CN206220594U - A kind of in-site installation steel parking lot - Google Patents
A kind of in-site installation steel parking lot Download PDFInfo
- Publication number
- CN206220594U CN206220594U CN201621249570.5U CN201621249570U CN206220594U CN 206220594 U CN206220594 U CN 206220594U CN 201621249570 U CN201621249570 U CN 201621249570U CN 206220594 U CN206220594 U CN 206220594U
- Authority
- CN
- China
- Prior art keywords
- parking lot
- landing
- parking
- site installation
- installation steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of in-site installation steel parking lot;The technical problem of solution:For the technological deficiency problem that the parking lot of the conventional steel bar concrete structure referred in background technology is present.The technical scheme of use:A kind of in-site installation steel parking lot, including it is horizontally disposed no less than one layer for the landing that parks cars, support is realized by pillar between landing per adjacent levels, automobile climb and fall guidance tape and the upper and lower staircase of personnel are set between the landing per adjacent levels;Landing is made up of the parking deck no less than a piece and is fixedly connected between deck of respectively stopping;Automobile import and export is set on the landing of the bottom, automatic payment machine is set at automobile import and export.Advantage:This parking lot is whole-steel, so that the compact dimensions in parking lot, lightweight, and is easy to build.
Description
Technical field
The utility model is related to a kind of in-site installation steel parking lot, belongs to parking lot technical field.
Background technology
As the increasingly improvement that people live, family car popularity rate are skyrocketed through, parking problem is caused increasingly to be dashed forward
Go out.Particularly residential quarter, Central Shopping area (CBD), hospital, station, airport, scenic spot etc..Therefore, constrain everybody significantly driving
The convenience of car trip, on parking problem, the parking facility of China lags far behind the U.S. or European countries.
Traditional parking lot is reinforced concrete structure, or is built on underground or ground, it is necessary to site operation construction, is applying
Between the duration, the road on periphery is taken, facility is engaged in the operations such as the transport of construction material, stacking, and time-consuming.In addition, traditional
Parking lot is difficult in following enlarging or reconstruction, not to mention resettlement and reuse.
The content of the invention
Technical problem to be solved in the utility model is:For the conventional steel bar concrete structure referred in background technology
Parking lot exist technological deficiency problem.
Design philosophy of the present utility model is to provide a kind of use whole-steel and the parking lot for assembling at the scene.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of in-site installation steel parking lot, including it is horizontally disposed no less than one layer for stopping for parking cars
Car platform, support is realized between the landing per adjacent levels by pillar, between the landing per adjacent levels
Automobile climb and fall guidance tape and the upper and lower staircase of personnel are set;Landing is made up of and first of respectively stopping the parking deck no less than a piece
It is fixedly connected between plate;Automobile import and export is set on the landing of the bottom, automatic payment is set at automobile import and export
Machine.
Parking lot in technical solutions of the utility model is whole-steel, so that the compact dimensions in parking lot, lightweight,
And be easy to build.Lengthen and increase in the case where former parking lot is unaffected, to increase parking stall.Removing in parking lot
Afterwards, still can use.This parking lot can be built in level land, waterborne, mountain valley etc., can be widely applied to house, airport, car
Stand, scenic spot nearby etc..
Improvement to technical solutions of the utility model, is fixedly connected between each parking deck using welding manner.This practicality
Parking deck in new technique scheme, using steel standard plate in workshop production line balance, can so ensure quality, carry
High efficiency.The flow that workshop makes has pretreatment, priming paint, assembly, welding and application etc., it is ensured that quality, can be with streamline
Operation, improves efficiency.Scene is arrived into the transport of parking deck, by specific purpose tool, assembled in situ welding, main structural engineering is complete
Into.The systems such as illumination, marking signal, cleaning, charging charge, monitoring, charging are installed, you can enable.Parking deck is in workshop system
Make, in-site installation greatly shortens the duration.Parking deck can be with production line balance, to ensure Quality advance efficiency.
Further improvement to technical solutions of the utility model, the gradient of automobile climb and fall guidance tape is less than 12.5 °.This parking
, being designed using staggered floor, the gradient up and down of vehicle is less than 12.5 degree so that climb and fall is safer.
Further improvement to technical solutions of the utility model, in-site installation steel parking lot also includes Car license recognition
Monitoring system and cell phone intelligent charging system.Parking lot is equipped with Intelligent Recognition and Fare Collection System, it is possible to achieve unmanned.Enter one
Step, parking lot of the present utility model is equipped with a considerable amount of charging piles, and power supply electrical automobile is used.
Compared with prior art, its advantage is the utility model:
1st, parking lot of the present utility model, parking lot is whole-steel, so that the compact dimensions in parking lot, weight
Gently, and be easy to build.
