CN206209073U - A kind of Performance Test System of power system disconnecting switch - Google Patents

A kind of Performance Test System of power system disconnecting switch Download PDF

Info

Publication number
CN206209073U
CN206209073U CN201621300737.6U CN201621300737U CN206209073U CN 206209073 U CN206209073 U CN 206209073U CN 201621300737 U CN201621300737 U CN 201621300737U CN 206209073 U CN206209073 U CN 206209073U
Authority
CN
China
Prior art keywords
disconnecting switch
measured
performance test
utility
power system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621300737.6U
Other languages
Chinese (zh)
Inventor
吕旺燕
刘世念
苏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201621300737.6U priority Critical patent/CN206209073U/en
Application granted granted Critical
Publication of CN206209073U publication Critical patent/CN206209073U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model embodiment discloses a kind of Performance Test System of power system disconnecting switch, for solve existing technology cannot analogue measurement disconnecting switch corrode out of doors under high voltage or the electrical property under high current technical problem.The utility model embodiment produces the salt fog being made up of corrosive solution to simulate outdoor corrosive environment by sprayer unit, high voltage in high voltage analog isolation switch is produced by high-voltage generator, the short-circuit transient high-current of high current analog isolation switch is produced by strong current generator, disconnecting switch is set to obtain the simulation working environment of the most limit, the resistance of the disconnecting switch under extreme operating conditions is measured by resistance measuring instrument, so as to measure the electrical property of disconnecting switch.

