aperture of control system (7) control pneumatic control valve (1), will The gas flow of every group of bubble generator acquisition is controlled in range of set value, so that being inflated on flotation column cross section equal It is even, it is ensured that the ore pulp that the uniform bubble layer for rising declines with adverse current is fully contacted collision, improves the efficiency of separation;By control system (7) every group of the charge air conditioning flow and gas pressure value of bubble generator are monitored, the running status of bubble generator can be judged, with Just failure is found, in time treatment, it is big by branch dissembling inspection, workload before solving the problems, such as.
Pneumatic ball valve (5) is installed on the tail end of sub-cylinder (4) gas circuit, pneumatic ball valve (5) is communicated to sub-cylinder (4), pneumatic ball valve (5) is connected to control system (7).Regularly pneumatic ball valve (5) is opened by control system (7), from And the effect of hydrops and dirt in discharge gas circuit can be reached, the infringement that is caused to bubble generator of dirt in gas circuit is reduced, The fault rate of bubble generator is reduced, the service life of foam maker is extended.
The control system (7) including flotation column aeration quantity adjust control module (9), gas circuit automatic pollution discharge module (10), Bubble generator state monitoring module (11), bubble generator reseting module (12).Flotation column aeration quantity adjusts control module (9) For being connected to gas flowmeter and pneumatic control valve (1), the numerical value of gas flowmeter can be obtained, pneumatic regulation can be manipulated The opening and closing degree of valve (1);Gas circuit automatic pollution discharge module (10), for being connected to pneumatic ball valve (5), and with clocking capability, when Preset Time reaches, then open pneumatic ball valve (5), hydrops and dirt in discharge gas circuit;Bubble generator state detection module, For obtaining gas flow values and gas pressure value in each group gas circuit and carrying out feedback processing;
A host computer (8) is also included, host computer (8) is connected to control system (7), and host computer (8) includes display Control module.Host computer (8) for the bubble generator in monitoring management flotation column stream condition, and with operation management Function;
In sum, integrated management and monitoring are carried out to the aeration quantity of flotation column bubble generator by control system (7), Can not only every group of hair bubble generator of precise control throughput it is identical so that inflated on flotation column cross section uniform, it is ensured that The ore pulp that the uniform bubble layer for rising declines with adverse current is fully contacted collision, so as to improve the efficiency of separation;Can also monitor in real time it is every The aerated flow value and pressure value of group bubble generator, are easy to provide the operation shape that staff judges bubble generator in time State, to find failure, treatment in time is big by branch dissembling inspection, workload before solving the problems, such as;Meanwhile, present apparatus tool Standby periodical blowdown function, hydrops and dirt in discharge gas circuit reduce the infringement that the dirt in gas circuit is caused to bubble generator, The fault rate of bubble generator is reduced, the service life of foam maker is extended;Bubble generator reliability examination can also regularly be carried out Test, by reducing the blowing pressure, make bubble generator timing reset, it is to avoid stuck phenomenon occurs in bubble generator, it is ensured that foaming Device effectively runs, and the comprehensive management to flotation column supply and monitoring is improve on the whole, there is provided the essence of right floatation process Accurate, efficient job security.
Brief description of the drawings
Fig. 1 is a kind of structural representation of flotation column bubble generator automaton;
Fig. 2 is the internal module connection diagram of control system;
Wherein:1-pneumatic control valve, 2-pressure transmitter, 3-vortex-shedding meter, 4-sub-cylinder, 5-pneumatic ball valve, 6-supply supervisor, 7-control system, 8-host computer, 9-select post aeration quantity regulation control module, 10-gas circuit automatic pollution discharge Module, 11-bubble generator state monitoring module, 12-bubble generator reseting module.
Specific embodiment
