CN206214640U - A kind of field operation individual soldier's physical training device with synchronous coordination training aids - Google Patents

A kind of field operation individual soldier's physical training device with synchronous coordination training aids Download PDF

Info

Publication number
CN206214640U
CN206214640U CN201621216450.5U CN201621216450U CN206214640U CN 206214640 U CN206214640 U CN 206214640U CN 201621216450 U CN201621216450 U CN 201621216450U CN 206214640 U CN206214640 U CN 206214640U
Authority
CN
China
Prior art keywords
coordination
spud pile
fixed
synchronising
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621216450.5U
Other languages
Chinese (zh)
Inventor
宋义刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ordnance Engineering College of PLA
Original Assignee
Ordnance Engineering College of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ordnance Engineering College of PLA filed Critical Ordnance Engineering College of PLA
Priority to CN201621216450.5U priority Critical patent/CN206214640U/en
Application granted granted Critical
Publication of CN206214640U publication Critical patent/CN206214640U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of field operation individual soldier's physical training device with synchronous coordination training aids, including equipment platform and ski rack, ski rack is fixed on the lower section of equipment platform, counterweight spud pile is fixed with the upper surface of equipment platform, pullback weight barbell piece is set with counterweight spud pile, also include the equipment spud pile and synchronous coordination training aids that are fixed on ski rack, the roller with demountable structure is additionally provided with the left and right sides of ski rack;Synchronous coordination training aids includes connecting pole, base plate and two exercise for coordination devices, two bottoms of the right-side pedal of exercise for coordination device are fixedly connected by the first synchronising (connecting) rod, and two bottoms of the left pedal of exercise for coordination device are fixedly connected by the second synchronising (connecting) rod.Equipment spud pile and synchronous coordination training aids are increased on the basis of existing ski rack, unitary function is solved the problems, such as, the roller of demountable structure is also additionally arranged, it is convenient to move at any time and carry, solve portable field operation demand.

Description

A kind of field operation individual soldier's physical training device with synchronous coordination training aids
Technical field
The utility model is related to the technical field of field individual training equipment, has synchronous association more specifically to one kind Adjust field operation individual soldier's physical training device of training aids.
Background technology
Into the new century and stage, the functional mission of army is constantly expanded, and vast officers and men was both born and defends country Sovereignty, safety, the Missions of territorial integrity, must cope with various security threats, accomplish a diverse array of military tasks again.Either The modern war of in the high-tech is won, or participation is dealt with contingencies, and is required for soldier to possess strong physique, and this is right Method of Military Training Result proposes requirement higher.And the training aids of the existing individual training equipment multidigit simple function of army of China Material, and extremely inconvenience is carried, the training device of conventional portable is also mostly simple ski rack structure, only increases counterweight Branch mesh is trained, and unitary function does not possess the requirement for synchronizing exercise for coordination, as the modern soldier's variation field operation instruction of limitation Experienced rigid problem.
Utility model content
The purpose of this utility model is to provide one kind and overcomes the deficiencies in the prior art, simple structure, reasonable in design, portable And a kind of field operation individual soldier's physical training device with synchronous coordination training aids of exercise for coordination can be synchronized.
To achieve these goals, the technological means that the utility model is taken is:
A kind of field operation individual soldier's physical training device with synchronous coordination training aids, including equipment platform and ski rack, snow Sledge frame is fixed on the lower section of equipment platform, and counterweight spud pile is fixed with the upper surface of equipment platform, is covered on counterweight spud pile Equipped with pullback weight barbell piece, also including the equipment spud pile and synchronous coordination training aids that are fixed on ski rack, on a left side for ski rack Right both sides are additionally provided with the roller with demountable structure;Synchronous coordination training aids is fixed on equipment platform, synchronous coordination instruction Practicing device includes connecting pole, base plate and two exercise for coordination devices, and connecting pole is connected with equipment spud pile, and base plate is fixed on connecting pole Upper end, exercise for coordination device is fixed on the upper end of base plate;Two bottoms of the right-side pedal of exercise for coordination device pass through first Synchronising (connecting) rod is fixedly connected, and two bottoms of the left pedal of exercise for coordination device are fixedly connected by the second synchronising (connecting) rod, and Arc expansion groove is provided with second synchronising (connecting) rod.
The equipment spud pile is four and is distributed in rectangular on ski rack that described counterweight spud pile is also four And be distributed in rectangular in the upper surface of equipment platform, counterweight spud pile and equipment spud pile are cylinder, and equipment is fixed External screw thread is provided with stake.
The demountable structure includes the roller bearing of the left and right sides for being fixed on ski rack and is matched therewith rolling bearing, rolls Dynamic bearing is fixed in roller, and roller bearing is fixedly connected with rolling bearing by bearing pin.
The free end closing of the arc expansion groove, the level height of arc expansion groove and the second synchronising (connecting) rod junction and First synchronising (connecting) rod maintains an equal level.
The left end of first synchronising (connecting) rod is connected by first axle with the right-hand tread plate of left side exercise for coordination device, and second The left end of synchronising (connecting) rod is connected by second hinge with the left-hand tread plate of left side exercise for coordination device.
The beneficial effects of the utility model are:Equipment spud pile and synchronous coordination are increased on the basis of existing ski rack Training aids, solves the problems, such as unitary function, is also additionally arranged the roller of demountable structure, convenient to move at any time and carry, and solves Portable field operation demand.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the utility model.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the top view of Fig. 1.
Fig. 4 is the structural representation of equipment platform and ski rack in Fig. 1.
In figure:Equipment platform 10;Ski rack 20;Counterweight spud pile 30;Equipment spud pile 40;Roller 50;Roller bearing 60;Connection Post 70;Base plate 80;First synchronising (connecting) rod 90;Second synchronising (connecting) rod 100;Arc expansion groove 110;First axle 120;Second hinge 130。
Specific embodiment
The utility model is described in further detail with specific implementation method below in conjunction with the accompanying drawings.
Specific embodiment, as shown in Figures 1 to 4, a kind of field operation individual soldier physical training dress with synchronous coordination training aids Put, including equipment platform 10 and ski rack 20, ski rack 20 is fixed on the lower section of equipment platform 10, in the upper table of equipment platform 10 Face is fixed with counterweight spud pile 30, and pullback weight barbell piece is set with counterweight spud pile 30, also including being fixed on ski rack 20 Equipment spud pile 40 and synchronous coordination training aids, be additionally provided with the rolling with demountable structure in the left and right sides of ski rack 20 Wheel 50;Synchronous coordination training aids is fixed on equipment platform 10, and synchronous coordination training aids includes connecting pole 70, base plate 80 and two Exercise for coordination device, connecting pole 70 is connected with equipment spud pile 40, and base plate 80 is fixed on the upper end of connecting pole 70, exercise for coordination dress Put the upper end for being fixed on base plate 80;Two bottoms of the right-side pedal of exercise for coordination device are fixed by the first synchronising (connecting) rod 90 and connected Connect, two bottoms of the left pedal of exercise for coordination device are fixedly connected by the second synchronising (connecting) rod 100, the first synchronising (connecting) rod 90 Left end be connected with the right-hand tread plate of left side exercise for coordination device by first axle 120, the left end of the second synchronising (connecting) rod 100 passes through Second hinge 130 is connected with the left-hand tread plate of left side exercise for coordination device, and is provided with arc expansion groove on the second synchronising (connecting) rod 100 110, the free end closing of arc expansion groove 110, the level height of the junction of 110 and second synchronising (connecting) rod of arc expansion groove 100 Maintain an equal level with the first synchronising (connecting) rod 90.
The equipment spud pile 40 is four and is distributed in rectangular on ski rack 20, described counterweight spud pile 30 It is distributed in rectangular for four and in the upper surface of equipment platform 10, counterweight spud pile 30 and equipment spud pile 40 are cylinder External screw thread is provided with shape, and equipment spud pile 40, demountable structure includes the roller bearing of the left and right sides for being fixed on ski rack 20 60 and rolling bearing is matched therewith, rolling bearing is fixed in roller 50, roller bearing 60 fixes company with rolling bearing by bearing pin Connect.
The utility model when in use, ski rack 20 is fixed on the lower section of equipment platform 10, in the upper of equipment platform 10 Surface is fixed with counterweight spud pile 30, and pullback weight barbell piece is set with counterweight spud pile 30, consolidates equipment on ski rack 20 Determine stake 40 and synchronous coordination training aids is fitted together, roller 50 is removed, synchronize two personnel difference of exercise for coordination Stand onto two pedals of exercise for coordination device, needed while carrying out when password latter two trainer that training starts is obtained The traveling of both legs, otherwise the left and right pedal of exercise for coordination device of left and right two can be synchronous in the first synchronising (connecting) rod 90, second respectively Movement differential is produced in the presence of connecting rod 100 so that pedal is unable to synchronous hunting, cause uncoordinated unbalance motion, in addition, While first synchronising (connecting) rod 90, the second synchronising (connecting) rod 100 keep the two exercise for coordination devices in left and right to be synchronized with the movement, first axle 120 and second hinge 130 can respectively allow for left and right exercise for coordination device and small fortune is had by the pedal that synchronising (connecting) rod is connected Moment is different, and without causing uncoordinated unbalance motion, prolonged exercise can imitate the training that personnel obtain sufficient synchronous coordination Really, after need not train, synchronous coordination training aids is removed from equipment spud pile 40 and ski rack 20, loads onto roller 50, Easily equipment can be carried.
Certain described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill Change, remodeling, addition or replacement that the those of ordinary skill in art field is made in essential scope of the present utility model, also belong to In protection domain of the present utility model.

Claims (5)

1. a kind of field operation individual soldier's physical training device with synchronous coordination training aids, including equipment platform (10) and ski rack (20), ski rack (20) is fixed on the lower section of equipment platform (10), and being fixed with counterweight in the upper surface of equipment platform (10) fixes Stake (30), pullback weight barbell piece is set with counterweight spud pile (30), it is characterised in that:Also include being fixed on ski rack (20) Equipment spud pile (40) and synchronous coordination training aids, be additionally provided with demountable structure in the left and right sides of ski rack (20) Roller (50);Synchronous coordination training aids is fixed on equipment platform (10), and synchronous coordination training aids includes connecting pole (70), bottom Plate (80) and two exercise for coordination devices, connecting pole (70) are connected with equipment spud pile (40), and base plate (80) is fixed on connecting pole (70) upper end, exercise for coordination device is fixed on the upper end of base plate (80);Two bottoms of the right-side pedal of exercise for coordination device It is fixedly connected by the first synchronising (connecting) rod (90), two bottoms of the left pedal of exercise for coordination device pass through the second synchronising (connecting) rod (100) it is fixedly connected, and arc expansion groove (110) is provided with the second synchronising (connecting) rod (100).
2. a kind of field operation individual soldier's physical training device with synchronous coordination training aids according to claim 1, its feature It is:The equipment spud pile (40) is distributed for four and in rectangular on ski rack (20), described counterweight spud pile (30) also for four and in the upper surface of equipment platform (10) in rectangular distribution, counterweight spud pile (30) and equipment spud pile (40) it is in cylinder, and equipment spud pile (40) and is provided with external screw thread.
3. a kind of field operation individual soldier's physical training device with synchronous coordination training aids according to claim 1, its feature It is:The demountable structure includes the roller bearing (60) of the left and right sides for being fixed on ski rack (20) and is matched therewith the axis of rolling Hold, rolling bearing is fixed in roller (50), and roller bearing (60) is fixedly connected with rolling bearing by bearing pin.
4. a kind of field operation individual soldier's physical training device with synchronous coordination training aids according to claim 1, its feature It is:The free end closing of the arc expansion groove (110), arc expansion groove (110) and the second synchronising (connecting) rod (100) junction Level height and the first synchronising (connecting) rod (90) maintain an equal level.
5. a kind of field operation individual soldier's physical training device with synchronous coordination training aids according to claim 1, its feature It is:The left end of first synchronising (connecting) rod (90) is connected by first axle (120) with the right-hand tread plate of left side exercise for coordination device Connect, the left end of the second synchronising (connecting) rod (100) is connected by second hinge (130) with the left-hand tread plate of left side exercise for coordination device.
CN201621216450.5U 2016-11-11 2016-11-11 A kind of field operation individual soldier's physical training device with synchronous coordination training aids Expired - Fee Related CN206214640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621216450.5U CN206214640U (en) 2016-11-11 2016-11-11 A kind of field operation individual soldier's physical training device with synchronous coordination training aids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621216450.5U CN206214640U (en) 2016-11-11 2016-11-11 A kind of field operation individual soldier's physical training device with synchronous coordination training aids

Publications (1)

Publication Number Publication Date
CN206214640U true CN206214640U (en) 2017-06-06

Family

ID=58792239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621216450.5U Expired - Fee Related CN206214640U (en) 2016-11-11 2016-11-11 A kind of field operation individual soldier's physical training device with synchronous coordination training aids

Country Status (1)

Country Link
CN (1) CN206214640U (en)

Similar Documents

Publication Publication Date Title
CN206214640U (en) A kind of field operation individual soldier's physical training device with synchronous coordination training aids
CN206198585U (en) A kind of field operation individual soldier's physical training device with confrontation tension trainer
CN204723719U (en) A kind of collapsible volleyball frame
CN206239969U (en) A kind of field operation individual soldier's physical training device with body-sensing equilibristat
CN105749515A (en) Three-dimensional detecting type basketball stand special for teaching
CN205886084U (en) Field operations individual soldier physical training device of training usefulness of sargent jumping
CN206239973U (en) A kind of field operation individual soldier's physical training device with resistance starter
CN204637495U (en) A kind of ping-pong table of telescopic folding
CN204447217U (en) Multifunctional roller skates storage car
CN206762216U (en) A kind of tennis ball hitting point trainer
CN206252778U (en) A kind of synchronous coordination training aids of field operation individual soldier physical training device
CN206688175U (en) A kind of basket shooting equipment for being used to strengthen the training of student's spinal motion degree
CN206950599U (en) One kind is used for basketball shooting training basketball stands
CN205964922U (en) Field operations individual soldier physical training device with kinetic energy barbell oscillating mast
CN206359190U (en) Middle-placed switch cabinet Special lifting table apparatus
CN206809711U (en) A kind of physical culture command set
CN206285412U (en) A kind of field operation individual soldier's physical training device with runing rest
CN206823039U (en) A kind of Weight-adjustable multifunctional dumbbell
CN204864681U (en) Pommelled horse is used in multi -functional sports teaching
CN214259679U (en) Rescue stretcher for physical education
CN206183935U (en) Balance training device is used in skidding training
CN201719737U (en) Adjustable lifting landing device for pole jump teaching and training
CN205815004U (en) A kind of have the field operations individual soldier's physical training device increasing the weight of training devices
CN206236513U (en) A kind of support meanss of transformer
CN205848943U (en) A kind of Multifunctional travel suitcase and adjustable triangular wheel thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20171111