2nd, parking lot of the present utility model, parking lot is designed using staggered floor, and the gradient up and down of vehicle is less than 12.5
Degree so that climb and fall is safer;.
3rd, parking lot of the present utility model, is steel construction parking lot, it is easy to reconstruct, extend, can also entirety strange land
Rebuild, building waste will not be produced.
4th, parking lot of the present utility model, uses the slab and girder of pillar support, therefore, parking lot is not necessarily
Build level land, it is also possible to build that waterborne, the ground such as between lakeside, mountain valley in.
5th, parking lot of the present utility model, is full steel structure parking lot, for the parking lot for riverside or lakeside,
Floating parking lot is can be made into, it is overall in plant construction, it is dragged to destination and installs i.e. usable.
6th, parking lot of the present utility model, using semiclosed design, gravity-flow ventilation is good, therefore does not set force ventilation,
Energy-conserving and environment-protective.
7th, parking lot of the present utility model, using high definition Car license recognition monitoring system, adds cell phone intelligent and pays system
System, this parking lot can be in principle unmanned parking lot
8th, parking lot of the present utility model, the upper and lower staircase of personnel is designed using standard module, transport to Site Welding
Install, for large parking lot, it is also possible to install elevator.
9th, parking lot of the present utility model, the top or bottom that parking lot is imported and exported can serve as other purposes, make
This parking lot has multi-functional.
Brief description of the drawings
Fig. 1 is the plan of the utility model individual layer landing.
Fig. 2 is the profile (by taking 5 layers of parking lot as an example) of the utility model parking lot.
In figure:1. landing, 2. pillar, 3. automobile climb and fall guidance tape, the 4. upper and lower staircase of personnel, deck of 5. stopping.
Specific embodiment
Technical solutions of the utility model are described in detail below, but protection domain of the present utility model is not limited to
The embodiment.
To make content of the present utility model more obvious understandable, done into one below in conjunction with accompanying drawing 1-2 and specific embodiment
The description of step.
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and implementation
Example, is further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only used to explain this
Utility model, is not used to limit the utility model.
Embodiment:The present embodiment is by taking 5 layers of parking lot as an example.
As illustrated in fig. 1 and 2, it is the in-site installation steel parking lot of the present embodiment, including five layers of horizontally disposed use
Support is realized by pillar 2 between the landing 1 for parking cars, the landing of every adjacent levels, per adjacent upper and lower
Automobile climb and fall guidance tape 3 and personnel's upper and lower staircase 4 are set between the landing of layer;The gradient of automobile climb and fall guidance tape is less than
12.5°.Landing is constituted and respectively fixed using welding manner between parking deck and connected by the parking deck 5 no less than a piece
Connect;Automobile import and export is set on the landing of the bottom, automatic payment machine is set at automobile import and export.In-site installation steel
Matter parking lot also includes Car license recognition monitoring system and cell phone intelligent charging system.
The Specific construction process of the parking lot of the present embodiment is as follows:
All of material such as steel plate, angle steel and round steel in the present embodiment parking lot, cleaned, derusting by sandblasting, priming paint
Drying pretreatment.The cutting of steel plate uses numerical control automatic blanking;Parking deck 5 uses automatically or semi-automatically welds jigsaw;Strengthen
Aggregate is installed and is also adopted by automatically or semi-automatically welding;The welding for strengthening panel and the web of girder can use automatic welding, and stop
The welding on car deck 5 uses semi-automatic or manual welding.So as to produce the plate of standard, it is suitable for transport, meanwhile, mix standard
Hanger, for entrucking, on-site hoisting.
Scene is transported on parking deck 5, and standard plate is lifted on into special cart group (by 2- using truck crane or other instruments
3 dolly compositions) on, can rotate, shift and height regulation.Spot welding is fixed, and parking uses semi-automatic welding, purlin between deck 5
Material is connected and pillar uses manual welding.Cleaned after the completion of welding, polished and repairing paint.
Parking lot agent structure is completed, and installs the upper and lower staircase 4 of automobile climb and fall guidance tape 3, personnel and railing, welding job one
Terminate, that is, clean, polish and repairing paint.
The drainage system in parking lot employs the struts of part-structure, therefore does not arrange additional conduits.If nearby had
Fire water pipeline, it may be connected to parking lot.
At the same time, electrician can march into the arena laying cable, install illumination and closed-circuit television CCTV monitoring systems and charge is
System.
Automatic payment machine, import and export/Fare Collection System and illumination are carried out after the completion of parking lot and charging system (if any) is adjusted
Formula, qualified rear referable is used.