Embodiment:The Kunyang flotation mill 1# flotation column applications of Yunnan phosphatization group, a kind of flotation column bubble generator is certainly Dynamic control device, as shown in Figure 1 and Figure 2, including some groups of sub-cylinders 4 of connection installation bubble generator, per the gas of component cylinder 4 Road is communicated on supply supervisor 6, and gas flowmeter, pneumatic control valve 1 are provided with supply supervisor 6 to the gas circuit of sub-cylinder 4 With pressure transmitter 2, the gas flowmeter, pneumatic control valve 1 and pressure transmitter 2 are connected to control system 7.By flotation Post bubble generator is divided into multigroup control, and being uniformly controlled gas flowmeter, pneumatic control valve 1 and pressure using control system 7 becomes Device 2 is sent, acquisition integrated level is high, be easily managed manipulation, supply supervisor 6 is delivered the gas in each group gas circuit, by control system 7 After the every group of gas circuit gas flow got from gas flowmeter, and by the aperture of the control pneumatic control valve 1 of control system 7, The gas flow that every group of bubble generator is obtained is controlled in range of set value, so that being inflated on flotation column cross section equal It is even, it is ensured that the ore pulp that the uniform bubble layer for rising declines with adverse current is fully contacted collision, improves the efficiency of separation;By control system 7 monitoring every group of the charge air conditioning flows and gas gas pressure value of bubble generator, can judge the running status of bubble generator, To find failure, treatment in time is big by branch dissembling inspection, workload before solving the problems, such as.
Pneumatic ball valve 5 is installed, pneumatic ball valve 5 is communicated to sub-cylinder 4, Pneumatic ball on the tail end of the gas circuit of the sub-cylinder 4 Valve 5 is connected to control system 7.Pneumatic ball valve 5 is opened by the timing of control system 7, so as to reach discharge gas circuit in Hydrops and dirt effect, reduce the infringement that is caused to bubble generator of dirt in gas circuit, reduce the event of bubble generator Barrier rate, extends the service life of foam maker.
The control system 7 includes flotation column aeration quantity regulation control module 9, gas circuit automatic pollution discharge module 10, bubble hair Raw device state monitoring module 11, bubble generator reseting module 12.A host computer 8 is also included, host computer 8 is connected to control System 7, host computer 8 includes display control module.
When specifically used:Supply supervisor 6 is connected to five component gas circuits, is adjusted by respective pneumatic control valve 1 in gas circuit Afterwards, in uniform conveying identical tolerance to every component gas circuit, respective bubble generator is finally separately input into, flotation column fills Tolerance regulation control module 9 is used to be connected to gas flowmeter and pneumatic control valve 1, can obtain the numerical value of gas flowmeter, And the numerical value is shown on host computer 8 in real time, while the opening and closing degree of pneumatic control valve 1 can be manipulated, with adjustment gas Flow value and also transmit the function of being shown and controlled to host computer 8;
Gas circuit automatic pollution discharge module 10, for being connected to pneumatic ball valve 5, and with clocking capability, when Preset Time reaches, Then open pneumatic ball valve 5, hydrops and dirt in discharge gas circuit;For example gas circuit blowdown is carried out by timing in 8 hours or so, it is ensured that gas Road is clean, reduces the infringement that the dirt in gas circuit is caused to bubble generator, reduces the fault rate of bubble generator, and bubble occurs Device once, extended to or so half a year by whole inspections in original 7 days or so, reduced the fault rate of foam maker;
Bubble generator state detection module, gas flow values and gas pressure value for obtaining in each group gas circuit are gone forward side by side Row feedback processing, gas flow values, gas gross value and gas pressure value can also be sent to host computer 8 shown, as follows Shown in form, it is easy to intuitively show and adjust, it can be ensured that tolerance stabilization, floatation indicators stabilization.
Can also show that the relation of aeration quantity and floatation indicators, i.e. aeration quantity are suitable for 12.01nm3/min from upper table result In tolerance.So as in production process, can quantitatively adjust aeration quantity according to floatation indicators, fine-grained management and behaviour are realized Control, improves accurate flotation, stabilization and controllability;
Bubble generator reseting module 12, for regularly carrying out bubble generator reliability test, by reducing inflation pressure Power, makes bubble generator timing reset, it is to avoid stuck phenomenon occurs in bubble generator, it is ensured that foam maker effectively runs;Specifically, One test period is set by bubble generator reseting module 12, the time once reaches preset value, is first turned on pneumatic ball valve 5, pneumatic control valve 1 is then shut off, bubble generator loses pressure, and post rod mechanism automatically resets, and exclusion is likely to result in stuck stifled The debris of plug, are then turned off pneumatic ball valve 5, open pneumatic control valve 1, and reaching bubble generator carries out the purpose of reset cleaning, So that bubble generator recovers and can continue to normal work.

Claims (5)

1. a kind of flotation column bubble generator automaton, it is characterised in that install bubble generators including some groups of connections Sub-cylinder (4), per component cylinder (4) gas circuit be communicated to supply supervisor (6) on, supply supervisor (6) to sub-cylinder (4) gas Gas flowmeter, pneumatic control valve (1) and pressure transmitter (2), the gas flowmeter, pneumatic control valve are installed on road And pressure transmitter (2) is connected to control system (7) (1).
2. a kind of flotation column bubble generator automaton according to claim 1, it is characterised in that described point of gas Pneumatic control valve (1) is installed, pneumatic control valve (1) is communicated to sub-cylinder (4), pneumatic control valve on the tail end of cylinder (4) gas circuit (1) it is connected to control system (7).
3. a kind of flotation column bubble generator automaton according to claim 1 and 2, it is characterised in that described Control system (7) adjusts control module (9), gas circuit automatic pollution discharge module (10), bubble generator shape including flotation column aeration quantity State monitoring modular (11), bubble generator reseting module (12).
4. a kind of flotation column bubble generator automaton according to claim 3, it is characterised in that also include One host computer (8), host computer (8) is connected to control system (7), and host computer (8) includes display control module.
5. a kind of flotation column bubble generator automaton according to claim 1, it is characterised in that the gas Flow is calculated as vortex-shedding meter (3).
CN201621321417.9U 2016-12-05 2016-12-05 A kind of flotation column bubble generator automaton Active CN206224229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621321417.9U CN206224229U (en) 2016-12-05 2016-12-05 A kind of flotation column bubble generator automaton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621321417.9U CN206224229U (en) 2016-12-05 2016-12-05 A kind of flotation column bubble generator automaton

Publications (1)

Publication Number Publication Date
CN206224229U true CN206224229U (en) 2017-06-06

Family

ID=58784610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621321417.9U Active CN206224229U (en) 2016-12-05 2016-12-05 A kind of flotation column bubble generator automaton

Country Status (1)

Country Link
CN (1) CN206224229U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110918270A (en) * 2019-12-31 2020-03-27 江西理工大学 Magnetic flotation column with coil height adjustable and forced ore discharge device and control method
CN111948343A (en) * 2020-08-04 2020-11-17 国网江苏省电力有限公司 Device for measuring foam stability

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110918270A (en) * 2019-12-31 2020-03-27 江西理工大学 Magnetic flotation column with coil height adjustable and forced ore discharge device and control method
CN111948343A (en) * 2020-08-04 2020-11-17 国网江苏省电力有限公司 Device for measuring foam stability

Similar Documents

Publication Publication Date Title
CN206224229U (en) A kind of flotation column bubble generator automaton
CN102886306B (en) Column-slot combined technology for grading calcium collophanite
CN101362118B (en) Flotation column pulp quadric mineralising method
CN202725512U (en) Full-grain high-efficiency dry coal preparation system for power coal separation
CN100562370C (en) The flotation column that is used for sorting mineral
CN203124084U (en) Tri-product coal slime sorter
DE112014000131T5 (en) Method and apparatus for underground separation, production and filling of coal and coal gangue
CN102101069A (en) Novel method for proportioning ore grinding media
CN110882850B (en) Mineral separation system and mineral separation method for protecting graphite flakes
CN104390799B (en) A kind of distinguished and admirable migration nature imitation experiment device of colliery Duo Chen sources working face dust-laden
AU2022256228A1 (en) Concentrate Sorting System With Automatic Dynamic Equilibrium
CN2917799Y (en) Pulsating magnetic selection column
CN206984995U (en) A kind of double-screw feeder
CN103111352A (en) Airflow purification production line special for sericite
CN103639067A (en) Special foam maker for direct-impact type flotation column without circulating pump
CN204402444U (en) The integrated skid-mounted unit of shale gas high pressure mining
CN203425907U (en) Wind power permanent-magnetic concentrator
CN115055265A (en) Large-scale iron ore deposit underground mining selects to select fills integration system
CN106179786B (en) One liter of a drop is appreciated without the method for waiting drop cyclone bar shaped unit integrated system to improve grinding efficiency and classification efficiency using overflow fineness
CN105013617A (en) Collophanite dressing technology
CN203155672U (en) Dust zero discharge concentrated treatment device for concrete mixing plant
CN205182958U (en) Coal slime flotation unit based on active oil vacuole of cold state
CN206951392U (en) A kind of spiral classifier
CN109701725B (en) Method for balancing underground tailing filling amount and tailing amount in mineral separation production
CN203792528U (en) Automatic water distributing and weighing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant