CN206209021U - A kind of charging pile intelligence aging equipment of energy source feedback - Google Patents

A kind of charging pile intelligence aging equipment of energy source feedback Download PDF

Info

Publication number
CN206209021U
CN206209021U CN201621327088.9U CN201621327088U CN206209021U CN 206209021 U CN206209021 U CN 206209021U CN 201621327088 U CN201621327088 U CN 201621327088U CN 206209021 U CN206209021 U CN 206209021U
Authority
CN
China
Prior art keywords
charging pile
energy source
source feedback
aging equipment
remote control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621327088.9U
Other languages
Chinese (zh)
Inventor
张明
周桂刚
陈守飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN KAIJIETE ELECTRONIC R & D Co Ltd
Original Assignee
KUNSHAN KAIJIETE ELECTRONIC R & D Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN KAIJIETE ELECTRONIC R & D Co Ltd filed Critical KUNSHAN KAIJIETE ELECTRONIC R & D Co Ltd
Priority to CN201621327088.9U priority Critical patent/CN206209021U/en
Application granted granted Critical
Publication of CN206209021U publication Critical patent/CN206209021U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model provides a kind of charging pile intelligence aging equipment of energy source feedback, and it includes:Ageing environment case, communication device, monitoring measurement apparatus, energy source feedback load device, industrial computer and display and input and output warning device.The charging pile intelligence aging equipment of energy source feedback of the present utility model possesses following advantage:(1) solve present in charging pile burn-in test process, high-power power consumption, equipment cooling, production grid electricity fee cost problem high reduce factory's heat dissipation exhaust system engineering amount, reduce heat dissipation exhaust system power;(2) realize that each electrical property of charging pile is monitored and analyzed in ageing process, bad products are excluded in time, improve the utilization rate of device;(3) realize many ground remote control, it is not necessary to which special messenger nurses, reduce cost of human resources.(4) remote control port facilitates the data traceability of downstream links, reduces the data information exchange cost in later stage.

Description

A kind of charging pile intelligence aging equipment of energy source feedback
Technical field
The utility model is related to charging pile technical field, more particularly to a kind of intelligent aging dress of charging pile of energy source feedback Put.
Background technology
At present, existing charging pile ageing testing method is mainly directly connected into the side of aged load by the output of charging pile Formula, such as pure resistor load, artificial electronic load, emulating reactance load.So as to the heat energy that converts electrical energy into, magnetic energy are consumed.Example Such as, every is calculated by 30KW, the production capacity of daily charging pile about 8000~15000 at this stage, the aging 4 hours, fill daily About 50000~100000 yuan of the electric aging grid electricity fee cost of stake.Therefore, the annual electricity charge are 1800~36,000,000 yuan, in great number to be paid The electricity charge about 20,000,000 yuan of one-time investment is gone back simultaneously to build factory's cooling system.
Existing charging pile aging equipment is basic with single its load form application, and the intelligence dress of system is not formed Put, if there is the partial function exception of charging pile so in ageing process, single load cannot obtain this information, it will Proceed ageing process, it is impossible to exclude bad products in time, waste the production time.Meanwhile, single load is more without automatic Function of the record charging pile in ageing process correlation performance parameters.
Additionally, in existing charging pile ageing testing method, the ageing process of product is continual whole day 24 hours Process, runs for equipment energy normal safe, and ageing system must in fact have the nurse of staff scene, it is impossible to remotely be controlled System.
Therefore, regarding to the issue above, it is necessary to propose further solution.
Utility model content
The purpose of this utility model is the charging pile intelligence aging equipment for providing a kind of energy source feedback, to overcome existing skill It is not enough present in art.
To realize above-mentioned utility model purpose, the utility model provides a kind of charging pile of energy source feedback intelligently aging dress Put, it includes:Ageing environment case, communication device, monitoring measurement apparatus, energy source feedback load device, industrial computer and display With input and output warning device;
The charging pile for carrying out burn-in test is provided with the ageing environment case, the monitoring measurement apparatus are by described logical News device is connected with the charging pile in the ageing environment case, and the charging pile has input and output end, the charging The output end of stake is connected with the input of the energy source feedback load device, and the output end of the energy source feedback load device is led to Cross grid-connected network to be connected with utility grid, the utility grid is connected with the input of the charging pile, the industrial electro Brain is connected with the monitoring measurement apparatus, and the display forms the man-machine friendship of the industrial computer with input and output warning device Mutual interface.
As the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, set in the ageing environment case If being equipped with dry ageing frock clamp.
As the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, gone back in the ageing environment case It is provided with temperature sensor and humidity sensor.
Used as the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, the communication device is used CAN carries out communication transfer by serial ports.
As the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, the monitoring measurement apparatus bag Include:Voltmeter can be compiled, ammeter, the high-accuracy data collection card of 16Bit, digital IO card, relay card can be compiled.
As the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, the energy source feedback load dress It is set to:Artificial electronic is loaded and/or emulating reactance load.
As the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, the display and input and output Warning device includes:Software interface, equipment operation panel are indicated and button, acousto-optic warning unit, remote control port.
Used as the improvement of the charging pile intelligence aging equipment of energy source feedback of the present utility model, the remote control port is Several, several remote control ports are connected by Internet of Things with remote control terminal.
Compared with prior art, the beneficial effects of the utility model are:The charging pile intelligence of energy source feedback of the present utility model Energy aging equipment possesses following advantage:
(1) solve present in charging pile burn-in test process, high-power power consumption, equipment cooling, production grid electricity fee cost Problem high, reduces factory's heat dissipation exhaust system engineering amount, reduces heat dissipation exhaust system power;
(2) realize that each electrical property of charging pile is monitored and analyzed in ageing process, bad products excluded in time, Improve the utilization rate of device;
(3) realize many ground remote control, it is not necessary to which special messenger nurses, reduce cost of human resources.
(4) remote control port facilitates the data traceability of downstream links, reduces the data information exchange cost in later stage.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments described in the utility model, for those of ordinary skill in the art, is not paying creative work On the premise of, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the three-dimensional signal of the charging pile intelligence specific embodiment of aging equipment one of energy source feedback of the present utility model Figure;
Fig. 2 is that the module of the charging pile intelligence specific embodiment of aging equipment one of energy source feedback of the present utility model is illustrated Figure;
Fig. 3 is the hardware system of the charging pile intelligence aging equipment based on windows platform of energy source feedback of the present utility model The module diagram of system and software systems.
Specific embodiment
Shown each implementation method is described in detail to the utility model below in conjunction with the accompanying drawings, but it should explanation, These implementation methods are not limitation of the utility model, and those of ordinary skill in the art are according to these implementation method institute works Equivalent transformation or replacement in energy, method or structure, belong within protection domain of the present utility model.
As shown in figure 1, the charging pile intelligence aging equipment of energy source feedback of the present utility model includes:Ageing environment case 10, Communication device 20, monitoring measurement apparatus 30, energy source feedback load device 40, industrial computer 50 and display and input and output alarm Device 60.
It is environment when product provides aging that the ageing environment case 10 is used for, and its internal temperature, humidity can be by programming sides Formula is adjusted.In ageing process, temperature and humidity changes with setting, and can be by PORT COM retaking of a year or grade ageing environment The real temperature and humidity value of case.
Specifically, the charging pile 11 for carrying out burn-in test is provided with the ageing environment case 10, the charging pile passes through Aging frock clamp 12 is fixed in the ageing environment case 10.As needed, the aging frock clamp 12 may be configured as many Individual, multiple aging frock clamps 12 can be respectively used to install the charging pile of the different test to be aging of fixation.Additionally, described aging Temperature sensor and humidity sensor are additionally provided with environmental cabinet 10.Can be real-time by the temperature sensor and humidity sensor The humiture in the ageing environment case 10 is gathered, to control it.
The monitoring measurement apparatus 30 are used to monitor the parameters such as real work voltage, the electric current of charging pile, by relevant parameter It is transferred to monitoring of software.To realize the purpose, the monitoring measurement apparatus 30 pass through the communication device 20 and the aging ring Charging pile 11 in border case 10 is connected.Wherein, the CAN and serial ports of the use of the communication device 20 pci bus, its compatible CAN, K-LIN communications association, realizes the communication between aging equipment and charging pile, controls the working condition of charging pile and obtains charging pile Operational data information.The monitoring measurement apparatus 30 include:Can compile voltmeter, ammeter can be compiled, the high accuracy data of 16Bit is adopted Truck, digital IO card, relay card.
The energy source feedback load device 40 is used to realize consumption and the recycling of charging pile electric energy.Specifically, it is described to fill Electric stake 11 has input and output end, the input of the output end of the charging pile 11 and the energy source feedback load device 40 It is connected, the output end of the energy source feedback load device 40 is connected by grid-connected network with utility grid, the civil power electricity Net is connected with the input of the charging pile 11.So as to, can be the supplying power for input end of charging pile by the utility grid, Recyclable 70~80% energy.Preferably, the energy source feedback load device can be:Artificial electronic is loaded and/or simulated Imaginary loading.
As shown in figure 3, the industrial computer 50 is connected with the monitoring measurement apparatus 30, the display and input and output Warning device 60 forms the interface of the man-machine interaction of the industrial computer 50.Specifically, the industrial computer is used to control to test Hardware runs, and stores local data.The display includes with input and output warning device 60:Software interface, equipment operation face Plate is indicated and button, acousto-optic warning unit, remote control port.
Wherein, the software interface is mainly the parameter of the operation of the system of being set and controlled, control system operation and stopping State, display monitoring measurement data, the state of display monitoring measurement result.The equipment operation panel basic control system Startup power supply, hardware service condition, be only in preparation ready state in equipment operation panel, systems soft ware could set up fortune Capable condition.The state of the acousto-optic warning unit instruction equipment operation, when equipment normal operation, acoustic-optic alarm BG Lamp or amber light, send out a warning and sound the alarm when equipment breaks down, and point out staff's handling failure.The remote control Port is connected by Internet of Things with remote control terminal, so that, workpiece personnel are carried out remotely by Internet of Things port to system The data of systematic survey and the state of operation are controlled and checked, can be run with control system and be terminated running.As needed, can be by The remote control port is set to several, and several remote control ports are connected by Internet of Things with remote control terminal Connect.
In sum, the charging pile intelligence aging equipment of energy source feedback of the present utility model possesses following advantage:(1) solve Present in charging pile burn-in test process, high-power power consumption, equipment cooling, production grid electricity fee cost problem high are reduced Factory's heat dissipation exhaust system engineering amount, reduces heat dissipation exhaust system power;(2) realize in ageing process to each of charging pile Electrical property is monitored and analyzes, and bad products are excluded in time, improves the utilization rate of device;(3) many ground remote control is realized, no Must special messenger's nurse, reduction cost of human resources.(4) remote control port facilitates the data traceability of downstream links, reduces the later stage Data information exchange cost.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can in other specific forms realize that this practicality is new Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each implementation method is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Specification an as entirety, the technical scheme in each embodiment can also be formed into those skilled in the art through appropriately combined May be appreciated other embodiment.

Claims (8)

1. the charging pile intelligence aging equipment of a kind of energy source feedback, it is characterised in that charging pile intelligence aging equipment includes: Ageing environment case, communication device, monitoring measurement apparatus, energy source feedback load device, industrial computer and display and input and output Warning device;
The charging pile for carrying out burn-in test is provided with the ageing environment case, the monitoring measurement apparatus are by the communication dress Put and be connected with the charging pile in the ageing environment case, the charging pile has input and output end, the charging pile Output end is connected with the input of the energy source feedback load device, and the output end of the energy source feedback load device is by simultaneously Net network is connected with utility grid, and the utility grid is connected with the input of the charging pile, the industrial computer with The monitoring measurement apparatus are connected, and the display forms the man-machine interaction of the industrial computer with input and output warning device Interface.
2. energy source feedback according to claim 1 charging pile intelligence aging equipment, it is characterised in that the ageing environment If being provided with dry ageing frock clamp in case.
3. energy source feedback according to claim 1 charging pile intelligence aging equipment, it is characterised in that the ageing environment Temperature sensor and humidity sensor are additionally provided with case.
4. energy source feedback according to claim 1 charging pile intelligence aging equipment, it is characterised in that the communication device Communication transfer is carried out by serial ports using CAN.
5. the charging pile intelligence aging equipment of energy source feedback according to claim 1, it is characterised in that monitoring measurement Device includes:Voltmeter can be compiled, ammeter, the high-accuracy data collection card of 16Bit, digital IO card, relay can be compiled Card.
6. energy source feedback according to claim 1 charging pile intelligence aging equipment, it is characterised in that the energy source feedback Load device is:Artificial electronic is loaded and/or emulating reactance load.
7. energy source feedback according to claim 1 charging pile intelligence aging equipment, it is characterised in that the display with it is defeated Entering to export warning device includes:Software interface, equipment operation panel are indicated and button, acousto-optic warning unit, remote control port.
8. energy source feedback according to claim 7 charging pile intelligence aging equipment, it is characterised in that the remote control Port is several, and several remote control ports are connected by Internet of Things with remote control terminal.
CN201621327088.9U 2016-11-29 2016-11-29 A kind of charging pile intelligence aging equipment of energy source feedback Expired - Fee Related CN206209021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621327088.9U CN206209021U (en) 2016-11-29 2016-11-29 A kind of charging pile intelligence aging equipment of energy source feedback

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621327088.9U CN206209021U (en) 2016-11-29 2016-11-29 A kind of charging pile intelligence aging equipment of energy source feedback

Publications (1)

Publication Number Publication Date
CN206209021U true CN206209021U (en) 2017-05-31

Family

ID=58751354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621327088.9U Expired - Fee Related CN206209021U (en) 2016-11-29 2016-11-29 A kind of charging pile intelligence aging equipment of energy source feedback

Country Status (1)

Country Link
CN (1) CN206209021U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107632216A (en) * 2017-08-31 2018-01-26 阜阳市风雅颂生产力促进中心有限责任公司 A kind of ageing tester of new energy charging pile
CN108599287A (en) * 2018-01-24 2018-09-28 广东容祺智能科技有限公司 A kind of lithium battery power supply interface aging prior-warning device
CN109167394A (en) * 2018-10-22 2019-01-08 台州市椒江万胜电子有限公司 A kind of power supply product aging feedback electricity generation system Internet-based and method
CN111208447A (en) * 2020-03-06 2020-05-29 上海度普新能源科技有限公司 Power module test system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107632216A (en) * 2017-08-31 2018-01-26 阜阳市风雅颂生产力促进中心有限责任公司 A kind of ageing tester of new energy charging pile
CN107632216B (en) * 2017-08-31 2019-08-27 阜阳市风雅颂生产力促进中心有限责任公司 A kind of ageing tester of new energy charging pile
CN108599287A (en) * 2018-01-24 2018-09-28 广东容祺智能科技有限公司 A kind of lithium battery power supply interface aging prior-warning device
CN109167394A (en) * 2018-10-22 2019-01-08 台州市椒江万胜电子有限公司 A kind of power supply product aging feedback electricity generation system Internet-based and method
CN111208447A (en) * 2020-03-06 2020-05-29 上海度普新能源科技有限公司 Power module test system

Similar Documents

Publication Publication Date Title
CN206209021U (en) A kind of charging pile intelligence aging equipment of energy source feedback
CN104219315B (en) A kind of operation monitoring system of power information acquisition system and method for supervising thereof
CN207198262U (en) A kind of charging pile test system with feedback function
CN112700032A (en) Fault prediction system and method for low-voltage direct-current power distribution and utilization system
CN202975216U (en) Automatic collector test tool system
CN102346204A (en) Programmable controlled virtual battery module
CN108736923A (en) A kind of low-voltage platform area line loss on-line monitoring terminal
CN103944265A (en) Interactive and smart electric energy distribution and consumption monitoring device and method
CN105785118A (en) Simulated intelligent electric energy meter
CN103323637A (en) Low-voltage intelligent electric meter electricity-stealing checking device
CN109581115B (en) Power distribution network low-voltage diagnosis system and diagnosis method
CN111131519A (en) Intelligent operation and maintenance cloud platform for transformer substation
CN207832915U (en) A kind of power unit module detection device
CN113949616A (en) Equipment fault monitoring system based on wireless sensor network
CN202093088U (en) Electrical parameter measuring device
CN202353313U (en) Monitoring system of power supply equipment for power
CN204858734U (en) Novel intelligence integration power supply monitoring system
CN202167821U (en) Monitoring and control device of cable branch box
CN104484753A (en) Method for tracing asset information of server
CN204989907U (en) Fire control device power monitoring device
CN205428327U (en) Power consumption information acquisition emulation wiring trouble analogue means
CN103310627A (en) Carrier failure analyzer and detection method thereof
CN107317715A (en) A kind of equipment condition monitoring instrument
CN209479469U (en) A kind of new-energy automobile charging station monitoring device
CN204154877U (en) Accumulator cell charging and discharging test apparatus and accumulator cell charging and discharging Test Data Acquisition System

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

Termination date: 20211129

CF01 Termination of patent right due to non-payment of annual fee