Description

A kind of Performance Test System of power system disconnecting switch
Technical field
The utility model is related to disconnecting switch performance test field, more particularly to a kind of performance of power system disconnecting switch Test system.
Background technology
Disconnecting switch (being commonly called as " disconnecting link ") is important device for switching in power plant and transformer station's electrical system, is power train One of electrical equipment that usage amount is maximum in system, range of application is most wide.As the critical component of disconnecting switch, dynamic and static contact Working condition directly influences the safe and stable operation of power system.Isolation switch contact can be sent out in being chronically exposed to natural environment Raw corrosion.Corroding the oxide-film for being formed makes contact resistance increase between dynamic and static contact, causes disconnecting switch contact site to generate heat, and Thus vicious circle is produced, the safety of grid company staff and equipment is threatened.It is domestic to find hair altogether from 2008 to 2012 years 2131 groups of thermal defect time, accounts for the 32.1% of disconnecting switch whole defect, wherein again with dynamic and static contact face heating problem most It is many.
Situations such as disconnecting switch electrical property, durability of each producer, is each different, and the security incident influence that it triggers is huge It is big and far-reaching.Therefore, the evaluation good and bad to disconnecting switch is particularly important.
Disconnecting switch electrical property of today measurement is usually to the on-line checking of disconnecting switch, or direct measurement isolation The electrical property of switch, or be the corrosion resistance of direct measurement disconnecting switch.Therefore, existing technology cannot analogue measurement every It is that those skilled in the art need the technology for solving to ask to leave and close the high voltage under corroding out of doors or the electrical property under high current Topic.
Utility model content
The utility model embodiment provides a kind of Performance Test System of power system disconnecting switch, existing for solving Technology cannot analogue measurement disconnecting switch corrode out of doors under high voltage or the electrical property under high current technical problem.
The utility model embodiment provides a kind of Performance Test System of power system disconnecting switch, including:Experiment casing, High-voltage generator, strong current generator, sprayer unit, resistance measuring instrument and disconnecting switch to be measured;
The high-voltage generator connects the disconnecting switch to be measured, for producing duration high voltage and being delivered to described treating Survey disconnecting switch;
The strong current generator connects the disconnecting switch to be measured, for producing lasting high current and being delivered to described treating Survey disconnecting switch;
The resistance measuring instrument connects the disconnecting switch to be measured, the resistance for measuring the disconnecting switch to be measured;
The sprayer unit is arranged at the experiment box house, for producing the salt fog that is made up of corrosive solution and spraying It is mapped to the experiment box house.
The sprayer unit, the resistance measuring instrument, the disconnecting switch to be measured are arranged at the experiment box house;
The high-voltage generator, the strong current generator are arranged at the chamber external body, and by electric wire electricity Cable is connected through the experiment casing with the disconnecting switch to be measured of the experiment box house.
Preferably, the utility model embodiment also includes:Pressure gauge;
The pressure gauge is arranged at the external side of the chamber, and the probe of the pressure gauge passes through the experiment casing to institute The air pressure for stating experiment box house is detected;
The gas pressure that the pressure gauge is used in chamber body described in real-time monitoring.
Preferably, the sprayer unit is specifically included:Air compressor, atomizer, tank;
The tank is provided with corrosive solution;
The water inlet end of the atomizer is immersed in the corrosive solution, for producing the salt being made up of corrosive solution Mist;
The air compressor connects the atomizer, for by the salt spray to the experiment box house.
Preferably, the utility model embodiment also includes sample stage;
The sample stage is arranged on the tank, and the disconnecting switch to be measured is arranged on the sample stage, described to treat Disconnecting switch is surveyed to be set with the corrosive solution noncontact.
Preferably, the utility model embodiment also includes sleeve pipe;
Described sleeve pipe is specifically arranged at the experiment box house, one end of described sleeve pipe by the sample stage with it is described Disconnecting switch alignment to be measured, the other end of described sleeve pipe passes through the experiment casing;
Electric wire is provided with described sleeve pipe, described sleeve pipe is used to protect the electric wire not rotten by the salt fog Erosion;
The disconnecting switch to be measured occurs with the high-voltage generator, the high current respectively by the electric wire Device is connected.
Preferably, the utility model embodiment also includes:Power supply;
The power supply connects the high-voltage generator, the strong current generator, the sprayer unit, the electricity respectively Resistance measuring instrument, for surveying to respectively the high-voltage generator, the strong current generator, the sprayer unit, the resistance Amount instrument is powered.
As can be seen from the above technical solutions, the utility model embodiment has advantages below:
The utility model embodiment produces the salt fog being made up of corrosive solution to simulate outdoor corrosion ring by sprayer unit Border, the high voltage in high voltage analog isolation switch is produced by high-voltage generator, is produced by strong current generator The short-circuit transient high-current of high current analog isolation switch, makes disconnecting switch obtain the simulation working environment of the most limit, by electricity The resistance of disconnecting switch of the resistance measuring instrument measurement under extreme operating conditions, so as to measure the electrical property of disconnecting switch, solves Existing technology cannot analogue measurement disconnecting switch corrode out of doors under high voltage or electrical property under high current technology Problem.
Additionally, the utility model embodiment also detects the air pressure of experiment box house by pressure gauge so that result of the test It is more accurate;The utility model embodiment recycles the corrosion in tank by tank, air compressor, the combination of atomizer Property solution so that experimentation cost reduction;The utility model embodiment by sleeve pipe prevent disconnecting switch and high-voltage generator or The connection electric wire of strong current generator is by salt air corrosion;The utility model embodiment prevents to be measured keeping apart by sample stage Pass contacts with corrosive solution, in order to avoid the accuracy of influence experiment.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
A kind of one reality of the Performance Test System of power system disconnecting switch that Fig. 1 is provided for the utility model embodiment Apply the schematic diagram of example;
A kind of Performance Test System of power system disconnecting switch that Fig. 2 is provided for the utility model embodiment another The schematic diagram of embodiment;
A kind of Performance Test System of power system disconnecting switch that Fig. 3 is provided for the utility model embodiment another The structure front view of embodiment;
A kind of one reality of the performance test methods of power system disconnecting switch that Fig. 4 is provided for the utility model embodiment Apply the flow chart of example;
A kind of performance test methods of power system disconnecting switch that Fig. 5 is provided for the utility model embodiment another The flow chart of embodiment;
Wherein, reference is as follows:
1st, power supply;2nd, high-voltage generator;3rd, air compressor;4th, tank;5th, atomizer;6th, disconnecting switch to be measured;7、 Sample stage;8th, resistance measuring instrument;9th, pressure gauge;10th, strong current generator;11st, casing is tested;12nd, sprayer unit.
Specific embodiment
The utility model embodiment provides a kind of Performance Test System of power system disconnecting switch, existing for solving Technology cannot analogue measurement disconnecting switch corrode out of doors under high voltage or the electrical property under high current technical problem.
To enable utility model purpose of the present utility model, feature, advantage more obvious and understandable, below will knot The accompanying drawing in the utility model embodiment is closed, the technical scheme in the utility model embodiment is clearly and completely described, Obviously, the embodiments described below are only a part of embodiment of the utility model, and not all embodiment.Based on this reality With the embodiment in new, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of the utility model protection.
Fig. 1 is referred to, the utility model embodiment provides the one of a kind of Performance Test System of power system disconnecting switch Individual embodiment, including:Experiment casing 11, high-voltage generator 2, strong current generator 10, sprayer unit 12, resistance measuring instrument 8 With disconnecting switch to be measured 6;
High-voltage generator 2 connects disconnecting switch to be measured 6, for producing duration high voltage and being delivered to disconnecting switch to be measured 6;
Strong current generator 10 connects disconnecting switch to be measured 6, for producing lasting high current and being delivered to be measured keeping apart Close 6;
Resistance measuring instrument 8 connects disconnecting switch to be measured 6, the resistance for measuring disconnecting switch to be measured 6;
Sprayer unit 12 is arranged inside experiment casing 11, for producing the salt fog that is made up of corrosive solution and being ejected into Inside experiment casing 11.
Sprayer unit 12, resistance measuring instrument 8, disconnecting switch to be measured 6 are arranged inside experiment casing 11;
High-voltage generator 2, strong current generator 10 are arranged at outside experiment casing 11, and through experiment casing 11 and are tried Disconnecting switch to be measured 6 inside tryoff body 11 is connected.
Above is the one of a kind of Performance Test System of the power system disconnecting switch provided the utility model embodiment Individual embodiment is described in detail, a kind of property of the power system disconnecting switch that will be provided the utility model embodiment below Another embodiment of energy test system is described in detail.
Fig. 2 and Fig. 3 is referred to, the utility model embodiment provides a kind of Performance Test System of power system disconnecting switch Another embodiment, including:Experiment casing 11, high-voltage generator 2, strong current generator 10, sprayer unit 12, resistance are surveyed Amount instrument 8 and disconnecting switch to be measured 6;
High-voltage generator 2 connects disconnecting switch to be measured 6, for producing duration high voltage and being delivered to disconnecting switch to be measured 6;
Strong current generator 10 connects disconnecting switch to be measured 6, for producing lasting high current and being delivered to be measured keeping apart Close 6;
Resistance measuring instrument 8 connects disconnecting switch to be measured 6, the resistance for measuring disconnecting switch to be measured 6;
Sprayer unit 12 is arranged inside experiment casing 11, for producing the salt fog that is made up of corrosive solution and being ejected into Inside experiment casing 11.
Sprayer unit 12, resistance measuring instrument 8, disconnecting switch to be measured 6 are arranged inside experiment casing 11;
High-voltage generator 2, strong current generator 10 are arranged at outside experiment casing 11, and through experiment casing 11 and are tried Disconnecting switch to be measured 6 inside tryoff body 11 is connected.
The utility model embodiment also includes:Pressure gauge 9;
Pressure gauge 9 is arranged at the outside of experiment casing 11, and the probe of pressure gauge 9 is passed through in experiment 11 pairs of experiment casings 11 of casing The air pressure in portion is detected;
The gas pressure that pressure gauge 9 is used in real-time monitoring experiment casing 11.
Sprayer unit 12 is specifically included:Air compressor 3, atomizer 5, tank 4;
Tank 4 is provided with corrosive solution;
In the water inlet end immersion corrosive solution of atomizer 5, for producing the salt fog being made up of corrosive solution;
Air compressor 3 connects atomizer 5, for by inside salt spray to experiment casing 11.
The utility model embodiment also includes sample stage 7;
Sample stage 7 is arranged on tank 4, and disconnecting switch to be measured 6 is arranged on sample stage 7, disconnecting switch to be measured 6 with corrosion Property solution noncontact set.
The utility model embodiment also includes sleeve pipe;
Sleeve pipe is specifically arranged inside experiment casing 11, and one end of sleeve pipe passes through sample stage 7 and disconnecting switch to be measured 6 pairs Together, the other end of sleeve pipe passes through experiment casing 11;
Electric wire is provided with sleeve pipe, sleeve pipe is used to protect electric wire not receive salt air corrosion;
Disconnecting switch to be measured 6 is connected with high-voltage generator 2, strong current generator 10 respectively by electric wire.
The utility model embodiment also includes:Power supply 1;
Power supply 1 connects high-voltage generator 2, strong current generator 10, sprayer unit 12, resistance measuring instrument 8 respectively, is used for Powered to high-voltage generator 2, strong current generator 10, sprayer unit 12, resistance measuring instrument 8 respectively.
It should be noted that above-mentioned corrosive solution can be that sodium chloride solution, or common acid-alkali salt are molten Liquid, is the solution to disconnecting switch with corrosiveness.
Above is a kind of Performance Test System of the power system disconnecting switch provided the utility model embodiment is another One embodiment is described in detail, a kind of power system disconnecting switch that will be provided the utility model embodiment below One embodiment of performance test methods is described in detail.
Fig. 4 is referred to, the utility model embodiment provides the one of a kind of performance test methods of power system disconnecting switch Individual embodiment, the Performance Test System based on a kind of above-mentioned power system disconnecting switch is tested, including:
101st, the salt fog that is made up of corrosive solution is produced by sprayer unit and is ejected into experiment box house;
102nd, duration high voltage is produced by high-voltage generator and is delivered to the first disconnecting switch to be measured, when persistently presetting Between after, close the high-voltage generator and the described first disconnecting switch to be measured simultaneously measured by resistance measuring instrument, record first is high Voltage salt spray test resistance;
103rd, produced by strong current generator and continue high current and be delivered to the first disconnecting switch to be measured, when persistently presetting Between after, close the strong current generator and the described first disconnecting switch to be measured simultaneously measured by resistance measuring instrument, record first is big Electric current salt spray test resistance.
Above is the one of a kind of performance test methods of the power system disconnecting switch provided the utility model embodiment Individual embodiment is described in detail, a kind of property of the power system disconnecting switch that will be provided the utility model embodiment below Another embodiment of energy method of testing is described in detail.
Fig. 5 is referred to, the utility model embodiment provides a kind of the another of performance test methods of power system disconnecting switch One embodiment, the Performance Test System based on a kind of above-mentioned power system disconnecting switch is tested, including:
201st, the first disconnecting switch to be measured and the second disconnecting switch to be measured are measured by resistance measuring instrument, record first is initial Resistance and the second initial resistance.
202nd, the salt fog that is made up of corrosive solution is produced by sprayer unit and is ejected into experiment box house, by pressure The gas pressure value of the power meter detection experiment box house, excursion is not in Preset Time to detect the gas pressure value More than predetermined threshold value;
203rd, duration high voltage is produced by high-voltage generator and is delivered to the first disconnecting switch to be measured, when persistently presetting Between after, close the high-voltage generator and the described first disconnecting switch to be measured simultaneously measured by resistance measuring instrument, record first is high Voltage salt spray test resistance;
204th, produced by strong current generator and continue high current and be delivered to the first disconnecting switch to be measured, when persistently presetting Between after, close the strong current generator and the described first disconnecting switch to be measured simultaneously measured by resistance measuring instrument, record first is big Electric current salt spray test resistance.
205th, replace the described first disconnecting switch to be measured with the second disconnecting switch to be measured, and produced by corruption by sprayer unit Salt fog that corrosion solution is made simultaneously is ejected into experiment box house, and the gas pressure of the experiment box house is detected by pressure gauge Force value, detects that gas pressure value excursion in Preset Time is no more than predetermined threshold value;
206th, produced by strong current generator and continue high current and be delivered to the described second disconnecting switch to be measured, continued pre- If after the time, closing the strong current generator and simultaneously measuring the described second disconnecting switch to be measured by resistance measuring instrument, record the Two high current salt spray test resistance;
207th, duration high voltage is produced by high-voltage generator and is delivered to the second disconnecting switch to be measured, when persistently presetting Between after, close the high-voltage generator and the described second disconnecting switch to be measured simultaneously measured by resistance measuring instrument, record second is high Voltage salt spray test resistance.
It should be noted that above-mentioned corrosive solution can be that sodium chloride solution, or common acid-alkali salt are molten Liquid, is the solution to disconnecting switch with corrosiveness.
Above is the one of a kind of Performance Test System of the power system disconnecting switch provided the utility model embodiment Individual embodiment is described in detail, a kind of property of the power system disconnecting switch that will be provided the utility model embodiment below Another embodiment of energy test system is described in detail.
Fig. 2 and Fig. 3 is referred to, the Performance Test System of power system disconnecting switch of the present utility model is provided with chamber Body 11 and the high-voltage generator 2 being placed in outside the experiment casing 11, strong current generator 10 and power supply 1, the experiment The placed inside of casing 11 has tank 4, atomizer 5, air compressor 3, pressure gauge 9, resistance measuring instrument 8, sample stage 7 and isolation Switch 6.The high-voltage generator 2 can export test required for continuous high voltage, the strong current generator 10 can be with Continuous high current required for exporting test, is both connected, it is ensured that described by wall bushing with the experiment casing 11 Test the sealing and insulating properties of casing 11, it is ensured that test safety.The atomizer 5 is connected with the tank 4, will can hold Sodium chloride solution in the tank 4 is made required salt fog.The salt fog that the air compressor 3 will can be made is by spray Mouth is ejected into the experiment casing 11.The pressure gauge 9 can test gas pressure in casing 11 described in real-time monitoring.Described The fixedly secured sample stage 7 in the middle of in experiment casing 11, the sample stage 7 is that insulating materials is made.The disconnecting switch 6 is consolidated It is scheduled on the sample stage 7, is connected by electric wire with the high-voltage generator 2 and the strong current generator 10.Institute State resistance measuring instrument 8 to be placed in the experiment casing 11, the resistance of the measurable disconnecting switch 6.
In order to test safety, as preferred embodiment of the present utility model:There is direct-connected tank wall in the experiment casing 11 With the sleeve pipe of the sample stage 7, the built-in electric wire of described sleeve pipe protects it from salt air corrosion in experiment casing 11, and makes It can ensure safe insulation distance.
A kind of performance test methods of power system disconnecting switch, described performance test methods are based on above-mentioned performance and survey Test system is implemented, and described performance test methods include:
Step one, by the disconnecting switch 6 install be fixed to it is described experiment casing 11 in the middle of sample stage 7 on, then, Start resistance measuring instrument 8, measure the initial resistance of disconnecting switch 6, as its electric property assessment index, close resistance measuring instrument 8.
Step 2, to the sodium chloride solution that 5% is poured into the tank 4, give the atomizer 5 and sky with the power supply 1 Air compressor 3 is powered, and the salt fog required for being made test is simultaneously ejected into the experiment casing 11.The pressure gauge real-time monitoring Gas pressure in the experiment casing 11, is that shape is stablized in system entrance when required concentration of saline fog pressure value is reached for a period of time State.The system steady-state condition is:Gas pressure is in Preset Time in experiment casing 11 described in the manometry Keep constant.
As improvement of the present utility model:Described performance test methods also include:
Step 3, system enter stable state after, be powered to the high-voltage generator 2 with the power supply 1, output try Required high-tension electricity 10kv is tested, high-tension electricity is loaded into by the two ends of the disconnecting switch 6 by electric wire.Continuous high-pressure salt spray test 1000h, closes the high-voltage generator 2, then starts resistance meter, disconnecting switch 6 after measurement high pressure salt spray test Resistance, closes resistance meter.Then the etch state and corrosion class of the disconnecting switch 6 are assessed, is commented as its durability Valency index.
As improvement of the present utility model:Described performance test methods also include:
After the completion of step 4, step 3, it is powered to the strong current generator 10 with the power supply 1, needed for output test High current 2000A, the two ends of the disconnecting switch 6 are loaded into by electric wire by high-tension electricity.Continue high current salt spray test 1000h, closes the strong current generator 10, then starts resistance meter, disconnecting switch 6 after measurement high current salt spray test Resistance, close resistance meter.Then the etch state and corrosion class of the disconnecting switch 6 are assessed, as its durability Evaluation index.
As improvement of the present utility model:Described performance test methods also include:
Step 5, using standby same batch with disconnecting switch 6 described in money, tested by step one, step 2, then will Step 3 and step 4 are exchanged, and first carry out step 4, then carry out step 3.
The utility model is not limited to above-mentioned specific embodiment, according to the above, according to the ordinary skill of this area Knowledge and customary means, under the premise of the above-mentioned basic fundamental thought of the utility model is not departed from, the utility model can also be made The equivalent modifications of other diversified forms, replace or change, all fall among protection domain of the present utility model.
It should be noted that compared with prior art, the utility model has the advantages that:
First, the utility model occurs by testing casing, tank, atomizer, air compressor, pressure gauge, high voltage Device and strong current generator constitute the performance detection environment of disconnecting switch.
Wherein, with Hi-pot test and high-current test be combined together salt spray test by the utility model, makes disconnecting switch Obtain the simulation working environment of the most limit.Because disconnecting switch is mainly using being out of doors, to be chronically exposed to work in natural environment Make, influence its performance mainly have outdoor corrosive environment, work in high voltage and short circuit when moment high current.
Second, the utility model measures the resistance variations of disconnecting switch using resistance measuring instrument, due to the work(of disconnecting switch Can disconnect and closed circuit, its electrical property is embodied in the quality of electric conductivity in closed circuit effect, and electric conductivity is most straight The parameter for connecing correlation is exactly resistance.
Wherein, tried with resistance, high current salt fog after resistance measuring instrument measurement disconnecting switch initial resistance, high pressure salt spray test Test rear resistance, and its resistance value after high pressure salt spray test after first high current salt spray test, acquisition can be used as disconnecting switch The data of electric property assessment index.
Wherein, step 3 and step 4 are exchanged retest by the utility model, exclude Hi-pot test and high-current test Influence of the sequencing to test result.
Therefore, the utility model can accurately test out the filter effect of disconnecting switch.
3rd, the utility model also by after evaluating disconnecting switch high pressure salt spray test and after high current salt spray test its Etch state and corrosion class, obtain disconnecting switch durability evaluation index, therefore, the utility model can be tested out accurately The durability of disconnecting switch.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
The above, above example is only used to illustrate the technical solution of the utility model, rather than its limitations;Although ginseng The utility model has been described in detail according to previous embodiment, it will be understood by those within the art that:It is still Technical scheme described in foregoing embodiments can be modified, or which part technical characteristic is equally replaced Change;And these modifications or replacement, the essence of appropriate technical solution is departed from each embodiment technical scheme of the utility model Spirit and scope.

Claims (6)

1. a kind of Performance Test System of power system disconnecting switch, it is characterised in that including:Experiment casing, high voltage occur Device, strong current generator, sprayer unit, resistance measuring instrument and disconnecting switch to be measured;
The high-voltage generator connects the disconnecting switch to be measured, for produce duration high voltage and be delivered to it is described it is to be measured every Leave pass;
The strong current generator connects the disconnecting switch to be measured, for produce lasting high current and be delivered to it is described it is to be measured every Leave pass;
The resistance measuring instrument connects the disconnecting switch to be measured, the resistance for measuring the disconnecting switch to be measured;
The sprayer unit is arranged at the experiment box house, for producing the salt fog that is made up of corrosive solution and being ejected into The experiment box house;
The sprayer unit, the resistance measuring instrument, the disconnecting switch to be measured are arranged at the experiment box house;
The high-voltage generator, the strong current generator are arranged at the chamber external body, and are worn by electric wire The experiment casing is crossed to be connected with the disconnecting switch to be measured of the experiment box house.
2. the Performance Test System of a kind of power system disconnecting switch according to claim 1, it is characterised in that also wrap Include:Pressure gauge;
The pressure gauge is arranged at the external side of the chamber, and the probe of the pressure gauge passes through the experiment casing to the examination The air pressure for testing box house is detected;
The gas pressure that the pressure gauge is used in chamber body described in real-time monitoring.
3. a kind of Performance Test System of power system disconnecting switch according to claim 1, it is characterised in that the spray Mist device is specifically included:Air compressor, atomizer, tank;
The tank is provided with corrosive solution;
The water inlet end of the atomizer is immersed in the corrosive solution, for producing the salt fog being made up of corrosive solution;
The air compressor connects the atomizer, for by the salt spray to the experiment box house.
4. the Performance Test System of a kind of power system disconnecting switch according to claim 3, it is characterised in that also include Sample stage;
The sample stage is arranged on the tank, and the disconnecting switch to be measured is arranged on the sample stage, it is described it is to be measured every Pass is left to be set with the corrosive solution noncontact.
5. the Performance Test System of a kind of power system disconnecting switch according to claim 4, it is characterised in that also include Sleeve pipe;
Described sleeve pipe is specifically arranged at the experiment box house, and one end of described sleeve pipe is to be measured with described by the sample stage Disconnecting switch is alignd, and the other end of described sleeve pipe passes through the experiment casing;
The electric wire is provided with described sleeve pipe, described sleeve pipe is used to protect the electric wire not rotten by the salt fog Erosion;
The disconnecting switch to be measured is connected with the high-voltage generator, the strong current generator respectively by the electric wire Connect.
6. the Performance Test System of a kind of power system disconnecting switch according to claim 1, it is characterised in that also wrap Include:Power supply;
The power supply connects the high-voltage generator, the strong current generator, the sprayer unit, the resistance and surveys respectively Amount instrument, for giving the high-voltage generator, the strong current generator, the sprayer unit, the resistance measuring instrument respectively Power supply.
CN201621300737.6U 2016-11-30 2016-11-30 A kind of Performance Test System of power system disconnecting switch Active CN206209073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621300737.6U CN206209073U (en) 2016-11-30 2016-11-30 A kind of Performance Test System of power system disconnecting switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621300737.6U CN206209073U (en) 2016-11-30 2016-11-30 A kind of Performance Test System of power system disconnecting switch