After parking lot completion is paid, can at any time be lengthened as needed, if being designed with consideration, also can at any time be added layer.
The construction period of layer is being lengthened and is adding, the operation to parking lot is substantially unaffected.If to be moved to parking lot, from upper and
Under, only the position that need to weld at the scene carries out surface trimming, then the plate of standard is transported into new address is assembled.
A kind of in-site installation steel parking lot in the present embodiment, mainly by whole-steel slab and girder and branch column combination
Form, using fixed welding manner connection, the particularly finishing system of high-quality and implementation, it is ensured that steel construction between structure
Anti-corrosion function, long service life.
The utility model is not directed to partly same as the prior art or can be realized using prior art.
Although as described above, having been represented with reference to specific preferred embodiment and having described the utility model, it must not
It is construed to the limitation to the utility model itself.The spirit and scope of the present utility model of appended claims definition are not being departed from
Under the premise of, can various changes can be made in the form and details to it.
Claims (4)
1. a kind of in-site installation steel parking lot, it is characterised in that:Including it is horizontally disposed no less than one layer for stopping
The landing of vehicle is put, support is realized by pillar between the landing per adjacent levels, stopping per adjacent levels
Automobile climb and fall guidance tape and personnel's upper and lower staircase are set between car platform;Landing is made up of the parking deck no less than a piece
And be fixedly connected between each parking deck;Automobile import and export is set on the landing of the bottom, is set at automobile import and export
Put automatic payment machine.
2. in-site installation steel parking lot as claimed in claim 1, it is characterised in that using weldering between each parking deck
The mode of connecing is fixedly connected.
3. in-site installation steel parking lot as claimed in claim 1, it is characterised in that the gradient of automobile climb and fall guidance tape
Less than 12.5 °.
4. in-site installation steel parking lot as claimed in claim 1, it is characterised in that in-site installation steel Multilayer parking
Field also includes Car license recognition monitoring system and cell phone intelligent charging system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621249570.5U CN206220594U (en) | 2016-11-18 | 2016-11-18 | A kind of in-site installation steel parking lot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621249570.5U CN206220594U (en) | 2016-11-18 | 2016-11-18 | A kind of in-site installation steel parking lot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206220594U true CN206220594U (en) | 2017-06-06 |
Family
ID=58790499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621249570.5U Active CN206220594U (en) | 2016-11-18 | 2016-11-18 | A kind of in-site installation steel parking lot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206220594U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368465A (en) * | 2016-11-18 | 2017-02-01 | 南通欣通船舶与海洋工程设计有限公司 | Field mounted steel multi-storey parking space |
-
2016
- 2016-11-18 CN CN201621249570.5U patent/CN206220594U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368465A (en) * | 2016-11-18 | 2017-02-01 | 南通欣通船舶与海洋工程设计有限公司 | Field mounted steel multi-storey parking space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206785050U (en) | A kind of vertical transport circular stereo garage | |
CN206397251U (en) | The steel structure platform that steel structure platform frame unit and assembling are built | |
CN103835218B (en) | Pavement in covered bridge type Multifunctional air | |
CN206591862U (en) | A kind of subway overhead station construction protecting platform car | |
CN202324576U (en) | Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall | |
CN104763212B (en) | Photovoltaic ecological paradise intelligent car storing dock | |
CN206220594U (en) | A kind of in-site installation steel parking lot | |
CN106869552A (en) | Underground rotating type stereo carport | |
CN113481814A (en) | Novel assembly type green pedestrian overpass and use method thereof | |
CN206538685U (en) | Twin shaft pier and middle binder truss move integrally system | |
CN105604368A (en) | Track type stereo garage and control method thereof | |
CN104878838B (en) | A liter support reinforced concrete building method of construction is changed in one kind supporting | |
CN104989139A (en) | Circular ring circulation rotating garage partially or totally arranged over ground | |
CN108114551A (en) | Construction site dust controlling method | |
CN106368465A (en) | Field mounted steel multi-storey parking space | |
CN115874594A (en) | Translation load receiving system and translation load receiving method for ocean booster station | |
CN106592438B (en) | Twin shaft pier and middle binder truss move integrally construction method | |
JP7097882B2 (en) | Urban transportation and logistics system | |
CN204804406U (en) | Part or whole sets up rotatory garage of ring circulation on ground | |
CN204826804U (en) | Big -and -middle -sized vehicle stereo garage with overhaul layer | |
CN114348882A (en) | Hoisting method of refining tower | |
CN205558410U (en) | Runway type stereo garage | |
CN102182336B (en) | Underground garage | |
CN102182321B (en) | Construction method of underground garage | |
CN207017100U (en) | A kind of bicycle expressway girder steel paving structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |