CN206219538U - A kind of gas processing system - Google Patents

A kind of gas processing system Download PDF

Info

Publication number
CN206219538U
CN206219538U CN201621161678.9U CN201621161678U CN206219538U CN 206219538 U CN206219538 U CN 206219538U CN 201621161678 U CN201621161678 U CN 201621161678U CN 206219538 U CN206219538 U CN 206219538U
Authority
CN
China
Prior art keywords
amine liquid
amine
natural gas
gas
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621161678.9U
Other languages
Chinese (zh)
Inventor
孟惟
任洪
王加壮
何晓
孟伟
丁俊
张艺瀚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANG'AN CO Ltd OF CHINA NATURAL GAS CO Ltd
Original Assignee
GUANG'AN CO Ltd OF CHINA NATURAL GAS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANG'AN CO Ltd OF CHINA NATURAL GAS CO Ltd filed Critical GUANG'AN CO Ltd OF CHINA NATURAL GAS CO Ltd
Priority to CN201621161678.9U priority Critical patent/CN206219538U/en
Application granted granted Critical
Publication of CN206219538U publication Critical patent/CN206219538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas Separation By Absorption (AREA)

Abstract

The utility model is related to liquefied natural gas processing technique field, specifically discloses a kind of gas processing system, including LNG storage tank, absorption tower, and cooling system, amine liquid and flashed vapour recycling system are connected with absorption tower;The cooling system includes the cooler, heat exchanger, molecular sieve, the ice chest that are sequentially connected;The amine liquid and flashed vapour recycling system include the amine liquid flash tank, knockout drum, amine liquid collecting tank, poor rich amine solution heat exchanger, the amine liquid regeneration boiler that are sequentially connected;From bottom to top flowed from LNG storage tank natural gas out from tower bottom is absorbed, flowed down from absorption tower top from the amine liquid of amine liquid regeneration boiler outflow, amine liquid and natural gas counter current contact, amine liquid enters amine liquid and flashed vapour recovery system after absorbing the sour gas in natural gas, removes acid natural gas and enters cooling system.The utility model has the advantages that, the natural gas temperature before ice chest is lowered into, reduce cryogen consumption;The fuel gas that will be flashed off simultaneously is reclaimed, and effectively reaches energy-saving purpose.

Description

A kind of gas processing system
Technical field
The utility model is related to liquefied natural gas processing technique field, particularly relates to a kind of gas processing system.
Background technology
Sour gas therein will be removed during natural gas processing first, gas and amine liquid will be separated afterwards, taken off Removal of acid gases needs to use amine liquid flash tank, and former technological process is to enter the sudden strain of a muscle of amine liquid after the carbon dioxide in the complete natural gas of amine absorption Steaming pot, amine liquid is flashed in this storage tank, and the gas for flashing off contains a large amount of methane, and this portion gas is put by pressure-control valve Sky to torch is burnt.A large amount of fuel gas containing methane that amine liquid flash tank is flashed off are sent directly into torch combustion Burn, this part energy can not be utilized effectively, cause to waste.
The ice chest used in liquefied natural gas has strict control due to material cause, the natural gas temperature to entering ice chest System is required i.e. not above 66 DEG C.Current equipment causes natural gas temperature drift before ice chest is entered, and highest can reach 46.5 DEG C, into ice chest after need the more cryogen of consumption to carry out it heat exchange cooling to can be only achieved -162 DEG C, production cost increases Plus, if into ice chest natural gas temperature more than 66 DEG C, the chain parking of device will be caused.
The content of the invention
The purpose of this utility model is to provide a kind of gas processing system, is lowered into the natural gas temperature before ice chest, The temperature difference of natural gas and cryogen is reduced, cryogen consumption is reduced;The fuel gas that will be flashed off simultaneously is reclaimed, used as fuel Gas is used, and effectively reaches energy-saving purpose.
To achieve these goals, the utility model employs following technical scheme:A kind of gas processing system, bag LNG storage tank, absorption tower are included, cooling system, amine liquid and flashed vapour recycling system are connected with absorption tower;
The cooling system includes the cooler, heat exchanger, molecular sieve, the ice chest that are sequentially connected;
The amine liquid and flashed vapour recycling system include that the amine liquid flash tank being sequentially connected, knockout drum, amine liquid are collected Tank, poor rich amine solution heat exchanger, amine liquid regeneration boiler;
Air inlet from after the scrubbed removing solid and liquid impurities of LNG storage tank natural gas out from absorption tower bottom is under And upper flowing, from top to bottom flowed down from absorption tower top from the amine liquid of amine liquid regeneration boiler outflow, amine liquid and natural gas pair Stream contact, amine liquid enters amine liquid and flashed vapour recovery system after absorbing the sour gas in natural gas, removes acid natural gas Into cooling system;
The gas flashed off from amine liquid flash tank flows into amine liquid receipts by flowing into fuelgas pipeline, rich amine solution after knockout drum Collection tank, through poor rich amine solution heat exchanger, rich amine solution enters amine liquid regeneration upper boiler after rising high-temperature, and liquid is along regenerator to dirty The dynamic high-temperature vapor counter current contacting come with reboiler, most sour gas are desorbed, and recover the poor amine liquid of absorbability Boiler bottom is regenerated by amine liquid to flow out, exchanged heat with cold rich solution in poor rich amine solution heat exchanger, after supercharging, filtering, further cooling, by Circulating pump suction absorption tower top.
Wherein, the knockout drum liquid phase pipeline is connected with amine liquid collecting tank, and vapor delivery line is connected with fuelgas pipeline.
Wherein, the absorption tower bottom is provided with air inlet, and top is provided with amine liquid/gas separator;
Wherein, the cooler is connected with the refrigerant compressor for lowering the temperature;Filter is provided with the molecular sieve.
Wherein, the molecular sieve at least two, is set up in parallel.
The beneficial effects of the utility model are:The fuel gas that amine liquid flash tank is flashed off effectively is used work For fuel gas is used, the rich amine solution isolated is collected and can regenerated with amine liquid collecting tank, it is to avoid cause to waste.
Cooler and heat exchanger both of which can lower the temperature to natural gas, and natural gas is carried out further using recirculated water effectively Secondary cooling treatment, both can guarantee that natural gas enter molecular sieve under low-temperature condition after dehydrating effect, cryogen consumption can be reduced again, 30 DEG C are dropped into the natural gas temperature before ice chest, refrigerant cycle amount and refrigerant compressor load and power consumption obtain one and fix Drop, effectively reduces factory's unit processing cost, has reached energy-saving purpose, it is to avoid the risk of unplanned parking, really After guarantor will not be because of chain parking caused by overtemperature, energy conservation and consumption reduction effects are notable.
Each enter following process system from absorption tower amine liquid out and natural gas, the system overall structure makes all of The energy is all reasonably processed and processed.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment technical scheme, below will be to make needed for embodiment description Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only the utility model in order to more clearly The utility model embodiment or technical scheme of the prior art are illustrated, below by institute in p- embodiment or description of the prior art The accompanying drawing for needing to use is briefly described, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
A kind of gas processing system as shown in Figure 1, including LNG storage tank, absorption tower, cooling system is connected with absorption tower System, amine liquid and flashed vapour recycling system;
The cooling system includes the cooler, heat exchanger, molecular sieve, the ice chest that are sequentially connected;
The amine liquid and flashed vapour recycling system include that the amine liquid flash tank being sequentially connected, knockout drum, amine liquid are collected Tank, poor rich amine solution heat exchanger, amine liquid regeneration boiler;
Air inlet from after the scrubbed removing solid and liquid impurities of LNG storage tank natural gas out from absorption tower bottom is under And upper flowing, regenerating amine liquid/gas separator of the amine liquid of boiler outflow from the top of absorption tower from the amine liquid from top to bottom flows down, amine Liquid and natural gas counter current contact, amine liquid enters amine liquid and flashed vapour recovery system, removing after absorbing the sour gas in natural gas Acid natural gas enters cooling system.
After the natural gas of removing acid gas sequentially passes through cooler, heat exchanger cooling by absorption tower tower top, molecular sieve is flowed into, passed through Ice chest liquefaction is flowed into after filter and molecular sieve dehydration, -160 DEG C of liquefied natural gas is produced.
The gas flashed off from amine liquid flash tank flows into amine liquid receipts by flowing into fuelgas pipeline, rich amine solution after knockout drum Collection tank, through poor rich amine solution heat exchanger, rich amine solution enters amine liquid regeneration upper boiler after rising high-temperature, and liquid is along regenerator to dirty The dynamic high-temperature vapor counter current contacting come with reboiler, most sour gas are desorbed, and recover the poor amine liquid of absorbability Boiler bottom is regenerated by amine liquid to flow out, exchanged heat with cold rich solution in poor rich amine solution heat exchanger, after supercharging, filtering, further cooling, by Circulating pump suction absorption tower top.
The absorption tower bottom is provided with air inlet, and top is provided with amine liquid/gas separator.
The cooler is connected with the refrigerant compressor for lowering the temperature;Filter is provided with the molecular sieve.
The heat exchanger connects outer net, and the refrigerant for coming from outer net is changed into heating agent, with the heat of Reasonable Utilization of Natural Gas, It is energy-saving.
The molecular sieve at least two, is set up in parallel, and either simultaneously or alternately uses.
The knockout drum liquid phase pipeline is connected with amine liquid collecting tank, and vapor delivery line is connected with fuelgas pipeline.Amine liquid is dodged The fuel gas that steaming pot is flashed off effectively is used and used as fuel gas, the rich amine solution isolated amine liquid collecting tank Collecting to be regenerated, it is to avoid cause to waste.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit the utility model, it is all at this Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (5)

1. a kind of gas processing system, it is characterised in that:Including LNG storage tank, absorption tower, cooling system is connected with absorption tower System, amine liquid and flashed vapour recycling system;
The cooling system includes the cooler, heat exchanger, molecular sieve, the ice chest that are sequentially connected;
It is amine liquid flash tank that the amine liquid and flashed vapour recycling system include being sequentially connected, knockout drum, amine liquid collecting tank, poor Rich amine solution heat exchanger, amine liquid regeneration boiler;
From after the scrubbed removing solid and liquid impurities of LNG storage tank natural gas out from the air inlet for absorbing tower bottom from bottom to top Flowing, from top to bottom flows down from the amine liquid of amine liquid regeneration boiler outflow from absorption tower top, and amine liquid connects with natural gas convection current Touch, amine liquid enters amine liquid and flashed vapour recovery system after absorbing the sour gas in natural gas, remove acid natural gas and enter Cooling system;
The gas flashed off from amine liquid flash tank flows into the collection of amine liquid by flowing into fuelgas pipeline, rich amine solution after knockout drum Tank, through poor rich amine solution heat exchanger, rich amine solution enters amine liquid regeneration upper boiler after rising high-temperature, and liquid flows downward along regenerator The high-temperature vapor counter current contacting come with reboiler, most sour gas are desorbed, recover the poor amine liquid of absorbability by Amine liquid regenerates boiler bottom outflow, is exchanged heat with cold rich solution in poor rich amine solution heat exchanger, after supercharging, filtering, further cooling, by following Ring pumping enters absorption tower top.
2. a kind of gas processing system according to claim 1, it is characterised in that:The knockout drum liquid phase pipeline and amine Liquid collecting tank is connected, and vapor delivery line is connected with fuelgas pipeline.
3. a kind of gas processing system according to claim 1, it is characterised in that:The absorption tower bottom is provided with air inlet Mouthful, top is provided with amine liquid/gas separator.
4. a kind of gas processing system according to claim 1, it is characterised in that:The cooler is connected with for dropping The refrigerant compressor of temperature;Filter is provided with the molecular sieve.
5. a kind of gas processing system according to claim 1, it is characterised in that:The molecular sieve at least two, and Row are set.
CN201621161678.9U 2016-10-25 2016-10-25 A kind of gas processing system Expired - Fee Related CN206219538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621161678.9U CN206219538U (en) 2016-10-25 2016-10-25 A kind of gas processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621161678.9U CN206219538U (en) 2016-10-25 2016-10-25 A kind of gas processing system

Publications (1)

Publication Number Publication Date
CN206219538U true CN206219538U (en) 2017-06-06

Family

ID=58788602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621161678.9U Expired - Fee Related CN206219538U (en) 2016-10-25 2016-10-25 A kind of gas processing system

Country Status (1)

Country Link
CN (1) CN206219538U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113717764A (en) * 2021-09-13 2021-11-30 芜湖中燃城市燃气发展有限公司 Natural gas impurity removal equipment and method with cooling function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113717764A (en) * 2021-09-13 2021-11-30 芜湖中燃城市燃气发展有限公司 Natural gas impurity removal equipment and method with cooling function
CN113717764B (en) * 2021-09-13 2023-06-16 芜湖中燃城市燃气发展有限公司 Natural gas impurity removal equipment with cooling function and method

Similar Documents

Publication Publication Date Title
CN106039960B (en) A kind of collecting carbonic anhydride liquefaction process of cascade utilization fume afterheat
CN103961979B (en) A kind of carbon dioxide capture system of multi-stage diffluence regeneration and technique
CN105013296B (en) A kind of selexol process decarbonization system and method for coupling acid gas concentrate
CN104399356B (en) A kind of carbon dioxide capture system
CN108211671B (en) Energy-saving carbon dioxide regeneration and compression system and method
CN212166984U (en) CO2Trapping system
CN106440658A (en) Combination process for preparing liquefied natural gas (LNG) through high-oxygen-content and high-nitrogen-content coalbed methane
CN107859539A (en) A kind of double Brayton cycle electricity generation systems of carbon dioxide of integrated carbon trapping
CN108980614A (en) Integrated natural gas processing system is recycled in a kind of formation testing, gas testing
CN208786105U (en) The carbon dioxide capture system utilized based on Waste Heat Recovery
CN203803335U (en) Multistage split regeneration carbon dioxide trapping system
CN102296979B (en) Dedusting and dehydrating process of deep condensation to gas by utilizing natural cold source
CN208804704U (en) A kind of boiler smoke-gas residual-heat recovering device
CN206219538U (en) A kind of gas processing system
CN208901087U (en) Integrated natural gas processing system is recycled in a kind of formation testing, gas testing
CN204337980U (en) A kind of carbon dioxide capture device
CN207533246U (en) A kind of carbon trapping system regeneration gas heat reclaim unit
CN108815993A (en) The carbon dioxide capture system utilized based on Waste Heat Recovery
CN217410284U (en) Novel chemical absorption method flue gas CO2 entrapment system
CN103589550A (en) Carbon dioxide balanced system for beer brewing technology
CN103353207B (en) Device for purifying methane liquid from purified landfill gas
CN203443264U (en) Device for extracting methane liquid from purified garbage landfill gas
CN106520236A (en) Natural gas processing system
CN108079736A (en) A kind of flashed vapour purification-recovery system
CN205481906U (en) System for utilize mixed working medium to pass through heating power driven compact desorption carbon dioxide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20181025