Publications (1)

Publication Number Publication Date
CN206209073U true CN206209073U (en) 2017-05-31

Family

ID=58750985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621300737.6U Active CN206209073U (en) 2016-11-30 2016-11-30 A kind of Performance Test System of power system disconnecting switch

Country Status (1)

Country Link
CN (1) CN206209073U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106371014A (en) * 2016-11-30 2017-02-01 广东电网有限责任公司电力科学研究院 Performance test system and method for disconnecting switch of power system
CN107831434A (en) * 2017-11-24 2018-03-23 国网山东省电力公司滨州市沾化区供电公司 A kind of Performance Test System of power system disconnecting switch
CN109297897A (en) * 2018-12-13 2019-02-01 福州大学 The experimental rig and method of the high voltage electric field environmental corrosion of controllable temperature and humidity

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106371014A (en) * 2016-11-30 2017-02-01 广东电网有限责任公司电力科学研究院 Performance test system and method for disconnecting switch of power system
CN107831434A (en) * 2017-11-24 2018-03-23 国网山东省电力公司滨州市沾化区供电公司 A kind of Performance Test System of power system disconnecting switch
CN109297897A (en) * 2018-12-13 2019-02-01 福州大学 The experimental rig and method of the high voltage electric field environmental corrosion of controllable temperature and humidity

Similar Documents

Publication Publication Date Title
CN206209073U (en) A kind of Performance Test System of power system disconnecting switch
CN106371014A (en) Performance test system and method for disconnecting switch of power system
CN101713810B (en) Test unit for monitoring oil-paper insulation state
CN203455389U (en) Simulation test stand for power transmission line insulator leakage current
CN103513132B (en) Power transmission and transformation system equipment state simulator
CN202974976U (en) System for detecting accuracy of SF6 on-line monitoring device
CN204758596U (en) Dissolved gas content dynamic calibration system among transformer oil
CN201903637U (en) Checking instrument for monitoring discharge counter on line
CN111458612A (en) State monitoring and defect simulation system for electrical insulation performance of oil-immersed sleeve
CN108089038A (en) The experimental rig and method that analysis winding defect pyrogenicity influences paper oil insulation performance
CN202903951U (en) Discharging characteristic detection apparatus of tower window-lead gap of pole and tower under influence of guano
CN204177718U (en) Evaluate the electrochemical test system of the lower oil-gas pipeline corrosion of alternative stray current interference
CN104569139B (en) Based on the pipeline non-destructive testing device of electric field fingerprint method
CN203287512U (en) Detection calibration system of insulator contamination current monitoring device
CN105353236B (en) The online remote detecting method of disk insulator state and device
CN203502513U (en) Power transmission and transformation system equipment state simulation apparatus
CN208013351U (en) Sulfur hexafluoride gas insulation equipment Superheated steam drier simulator
CN103792262A (en) Power transformer damp detection method based on frequency domain Havriliak-Negami model
CN108845185A (en) The measurement of soft graphite grounding body ground resistance and accelerated corrosion test device and method
CN203811519U (en) ADSS (All Dielectric Self Supporting) cable testing device
CN202329970U (en) Constant-temperature photoelectric measurement device for leakage of sulfur hexafluoride (SF6)
CN205844414U (en) A kind of earth resistance circuit structure measured based on split-core type meter
CN110045188A (en) A kind of system and method for not removing high-side lead measuring transformer insulation resistance
CN206114165U (en) Perpendicular force sensor of transformer high -tension bushing tip goat's horn type gold utensil
CN209198284U (en) Online hanger device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant